Distr. : Limited
ECA/INR/EXB.2/wp/4 ECAIINRICOUNCIL. 2/TrP14
23 June 19RO
Original: ENGLISH
ECONOMIC COMMISSION FOR AFRICA
Meetings of the Executive Board and of the Council of th~ African Regional Centre for En~ineerin~ Desi~ and :tanufac turing
Addis Ababa, Ethiopia, 6~ 7 and 8 August 1980
Buj)G~'i' OF THE CENTRE 1980-1982
Table of Contents
Page Contributions by member States based on actual Me~bership
in 1980, 1981 and 1982 •.•..••••.••..• ,... 1 Staff est.abltst••:':nt for 1980 to 1932... 2 Annex I: Aide memoire on the immediate responsibilities
oE the Government of the Federal Republic of Nigeria as the host Governm~nt for the African
R~gional ~entre for Engineering Design and HanufactuLing (ARCEDEU) in gettinrr, the Centre
launched .. 0 • • • 0 • • •III . . .III IIIIIIIII III. . . III• • • • III.. III• • • • • •III• III• • • •
Annex II~ Proposad scale of contributions by member States to the budF,et of the Centre on the basis of OAU
formula, 1980, 1981 and 1982 .
,ECA/INR/EXB.2/~~/4 ECA/INR/COUNCIL.2/~{P/4
Contributions by member States based on actual membership
1. The member States of the Centre are expected to provide through their subscriptions and grants, the funds necessary to op~rate ,and main,ta~n the Centre. The member States are also responsible for finding the 'funds necessary for procuring and installing the physical plant, machinery anrl.equip~ent.
, - . . '.
2. Out of.US$14,416,740 of the cost estimates envisaged for 1980, 1981 and 1982g it is assumed that the host Government will meet fully the sumoiUS$4~780s000in b~ild!n~
facilities for the Centre. Therefore, the balance of US$9~636,740 is to be contributed fully by member States unless ,outside resources are forthcoming. The br~akdown of that balance whi~h comprises staff costs plus machinery, equipment qnd related fees is
US04,4039 2 8 0 , US$4,320,OOO and U5$920,000, (rounded up) for 1980, 1981 and 1982
respectively. .
3. It has to be noted that the 19~2 t'otal budget has dropped down due to the absence of building; and machinery costs requirements. Consequently, individual contributions from member States have decreased sharply compared· to 1980 and 1981.
4. The annual actual membership to the Centre is as fo11ow~~
1979; :20 member States
1980~ 21 member' States (as of 15 June 1930)
For 1981 and 1982 it is hopefully expected tnat,the membership will increase, but for reasons of submission to the institutional booies for appravs1' and for reasons of payment by member States~ computation 'for 1980~ 19R1 and 1982 is based 00'21
members.
If more ~em~er ~tates join the'Centre in 1980J 19B1 and 1982, the member States
whb
paid in excess ~ri11 see the excess payment brought forward to the next year's' contribu- tions thus reducinR the latter by this ,excess payment.
5. Contributions for 1980) 1981 and 1982 are ,shown in 'Annex II of this document.
;':
I : ,
ECA/I1~tEXB.2/~~/4 ECA/INR/GOin~CIL
..
2/tfP /4
Page 2
Staff establishment for 1980 to 1982
I-_I , "~" .; :_!~• :
,STAFF ESTABLISID-1ENT
' . ' l ·
Grade level . Exe'cut:iv~: Director,~.. s Office
1980 m/m
1981
"r'
, m,m
1982 , m/m
- ,',
Exeeu~iv:~j}~r~cto-r . , ' Ass Lstant . Dfre ct.o r (P'rogr ammf.ng ,
P1annine and Liaison) Secretary/Legal Officer Admini.strative Aas Lst.ant Sec~et:ary/Ty.pisi:." , C " .
Total Executive Dir~ctorts 0~fice· 5
D-2 P-5 P-4
~S~9
GS-8
12 12 12 12 12
12 12 12 12 12
12 12 12 12 12
Division of Admi~istration
84 ,12 12
).2
12 12 12 12
84 12 12 12 .12 12.
