(1)

Nuclear Power Reactors

in the World

R E F E R E N C E D A T A S E R I E S No. 2 2009 Edition

(2)
(3)

REFERENCE DATA SERIES No. 2

NUCLEAR POWER REACTORS IN THE WORLD

2009 Edition

INTERNATIONAL ATOMIC ENERGY AGENCY

VIENNA, 2009

(4)

NUCLEAR POWER REACTORS IN THE WORLD IAEA, VIENNA, 2009

IAEA-RDS-2/29 ISBN 978–92–0–105809–6

ISSN 1011–2642

Printed by the IAEA in Austria

July 2009

(5)

CONTENTS

Introduction. . . 5 Definitions. . . 7 Table 1. Reactors in operation, long-term shut down

and under construction, 31 Dec. 2008 . . . 10 Table 2. Type and net electrical power of

reactors connected to the grid,

31 Dec. 2008 . . . 12 Table 3. Type and net electrical power of

reactors under construction,

31 Dec. 2008 . . . 13 Table 4. Reactor years of experience,

up to 31 Dec. 2008 . . . 14 Table 5. Operating reactors and net electrical power,

1980 to 2008 . . . 16 Table 6. Nuclear electricity production and share

from 1980 to 2008. . . 18 Table 7. Annual construction starts and

connections to the grid, 1954 to 2008 . . . 21 Table 8. Number of new reactors connected to the

grid and median construction time span . . . . 22 Table 9. Construction starts during 2008 . . . 24 Table 10. Connections to the grid during 2008 . . . 25 Table 11. Scheduled connections to the grid

during 2009 . . . 25 Table 12. Reactors planned for construction

as known on 31 Dec. 2008 . . . 26 Table 13. Reactors under construction

31 Dec. 2008 . . . 28 Table 14. Reactors in operation,

31 Dec. 2008 . . . 30 Table 15. Long-term shut down reactors,

31 Dec. 2008 . . . 46 Table 16. Reactors permanently shut down,

31 Dec. 2008 . . . 47 Table 17. Reactors in decommissioning process

or decommissioned, 31 Dec. 2008 . . . 52 Table 18. Performance factors by

reactor category, 2005 to 2008 . . . 56

Table 19. Full outage statistics during 2008 . . . 57

Table 20. Direct causes of full outages during 2008 . . 58

(6)

Table 21. Direct causes of full outages,

1971 to 2008 . . . 59 Table 22. Countries – abbreviations

and summary . . . 60 Table 23. Reactor types – abbreviations

and summary . . . 61 Table 24. Operators – abbreviations

and summary . . . 62 Table 25. NSSS suppliers – abbreviations

and summary . . . 68 Figure 1. Nuclear reactors by type and

net electrical power (as of 31 Dec. 2008) . . . 72 Figure 2. Reactors under construction by type and

net electrical power (as of 31 Dec. 2008) . . . 73 Figure 3. Nuclear share of electricity generation

(as of 31 Dec. 2008) . . . 74 Figure 4. Worldwide median construction time span

(as of 31 Dec. 2008) . . . 75 Figure 5. Number of reactors in operation by age

(as of 31 Dec. 2008) . . . 76 Figure 6. Annual construction starts and

connections to the grid (1954–2008) . . . 77

(7)

INTRODUCTION

This is the twenty-ninth edition of Reference Data Series No. 2, Nuclear Power Reactors in the World, which is published once per year, and presents the most recent reactor data available to the IAEA. It contains the follow- ing summarized information:

– General information as of the end of 2008 on power reactors operating or under construction, and shut down;

– Performance data on reactors operating in the Agency’s Member States, as reported to the IAEA.

The IAEA’s Power Reactor Information System (PRIS) is a comprehensive data source on nuclear power reac- tors in the world. It includes specification and perform- ance history data of operating reactors as well as reactors under construction or reactors being decommissioned.

PRIS data are collected by the IAEA through the desig- nated national correspondents of Member States.

PRIS outputs are available in the annual publications and on the PRIS web site

http://www.iaea.org/dbpage.

Detailed outputs are accessible to registered users through on-line applications. Enquiries should be addressed to:

Director

Division of Nuclear Power

International Atomic Energy Agency Vienna International Centre

PO Box 100

1400 Vienna, Austria

(8)
(9)

DEFINITIONS

Performance Factors

(REG – PEL – UEL – XEL)

EAF (%) = × 100

REG (REG – PEL – UEL)

UCF (%) = × 100

REG UCL (%) = UEL × 100

REG PCL (%) = PEL × 100

REG

LF (%) = EG × 100

REG

Online Hours

OF (%) = × 100

Total Hours where

EAF is the energy availability factor, expressed in per cent.

UCF is the unit capability factor, expressed in per cent.

UCL is the unplanned capability loss factor, ex- pressed in per cent.

PCL is the planned capability loss factor, expressed in per cent.

LF is the load factor, expressed in per cent.

OF is the operating factor, expressed in per cent.

REG reference energy generation: is the net electri-

cal energy (MW·h), which would have been

supplied when a unit is continuously operated

at the reference unit power during the entire ref-

erence period.

(10)

8

PEL planned energy loss: is the energy (MW·h) that was not supplied during the period because of planned shutdowns or load reductions due to causes under plant management control.

Energy losses are considered planned if they are scheduled at least four weeks in advance.

UEL unplanned energy loss: the energy (MW·h) that was not supplied during the period because of unplanned shutdowns, outage extensions, or load reductions due to causes under plant man- agement control. Energy losses are considered to be unplanned if they are not scheduled at least four weeks in advance.

XEL external energy loss: the energy (MW·h), that was not supplied due to constraints reducing plant availability and being beyond plant man- agement control.

EG the net electrical energy supplied during the ref- erence period as measured at the unit outlet terminals, i.e. after deducting the electrical energy taken by unit auxiliaries and the losses in transformers that are considered integral parts of the unit.

Construction Start

Date when first major placing of concrete, usually for the base mat of the reactor building, is done.

First Criticality

Date when the reactor is made critical for the first time.

Grid Connection

Date when the plant is first connected to the electrical grid for the supply of power. After this date, the plant is consid- ered to be in operation.

Commercial Operation

Date when the plant is handed over by the contractors to the owner and declared officially to be in commercial operation.

Permanent Shutdown

Date when the plant is officially declared to be shut down

by the owner and taken out of operation permanently.

(11)

Long term Shutdown

A unit is considered in the long-term shutdown status, if it has been shut down for an extended period (usually sev- eral years) without any firm recovery schedule at the beginning but there is the intention to re-start the unit eventually.

Units and Energy Conversion

1 terawatt-hour (TW·h) = 10 6 megawatt-hours (MW·h).

For an average power plant,

1 TW·h = 0.39 megatonnes of coal equivalent (input)

= 0.23 megatonnes of oil equivalent (input).

(12)

10

TABLE 1. REACTORS IN OPERATION, LONG-TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2008 No of Total No of Total No of Total % of Units MW (e ) Units MW (e ) Units MW (e ) Total

ARGENTINA293516926.856.18 ARMENIA13762.2739.35 BELGIUM7582443.3653.76 BRAZIL2176613.213.12 BULGARIA CANADA2 181906 125772 27261906 14.74 88.3032.92 14.804 CHINA118438111022065.322.15 CZECH REP.6363425.0232.45 FINLAND426961160022.0529.73 FRANCE596326011600419.8076.18 GERMANY1720470140.8928.82 HUNGARY4185913.8737.15 INDIA1737826291013.182.03 IRAN,ISL.REP.1915NANA JAPAN5547278124622191241.2524.93 KOREA REP.201764755180144.2535.62 LITHUANIA111859.1472.89 MEXICO213009.364.04 NETHERLANDS14823.933.80 PAKISTAN242513001.741.91 ROMANIA2130010.3317.54 RUSSIA312174385809152.0616.86 SLOVAKIA4171115.4556.42 SLOVENIA16665.9741.71 SOUTH AFRICA2180012.755.25 SPAIN8745056.4518.27 SWEDEN10899661.3442.04 SWITZERLAND5322026.2739.22

Reactors under Construction Nuclear Electricity Supplied in 2008 Country Reactors in Operation Long-term Shutdown Reactors TW(e).h

(13)

TABLE 1. REACTORS IN OPERATION, LONG-TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2008 — continued No o f Total No o f Total No o f Total % o f Units MW (e ) Units MW (e ) Units MW (e ) Total

UK191009748.2113.45 UKRAINE15131072190084.4747.40 USA10410068311165806.6819.66 Total4383715625297244389882597.8117.71 Note: The total includes the following data from Taiwan, China: — 6 units, 4949 MW(e) in operation; 2 units, 2600 MW(e) under construction; — 39.30 TW(e).h of nuclear electricity generation, representing 17.45% of the total electricity generated there; The total share is related only to the countries with NPPs in operation

Nuclear Electricit y S upplied in 2008 TW(e).h Country Reactors in Operation Long-term Shutdown Reactors Reactors under Construction

(14)

12

TABLE 2. TYPE AND NET ELECTRICAL POWER OF REACTORS CONNECTED TO THE GRID, 31 DEC. 2008 No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e )

ARGENTINA29352935 ARMENIA13761376 BELGIUM7582475824 BRAZIL2176621766 BULGARIA2190621906 CANADA18125771812577 CHINA9713821300118438 CZECH REP.6363463634 FINLAND29762172042696 FRANCE586313011305963260 GERMANY1114013664571720470 HUNGARY4185941859 INDIA2300153482173782 JAPAN231842032288585547278 KOREA REP.1614925427222017647 LITHUANIA1118511185 MEXICO2130021300 NETHERLANDS14821482 PAKISTAN130011252425 ROMANIA2130021300 RUSSIA1510964151021915603121743 SLOVAKIA4171141711 SLOVENIA16661666 SOUTH AFRICA2180021800 SPAIN659402151087450 SWEDEN3278776209108996 SWITZERLAND317002152053220 UK111881889091910097 UKRAINE15131071513107 USA69667393533944104100683 TOTAL2642431599484959188909442244116114042690438371562 The totals include 6 units, 4949 MW(e) in Taiwan, China.

