Publisher’s version / Version de l'éditeur:
Vous avez des questions? Nous pouvons vous aider. Pour communiquer directement avec un auteur, consultez la Questions? Contact the NRC Publications Archive team at
PublicationsArchive-ArchivesPublications@nrc-cnrc.gc.ca. If you wish to email the authors directly, please see the first page of the publication for their contact information.
https://publications-cnrc.canada.ca/fra/droits
L’accès à ce site Web et l’utilisation de son contenu sont assujettis aux conditions présentées dans le site LISEZ CES CONDITIONS ATTENTIVEMENT AVANT D’UTILISER CE SITE WEB.
Invited Seminar at FP Innovations, Quebec City: 15 March 2011, Quebec City, Quebec [Proceedings], 2011-03-15
READ THESE TERMS AND CONDITIONS CAREFULLY BEFORE USING THIS WEBSITE.
https://nrc-publications.canada.ca/eng/copyright
NRC Publications Archive Record / Notice des Archives des publications du CNRC :
https://nrc-publications.canada.ca/eng/view/object/?id=016a9cab-977a-426a-9e83-1ee379585173 https://publications-cnrc.canada.ca/fra/voir/objet/?id=016a9cab-977a-426a-9e83-1ee379585173
This publication could be one of several versions: author’s original, accepted manuscript or the publisher’s version. / La version de cette publication peut être l’une des suivantes : la version prépublication de l’auteur, la version acceptée du manuscrit ou la version de l’éditeur.
Access and use of this website and the material on it are subject to the Terms and Conditions set forth at
Invited Professional Development Seminar - BIM - a Tool to Optimize Building Construction
1
Institute for Research in Construction
BIM
– A Tool to Optimize Building
Construction
Centre for Computer-assisted Construction Technology
John Dickinson, Ph.D., P. Eng. John.Dickinson@nrc.gc.ca
15 March 2011
Institute for Research in Construction
National Research Council
• National organization, federal government agency
• Over 4,200 full-time employees; over 1,446 guest workers • Labs and facilities across Canada
• Dissemination of S&T information to industry and scientific community
• Provides essential elements of national S&T infrastructure
Institute for Research in Construction
The NRC Centre for Computer-assisted Construction Technologies
Part of NRC Institute for Research in Construction
Research and development driven by four issues in construction industry:
• the need to improve productivity
• growing complexity of built environments • sustainable development
• changing workforce demographics
NRC-CCCT
Increasing productivity of the construction
life-cycle through applied technology
• Computational tools to aid design, implementation & management of built resources
• Decision support tools
• Digital knowledge & information management • Tools and practices to improve the efficiency of the
3
Institute for Research in Construction
Presentation Outline
What is BIM?
Why care? Intent or promise Definition Game ChangerBIM @ work
In use Organisations StandardsRelevance to Wood
Products & Systems BIM Capabilities
Near-term Longer-term
Institute for Research in Construction
What is BIM?
Why care?
BIM Intent or Promise
Defining BIM
Game Changer
Institute for Research in Construction
Why Care?
