• Aucun résultat trouvé

Energy Management Plan: Section One Facilities Lighting Upgrade

N/A
N/A
Protected

Academic year: 2021

Partager "Energy Management Plan: Section One Facilities Lighting Upgrade"

Copied!
29
0
0

Texte intégral

(1)

Publisher’s version / Version de l'éditeur:

Vous avez des questions? Nous pouvons vous aider. Pour communiquer directement avec un auteur, consultez la

première page de la revue dans laquelle son article a été publié afin de trouver ses coordonnées. Si vous n’arrivez pas à les repérer, communiquez avec nous à [email protected].

Questions? Contact the NRC Publications Archive team at

[email protected]. If you wish to email the authors directly, please see the first page of the publication for their contact information.

https://publications-cnrc.canada.ca/fra/droits

L’accès à ce site Web et l’utilisation de son contenu sont assujettis aux conditions présentées dans le site LISEZ CES CONDITIONS ATTENTIVEMENT AVANT D’UTILISER CE SITE WEB.

Student Report; no. SR-2009-12, 2009-01-01

READ THESE TERMS AND CONDITIONS CAREFULLY BEFORE USING THIS WEBSITE.

https://nrc-publications.canada.ca/eng/copyright

NRC Publications Archive Record / Notice des Archives des publications du CNRC : https://nrc-publications.canada.ca/eng/view/object/?id=64664098-1460-4885-82c1-3fd9091ec91e https://publications-cnrc.canada.ca/fra/voir/objet/?id=64664098-1460-4885-82c1-3fd9091ec91e

NRC Publications Archive

Archives des publications du CNRC

For the publisher’s version, please access the DOI link below./ Pour consulter la version de l’éditeur, utilisez le lien DOI ci-dessous.

https://doi.org/10.4224/18238671

Access and use of this website and the material on it are subject to the Terms and Conditions set forth at

Energy Management Plan: Section One Facilities Lighting Upgrade

(2)

National Research Council Canada Institute for Ocean Technology Conseil national de recherches Canada Institut des technologies oc ´eaniques

SR-2009-12

Student Report

Energy Management Plan: Section One Facilities Lighting

Upgrade.

Bartlett, C.

Bartlett, C., 2009. Energy Management Plan: Section One Facilities Lighting Upgrade. St. John's, NL : NRC Institute for Ocean Technology. Student Report, SR-2009-12.

(3)

DOCUMENTATION PAGE

REPORT NUMBER

SR-2009-12

NRC REPORT NUMBER DATE

August 2009

REPORT SECURITY CLASSIFICATION

Unclassified DISTRIBUTION Unlimited TITLE AUTHOR(S) Courtney Bartlett

CORPORATE AUTHOR(S)/PERFORMING AGENCY(S)

Institute for Ocean Technology, National Research Council, St. John’s, NL

PUBLICATION

SPONSORING AGENCY(S)

IOT PROJECT NUMBER NRC FILE NUMBER

KEY WORDS

Lighting, energy, inefficient, ergonomics, sensors

PAGES

12, App. A-E

FIGS. TABLES

SUMMARY

The current lighting system at the National Research Council - Institute for Ocean

Technology (NRClOT) is inefficient and causing an increase in energy costs, which raise the cost of energy bills, maintenance and labour. This rising cost is expected to continue to increase in the foreseeable future. NRC-lOT has searched for more efficient products and solutions that will help with the reduction in operating costs. Lighting is recognized

as a major area for economic energy savings.

ADDRESS National Research Council

Institute for Ocean Technology Arctic Avenue, P. O. Box 12093 St. John's, NL A1B 3T5

(4)

1+1

National Research Council Conseil national de recherches

Canada Canada

Institute for Ocean

Technology Institut des technologiesoceaniques

Development

&

Implementation of a Lighting

Efficiency Plan

SR-2009-12

Courtney Bartlett

(5)

Summary

The following report was based on work completed at the National Research Council - Institute for Ocean Technology (NRC-lOT). The current lighting system at NRC-lOT is inefficient and therefore causing an increase in energy costs. This in turn raises the cost of energy bills, maintenance and labour. The rising cost is expected to continue in the foreseeable future. NRC-lOT has searched for more efficient products and solutions that will help with the reduction in operating costs. Lighting is recognized as a major area for

. .

economic energy savmgs.

The following will be discussed in this report: ergonomics of lighting in offices, problems associated with the current system, savings in energy and cost associated with the new system, the environmental effects of the old and new system, and the reduction in maintenance and labour of the new system. The upgrade will consist of a modern more efficient lighting system that will be installed within a year. Occupancy sensors will be installed and integrated into the lighting circuits of the building. These sensors will turn the lights off when a space is unoccupied for a period of time and will turn these lights on again once the sensor has redetected a person in the area. Also, included in this report are recommendations for the plan to be completed in a timely manor and suggestions for proper implementation.