Country FBR Total PWR BWR PHWR LWGR GCR

(15)

TABLE 3. TYPE AND NET ELECTRICAL POWER OF REACTORS UNDER CONSTRUCTION, 31 DEC. 2008 No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e )

ARGENTINA16921692 BULGARIA2190621906 CHINA11102201110220 FINLAND1160011600 FRANCE1160011600 INDIA218343606147062910 IRAN,ISL.REP19151915 JAPAN18661132522191 KOREA REP.5518055180 PAKISTAN13001300 RUSSIA641341925175085809 UKRAINE2190021900 USA1116511165 TOTAL3431620(*) 33925412981925212204438988 (*) The totals include 2 unit s ( 2xBWR), 2600 MW(e) in Taiwan, China. During 2008, 10 reactors, 10470 MW(e) started construction.

Total FBR Country PHWR LWGR PWR BWR

(16)

14

TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2008

CapacityCapacityCapacityCapacity NoMW(e) NetNoMW(e) NetNoMW(e) NetNoMW(e) NetYearsMonths ARGENTINA29352935607 ARMENIA137613762752348 BELGIUM75824110858342267 BRAZIL2176621766353 BULGARIA2190641632635381453 CANADA181257742726347825157815642 CHINA118438118438883 CZECH REP.636346363410410 FINLAND42696426961194 FRANCE5963260113748706700816412 GERMANY172047019587936263497345 HUNGARY4185941859942 INDIA1737821737823014 ITALY414234142381 JAPAN554727812463297594782113868 KAZAKHSTAN1521522510 KOREA REP.201764720176473198 LITHUANIA111851118522370426 MEXICO21300213003311 NETHERLANDS1482155253764 PAKISTAN242524254510 ROMANIA21300213001311 RUSSIA3121743578636225299634 SLOVAKIA417113909726201287 SLOVENIA16661666273 SOUTH AFRICA2180021800483 SPAIN8745026211080712616 SWEDEN1089963122513102213626 CountryExperience

Reactors Connected to the GridLong-term Shutdown ReactorsPermanently Shutdown ReactorsTotal, Operating and Shutdown Reactors

(17)

TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2008 — continued

CapacityCapacityCapacityCapacity NoMW(e) NetNoMW(e) NetNoMW(e) NetNoMW(e) NetYearsMonths SWITZERLAND532205322016810 UK1910097263666451376314388 UKRAINE15131074351519166223536 USA10410068328976413211044733959 Total4383715625297212035621563410155134757 Notes: 1. The total includes the following data from Taiwan, China: — reactors connected to the grid: 6 units, 4949 MW(e), 164 years 1 month. 2. Operating Experience is counted from the grid connection excluding a long-term shutdown period.

Country

Reactors ConnectedLong-term ShutdownPermanently Shutdown Experience Total, Operating to the GridReactorsReactorsand Shutdown Reactors

(18)

16

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, 1980 TO 2008

No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e) ARGENTINA13352935293529352978293529352935 ARMENIA2816281613761376137613761376 BELGIUM4167085464755017563175712758017582475824 BRAZIL16261626162621976219012179521766 BULGARIA3122441632525856353863760427222190621906 CANADA10517216974120139932114902149998181258418126101812577 CHINA321883218896587118438118438 CZECH REP.1391416324178252611633736361963634 FINLAND4220842300423104231042656426764269642696 FRANCE22143884337478565580856585735963080596326059632605963260 GERMANY19103232418110212125019209721921283172033917204301720470 HUNGARY2825417104172941729417554182941859 INDIA48326114371324101746142508152993173782173782 ITALY4111231273 JAPAN23149183323612413086750396255243262554759355475875547278 KAZAKHSTAN113511351135150 KOREA REP.156453580972201191151612990201681020174512017647 LITHUANIA11380227602237022370111851118511185 MEXICO16402125621290213602136021300 NETHERLANDS24982508253925101449145014821482 PAKISTAN11251137112511252425242524252425 ROMANIA165516552130521300 RUSSIA2085962815841291889830198483019848312174331217433121743 SLOVAKIA278041632416324163262440624425203441711 SLOVENIA1632162016201676165616661666 SOUTH AFRICA21840218402184021840218002180021800 SPAIN3107385608970999709797468975918745087450 SWEDEN855151294501299191210058119417108916109034108996 SWITZERLAND4194052881529425305653170532205322053220 200720051980CountryNumber of Units and Net Capacity (MW(e)) Connected to the Grid at 31st Dec. of Each Year 20001995199019852008

(19)

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, 1980 TO 2008 — continued

No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e) UK3386863812485371349635137183313059231185219102221910097 UKRAINE32286108324151302015130451311195151310715131071513107 USA6950881907440110896228108980681039629710398145104100266104100683 WORLD245135285363248070416320482434342225435350590441368136439371758438371562 Note: The world total includes the following data in Taiwan, China: - 1980: 2 units, 1208 MW(e), 1985: 6 units, 4890 MW(e), 1990: 6 units, 4828 MW(e), 1995: 6 units, 4884 MW(e), 2000: 6 units, 4884 MW(e), 2005: 6 units, 4884 MW(e), 2007: 6 units, 4921 MW(e), 2008: 6 units, 4949 MW(e).

CountryNumber of Units and Net Capacity (MW(e)) Connected to the Grid at 31st Dec. of Each Year 19801985199019952000200520072008

(20)

18

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE FROM 1980 TO 2008

TW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of Total ARGENTINA2.18NA5.2511.76.7219.86.5711.85.747.36.376.96.726.26.856.2 ARMENIA1.8433.02.5042.72.3543.52.2739.4 BELGIUM11.86NA29.2559.840.5960.139.3055.545.8156.845.3455.645.8554.143.3653.8 BRAZIL3.171.72.061.02.331.05.591.99.202.511.652.813.213.1 BULGARIA5.71NA12.1731.613.5135.716.2246.416.7945.017.3844.113.6932.114.7432.9 CANADA38.02NA59.4712.769.8714.893.9817.369.1211.886.8314.588.1914.788.3014.8 CHINA12.131.216.021.250.332.059.301.965.322.2 CZECH REP.1.99NA11.77NA12.2320.012.7118.723.2530.524.6430.325.0232.5 FINLAND6.68NA17.9838.218.1335.118.1329.921.5832.222.3632.922.5128.922.0529.7 FRANCE57.31NA213.2664.8297.6174.5358.7176.1395.3976.4431.1878.5420.1376.9419.8076.2 GERMANY41.44NA119.5931.2139.3733.1146.1329.6160.6630.6154.6131.1133.2127.3140.8928.3 HUNGARY6.1023.612.8951.413.2042.313.3540.613.0237.213.8636.813.8737.2 INDIA2.77NA3.872.25.292.26.991.914.233.115.732.815.762.513.182.0 ITALY2.11NA6.463.8 JAPAN79.11NA145.3722.7187.1927.1274.7133.4305.6733.8280.5029.3267.3427.5241.2524.9 KAZAKHSTAN0.080.1 KOREA REP.3.26NA12.1423.250.2649.160.2136.1103.5440.7137.5944.7136.6035.3144.2535.6 LITHUANIA8.75NA15.70NA10.6486.17.4273.99.5470.39.0764.49.1472.9 MEXICO2.782.67.536.07.923.910.325.09.954.69.364.0 NETHERLANDS3.97NA3.696.13.294.93.784.93.704.33.773.93.994.13.933.8 PAKISTAN0.070.50.261.00.381.10.460.90.901.72.412.82.312.31.741.9 ROMANIA5.0510.95.118.67.0813.010.3317.5 RUSSIA43.78NA88.26NA109.62NA91.5911.8120.1015.0137.6415.8147.9916.0152.0616.9 SLOVAKIA4.52NA8.70NA11.16NA11.3544.115.1753.416.3456.114.1654.315.4556.4 SLOVENIA3.85NA4.39NA4.5739.54.5537.45.6142.45.4341.65.9741.7 SOUTH AFRICA5.394.28.475.611.296.513.006.612.245.512.605.512.755.3 SPAIN4.98NA26.8324.051.9835.953.4934.159.4927.654.9919.652.7117.456.4518.3 SWEDEN25.42NA55.8942.365.2745.967.1946.651.8839.069.6444.964.3146.161.3442.0 SWITZERLAND13.63NA21.2839.822.4042.623.5839.925.0538.222.1138.026.4940.026.2739.2 200720051980CountryNuclear production (TW(e).h) of reactors connected to the Grid at 31st Dec. of the year 20001995199019852008

(21)

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE FROM 1980 TO 2008 — continued

