TRANSBOUNDARY TRANSBOUNDARY
GROUNDWATER
A model : The Bellagio Draft A model : The Bellagio Draft
Treaty
Basic concepts
• Designation of critical areas (hot spots)
• Enforcement left to national agencies Enforcement left to national agencies
• Joint body with limited substantive
di ti b t t t k
discretion, but power to take
initiative
Structure
• Joint body (Commission)
• Based on data & information, declares Transboundary y
Groundwater Conservation Areas
• Preparation of management plans Preparation of management plans
• Emphasis on planned depletion &
drought management drought management
• Groundwater protection
The Commission: functions e Co ss o u ct o s
• To declare Transboundary Groundwater
C ti A D ht Al t
Conservation Areas, Drought Alerts, Drought Emergencies & Public Health Emergencies;
Emergencies;
• To promulgate plans, including depletion plans;
plans;
• Any other matter, as referred to it by the [two] governments jointly;
[two] governments jointly;
• To provide advice to each individual government upon request;
government upon request;
• To assess periodically the effectiveness of measures taken by states & report on it;
measures taken by states & report on it;
• To maintain database
Database Database
Created and maintained by the Commission Data provided by the parties
Content of database:
• QuantityQuantity
• Quality
• Aquifer geometry
• Aquifer geometry
• Recharge rates
• Interaction with surface water
• Interaction with surface water
• Other relevant data
Duty of Commission to y carry out research
• Identification of data gaps & remedial action
• Identification of present & potential uses
• Assessment of the impact of present andAssessment of the impact of present and potential development
• Study of possible alternative sources ofStudy of possible alternative sources of surface and groundwater supply, taking into consideration conjunctive usej
• Assessment of potential for and effects of drought, floods & contaminationg ,
Water quality protection
• Duty of the parties to protect & improve
d t lit d t id
groundwater quality, and to avoid appreciable harm
• Duty to inform the Commission of actual or planned significantly polluting
discharges into transboundary
groundwater or discharge area, and of potential leakages
Declaration of Transboundary y Groundwater Conservation Area
• By the Commission
– Withdrawals exceed recharge
– Recharge is or will become impaired
– Water use as source of drinking water is or will become impaired
G
– Groundwater contamination – Drought
• Governments may object within 180 days
Comprehensive p management plans
• Prepared by the Commission for TGCA
S b itt d t t
• Submitted to governments
• Power of governments to object within 180 d
days
• In the absence of objections, adopted by
C i i
Commission
• Implementation monitored by Commission
• In the case of objections, referral to governments for resolution by
lt ti
consultation
Content of plans Content of plans
• Measures to prevent, mitigate or eliminateMeasures to prevent, mitigate or eliminate quality degradation (incl. control of land use)
• Groundwater allocation
• Limitations concerning wellstat o s co ce g e s
• Aquifer recharge programmes
• Conjunctive use programmesConjunctive use programmes
• Quality & quantity control integration programmes
programmes
• Other measures as deemed appropriate
Pl d d l ti
Planned depletion
Pl t b d d d ( ith
• Plan to be prepared and approved (with the consent of the governments) by the Commission
Commission
• Depletion to take place over a calculated period of time
period of time
• Information to be provided by governments
governments
• Possible content of plan:
A ti t f
– Apportionment of uses
– Specification of rates & means of extraction Authorization of advances exchanges and – Authorization of advances, exchanges and
transboundary transfers
Drought management plan g g p
• To be prepared by the Commission and approved by the governments
approved by the governments
• Data to be supplied by the governments
M d t t t
• Mandatory content:
– Indication of preconditions for the declaration of a drought alert and of conservation
of a drought alert and of conservation measures
– Indication of preconditions for the declarationIndication of preconditions for the declaration of a drought emergency and of ensuing
measures
P i i f h d t l i l it i
– Provisions for hydrometeorological monitoring and for monitoring compliance with measures – Provisions for reporting to governments
– Provisions for reporting to governments during drought alert or drought emergency
Drought management plan Drought management plan
(cont’d) (cont d)
• Non-mandatory contenty
– Designation and reservation of certain aquifers or well sites for use in times of drought
– During drought emergency, provision for
• Conjunctive management of surface water &
d t groundwater
• Increase or reduction in allowable withdrawals (maintaining the ratios set)
( g )
• Use of designated and reserved groundwater
– Other structural and non-structural measures