Climate Indicators

Dans le document Energy in Croatia 2009, Annual Energy Report (Page 192-200)

RENEWABLE ENERGY SOURCES

8.1 Climate Indicators

-5 0 5 10 15 20 25 30 35

I II III IV V VI VII VIII IX X XI XII

2000. 2001. 2002. 2003. 2004. 2005. 2006. 2007. 2008. 2009.

prosjek | average (1961.-1990.)

˚C

2000. 2001. 2002. 2003. 2004. 2005. 2006. 2007. 2008. 2009.

0 50 100 150 200 250

I II III IV V VI VII VIII IX X XI XII

mm

Slika | Figure 8.1.3. Zagreb – Maksimir, srednja brzina vjetra | Zagreb – Maksimir, Average wind speed Izvor | Source: DHMZ

Slika | Figure 8.1.4. Zagreb – Maksimir, mjesečne i godišnje sume sijanja Sunca | Zagreb – Maksimir, Sunshine duration Izvor | Source: DHMZ

2000. 2001. 2002. 2003. 2004. 2005. 2006. 2007. 2008. 2009.

prosjek | average (1961.-1990.)

I II III IV V VI VII VIII IX X XI XII

0 2 4 6 8

m/s

2000. 2001. 2002. 2003. 2004. 2005. 2006. 2007. 2008. 2009.

prosjek | average (1961.-1990.)

I II III IV V VI VII VIII IX X XI XII

0 50 100 150 200 250 300 350 400 450

sati | hours

Slika | Figure 8.1.5. Split – Marjan, srednja temperatura zraka po mjesecima | Split – Marjan, Monthly average air temperature – Izvor | Source: DHMZ

-5 0 5 10 15 20 25 30 35

I II III IV V VI VII VIII IX X XI XII

2000. 2001. 2002. 2003. 2004. 2005. 2006. 2007. 2008. 2009.

prosjek | average (1961.-1990.)

˚C

2000. 2001. 2002. 2003. 2004. 2005. 2006. 2007. 2008. 2009.

prosjek | average (1961.-1990.) 0

50 100 150 200 250

I II III IV V VI VII VIII IX X XI XII

mm

Slika | Figure 8.1.7. Split – Marjan, srednja brzina vjetra | Split – Marjan, Average wind speed Izvor | Source: DHMZ

Slika | Figure 8.1.8. Split – Marjan, mjesečne i godišnje sume sijanja Sunca | Split – Marjan, Sunshine duration Izvor | Source: DHMZ

2000. 2001. 2002. 2003. 2004. 2005. 2006. 2007. 2008. 2009.

prosjek | average (1961.-1990.)

I II III IV V VI VII VIII IX X XI XII

0 2 4 6 8

m/s

2000. 2001. 2002. 2003. 2004. 2005. 2006. 2007. 2008. 2009.

prosjek | average (1961.-1990.)

I II III IV V VI VII VIII IX X XI XII

0 50 100 150 200 250 300 350 400 450

sati | hours

8.2. Kapaciteti

U tablici 8.2.1. dane su procjene podataka o instaliranim kapacitetima za proizvodnju toplinske energije iz obnovljivih izvora (OIE) te statistički podaci o instaliranim kapacitetima za proizvodnju električne energije iz OIE za 2009. godinu.

Tablica | Table 8.2.1. Instalirani kapaciteti za proizvodnju toplinske i električne energije iz OIE u Hrvatskoj 2009.

godine | Installed capacities for heat and electricity generation from RES in Croatia for 2009 OIE

RES

Instalirana toplinska snaga Installed heat capacity (MW)

Instalirana električna snaga Installed power capacity (MW) Sunce

Solar 58,80 * 0,109 **

Vjetar

Wind 0 69,75 ***

Biomasa

Biomass 513,65 * 5,59

Male hidroelektrane

Small hydro power plants 0 31,05

Geotermalna

Izvor | Source: EIHP, HEP, Šumarski fakultet Sveučilišta u Zagrebu: Drvno-tehnološki odsjek, INA Naftaplin, WGC 2005 | EIHP, HEP, University of Zagreb, Faculty of Forestry – Department of Wood Processing, INA Naftaplin, WGC 2005

* procjena | estimation

** sustavi priključeni na elektroenergetsku mrežu | systems connected to the grid

*** od toga 42 MW je u probnom pogonu | out of which 42MW are in testing period

8.2 Capacities

Table 8.2.1 provides estimated data on installed capacities for heat generation from the renewable energy sources (RES-H) and statistical data on installed capacities for electricity generation from RES (RES-E) for 2009.