TW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of Total UK32.32NA53.7319.658.7719.770.6425.472.9921.975.3419.957.5215.148.2113.5 UKRAINE6.38NA35.81NA71.26NA65.7837.872.5647.383.4048.587.2248.184.4747.4 USA249.84NA378.6815.5578.0820.6673.5222.5755.5519.8783.3519.3806.5519.4806.6819.7 WORLD635.361327.191890.352190.132440.372626.402608.142597.81 Note: The world total includes the following data from Taiwan, China: 1990: 31.54 TW(e).h of nuclear electricity generation, representing 38.32% of the total electricity generated there 1995: 33.8 TW(e).h of nuclear electricity generation, representing 28.79% of the total electricity generated there 2000: 37 TW(e).h of nuclear electricity generation, representing 23.64% of the total electricity generated there 2005: 38.4 TW(e).h of nuclear electricity generation, representing 20.25% of the total electricity generated there 2007: 38.96 TW(e).h of nuclear electricity generation, representing 19.3% of the total electricity generated there 2008: 39.3 TW(e).h of nuclear electricity generation, representing 19.62% of the total electricity generated there CountryNuclear production (TW(e).h) of reactors connected to the Grid at 31st Dec. of the year 19801985199019952000200520072008

(22)
(23)

TABLE 7. ANNUAL CONSTRUCTION STARTS AND CONNECTIONS TO THE GRID, 1954 TO 2008

Units MW(e) Units MW(e) Units MW(e)

1954 1 60 1 5 1 5

1955 8 352 1 5

1956 5 581 1 50 2 55

1957 13 1746 3 134 5 189

1958 6 434 1 50 6 239

1959 7 906 5 238 11 477

1960 11 918 4 452 15 929

1961 7 1391 1 15 16 946

1962 7 1237 9 893 25 1839

1963 5 2100 9 456 33 2271

1964 9 2747 8 1036 40 3232

1965 9 3032 8 1681 48 4913

1966 15 7116 8 1375 55 6279

1967 25 15395 11 2107 64 8310

1968 32 21802 6 1063 68 9334

1969 16 11485 10 3670 78 13004

1970 36 23849 6 3539 84 18986

1971 14 8713 16 7748 99 26611

1972 30 23160 16 8538 113 35268

1973 27 22981 20 11696 132 45953

1974 27 23634 26 16878 154 63290

1975 32 30017 15 9760 169 72709

1976 33 30536 19 13533 186 86162

1977 19 16478 18 12889 200 98696

1978 14 13079 20 15496 219 114213

1979 25 21763 8 6889 225 120102

1980 20 18925 21 15170 245 135285

1981 15 14123 23 20391 267 156098

1982 14 15627 19 14997 284 170790

1983 9 7628 23 18921 306 190067

1984 7 7045 33 30878 336 220865

1985 14 11568 33 30631 363 248070

1986 5 4046 27 26876 389 274438

1987 7 6820 22 22002 407 298233

1988 5 5836 14 13618 416 307457

1989 6 4014 12 10397 420 314333

1990 5 3263 10 10531 416 320482

1991 2 2246 4 3668 415 323865

1992 3 3092 6 4799 418 327202

1993 4 3535 9 9026 427 335856

1994 2 1300 5 4164 429 338860

1995 5 3529 434 342225

1996 1 610 6 6974 438 348140

1997 5 4386 3 3555 434 348836

1998 3 2111 4 2978 430 345756

1999 4 4560 4 2704 432 348194

2000 6 5265 6 3213 435 350590

2001 1 1304 3 2696 438 353321

2002 5 2440 6 5016 439 357708

2003 1 202 2 1625 437 359961

2004 2 1336 5 4785 438 364704

2005 3 2900 4 3821 441 368136

2006 4 3320 2 1490 435 369682

2007 8 6519 3 1785 439 371758

2008 10 10470 438 371562

Year

Construction Starts

Reactors in operation Connections

to the Grid

(24)

22

TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME SPAN No. Months No. Months No. Months No. Months No. Months No. Months No. Months

ARGENTINA1109 ARMENIA273 BELGIUM480 BRAZIL11321295 BULGARIA18711041891113 CANADA4697985101297 CHINA373660280 CZECH REP.17439311671191 FINLAND463 FRANCE1366246815863934124 GERMANY96871006103 HUNGARY2112290 INDIA11522154115231204122164268 ITALY1101 JAPAN116110468491046342447 KOREA REP.159465462261556454 LITHUANIA1801116 MEXICO11511210 PAKISTAN183 ROMANIA11691290 RUSSIA67497347211092233 SLOVAKIA2892992187 SLOVENIA180 SOUTH AFRICA2102 SPAIN5112296 SWEDEN385474 SWITZERLAND1631125 UK41066186498180

to 1980 to 1990 Country

2001 to 2005

1996 to 2000

1976 2006 to 2008

1981 to 1985

1991 to 1995

1986

(25)

TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME SPAN — continued No. Months No. Months No. Months No. Months No. Months No. Months No. Months

UKRAINE38976465711132227 USA1895251152214412211278 TOTAL867413199859529103231462064580 Note: Construction time is measured from the first pouring of concrete to the connection of the unit to the grid. The totals include the following data from Taiwan, China: — 1976 to 1980: 2 units, 64 Months — 1981 to 1985: 4 units, 72 Months No grid connection in 2008

2008 to 2006 Country

1976 1981 1986 1990 to to to 1980 1985

1991 1996 2001 to to to 1995 2000 2005

(26)

24

TABLE 9. CONSTRUCTION STARTS DURING 2008

TypeModel CodeNameThermalGrossNet CHINA CN -28FANGJIASHAN 1PWRCPR-1000290510871000 QNPCDFEC 2008-12—— CN -30FUQING 1PWRCPR-1000290510871000 FuqingDFEC 2008-11—— CN -21HONGYANHE 2PWRCPR-1000290510801000 LHNPCDFEC 2008-3—— CN -36NINGDE 1PWRM310290510871000 NDNPCDFEC 2008-2—— CN -37NINGDE 2PWRM310290510801000 NDNPCDFEC 2008-11—— CN -18YANGJIANG 1PWRCPR-1000290510871000 YJNPCDFEC 2008-12—— KOREA REP. KR -25SHIN-KORI-3PWRAPR-1400398314001340 KHNPDHICKOPC 2008-10—2013-9 KR -24SHIN-WOLSONG-2PWROPR-100028251000960 KHNPDHICKOPC 2008-92012-52012-10 RUSSIA RU -163LENINGRAD 2-1PWRVVER-AES-320011701085 EAROSATOM 2008-10—— RU -161NOVOVORONEZH 2-1PWRVVER-1100320011701085 EAROSATOM 2008-6—2012-12 During 2008, 10 reactors (10470 MW) started construction.

Commercial OperationNSSS Supplier Construction startGrid ConnectionCountryReactorCapacity [MW] Operator

(27)

TABLE 10. CONNECTIONS TO THE GRID DURING 2008

CodeNameThermalGrossNet There were no grid connections in 2008.

OperatorGrid ConnectionNSSS Supplier Construction Start First Criticality

Capacity [MW] CountryReactor TypeModel

TABLE 11. SCHEDULED CONNECTIONS TO THE GRID DURING 2009

CodeNameThermalGrossNet INDIA IN -16KAIGA-4PHWRHorizontal Pre800220202 NPCILNPCIL 2002-5—2009-11 IN -25KUDANKULAM-1PWRVVER V-41201000917 NPCILMAEP 2002-3—2009-7 IN -20RAJASTHAN-6PHWRHorizontal Pre0220202 NPCILNPCIL 2003-1—2009-6 IRAN,ISL.REP IR -1BUSHEHR 1PWRVVER1000 V-4430001000915 NPPDCOASE 1975-5—2009-9 JAPAN JP -64TOMARI-3PWRM (3-loop)2652912866 HEPCOMHI 2004-11—2009-12 During 2009, 5 reactors (3102 MW(e)) are expected to achieve grid connection.

Capacity [MW]CountryReactorModelType OperatorGrid Date NSSS Supplier Construction Start First Criticality

(28)

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN AT 31 DEC. 2008

CodeNameThermalGrossNet BRAZIL BR -3ANGRA-3 PWR376513501275 ELETRONUKWU — CHINA CN -42BAMAOSHANPWRCRP-100001080900 — CN -29FANGJIASHAN 2PWRCPR-100000 — CN -31FUQING 2PWRCPR-1000290510871000 FuqingDFEC — CN -24HAIYANG 1PWRAP100001000 SNPCWH — CN -25HAIYANG 2PWRAP1000010000WH — CN -26HONGSHIDING 1PWR00 — CN -27HONGSHIDING 2PWR00 HONGYANHDFEC — CN -22HONGYANHE 3PWRCPR-1000290510801000 LHNPCDFEC — CN -23HONGYANHE 4PWRCPR-1000290510801000 — CN -38NINGDE 3PWRM310290510801000 — CN -39NINGDE 4PWRM310290510801000 — CN -16SANMEN 1PWRAP-1000341511151000 SMNPCWH/MHI 2009-4 CN -17SANMEN 2PWRAP-1000001000 SMNPCWH/MHI — CN -34TAISHAN 1PWREPR01000 — CN -35TAISHAN 2PWREPR01700 — CN -32TAOHUAJIANG 1PWR00 — CN -33TAOHUAJIANG 2PWR00 — CN -40XIANNING 1PWR00 — CN -41XIANNING 2PWR00 — CN -19YANGJIANG 2PWRCPR-100029051087900 YJNPCDFEC — CN -43YANGJIANG 3PWRCPR1000290510871000 YJNPCDFEC — CN -44YANGJIANG 4PWRCPR1000290510871000 YJNPCDFEC — CN -45YANGJIANG 5PWRCPR1000290510871000 YJNPCDFEC — CN -46YANGJIANG 6PWRCPR1000290510871000 YJNPCDFEC — IRAN,ISL.REP. IR -2BUSHEHR 2PWRVVER30001000915 NPPDCOASE 2011-1 IR -5BUSHEHR 3PWRTBD30001000915 NPPDCOASE 2012-1 Capacity [MW] Operator