, '12 12
84 12 12 12 12 12 12 12
GS-2/3 carpenter )
Electrician ) Cleaners (2) ) Drivers (2) ) Nessenger (1) )
Assistant Director P-S
Chief Personnel Officer P-4
Chief Finance Officer P-4
Chief of General Services(Civi1/Municip~1)P-4 Administrative Assistant" "; . "GS-9
Secretary/Typist GS-7
Typist GS-6
General Services Staff~
Total Division of Administration~ 15 Additional Office Staffing
~epartment of Design Director
Chief Design En~ineer
Draughtsman Secretary/Typist
D-1 P-5 GS-8/9 GS-7/8
12 12 12 12
12 12 12 12
12 12 12 12 Total ~epartment of DesiBn~
4
Department of Hanufacturine Director
Chief Production Engineer Chief Foundry Engineer Secretary/Typi.st
:)-1 P-5
p-s
GS-7/'S
12 12 12 12
12 12 12 12
12 12 12 12 Total Department of Hanufac turtng: 4
ECA/I!~/EXJ!,.2/f!rP/4 :;
ECA/INr'/Cot1NCIL.2/np /4 Page 3
; : : ,
Department of Enr,ineering Development and Testing'
Grade level
19GO ..J'lfrn
1931 m/m
1932 m/m
Director
Chief' Met~llurgist Secretary/Typist
Total Department of Engineerine Development and Testin~;
Librarl
3
D-1 P-5 GS-7/S
12 12 12
12 12 " .. •
12 ';12
12 12
Chief Librarian Library Ass.1.si:iint"
Secretary/T~pist
Total Library: 3
Budget estimates
P-4
GS-C/9 r;s ...6/7.;q.
12 12
,
i~1,2
Ii
~' \:
,'t.able 1~ "Esq.mates
of
staff costs (net base salaries according to UN; . .salary sc~le
r . -,
Grade.
level
P~oiect 're~$onnel
P~ofessionalcategorY
!:te6ular staff
1980
rnlrn
US$1981.' . . 1982
D-2 D-1 P-5 3'-4
GS-9
Total
Executive Director 12 36.000 12 36,000 12 36.000
Directors of Departments 36 97>200 36 97,200 36 97,200 Chief Engineers
&
Asst. Directors 60 144,000 72 172 ,000 72 172,000 Senior Engineers. Chief ofSections 60 12Q.000 60 120tOOO 60 120,000
Administrative Assistant 12 16,800 12 16,800 12 16,800
Sub··t4'te.l 180 414,000 192 442,000 192 442.000
Other costs 124,200 132,600 154, ZOO
538,200 574,,600 596,700
ECAlr;Nf{IEXB.2/t-lP14,
EC~.JINR/COU1'lCIL'.2/HP14 \
Page.A· ' '
Table 2~ Est'imates of staff cost,s: Administrative ersonne1 (based on m1 ~ates and allowances
Gradel
level Project personnel
1980 m/m US$
1981 m/m US$
,1982 m/m US$
Administrative support personnel
36 46~OOO 36 46~OOO 45 45~120 45 45 :,120 36 33~840 36 33~840
84 26 ,040-
84
: . 26 ,040 204 151jOBO -~O4 151)(\8046~080
45~120
33j 3 4 0
26,040 151,080 Draughtsrnan, Administrative Asst.,
Library Assistant 36
Secretary/Typists 48
Secretary/Typists &Typists 36
General Labour _ _ _84 ~ ---S...,...,...._ _- - - , - - - : _ - - " - - - - , - - _
Total 204
GS-·9 GS-7/S GS-6/7
GS-_·~/3
Table ~- Ot~er operat!ona~costs (in US$)
Total 1980 1~81 19'8'2' ; t.J~.;" ~
Stationery 50,000 '20,00-0 - 10~OOO 20,000
Office machinery and equipment 144,000 144)000 - 100,000 100,000 Transport: 1 Van & accessories ($20,000»
. 1- Se rvd ce car and accessories) 35,000 35,000
(159000) )"
\:J, 1 Heavy truck 45,000 20,OO~ 25,000
Operations and mafnt.enance 50~OOO 15,000 - 15~OO(j . 20-,-000 -
Total 524~OOO 214,000 . 14?~'Ot)0 .: 165,000
, I~"
'-'-....
\ ' . '• . J. ,-~
ECAIINR/EX~~' 2/~\'rP/14' EGA/INR/COUNCIL.2/lfP/4 Page 5 Table 4~ Estimated capital costs of buildin~s, machinery and equipment
and fees for topographic survey and planning for the site and design of offices and factory buildin~s and selection of heavy
equipment ,"
'r, I
, , . I r..~ \
Facility
", , .'
Building;' costs' \ ,..., Machinery & equipme,l1t (f000
trss )
cosis
(1000us
$) .-Hain office Block 1 Block 2 - Block 3..
