Fuzzy uncertainty modelling for project planning; application to helicopter maintenance

N/A
N/A
Protected

Academic year: 2021

Partager "Fuzzy uncertainty modelling for project planning; application to helicopter maintenance"

Copied!
24
0
0

Texte intégral

Loading

Figure

Figure 1. Some fuzzy profiles.
Figure 2. Possibility and Necessity of τ ≤ t with τ ∈ e A.
Figure 3 presents the possibility and necessity membership functions for an event t to be between fuzzy intervals e A and e B.
Figure 4. Fuzzy inspection release date
+7

Références

Documents relatifs

Begin Choose a priority rule; Initialize resource, period capacity value; Initial time t̃ := project starting date; Repeat Step 1: compose the set Qt̃ of tasks ready for scheduling

fraction θ of the future return from her productive investment and the market value of the bubble at period t + 2. As in the model AI, two assets serve as a collateral: the capital

fraction θ of the future return from her productive investment and the market value of the bubble at period t + 2. As in the model AI, two assets serve as a collateral: the capital

There are fi ve key arguments being made: (i) the early-years foundation stage (EYFS) specialists need to have a view for exactly what foundations are being laid in classrooms; (ii)

Thus, Geometry DB as an information system has to provide the following functionality: store the modules of CBM, load the geometry modules for setup construction, construct

16 In the manele universe, fatness can be praised explicitly, like in the song “I'm fat and beautiful” (Sunt gras şi frumos) by Florin Salami (Florin Salam). 17 An example is

Based on these modelling approaches, sev- eral algorithms (Simulated Annealing, Genetic Algorithm and Parallel SGS) are developed to solve the Fuzzy Rough Cut Capacity Problem

Nous avons terminé ce travail par un exemple d’application de notre modèle numérique à l’éva- luation structurale de murs de soutènements en maçonnerie, étudiant l’influence