Expected Construction Start

NSSS SupplierCountryReactor TypeModel

26

(29)

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN AT 31 DEC. 2008 — continued

CodeNameThermalGrossNet IR -9DARKHOVAINPWRIR-3601113360330 NPPDCO 2010-1 JAPAN JP -70FUKUSHIMA-DAIICHI-7BWRABWR392613801325 TEPCO — JP -71FUKUSHIMA-DAIICHI-8BWRABWR392613801325 TEPCO — JP -69HIGASHI DORI 1 (TEPCO)BWRABWR392613851325 TEPCO — JP -74HIGASHI DORI 2 (TEPCO)BWRABWR01067 TEPCO — JP -72HIGASHI DORI 2 (TOHOKU)BWRABWR01067 TOHOKU — JP -62KAMINOSEKI 1BWRABWR013730 CHUGOKU — JP -63KAMINOSEKI 2BWRABWR013730 CHUGOKU — JP -73NAMIE-ODAKABWRBWR0825 TOHOKU — JP -66OHMABWRABWR392613831325 J-POWER — JP -67TSURUGA-3PWRAPWR446615380 JAPCO — JP -68TSURUGA-4PWRAPWR446615380 JAPCO — KOREA REP. KR -26SHIN-KORI-4PWRAPR-1400393814001340 KHNPDHICKOPC 2009-10 KR -27SHIN-ULCHIN-1PWRAPR-1400393814001340 KHNPDHICKOPC 2011-5 KR -28SHIN-ULCHIN-2PWRAPR-1400398314001340 KHNPDHICKOPC 2012-5 RUSSIA RU -166KURSK 2-1PWRVVER-1100320011701000 EAROSATOM — RU -164LENINGRAD 2-2PWRVVER-1100320011701085 EAROSATOM — RU -165LENINGRAD 2-3PWRVVER-1100320011701085 EAROSATOM — RU -162NOVOVORONEZH 2-2PWRVVER-1100320011701085 EAROSATOM — TURKEY TR -1AKKUYUPWR000 TEAS — Status as of 31 December 2008, 47 reactors (36469 MW(e)) are planned.

CountryReactor TypeModelCapacity [MW] OperatorNSSS Supplier Expected Construction Start

(30)

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2008 Code Name Thermal Gross Net

ARGENTINA AR -3ATUCHA-2 PHWR2160745692 NASASIEMENS1981-7—2010-10— BULGARIA BG -7BELENE-1PWRVVER V-46630001000953 KOZNPPASE1987-1——— BG -8BELENE-2PWRVVER V-46630001000953 KOZNPPASE1987-3——— CHINA CN -28FANGJIASHAN 1PWRCPR-1000290510871000 QNPCDFEC2008-12——— CN -30FUQING 1PWRCPR-1000290510871000 FuqingDFEC2008-11——— CN -20HONGYANHE 1PWRCPR-1000290510801000 LHNPCDFEC2007-8——— CN -21HONGYANHE 2PWRCPR-1000290510801000 LHNPCDFEC2008-3——— CN -12LINGAO 3PWRM310290510871000 LDNPCDFEC2005-122010-72010-82010-12 CN -13LINGAO 4PWRM310290510861000 LDNPCDFEC2006-6——— CN -36NINGDE 1PWRM310290510871000 NDNPCDFEC2008-2——— CN -37NINGDE 2PWRM310290510801000 NDNPCDFEC2008-11——— CN -14QINSHAN 2-3PWRCNP6001930650610 NPQJVCCNNC2006-32010-112010-122011-3 CN -15QINSHAN 2-4PWRCNP 6001930650610 NPQJVCCNNC2007-12009-122011-92012-1 CN -18YANGJIANG 1PWRCPR-1000290510871000 YJNPCDFEC2008-12——— FINLAND FI -5OLKILUOTO-3PWREPR430017201600 TVOAREVA2005-8——2011-6 FRANCE FR -74FLAMANVILLE-3PWREPR430016501600 EDFAREVA2007-122011-122012-5— INDIA IN -16KAIGA-4PHWRHorizontal Pre800220202 NPCILNPCIL2002-5——— IN -25KUDANKULAM-1PWRVVER V-4121000917 NPCILMAEP2002-3——— IN -26KUDANKULAM-2PWRVVER V-4121000917 NPCILMAEP2002-72010-32010-42010-5 IN -29PFBRFBR1253500470 BHAVINI2004-10——— IN -19RAJASTHAN-5PHWRHorizontal Pre220202 NPCILNPCIL2002-9——— IN -20RAJASTHAN-6PHWRHorizontal Pre220202 NPCILNPCIL2003-1——— IRAN,ISL.REP IR -1BUSHEHR 1PWRVVER1000 V-4430001000915 NPPDCOASE1975-5———

Capacity [MW] Operator Commercial Operation NSSS Supplier Construction Start Grid Connection First Criticality Country Reactor Type Model

28

(31)

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2008 — continued Code Name Thermal Gross Net

JAPAN JP -65SHIMANE-3BWRABWR392613731325 CHUGOKUHITACHI2007-10——2011-12 JP -64TOMARI-3PWRM (3-loop)2652912866 HEPCOMHI2004-11——2009-12 KOREA REP. KR -21SHIN-KORI-1PWROPR-100028251000960 KHNPDHICKOPC2006-62010-72010-82010-12 KR -22SHIN-KORI-2PWROPR-100028251000960 KHNPDHICKOPC2007-62011-72011-82011-12 KR -25SHIN-KORI-3PWRAPR-1400398314001340 KHNPDHICKOPC2008-10——2013-9 KR -23SHIN-WOLSONG-1PWROPR-100028251000960 KHNPDHICKOPC2007-112011-52011-52011-10 KR -24SHIN-WOLSONG-2PWROPR-100028251000960 KHNPDHICKOPC2008-92012-52012-52012-10 PAKISTAN PK -3CHASNUPP 2PWRPWR999325300 PAECCNNC2005-122011-42011-52011-8 RUSSIA RU -116BELOYARSKY-4 (BN-800)FBRBN-8002100800750 EAROSATOM2006-7——— RU -37KALININ-4PWRVVER V-32032001000950 EAROSATOM1986-8——— RU -120KURSK-5LWGRRBMK-10001000925 EAROSATOM1985-12——— RU -163LENINGRAD 2-1PWRVVER-AES-2006320011701085 EAROSATOM2008-10——— RU -161NOVOVORONEZH 2-1PWRVVER-1100320011701085 EAROSATOM2008-6——2012-12 RU -151SEVERODVINSK 1PWRKLT-40S 'Float1503532 EAROSATOM2007-4——2010-12 RU -152SEVERODVINSK 2PWRKLT-40S 'Float1503532 EAROSATOM2007-4——2010-12 RU -62VOLGODONSK-2PWRVVER V-320I32001000950 EAROSATOM1983-5——— UKRAINE UA -51KHMELNITSKI-3PWRVVER V-392B32001000950 NNEGCASE1986-3—2015-1— UA -52KHMELNITSKI-4PWRVVER32001000950 NNEGCASE1987-2—2016-1— USA US -391WATTS BAR-2PWRW (4-loop) (IC342512181165 TVAWH1972-12—2012-8— Status as of 31 December 2008, 44 reactors (38988 MW(e)) are planned, including 2 units (2600 MW(e)) from Taiwan, China. TWN, CHINA TW -7LUNGMEN 1BWRABWR392613501300 TPCGE1999-3——— TW -8LUNGMEN 2BWRABWR392613501300 TPCGE1999-82009-122010-12010-7

First Criticality Grid Connection

Commercial Operation Capacity [MW] Operator NSSS Supplier

Construction Start Country Reactor Type Model

(32)

30

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics ARGENTINA AR -1ATUCHA-1PHWRPHWR KWU1179357335 NASASIEMENS1968-61974-31974-671.773.0- AR -2EMBALSEPHWRCANDU 62015648600 NASAAECL1974-41983-41984-186.887.2- ARMENIA AM -19ARMENIA-2PWRVVER V-2701375408376 ANPPJSCFAEA1975-71980-11980-564.466.4- BELGIUM BE -2DOEL-1PWR1192412392 ELECTRABACECOWEN1969-71974-81975-285.286.1- BE -4DOEL-2PWR1311454433 ELECTRABACECOWEN1971-91975-81975-1281.482.3- BE -5DOEL-3PWR277510561006 ELECTRABFRAMACEC1975-11982-61982-1085.987.3- BE -7DOEL-4PWR298810411008 ELECTRABACECOWEN1978-121985-41985-784.184.9- BE -3TIHANGE-1PWRFramatome 3 lo28731009962 ELECTRABACLF1970-61975-31975-1083.586.0- BE -6TIHANGE-2PWRWE 3-loops306410551008 ELECTRABFRAMACEC1976-41982-101983-687.488.6- BE -8TIHANGE-3PWRWE 3-loops300010651015 ELECTRABACECOWEN1978-111985-61985-987.889.5- BRAZIL BR -1ANGRA-1PWR2-loop PWR1484520491 ELETRONUWH1971-51982-41985-153.260.5- BR -2ANGRA-2PWRPRE KONVOI376413501275 ELETRONUKWU1976-12000-72001-282.584.6- BULGARIA BG -5KOZLODUY-5PWRVVER V-32030001000953 KOZNPPAEE1980-71987-111988-1263.666.8DH BG -6KOZLODUY-6PWRVVER V-32030001000953 KOZNPPAEE1982-41991-81993-1271.474.1DH CANADA CA -10BRUCE-3PHWRCANDU 750A2832805734 BRUCEPOWNEI.P1972-71977-121978-272.973.7- CA -11BRUCE-4PHWRCANDU 750A2832805734 BRUCEPOWNEI.P1972-91978-121979-171.071.9- CA -18BRUCE-5PHWRCANDU 750B2832872817 BRUCEPOWOH/AECL1978-61984-121985-383.484.1- CA -19BRUCE-6PHWRCANDU 750B2690891817 BRUCEPOWOH/AECL1978-11984-61984-980.581.3- CA -20BRUCE-7PHWRCANDU 750B2832872817 BRUCEPOWOH/AECL1979-51986-21986-483.884.7- CA -21BRUCE-8PHWRCANDU 750B2690845782 BRUCEPOWOH/AECL1979-81987-31987-582.383.6- CA -22DARLINGTON-1PHWRCANDU 8502776934878 OPGOH/AECL1982-41990-121992-1183.584.5- CA -23DARLINGTON-2PHWRCANDU 8502776934878 OPGOH/AECL1981-91990-11990-1076.677.6- CA -24DARLINGTON-3PHWRCANDU 8502776934878 OPGOH/AECL1984-91992-121993-285.786.6- CA -25DARLINGTON-4PHWRCANDU 8502776934878 OPGOH/AECL1985-71993-41993-685.686.3- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