Block 4 - Sub-total Fees
,.
and w~lfareblock
Engineerinr- Development
,~tlil:cuttinptoTorkshop Ue.t,a,l':':fr.amiog ~1Orkshop
Fo~dry &patternship
1st 2nd 1st 2nd'.'3ia:
year year year year
year'
~~5 1~345 400 350: ; ~
...
~,.. t : !250 250 500 500
- -
25,0., {' 250 S50 950 '250 ..250 700
aoo
25'0
2,50 950 850
"1,355' 2)'3/~S 3,400 3,450
',L -.',~'~ Lr~',·~.
',; ~.
2,130 Topographic survey of the site
Soil survey of site
Planning of office buildinr,s an~ housing Planning of~ Factory buildings, i~ternal
road system,water suppiy system, power supply system, .power supply system, sewerage
system and at orage structure Design of office buildings
Design "of tesidentialhousing ,
Design of : Factory buf.LdLnga , workshop layout. 'selection of heavy materialst handling equipment) selection of major machinery and equipment
Project management Grand total
35 15
40
. c:·
150-·· ..·
135 -
I , , \ "
250 150
... 55--·
250 2.650
100
3,500 3,450
ECA/pm/EXB.2/np
14
ECA/nTr'/COUilCIL. 2/HP11+
Pa~e-6
Table 5- Summamyof estimates
5(a) Personnel and administrative 'costs
Tot:'l1
rn/m n~$
1,)~O
isci
m/m US~
- - - "
Prb'fessiona1 category
(regular staff) ,_. 564 1>70~SOO 180 53~,2:10 1:'2 .5 74 ;600 192 SI)f. ;70~)
Administrative support
personnel 612
')ther operat Lonal, costs ..
Total partiel . -.
5(b) Capital equipment and construction costs
~uilding and related fees
!1ac"'1inery, equipment and related fees Sub·-tota1
Grand Total
453,240 204 151,0110 ~0l, 157,080 204 1.51,030
52l: /100 214,060 145~000 165,')1)0
._---
2-,686;740 33l. 903;2r.O ~96 370,680 396 912.7.0,0
-~--~-
EC1\/IN~lEXB.2/'J}!J/~.
. .?..
CA/pui/
cOl.nT~it:.:2't~·:~Fjl:Ar~n'C:L. -L
,-~_~l
- , , ) - / ',
I:
,j,'ji,~) "
Aide 1"'icTroire on
th e ir:MedLatc re spansib i l i t ias 0f th e r.ove.rn.'!lcnt ' f0._ t'"11e
federal Rep~blic of Ni?,eria.as the host Covernment , for theAfr~call' ~.er;{~nal:Ce'ntre;,
for
Enr,incering ,,De's1.gn an~~'1ant!fa~'iu~1~~ ,(f.JlC~:)Ir'~) in get; t:inr: the . '. . 'Centre Launcha-"
, " . ; . l '
. ,!'/t:I , '
"" i'".
. ,~.t :
1. PROVISION OF ~,
,', ,,'-r,: :.' '
'l;he, Nige,~~m GovernrJent is to provide thQ lend for the establishment of th«
Ceht"tQ'~. . ':, ',.' , "."; , .' . ',"
-"-.'; ",""'::-
Since housing and some social facilities for staff and trainees 'will be"incl11G'~1
a site area of about 50 hectares should be provided. The need to accommodate the request at the meeting of Plenipotentiaries to expand activities of the Centre into other sectors (e.8. machine tools9 electrical equipment) should be borne in mind.
The site will need to be surveyed and a topographical map prepared by the Nir.,~,r.::.:".
Government. The map should also be supplemented by a plan showing the road link~~~,
from the site to the city of Ibadan.
The host Government will be responsible for site preparation for constructlo~
which will involve clearing and levelling of the site and the construction of aCCt~~
roads.
2. PROVISION OF THE OFFICES AND t-lORKSHOP BUILDINGS
The Nigerian Government is to provide the offices and workshop buildinRs.
involves the following stap.es~
(i) Preparation of a site utilization plan and a site layout plan showing the positions of the different buildin~s and services.
.,.,~ . r.n ; s
(ii) Design and construction of the office buildinRs. The requirements and specifications for these are to be agreed with ECAs but will be based on the outline office requirements spelt out in the project report.
,,'
(iii) Design of the individual layouts of the plant and machinery in each of the workshop buildings and laboratories. There will be consultation with ECA in the approval of the layout design w~ich requires to be co-ordinated with the machinery selection.
(iv) Design and construction of the workshop buildings to the requirements of the machinery and plant layouts and Rpecifications provided in conjunction with the layout plans.