Lost Money
2004 NIST report
(Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry)
$15.8B/y lost due to poor interoperability
• 1-2% industry’s revenue
2/3 during operations and maintenance phase
http://www.bfrl.nist.gov/oae/publications/gcrs/04867.pdf
The Promise:
Interoperability
5
Institute for Research in Construction
BIM in Short
– Interoperability
9 h ttp :// e e td n e w s. lb l.g o v/ n l0 3 /im a g e s/ b liss -sp ira l.p n g Asti.comInstitute for Research in Construction
BIM Standards Organisations
principal product is the National BIM Standard
Institute for Research in Construction
BIM Lifecycle View
http://www.jotne.com/project-information-owners.442302-79297.html
CAD vs. BIM
• 2D or 3D
• Lines
• Layers if done properly
• Robust exchange
standards
• No standard way of
adding contextual
• 3D or more
• Physical & functional
elements
• Well-defined collection
of facility data
• Machine interpretable
• Traceability, ownership
4D
– Time
5D
– Cost
7
Institute for Research in Construction
Potential for Game Changer
• Full/Better solutions up-front- Mutual understanding, consensus multi-disciplinary approaches
• Avoid late changes
- Miss-understandings - Unforeseen consequences - Less errors/clashes
• Correct materials/tools/people at correct time,
• Offsite work, prefab assemblies
http://www.cenews.com/magazine-article-cenews.com-october-2008-what_does_bim_mean_for_civil_engineers_-6098.html
Communication
Collaboration
Coordination
Institute for Research in Construction
BIM @ Work
BIM In Use
Organisations Backing/Using BIM
Standards
Institute for Research in Construction
Design
Visualisation
• Architects • Industrial Designers • Functional Analysis • Real Estate • Commercial Property Managers • Interior Decorators h ttp :// m y. o p e ra .co m /ki e n tru cv n /a lb u m s/ sh o w p ic .d m l? a lb u m = 7 2 4 0 1 2 & p ict u re = 9 7 7 9 6 6 2 h tt p :/ / d isco u n t. b in a o ff ice fu rn itu re .co m /2 0 1 0 _ 0 7 _ 0 1 _ a rc h iv e .h tm lFacility Appearance - Visualisation
Geographical Rendering and Neighbourhood Impact9
Institute for Research in Construction
Walkthrough Example
Institute for Research in Construction
Engineer
– Architect Collaboration
- Green/LEED/Sustainable
Orientation OptimizationInstitute for Research in Construction
Engineering - Systems & Structure
h ttp :// w w w .b im o u tso u rci n g .co m /h va c-se rvi ce .h tm http://www.pmengineer.com/Art icles/Cover_Story/2009/02/01/T he-Benefits-of-BIM-in-Plumbing-Design h ttp :// w w w .risa te ch e sp a n o l.co m /im a g e s/ p a rtn e rs/ re vi t/r isa R e vi tL in k. jp g
Facility Performance
– Owners/Ops
Consummation Variation on a year
4,000.00 4,500.00 5,000.00 5,500.00 6,000.00 6,500.00 7,000.00 7,500.00 8,000.00 8,500.00 9,000.00 J a n J a n J a n J a n J a n F e b F e b F e b F e b M a r M a r M a r M a r A p r A p r A p r A p r A p r M a y M a y M a y M a y J u n J u n J u n J u n Jul J u l J u l J u l J u l A u g A u g A u g A u g S e p S e p S e p S e p S e p O c t O c t O c t O c t N o v N o v N o v N o v D e c D e c D e c D e c D e c E n e rg y C o n s u m m a ti o n ( k Wh ) Average 2003 Average 2004 Average 2005 Average 2006 Average 2007
Energy analysis, comfort, controls automation
2 3
1
4 N
Daily Direct Radiation Average
100 200 300 400 500 600 700 800 900 1000 D ir e c t R a di a ti on ( k J /m 2 )
11
Institute for Research in Construction
Analysis Simulations
Institute for Research in Construction
General Contractors
– VDC
• Constructability – clashes before workers onsite
• Scheduling – planning, slippage
• Reduce # and $ of RFIs – models vs. drawings
• Bid – 3D-4D visualization of process
• Lower uncertainty reduced contingency
• Coordination meetings / Progress tracking
• Materials / Supplies
Institute for Research in Construction
General Contractor
Workface planning, scheduling, coordination
• General Contractors
h ttp :// w w w .ca d a lyst .co m /a e c/ b im -and -p ro je ct -p la n n in g-1 -2 -3 -re vi t-t u to ria l-3 5 2 0 http://www.youtube.com/watch?v=FE_zYiltsAwAccurate Cost Estimating
http://www.cadalyst.com/aec/army-corps-drawn-bim-design-3764
13
Institute for Research in Construction
Bottom Line
– GC
Partial VDC project vs. Benchmark projects
• 50% RFIs
• Per-RFI cost 1/5
th• Over-runs costs 1/15
thtypical
• Project completed months ahead schedule
- Benchmarks months delayed
http://www.tpm.com/component/content/article/1-latest-news/513-how-bim-is-being-utilized-by-general-contractors-and-its-benefits-a-general-contractor
Institute for Research in Construction
Bottom Line
– Owner
Tendency to:
• Better understand what they are buying
- Improved upfront design- Less requests for changes
• Get better quality
- built as-planned
- less problems/ad-hoc solutions/products • Future
Institute for Research in Construction
Early Canadian Industry Adopters
EllisDon HIP Architects RCNA Stantec Halsall Associates PCL Construction PFLA Inc DOWCO Group ... more
Organisations
American Institute of Architects Associated General Contractors General Services Administration The FIATECH Consortium
Construction Specifications Institute Canada/US Green Building Council Canadian Construction Assoc. Canada BIM Council
Steel Construction Institute Institute for BIM in Canada
15
Institute for Research in Construction
Regional Adoptions
Scandinavia:
Finland, Norway, Denmark
Australia
Singapore
US:
GSA, universities, army, NASA
Canada:
Alberta, BC, Montreal?