Capacity [MW]Grid ConnectionCommercial Operation OperatorNSSS SupplierConstruction StartCountryReactorTypeModel

(33)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics CA -12GENTILLY-2PHWRCANDU 62156675635 HQBBC1974-41982-121983-1081.583.4- CA -4PICKERING-1PHWRCANDU 500A1744542515 OPGOH/AECL1966-61971-41971-765.465.6- CA -7PICKERING-4PHWRCANDU 500A1744542515 OPGOH/AECL1968-51973-51973-666.566.8- CA -13PICKERING-5PHWRCANDU 500B1744540516 OPGOH/AECL1974-111982-121983-573.474.0- CA -14PICKERING-6PHWRCANDU 500B1744540516 OPGOH/AECL1975-101983-111984-277.277.8- CA -15PICKERING-7PHWRCANDU 500B1744540516 OPGOH/AECL1976-31984-111985-176.977.6- CA -16PICKERING-8PHWRCANDU 500B1744540516 OPGOH/AECL1976-91986-11986-275.676.3- CA -17POINT LEPREAUPHWRCANDU 62180680635 NBEPCAECL1975-51982-91983-280.481.5- CHINA CN -2GUANGDONG-1PWRM3102905984944 GNPJVCGEC1987-81993-81994-282.586.7- CN -3GUANGDONG-2PWRM3102905984944 GNPJVCGEC1988-41994-21994-581.883.8- CN -6LINGAO 1PWRM3102895990938 LANPCFRAM1997-52002-22002-587.187.6- CN -7LINGAO 2PWRM3102895990938 LANPCFRAM1997-112002-122003-187.587.7- CN -1QINSHAN 1PWRCNP-300966310288 QNPCCNNC1985-31991-121994-477.178.9- CN -4QINSHAN 2-1PWRCNP6001930650610 NPQJVCCNNC1996-62002-22002-476.576.5- CN -5QINSHAN 2-2PWRCNP6001930650610 NPQJVCCNNC1997-42004-32004-587.487.5- CN -8QINSHAN 3-1PHWRCANDU 62064700650 TQNPCAECL1998-62002-112002-1286.486.9- CN -9QINSHAN 3-2PHWRCANDU 62064700650 TQNPCAECL1998-92003-62003-788.888.9- CN -10TIANWAN 1PWRVVER V-42830001000933 JNPCIZ1999-102006-52007-575.275.2- CN -11TIANWAN 2PWRVVER V-42830001000933 JNPCIZ2000-102007-52007-885.985.9- CZECH REP. CZ -4DUKOVANY-1PWRVVER V-2131375456427 CEZSKODA1979-11985-21985-582.783.6- CZ -5DUKOVANY-2PWRVVER V-2131375456427 CEZSKODA1979-11986-11986-383.184.0- CZ -8DUKOVANY-3PWRVVER V-2131375456427 CEZSKODA1979-31986-111986-1282.984.6- CZ -9DUKOVANY-4PWRVVER V-2131375456427 CEZSKODA1979-31987-61987-783.784.7- CZ -23TEMELIN-1PWRVVER V-32030001013963 CEZSKODA1987-22000-122002-665.465.5DH CZ -24TEMELIN-2PWRVVER V-32030001013963 CEZSKODA1987-22002-122003-475.175.3DH FINLAND FI -1LOVIISA-1PWRVVER V-2131500510488 FORTUMPHAEE1971-51977-21977-586.787.1- FI -2LOVIISA-2PWRVVER V-2131500510488 FORTUMPHAEE1972-81980-111981-188.789.4- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

Grid Connection Commercial Operation

Capacity [MW] OperatorNSSS Supplier Construction StartCountryReactor TypeModel

(34)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics FI -3OLKILUOTO-1BWRBWR 25002500890860 TVOASEASTAL1974-21978-91979-1092.492.7- FI -4OLKILUOTO-2BWRBWR 25002500890860 TVOASEASTAL1975-81980-21982-793.894.3- FRANCE FR -54BELLEVILLE-1PWRP'4 REP 1300381713631310 EDFFRAM1980-51987-101988-675.276.5- FR -55BELLEVILLE-2PWRP'4 REP 1300381713631310 EDFFRAM1980-81988-71989-178.379.9- FR -32BLAYAIS-1PWRCP12785951910 EDFFRAM1977-11981-61981-1277.179.5- FR -33BLAYAIS-2PWRCP12785951910 EDFFRAM1977-11982-71983-280.582.5- FR -34BLAYAIS-3PWRCP12785951910 EDFFRAM1978-41983-81983-1180.682.6- FR -35BLAYAIS-4PWRCP12785951910 EDFFRAM1978-41983-51983-1080.182.3- FR -13BUGEY-2PWRCP02785945910 EDFFRAM1972-111978-51979-372.374.2- FR -14BUGEY-3PWRCP02785945910 EDFFRAM1973-91978-91979-373.475.4- FR -15BUGEY-4PWRCP02785917880 EDFFRAM1974-61979-31979-772.975.1- FR -16BUGEY-5PWRCP02785917880 EDFFRAM1974-71979-71980-175.677.9- FR -50CATTENOM-1PWRP'4 REP 1300381713621300 EDFFRAM1979-101986-111987-472.974.2- FR -53CATTENOM-2PWRP'4 REP 1300381713621300 EDFFRAM1980-71987-91988-277.879.8- FR -60CATTENOM-3PWRP'4 REP 1300381713621300 EDFFRAM1982-61990-71991-280.682.7- FR -65CATTENOM-4PWRP'4 REP 1300381713621300 EDFFRAM1983-91991-51992-183.885.5- FR -40CHINON-B-1PWRCP22785954905 EDFFRAM1977-31982-111984-278.679.8- FR -41CHINON-B-2PWRCP22785954905 EDFFRAM1977-31983-111984-878.279.4- FR -56CHINON-B-3PWRCP22785954905 EDFFRAM1980-101986-101987-379.381.1- FR -57CHINON-B-4PWRCP22785954905 EDFFRAM1981-21987-111988-480.482.0- FR -62CHOOZ-B-1PWRN4 REP 1450427015601500 EDFFRAM1984-11996-82000-581.783.8- FR -70CHOOZ-B-2PWRN4 REP 1450427015601500 EDFFRAM1985-121997-42000-982.385.2- FR -72CIVAUX-1PWRN4 REP 1450427015611495 EDFFRAM1988-101997-122002-178.679.9- FR -73CIVAUX-2PWRN4 REP 1450427015611495 EDFFRAM1991-41999-122002-483.084.6- FR -42CRUAS-1PWRCP22785956915 EDFFRAM1978-81983-41984-479.381.0- FR -43CRUAS-2PWRCP22785956915 EDFFRAM1978-111984-91985-478.580.7- FR -44CRUAS-3PWRCP22785956915 EDFFRAM1979-41984-51984-979.582.0- FR -45CRUAS-4PWRCP22785956915 EDFFRAM1979-101984-101985-278.080.1- FR -22DAMPIERRE-1PWRCP12785937890 EDFFRAM1975-21980-31980-976.477.4- Grid Connection

Commercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

32

(35)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics FR -29DAMPIERRE-2PWRCP12785937890 EDFFRAM1975-41980-121981-277.078.7- FR -30DAMPIERRE-3PWRCP12785937890 EDFFRAM1975-91981-11981-577.779.3- FR -31DAMPIERRE-4PWRCP12785937890 EDFFRAM1975-121981-81981-1176.378.1- FR -11FESSENHEIM-1PWRCP02660920880 EDFFRAM1971-91977-41978-170.772.0- FR -12FESSENHEIM-2PWRCP02660920880 EDFFRAM1972-21977-101978-474.575.4- FR -46FLAMANVILLE-1PWRP4 REP 1300381713821330 EDFFRAM1979-121985-121986-1273.576.0- FR -47FLAMANVILLE-2PWRP4 REP 1300381713821330 EDFFRAM1980-51986-71987-376.277.4- FR -61GOLFECH-1PWRP'4 REP 1300381713631310 EDFFRAM1982-111990-61991-282.485.2- FR -68GOLFECH-2PWRP'4 REP 1300381713631310 EDFFRAM1984-101993-61994-383.485.2- FR -20GRAVELINES-1PWRCP12785951910 EDFFRAM1975-21980-31980-1176.478.1- FR -21GRAVELINES-2PWRCP12785951910 EDFFRAM1975-31980-81980-1279.380.7- FR -27GRAVELINES-3PWRCP12785951910 EDFFRAM1975-121980-121981-679.480.8- FR -28GRAVELINES-4PWRCP12785951910 EDFFRAM1976-41981-61981-1079.080.5- FR -51GRAVELINES-5PWRCP12785951910 EDFFRAM1979-101984-81985-180.582.2- FR -52GRAVELINES-6PWRCP12785951910 EDFFRAM1979-101985-81985-1079.981.3- FR -58NOGENT-1PWRP'4 REP 1300381713631310 EDFFRAM1981-51987-101988-276.878.4- FR -59NOGENT-2PWRP'4 REP 1300381713631310 EDFFRAM1982-11988-121989-580.882.9- FR -36PALUEL-1PWRP4 REP 1300381713821330 EDFFRAM1977-81984-61985-1276.478.1- FR -37PALUEL-2PWRP4 REP 1300381713821330 EDFFRAM1978-11984-91985-1273.775.8- FR -38PALUEL-3PWRP4 REP 1300381713821330 EDFFRAM1979-21985-91986-274.275.8- FR -39PALUEL-4PWRP4 REP 1300381713821330 EDFFRAM1980-21986-41986-675.977.7- FR -63PENLY-1PWRP'4 REP 1300381713821330 EDFFRAM1982-91990-51990-1281.983.4- FR -64PENLY-2PWRP'4 REP 1300381713821330 EDFFRAM1984-81992-21992-1182.884.0- FR -10PHENIXFBRPH-250350140130 CEA/EDFCNCLNEY1968-111973-121974-747.647.9- FR -48ST. ALBAN-1PWRP4 REP 1300381713811335 EDFFRAM1979-11985-81986-573.875.4- FR -49ST. ALBAN-2PWRP4 REP 1300381713811335 EDFFRAM1979-71986-71987-373.776.2- FR -17ST. LAURENT-B-1PWRCP22785956915 EDFFRAM1976-51981-11983-876.377.9- FR -23ST. LAURENT-B-2PWRCP22785956915 EDFFRAM1976-71981-61983-876.778.5- FR -18TRICASTIN-1PWRCP12785955915 EDFFRAM1974-111980-51980-1277.380.1- FR -19TRICASTIN-2PWRCP12785955915 EDFFRAM1974-121980-81980-1276.579.0- Grid Connection

Commercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

(36)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics FR -25TRICASTIN-3PWRCP12785955915 EDFFRAM1975-41981-21981-579.081.3- FR -26TRICASTIN-4PWRCP12785955915 EDFFRAM1975-51981-61981-1179.281.9- GERMANY DE -12BIBLIS-A (KWB A)PWRPWR351712251167 RWEKWU1970-11974-81975-269.570.0- DE -18BIBLIS-B (KWB B)PWRPWR373313001240 RWEKWU1972-21976-41977-174.074.4- DE -32BROKDORF (KBR)PWRPWR390014801410 E.ONKWU1976-11986-101986-1290.390.6- DE -13BRUNSBUETTEL (KKB)BWRBWR '692292806771 KKBKWU1970-41976-71977-259.060.0- DE -33EMSLAND (KKE)PWRKonvoi385014001329 KLEKWU1982-81988-41988-693.493.4- DE -23GRAFENRHEINFELD (KKG)PWRPWR376513451275 E.ONKWU1975-11981-121982-688.188.1- DE -27GROHNDE (KWG)PWRPWR390014301360 KWGKWU1976-61984-91985-292.492.5- DE -26GUNDREMMINGEN-B (GUN-B)BWRBWR 72384013441284 KGGKWU1976-71984-31984-788.388.6- DE -28GUNDREMMINGEN-C (GUN-C)BWRBWR 72384013441288 KGGKWU1976-71984-111985-186.887.1- DE -16ISAR-1 (KKI 1)BWRBWR '692575912878 E.ONKWU1972-51977-121979-382.883.2- DE -31ISAR-2 (KKI 2)PWRKonvoi395014751400 E.ONKWU1982-91988-11988-491.892.1- DE -20KRUEMMEL (KKK)BWRBWR 69369014021346 KKKKWU1974-41983-91984-375.375.7- DE -15NECKARWESTHEIM-1 (GKN 1)PWRPWR2497840785 EnKKKWU1972-21976-61976-1282.983.0- DE -44NECKARWESTHEIM-2 (GKN 2)PWRKonvoi385014001310 EnKKKWU1982-111989-11989-493.493.5- DE -14PHILIPPSBURG-1 (KKP 1)BWRBWR '692575926890 EnKKKWU1970-101979-51980-379.579.7- DE -24PHILIPPSBURG-2 (KKP 2)PWRPWR395014581392 EnKKKWU1977-71984-121985-489.290.4- DE -17UNTERWESER (KKU)PWRPWR390014101345 E.ONKWU1972-71978-91979-982.082.6- HUNGARY HU -1PAKS-1PWRVVER V-2131485500470 PAKS ZrtAEE1974-81982-121983-885.685.6- HU -2PAKS-2PWRVVER V-2131485500473 PAKS ZrtAEE1974-81984-91984-1178.978.9DH HU -3PAKS-3PWRVVER V-2131375470443 PAKS ZrtAEE1979-101986-91986-1286.586.9DH HU -4PAKS-4PWRVVER V-2131485500473 PAKS ZrtAEE1979-101987-81987-1187.687.8DH INDIA IN -13KAIGA-1PHWRHorizontal Pre801220202 NPCILNPCIL1989-92000-102000-1172.290.5- IN -14KAIGA-2PHWRHorizontal Pre801220202 NPCILNPCIL1989-121999-122000-372.689.3- IN -15KAIGA-3PHWRHorizontal Pre800220202 NPCILNPCIL2002-32007-42007-523.151.1- IN -9KAKRAPAR-1PHWRHorizontal Pre801220202 NPCILNPCIL1984-121992-111993-567.476.4- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

Grid Connection Commercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

34

(37)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics IN -10KAKRAPAR-2PHWRHorizontal Pre801220202 NPCILNPCIL1985-41995-31995-978.088.4- IN -5MADRAS-1PHWRHorizontal Pre801220205 NPCILNPCIL1971-11983-71984-153.759.2DS IN -6MADRAS-2PHWRHorizontal Pre801220202 NPCILNPCIL1972-101985-91986-359.266.3DS IN -7NARORA-1PHWRHorizontal Pre801220202 NPCILNPCIL1976-121989-71991-155.061.8- IN -8NARORA-2PHWRHorizontal Pre801220202 NPCILNPCIL1977-111992-11992-763.071.2- IN -3RAJASTHAN-1PHWRHorizontal Pre69310090 NPCILAECL1965-81972-111973-1224.225.2PH IN -4RAJASTHAN-2PHWRHorizontal Pre693200187 NPCILAECL/DAE1968-41980-111981-454.457.8PH IN -11RAJASTHAN-3PHWRHorizontal Pre801220202 NPCILNPCIL1990-22000-32000-673.088.4PH IN -12RAJASTHAN-4PHWRHorizontal Pre801220202 NPCILNPCIL1990-102000-112000-1273.791.2PH IN -1TARAPUR-1BWRBWR-1, Mark 2 530160150 NPCILGE1964-101969-41969-1068.769.4- IN -2TARAPUR-2BWRBWR-1, Mark 2 530160150 NPCILGE1964-101969-51969-1067.868.5- IN -23TARAPUR-3PHWRHorizontal Pre1730540490 NPCILNPCIL2000-52006-62006-855.787.4- IN -24TARAPUR-4PHWRHorizontal Pre1730540490 NPCILNPCIL2000-32005-62005-949.779.1- JAPAN JP -5FUKUSHIMA-DAIICHI-1BWRBWR-31380460439 TEPCOGE/GETSC1967-71970-111971-353.653.6- JP -9FUKUSHIMA-DAIICHI-2BWRBWR-42381784760 TEPCOGE/T1969-61973-121974-761.061.0- JP -10FUKUSHIMA-DAIICHI-3BWRBWR-42381784760 TEPCOTOSHIBA1970-121974-101976-365.765.8- JP -16FUKUSHIMA-DAIICHI-4BWRBWR-42381784760 TEPCOHITACHI1973-21978-21978-1070.070.1- JP -17FUKUSHIMA-DAIICHI-5BWRBWR-42381784760 TEPCOTOSHIBA1972-51977-91978-470.970.9- JP -18FUKUSHIMA-DAIICHI-6BWRBWR-5329311001067 TEPCOGE/T1973-101979-51979-1070.870.9- JP -25FUKUSHIMA-DAINI-1BWRBWR-5329311001067 TEPCOTOSHIBA1976-31981-71982-476.176.2- JP -26FUKUSHIMA-DAINI-2BWRBWR-5329311001067 TEPCOHITACHI1979-51983-61984-273.773.7- JP -35FUKUSHIMA-DAINI-3BWRBWR-5329311001067 TEPCOTOSHIBA1981-31984-121985-665.665.6- JP -38FUKUSHIMA-DAINI-4BWRBWR-5329311001067 TEPCOHITACHI1981-51986-121987-872.472.4- JP -12GENKAI-1PWRM (2-loop)1650559529 KYUSHUMHI1971-91975-21975-1073.173.1- JP -27GENKAI-2PWRM (2-loop)1650559529 KYUSHUMHI1977-21980-61981-380.680.6- JP -45GENKAI-3PWRM (4-loop)342311801127 KYUSHUMHI1988-61993-61994-384.884.8DS JP -46GENKAI-4PWRM (4-loop)342311801127 KYUSHUMHI1992-71996-111997-785.885.8DS JP -11HAMAOKA-1BWRBWR41593540515 CHUBUTOSHIBA1971-61974-81976-348.348.4- JP -24HAMAOKA-2BWRBWR42436840806 CHUBUTOSHIBA1974-61978-51978-1159.759.7- The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, PH process heating.