·ECA/INR/EXB~2/tw/4 ECA/INR/cOUNCIL.2/~w/4 Annex I
Page 2.
3. PROVISION OF RESIDENCES FOR THE SENIOR TECHNICAL STAFF
The Nigerian Government 'is to provide a residence for the Executive Director.
Initially the host Government will provide temporary residences durIng the constr-.
tion period for the Executive Director~ Department Directors and Assistant Direct(
for Administration. However1 the host Government will be responsible for the des:" . and construction of the permanent residence for the Executive Director, presumabl:' as part of the residential estate to be developed for the other staff.
4. ACQUISITION OF EQUIPHENT FOR THE PORKSEOPS AND LABORATORIES
The Nigerian'Covernment is to render every assistance to the ECA and the Ah~.
in the acquisition of the equipment and machinery renutred by the Centre from b'::!_~r- donor sources.
';,
, ,or
Annex I I
Proposed scale of contributions by ~ember States to the budr,et of the Centre on the basis of OAU formula, 1~8~, 19~1 and 19G2
Amount of the burlp.et; 1ge0'
1931~
lQ32 •
lJS~4)40J,2GO
US:¥4, 320 _,6110 US':i 920.:)00
Algeria Benin Burundi Comoro
Ghana Guinea Kenya Liberia
~!orocco
iHr,eria
R~'Tanda
Senegal f:.ierra Leone Sudan
Tanzania
To~o
Upper Volta Zaire
Zanbia
Coeffi"
cient 6.15 0.54 0.61 0.50 7.57 3.24 0.68 2.28 1.31 4.30 0.72 7.63 0.50 0.96 1.37 1.85 1.64
o
.5!10.54 2.15 3.27 48.89
tage share
1?.58 1.11 1.25 L02 15.1..0 6.63 1. 39 4.66 3.70
1.47 15.61 1.02 1.96 2.30
3.713 3.35 1.19 1.11 4.40 6.65 100.')1)
t.r.
on,:,::=.1/4·
~2'J~/
4> IJOQ}:./
3.36r:.
l
59,.41';!/
''It: 44ol/
i..J " .
4,S6;Y 17, H8rJ}) 1/. 190!./s
5 t64o-!/
59,S8o!/
3,930-1./
7 53,)./
?9,21G!:/
14.,52oY 12 J
370l/
if~560·=-1/
3:>63,}Y
16
.36~/
2l,99~/
1980
US~
631,,7B13/ 55,481'
Y
62,527
l../
'+
I),317!!../777
J; '. rJ-/
"3" '1(',,3/_I c, ~ o...J()~
66:>9 30!!./
2.1L:. •
z
5;J.I
Hl5,:
n q 1/
3B7,MI.CY'll 73 ;9 7
5-'-~./
733 .. 7SJ-/
51.5lG-~.I
9B,63J-/
HO
1~osl/
109J7B1
2/
1681
20S-~/
5J ,,l}44
1/
5 3. ?i'.0!!/
220,604
1/
335
•
9701/lS81
U~~
453,542
47~960
51../)08
M.,07l 668,841
60,057 2/H)3 /l 4 1.59,:-:55 3m.220 6.3,514 674,45"
4/~,071
?4.;6~5
121)/179 163.,322
1440 7 4 3
51,416 47,960 190,110 2D9,Q53
1982
U~$
115,736 10,212 11,500
1~2./}16 60) 996
12)7C~
42> 1':72 34.040 80"960 13,524 143,.612 9,3D4
25,7G0.
3/.,776 30,320
1~.94E 10,212 M),4~O
61,5Mj
1/ Contributions computed on the basis of the 15 ori~inal foundinp; nenbers who acceded to the Constitution dur Lna the ~!eetinp: of Plenipotentiaries held at Cotonou in April 1979. Fip.ures already communicated to Govern~ents for payment.
2/
in 1979,
Contributions computed on the basis of 2~ memher ~tates as the total ~eMbership
Figures already co~unicated to r.overnments for payment.
3/ Contributions conputed on the basis of 17 memher ~tates as of 25 SepteMber 197~
in preparation of the bu~~et to be submitted to the inau~ural meetinp; of the Executive Board held at Tbadan on 29 October 1979. Subndt t.ed budget; t>Tas approved by the meetf.ng and fi~ures already co~unicated to Governments for pa.vment.
4/ Contributions computed on the basis o~ ?!) ne~ber ~tates as the total ne~bershir
in 1979. Fi~res already COmMunicated to Governaentn for paYMent.
5/ Figures computed on the basis of 21 metnber States as of 20 June 19Dfl.