Western European Practitioners:
36% (2010)
USA Practitioners:
48% (2010)
http://images.autodesk.com/adsk/files/business_value_of_bim_in_europe_2010_final_new.pdf
Institute for Research in Construction
Interoperability at a glance
– IFC
IFC
: Industry Foundation Classes (.ifc)
• Objects: spaces, basic building elements, ... • Certification program• Model View Definitions – legal subsets of data
Two common IFC2x3 model views:
• Coordination View – design & construction • Basic FM Hand Over – construction & operator
- COBie: Construction Operations Building information exchange
Institute for Research in Construction
Interoperability
CIS/2.1 & gbXML
CIS/2.1
: CIMsteel Integration Standards Release 2
• Steel Construction Institute • Structural steelwork industry • Detailing, analysis, fabrication, …
gbXML
: green building XML
• Mostly for energy and comfort modelling packages • Chunks facility into contiguous spaces
• Equipment
BIM Relevance to Wood
Products and Systems
BIM Capabilities
Near-term
Longer-term
17
Institute for Research in Construction
BIM
Design & Material Specification •Mfg Catalogue •Specifications Assemblies Analysis •Codes / Reg. •Acoustics / Fire •... Green Certification •LEED •BREEAM •... Takeoffs •Material •Labour •Supply chain Operations •Maintenance •Status •Warrantee Demolition •Reclamation •RecyclingBIM for Manufacturers
Institute for Research in Construction
BIM: Value-adding
Early Material Selection in Design Visualisation & Performance Based on Specs Construction & Supply Chain Integration Orders from Manufacturers Manufacturers BIM Product SpecificationsInstitute for Research in Construction
BIM Capabilities
– Near-Term
- Design tools –Revit(Framing Tool), - Design and Analysis tools:
- Tekla& Risa
- Parametric librariesof wood & composite products supply chain
- Limited code checking or
requirements assessment
- Link to Fabrication (Cadwork)
- Still manual CAD and not BIM – joins, cuts, machining
BIM Capabilities
– Far-Term
- Link to Analysis
- Improved Structural
- Fire (NIST – FDS) Geometry and common properties - Acoustic (not soon) – digital guides
- Design to Fabrication (need CIS/2 for Wood)
- Automation – First in CAD, later BIM? - Standards for Stakeholders
- Analysis, Process, Materials, Parts, Assembly
19
Institute for Research in Construction
Key Points
• Exchange and collaborate with partners • Avoid re-entry
• Game changer
BIM Interoperability
• Design • Construction
• Analysis – Code, Lighting, Water, Energy, Basic Structure
Significant Penetration
• Analysis – Structure, Fire, ... • Design to Fabrication
Future for Wood
Institute for Research in Construction
Contact Details
John Dickinson Tel: (519) 430-7123
John.Dickinson@nrc.gc.ca
Centre for Computer-Assisted Construction Technologies National Research Council Canada