Grid Connection Commercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

(38)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics JP -36HAMAOKA-3BWRBWR-5329311001056 CHUBUTOSHIBA1983-41987-11987-878.078.1- JP -49HAMAOKA-4BWRBWR-5329311371092 CHUBUTOSHIBA1989-101993-11993-981.982.0- JP -60HAMAOKA-5BWRABWR392612671212 CHUBUTOSHIBA2000-72004-42005-164.965.0- JP -58HIGASHI DORI 1 (TOHOKU)BWRBWR-5329311001067 TOHOKUTOSHIBA2000-112005-32005-1277.777.8- JP -23IKATA-1PWRM (2-loop)1650566538 SHIKOKUMHI1973-91977-21977-978.278.3DS JP -32IKATA-2PWRM (2-loop)1650566538 SHIKOKUMHI1978-81981-81982-382.482.5DS JP -47IKATA-3PWRM (3-loop)2660890846 SHIKOKUMHI1990-101994-31994-1285.385.3DS JP -33KASHIWAZAKI KARIWA-1BWRBWR-5329311001067 TEPCOTOSHIBA1980-61985-21985-968.269.5- JP -39KASHIWAZAKI KARIWA-2BWRBWR-5329311001067 TEPCOTOSHIBA1985-111990-21990-969.069.0- JP -52KASHIWAZAKI KARIWA-3BWRBWR-5329311001067 TEPCOTOSHIBA1989-31992-121993-868.169.2- JP -53KASHIWAZAKI KARIWA-4BWRBWR-5329311001067 TEPCOHITACHI1990-31993-121994-866.870.1- JP -40KASHIWAZAKI KARIWA-5BWRBWR-5329311001067 TEPCOHITACHI1985-61989-91990-471.374.1- JP -55KASHIWAZAKI KARIWA-6BWRABWR392613561315 TEPCOTOSHIBA1992-111996-11996-1172.776.1- JP -56KASHIWAZAKI KARIWA-7BWRABWR392613561315 TEPCOHITACHI1993-71996-121997-768.972.1- JP -4MIHAMA-1PWRW (2-loop)1031340320 KEPCOWH1967-21970-81970-1151.151.3- JP -6MIHAMA-2PWRM (2-loop)1456500470 KEPCOMHI1968-51972-41972-761.461.4- JP -14MIHAMA-3PWRM (3-loop)2440826780 KEPCOMHI1972-81976-21976-1269.669.6- JP -15OHI-1PWRW (4-loop)342311751120 KEPCOWH1972-101977-121979-366.666.7DS JP -19OHI-2PWRW (4-loop)342311751120 KEPCOWH1972-121978-101979-1272.973.1DS JP -50OHI-3PWRM (4-loop)342311801127 KEPCOMHI1987-101991-61991-1280.880.8- JP -51OHI-4PWRM (4-loop)342311801127 KEPCOMHI1988-61992-61993-284.584.6- JP -22ONAGAWA-1BWRBWR-51593524498 TOHOKUTOSHIBA1980-71983-111984-666.968.8- JP -54ONAGAWA-2BWRBWR-52436825796 TOHOKUTOSHIBA1991-41994-121995-774.978.0- JP -57ONAGAWA-3BWRBWR-52436825796 TOHOKUTOSHIBA1998-12001-52002-168.270.0- JP -28SENDAI-1PWRM (3-loop)2660890846 KYUSHUMHI1979-121983-91984-781.881.8- JP -37SENDAI-2PWRM (3-loop)2660890846 KYUSHUMHI1981-101985-41985-1183.683.6- JP -48SHIKA-1BWRBWR 51593540505 HOKURIKUHITACHI1989-71993-11993-770.970.9- JP -59SHIKA-2BWRABWR392612061108 HOKURIKUHITACHI2001-82005-72006-329.829.8- JP -7SHIMANE-1BWRBWR-31380460439 CHUGOKUHITACHI1970-71973-121974-373.073.2- JP -41SHIMANE-2BWRBWR-52436820789 CHUGOKUHITACHI1985-21988-71989-282.082.0- The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination.

Grid Connection Commercial OperationCountryReactor TypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

36

(39)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics JP -8TAKAHAMA-1PWRM (3-loop)2440826780 KEPCOWH/MHI1970-41974-31974-1168.168.2- JP -13TAKAHAMA-2PWRM (3-loop)2440826780 KEPCOMHI1971-31975-11975-1167.567.6- JP -29TAKAHAMA-3PWRM (3-loop)2660870830 KEPCOMHI1980-121984-51985-181.982.0DS JP -30TAKAHAMA-4PWRM (3-loop)2660870830 KEPCOMHI1981-31984-111985-683.483.4DS JP -21TOKAI-2BWRBWR-5329311001060 JAPCOGE1973-101978-31978-1173.773.8- JP -43TOMARI-1PWRM (2-loop)1650579550 HEPCOMHI1985-41988-121989-684.184.1- JP -44TOMARI-2PWRM (2-loop)1650579550 HEPCOMHI1985-61990-81991-483.283.2- JP -3TSURUGA-1BWRBWR-21070357340 JAPCOGE1966-111969-111970-368.268.4- JP -34TSURUGA-2PWRM (4-loop)341111601110 JAPCOMHI1982-111986-61987-277.677.7- KOREA REP. KR -1KORI-1PWRWH △601729603576 KHNPWH1972-81977-61978-478.279.1- KR -2KORI-2PWRWH F1882675637 KHNPWH1977-121983-41983-786.086.1- KR -5KORI-3PWRWH F27851004979 KHNPWH1979-101985-11985-985.685.7- KR -6KORI-4PWRWH F27851006977 KHNPWH1980-41985-111986-487.487.5- KR -9ULCHIN-1PWRFrance CPI2785985945 KHNPFRAM1983-11988-41988-986.286.5- KR -10ULCHIN-2PWRFrance CPI2775984942 KHNPFRAM1983-71989-41989-986.887.0- KR -13ULCHIN-3PWROPR-100028251047994 KHNPDHICKOPC1993-71998-11998-890.690.8- KR -14ULCHIN-4PWROPR-100028251045998 KHNPDHICKOPC1993-111998-121999-1290.890.9- KR -19ULCHIN-5PWROPR-1000281510481001 KHNPDHICKOPC1999-102003-122004-792.292.2- KR -20ULCHIN-6PWROPR-1000282510481001 KHNPDHICKOPC2000-92005-12005-491.691.8- KR -3WOLSONG-1PHWRCANDU 62061622597 KHNPAECL1977-101982-121983-484.284.6- KR -4WOLSONG-2PHWRCANDU 62061730710 KHNPAECL/DHI1992-91997-41997-791.091.0- KR -15WOLSONG-3PHWRCANDU 62061729707 KHNPAECL/DHI1994-31998-31998-792.492.4- KR -16WOLSONG-4PHWRCANDU 62061730708 KHNPAECL/DHI1994-71999-51999-1093.793.7- KR -7YONGGWANG-1PWRWH F2787985953 KHNPWH1981-61986-31986-887.487.4- KR -8YONGGWANG-2PWRWH F2787978947 KHNPWH1981-121986-111987-685.485.5- KR -11YONGGWANG-3PWROPR-100028251039997 KHNPDHICKAEC1989-121994-101995-389.389.3- KR -12YONGGWANG-4PWROPR-100028251039994 KHNPDHICKAEC1990-51995-71996-189.489.4- KR -17YONGGWANG-5PWROPR-100028251046988 KHNPDHICKOPC1997-62001-122002-585.986.0- KR -18YONGGWANG-6PWROPR-100028251050996 KHNPDHICKOPC1997-112002-92002-1287.187.3- The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination.