Kod tumačenja navedenih podataka o instaliranim kapacite-tima za proizvodnju toplinske energije iz OIE mora se uzeti u obzir činjenica da ne postoje pouzdani statistički podaci o instaliranim snagama za Sunce i biomasu, a da kod geo-termalne toplinske energije postoje dvije metode praćenja podataka.

Instalirana toplinska snaga sunčanih kolektora procijenjena je na temelju podataka o njihovoj površini prikupljenih putem ankete EIHP-a, dok je toplinska snaga sunčanih sustava pro-računata prema smjernicama udruge European Solar Thermal

When interpreting data on installed capacities on RES-H, it is necessary to bare in mind that there are no reliable statistical data on installed capacities for solar and biomass heating systems while heat from geothermal sources includes two methodologies for reporting the values.

Installed heat capacity of solar systems has been estimated according to the surface and type of collectors as recom-mended by the European Solar Thermal Industry Federation (ESTIF), data from the EIHP survey on installed capacities until 1998 and data on sales and imports of plate and vacuum

U stručnoj literaturi postoje dvije metodologije prikazivanja iskorištene geotermalne energije: kada se promatra samo energija za grijanje prostora i kada se promatra energija za grijanje prostora i pripremu tople vode. Ukupni instalirani kapacitet geotermalnih izvora u Hrvatskoj s 18 lokacija na kojima se koristi je 36,66 MWt ako se promatra samo grijanje prostora, odnosno 113,9 MWt ako se promatra geotermalna energija za grijanje prostora i pripremu tople vode.

Podatak o instaliranoj snazi fotonaponskih sustava razlikuje se od službenog podatka HROTE-a jer uključuje i one sustave koji nisu u statusu povlaštenog proizvođača, a poznato je da proizvode električnu energiju. Isto se odnosi i na podatke o proizvedenoj energiji. Snaga autonomnih fotonaponskih sustava koji se koriste za opskrbu električnom energijom objekata koji nisu spojeni na mrežu (svjetionici, kuće za odmor, bazne GSM postaje i slično) procijenjena je na oko 400 kW.

Trend porasta instaliranih kapaciteta za proizvodnju toplinske i električne energije iz obnovljivih izvora prikazan je na slikama 8.2.1 i 8.2.2.

* geotermalna toplinska energija za grijanje prostora | geothermal heat for space heating

**uključujući i geotermalnu toplinsku energiju za grijanje tople vode za kupanje | including geothermal heat for hot water and bathing

Slika | Figure 8.2.1. Instalirani kapaciteti za proizvodnju toplinske energije iz obnovljivih izvora u Hrvatskoj | Installed Professional literature mentions two methodologies of expre-ssing the used geothermal energy: one for the energy used for space heating only and the other for the energy used for heating and hot water. Total installed capacities of geothermal sources in 18 locations in use in Croatia amount to 36.66 MWt when space heating is concerned, and 113.9 MWt when geothermal energy for space heating and hot water preparati-on in spas and recreatipreparati-onal centres is cpreparati-oncerned.

Installed power capacity of photovoltaic systems differs from the value provided by HROTE as it refers to grid connected systems including autonomous PV systems. Installed capa-city of autonomous PV systems that supply facilities without grid connection (lighting houses, holiday houses, GSM bases, parking machines etc.) is estimated to 400 kW.

Trend of installed capacities for RES-H and RES-E is shown on figures 8.2.1 and 8.2.2.

0,00

2004. 2005. 2006. 2007. 2008. 2009.

MW

Sunce | Solar Biomasa | Biomass

Geotermalna | Geothermal* Geotermalna | Geothermal**

Ukupno | Total**

Ukupno | Total*

Slika | Figure 8.2.2. Instalirani kapaciteti za proizvodnju električne energije iz obnovljivih izvora u Hrvatskoj | Installed capacities for RES-E generation in Croatia – Izvor | Source: EIHP

8.2.1. Registar OIE i kogeneracije

Prvi korak prema statusu povlaštenog proizvođača električne energije, čime se stječe pravo na poticajnu cijenu, je ishođe-nje prethodnog energetskog odobrenja za izgradnju postroje-nja. Odobrenje omogućuje upis u Registar projekata i postro-jenja za korištenje obnovljivih izvora energije i kogeneracije te povlaštenih proizvođača (Registar OIEKPP). Time se uređuju pravno-imovinski odnosi na zemljištu Republike Hrvatske te se, ovisno o projektu, kreće u ispitivanje potencijala. Registar OIEKPP vodi Ministarstvo gospodarstva, rada i poduzetništva.

Do kraja 2009. godine u Registar je prijavljeno 267 projekata.