(6)

Methodology

Information for this report was obtained through the NRC-lOT network, which all

employees have access to. Stored on this network is documentation pertaining to specific

projects implemented at lOT, such as pdf and auto-cad drawings, facility project plans, fOlms

and templates. Information was also obtained through Natural Resources Canada Energy

Efficiency documentation. Depending on the topic of discussion, the appropriate personnel

were contacted for guidance and assistance.

Acknowledgments

I would like to thank Mr. Rod Grittiths, Maintenance Supervisor, for answering

questions and providing ongoing support and guidance for the past sixteen weeks. Rod was a

major source of information and contributed his expertise to the Facilities Engineering

SUPP0l1 & Maintenance department at lOT. His guidance and knowledge contributed to the

development of the Lighting Efficiency Plan. He showed consistent determination in

expanding my experience, and most importantly encouraging me to learn through

involvement in changeling projects. This involvement fostered my independent development

(7)

Table of Contents

1.0 Introduction

I

2.0 Lighting Efficiency Plan

2

3.0 Current and Proposed Lighting Systems

3

4.0 Construction Phases

5

5.0 Cost Savings

7

6.0 Lighting in Offices

9

7.0 Conclusion

10

8.0 Recommendations

11

9.0 References

12

List ofAppendices

Appendix A

Site Map

Appendix B

Bulb Diameter Comparison

Appendix C

Energy Efficient Lighting Savings Calculator

Appendix D

.Key Plan

(8)

1.0 Introduction

The Institute for Ocean Technology (lOT), a branch of the National Research

Council was established in 1985 to provide technical exper1ise in support of Canada's

ocean teclmology industries. The Institute's capability is unique to the nation. No other

organization offers the combination of knowledge, experience and world-class facilities.

lOT conducts ocean engineering research through the modeling of ocean environments,

predicting and improving the performance of marine systems, and developing innovative

technologies that bring benefits to the Canadian marine industry [II.

The Facilities Engineering Support & Maintenance (FESM) department manages

the provision of utilities for the Institute. It provides safe and efficient operations,

maintenance management of buildings, grounds, process systems, and material handling

equipment, maintenance servicing for lab and shop equipment, and project management

services for design, construction and procurement projects.

Due to the large size of lOT's facility and its operations in the ice tank, tow tank

and ocean engineering basin, energy costs soar in the tens of thousands every month.

FESM is assigned the role of planning and implementing an Energy Management Plan to

reduce these costs. Lighting is recognized as a major area for economic energy savings

and is one of the simplest upgrades that can be made. It is for this reason that a lighting

upgrade is chosen as section one of the energy management plan.

(9)

2.0 Lighting Efficiency Plan

lOT is composed of several thousand square feet of lighted area at its facility in St. John's (Refer to Appendix A for Site Map). Employment consists of over one hundred lOT staff and another fifty contractors. Since the facility was built in 1986, there has been no lighting retrofit. The current lighting system is inefficient, causing an increase in energy consumption; which therefore raises the cost of energy bills, maintenance and labour. This rising cost is expected to continue to increase in the foreseeable future. lOT has searched for more efficient products and solutions that will help with the reduction in operating costs. Objectives of this project are to reduce energy consumption and lower energy bills, reduce maintenance and labour, improve quality of lighting, consume less electricity and reduce harmful emissions associated with power generation.

The first step associated with the lighting upgrade is to divide the facility into separate construction phases, allowing each area's project management to be less complex. The second step is to develop a more comprehensive understanding of the current lighting system so it can be assessed. Once problems associated with the current system are determined, the third step it to establish a more efficient alternate method of lighting. The fourth step is to bring professionals, Blair Davis from B. Davis Agencies LTD. and Gus Gallant from McLoughlan Supplies Ltd., into the facility to complete tours of each phase area and decide exactly what supplies are needed for upgrade. The final step is the installation of supplies in each phase area.

(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)

Références

Documents relatifs

Indeed, in times of greater agitation (e.g., day vs night; meal times) one would have expected larger correction frequencies especially for data measured after the

In this paper, we suggest, in the context of collaborative planning within a supply chain, a new method to calculate the maximal cumulative gross requirements, so that a general

Ces armaillis de la Gruyère ont ça dans le sang... La montagne n'a jamais cessé de vivre. Elle vibre même de la vie, du labeur des armaillis, ces grands solitaires de l'alpe. Une

[r]

There are three main components in the architecture: the widgets which encapsulate the abstract i/o abilities of the interface components; the interaction manager which coordinates

(a) Array geometry (sphere diameter 31.2 cm, microphone spac- ings 10 cm and 11.1 cm), microphones on back half of array not shown, (b) 1 kHz beam pattern for optimized design

Most corrosion of iron water mains is galvanic: two metals of different electrical potential-an anode and a cathode-together with an electrolyte-such as soil moisture-generate

Objectives To evaluate the diagnostic accuracy and vari- ability of 3 semi-quantitative (SQt) methods for assessing right ventricular (RV) systolic function from cardiac MRI in