Samo u 2009. godini je prijavljeno 162 projekta, što je porast od 61 posto u odnosu na prošlu godinu. Od prijavljenih pro-jekata u 2009. godini 41,36 posto čine vjetroelektrane, a sli-jede 24,07 posto male hidroelektrane, 14,81 posto sunčane

8.2.1 Registry of RES and cogeneration

The first step towards gaining the eligible producer status of RES-E and feed-in tariff is obtaining the Preliminary energy approval for building the plant. The approval allows recording at the Registry of RES and cogeneration and eligible producers (Registar OIEiKPP), settles the legal-proprietary relationships at the area of Republic of Croatia, and, depending on the project type (i.e. wind), one can start evaluating the potential. The Ministry of Economy, Labour and Entrepreneurship is responsible for maintenance of the Registry.

Until the end of 2009, 267 projects have been recorded at the Registry, which represents a 61 percent increase in RES projects within a year: 41.36 percent are wind power plants followed by small hydro power plants (24.07 percent),

pho-2004. 2005. 2006. 2007. 2008. 2009.

Sunce | Solar Biomasa | Biomass

Vjetar | Wind

Ukupno | Total 0,00

20,00 40,00 60,00 80,00 100,00 120,00

MW

Male hidroelektrane | Small hydro

vjetroelektrana. U udjelu ukupne instalirane snage projekata dalje slijede male hidroelektrane (4,19 posto), elektrane na biomasu (2,06 posto), elektrane na bioplin (0,80 posto) te sunčane elektrane (0,53 posto). Operator prijenosnog sustava odredio je granicu od 360 MW instalirane snage vjetroelek-trana koju hrvatski elektroenergetski sustav može prihvatiti, a pri kojem se jamči sigurnost pogona sustava. Na sljedećih pet slika prikazana je prijavljena instalirana snaga elektrana po pojedinom obnovljivom izvoru energije te status prijav-ljenih projekata: PEO – prethodno energetsko odobrenje;

PEOz – prethodno energetsko odobrenje zatečenog stanja; EO – energetsko odobrenje; Upis – upis u Registar postojećeg objekta (što ne znači da je objekt stekao status povlaštenog proizvođača energije).

92.27 percent of enlisted capacity. The rest is divided among small hydro power plants (4.19 percent), biomass power plants (2.06 percent), biogas power plants (0.80 percent) and photovoltaic (0.53 percent). HEP-OTS has set the limit of 360 MW installed capacity from wind power plants to be safely included in the Croatian power system. The next five figures present recorded installed capacity of power plants according to the each type of RES together with the status of the projects: PEO – preliminary energy approval; PEOz – pre-liminary energy approval according to the situation existed;

EO – energy approval; Upis – recording in the Registry of the existing power plant (which does not imply that the plant has gained the eligible producer status).

Slika | Figure 8.2.3. Instalirana snaga sunčanih elektrana prijavljenih u Registar OIEiK tijekom 2009. | Installed capacity of solar power plants recorded in the Registry during 2009

Izvor | Source: Ministarstvo gospodarstva, rada i poduzetništva | Ministry of Economy, Labour and Entrepreneurship

Slika | Figure 8.2.4. Instalirana snaga malih hidroelektrana prijavljenih u Registar OIEiK tijekom 2009. | Installed capacity of small hydro power plants recorded in the Registry during 2009

Izvor | Source: Ministarstvo gospodarstva, rada i poduzetništva | Ministry of Economy, Labour and Entrepreneurship Sunčane elektrane | Solar PP

15,9295 MW (total 16,8662 MW)

PEO 99,68%

EO 0,32% Upis 0,00%

Male hidroelektrane | Small HPP 126,64 MW (total 170,982 MW)

PEO 99,92%

EO 0,08% Upis 0,00%

Slika | Figure 8.2.5. Instalirana snaga vjetroelektrana prijavljenih u Registar OIEiK tijekom 2009. | Installed capacity of wind power plants recorded in the Registry during 2009

Izvor | Source: Ministarstvo gospodarstva, rada i poduzetništva | Ministry of Economy, Labour and Entrepreneurship

Slika | Figure 8.2.6. Instalirana snaga elektrana na biomasu prijavljenih u Registar OIEiK tijekom 2009. | Installed capacity of biomass power plants recorded in the Registry during 2009

Izvor | Source: Ministarstvo gospodarstva, rada i poduzetništva | Ministry of Economy, Labour and Entrepreneurship Vjetroelektrane | Wind PP

2792,1 MW (total 5061,96 MW)

PEOz 0,35

PEO 0,65

EO 0,01 Upis 0,00

Elektrane na biomasu | Biomass PP 62,20 MW (total 70,10 MW)

PEO 90,77%

EO 9,23% Upis 0,00%

Elektrane na bioplin | Biogas PP:

24,20 MW (total 28,15 MW)

PEO 0,69 EO 0,22 Upis 0,09