Grid Connection Commercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

(40)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics LITHUANIA LT -47IGNALINA-2LWGRRBMK-1500480013001185 INPPMAEP1978-11987-81987-864.674.2- MEXICO MX -1LAGUNA VERDE-1BWRBWR-52027682650 CFEGE1976-101989-41990-781.281.9- MX -2LAGUNA VERDE-2BWRBWR-52027682650 CFEGE1977-61994-111995-484.685.3- NETHERLANDS NL -2BORSSELEPWR2 loops PWR1366515482 EPZS/KWU1969-71973-71973-1084.584.9- PAKISTAN PK -2CHASNUPP 1PWRCNP-300999325300 PAECCNNC1993-82000-62000-969.370.1- PK -1KANUPPPHWRCANDU-137 MW433137125 PAECCGE1966-81971-101972-1229.130.2DS ROMANIA RO -1CERNAVODA-1PHWRCANDU 62180706650 SNNAECL1982-71996-71996-1287.288.4DH RO -2CERNAVODA-2PHWRCANDU 62180706650 SNNAECL1983-72007-82007-1096.397.8DH RUSSIA RU -96BALAKOVO-1PWRVVER V-32030001000950 EAFAEA1980-121985-121986-566.869.5DH, PH RU -97BALAKOVO-2PWRVVER V-32030001000950 EAFAEA1981-81987-101988-165.368.9DH, PH RU -98BALAKOVO-3PWRVVER V-32030001000950 EAFAEA1982-111988-121989-470.575.1DH, PH RU -99BALAKOVO-4PWRVVER V-32032001000950 EAFAEA1984-41993-41993-1274.980.6DH, PH RU -21BELOYARSKY-3 (BN-600)FBRBN-6001470600560 EAFAEA1969-11980-41981-1173.874.5DH, PH RU -141BILIBINO-1LWGREGP-6621211 EAFAEA1970-11974-11974-468.980.2DH RU -142BILIBINO-2LWGREGP-6621211 EAFAEA1970-11974-121975-269.381.4DH RU -143BILIBINO-3LWGREGP-6621211 EAFAEA1970-11975-121976-268.781.0DH RU -144BILIBINO-4LWGREGP-6621211 EAFAEA1970-11976-121977-166.978.8DH RU -30KALININ-1PWRVVER V-33830001000950 EAFAEA1977-21984-51985-671.872.8DH, PH RU -31KALININ-2PWRVVER V-33830001000950 EAFAEA1982-21986-121987-371.874.9DH, PH RU -36KALININ-3PWRVVER V-33832001000950 EAFAEA1985-102004-122005-1183.083.3PH RU -12KOLA-1PWRVVER V-2301375440411 EAFAEA1970-51973-61973-1269.876.7DH, PH RU -13KOLA-2PWRVVER V-2301375440411 EAFAEA1970-51974-121975-270.676.7DH, PH RU -32KOLA-3PWRVVER V-2131375440411 EAFAEA1977-41981-31982-1274.182.8DH, PH RU -33KOLA-4PWRVVER V-2131375440411 EAFAEA1976-81984-101984-1273.282.0DH, PH RU -17KURSK-1LWGRRBMK-100032001000925 EAFAEA1972-61976-121977-1059.661.7DH, PH The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.

Grid Connection Commercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

38

(41)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics RU -22KURSK-2LWGRRBMK-100032001000925 EAFAEA1973-11979-11979-862.164.7DH, PH RU -38KURSK-3LWGRRBMK-100032001000925 EAFAEA1978-41983-101984-370.371.5DH, PH RU -39KURSK-4LWGRRBMK-100032001000925 EAFAEA1981-51985-121986-275.777.0DH, PH RU -15LENINGRAD-1LWGRRBMK-100032001000925 EAFAEA1970-31973-121974-1169.570.2DH, PH RU -16LENINGRAD-2LWGRRBMK-100032001000925 EAFAEA1970-61975-71976-269.770.6DH, PH RU -34LENINGRAD-3LWGRRBMK-100032001000925 EAFAEA1973-121979-121980-669.370.5DH, PH RU -35LENINGRAD-4LWGRRBMK-100032001000925 EAFAEA1975-21981-21981-872.573.8DH, PH RU -9NOVOVORONEZH-3PWRVVER V-1791375417385 EAFAEA1967-71971-121972-670.971.7DH, PH RU -11NOVOVORONEZH-4PWRVVER V-1791375417385 EAFAEA1967-71972-121973-377.578.9DH, PH RU -20NOVOVORONEZH-5PWRVVER V-18730001000950 EAFAEA1974-31980-51981-262.963.8DH, PH RU -23SMOLENSK-1LWGRRBMK-100032001000925 EAFAEA1975-101982-121983-972.074.5DH, PH RU -24SMOLENSK-2LWGRRBMK-100032001000925 EAFAEA1976-61985-51985-773.275.9DH, PH RU -67SMOLENSK-3LWGRRBMK-100032001000925 EAFAEA1984-51990-11990-1078.280.8DH, PH RU -59VOLGODONSK-1PWRVVER V-320I32001000950 EAFAEA1981-92001-32001-1285.285.9- SLOVAKIA SK -13BOHUNICE-3PWRVVER V-2131430462429 SE,plcSKODA1976-121984-81985-277.580.8DH, PH SK -14BOHUNICE-4PWRVVER V-2131375442410 SE,plcSKODA1976-121985-81985-1279.082.2DH, PH SK -6MOCHOVCE-1PWRVVER V-2131471470436 SE,plcSKODA1983-101998-71998-1082.084.8- SK -7MOCHOVCE-2PWRVVER V-2131471470436 SE,plcSKODA1983-101999-122000-482.984.8- SLOVENIA SI -1KRSKOPWRWestinghouse 21994730666 NEKWH1975-31981-101983-183.584.9- SOUTH AFRICA ZA -1KOEBERG-1PWRCP12785944900 ESKOMFRAM1976-71984-41984-771.376.1- ZA -2KOEBERG-2PWRCP12785944900 ESKOMFRAM1976-71985-71985-1169.776.9- SPAIN ES -6ALMARAZ-1PWRWE 3-loops2729977944 CNATWH1973-71981-51983-985.486.4- ES -7ALMARAZ-2PWRWE 3-loops2729980956 CNATWH1973-71983-101984-787.288.3- ES -8ASCO-1PWRWE 3-loops29311033995 ANAVWH1974-51983-81984-1285.485.9- ES -9ASCO-2PWRWE 3-loops29101027997 ANAVWH1975-31985-101986-387.388.1- ES -10COFRENTESBWRBWR-6323710921064 IDGE1975-91984-101985-386.186.9- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating, PH process heating.

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(42)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics ES -2SANTA MARIA DE GARONABWRBWR-31381466446 NUCLENORGE1966-51971-31971-577.678.3- ES -11TRILLO-1PWRPWR 3 loops301010661003 CNATKWU1979-81988-51988-886.686.8- ES -16VANDELLOS-2PWRWE 3-loops294110871045 ANAVWH1980-121987-121988-382.383.1- SWEDEN SE -9FORSMARK-1BWRBWR 7529281016978 FKAABBATOM1973-61980-61980-1283.685.7- SE -11FORSMARK-2BWRBWR 7529281028990 FKAABBATOM1975-11981-11981-784.286.1- SE -14FORSMARK-3BWRBWR 3000330012121170 FKAABBATOM1979-11985-31985-886.989.2- SE -2OSKARSHAMN-1BWRABB BWR1375487473 OKGABBATOM1966-81971-81972-263.063.3- SE -3OSKARSHAMN-2BWRABB BWR1800623590 OKGABBATOM1969-91974-101975-179.279.9- SE -12OSKARSHAMN-3BWRBWR 75330011971152 OKGABBATOM1980-51985-31985-886.887.5- SE -4RINGHALS-1BWR2540887856 RABABBATOM1969-21974-101976-172.573.4- SE -5RINGHALS-2PWR2660917867 RABWH1970-101974-81975-572.173.5- SE -7RINGHALS-3PWR31601037985 RABWH1972-91980-91981-977.479.0- SE -10RINGHALS-4PWR2775979935 RABWH1973-111982-61983-1185.387.2- SWITZERLAND CH -1BEZNAU-1PWRWH - 2 loops1130380365 NOKWH1965-91969-71969-984.284.5DH CH -3BEZNAU-2PWRWH - 2 loops1130380365 NOKWH1968-11971-101971-1287.287.3DH CH -4GOESGENPWRPWR 3 Loop29001020970 KKGKWU1973-121979-21979-1188.489.3PH CH -5LEIBSTADTBWRBWR 6360012201165 KKLGETSCO1974-11984-51984-1285.287.0- CH -2MUEHLEBERGBWRBWR 41097390355 BKWGETSCO1967-31971-71972-1186.487.6- UK GB -18ADUNGENESS-B1GCRAGR1500615520 BEAPC1965-101983-41985-444.246.0- GB -18BDUNGENESS-B2GCRAGR1500615520 BEAPC1965-101985-121989-450.550.8- GB -19AHARTLEPOOL-A1GCRAGR1500655595 BENPC1968-101983-81989-468.068.1- GB -19BHARTLEPOOL-A2GCRAGR1500655595 BENPC1968-101984-101989-471.571.7- GB -20AHEYSHAM-A1GCRAGR1500625585 BENPC1970-121983-71989-470.570.8- GB -20BHEYSHAM-A2GCRAGR1500625575 BENPC1970-121984-101989-468.769.3- GB -22AHEYSHAM-B1GCRAGR1550680615 BENPC1980-81988-71989-476.176.8- GB -22BHEYSHAM-B2GCRAGR1550680620 BENPC1980-81988-111989-476.177.2- GB -16AHINKLEY POINT-B1GCRAGR1494655410 BETNPG1967-91976-101978-1075.375.9- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating, PH process heating.

Grid ConnectionCommercial OperationCountryReactor TypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

40

(43)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics GB -16BHINKLEY POINT-B2GCRAGR1494655410 BETNPG1967-91976-21976-972.773.9- GB -17AHUNTERSTON-B1GCRAGR1496644410 BETNPG1967-111976-21976-270.170.5- GB -17BHUNTERSTON-B2GCRAGR1496644410 BETNPG1967-111977-31977-370.770.8- GB -11AOLDBURY-A1GCRMAGNOX730230217 MELTNPG1962-51967-111967-1279.880.2- GB -11BOLDBURY-A2GCRMAGNOX660230217 MELTNPG1962-51968-41968-978.178.1- GB -24SIZEWELL-BPWR342512501188 BEPPC1988-71995-21995-986.386.4- GB -23ATORNESS 1GCRAGR1623682615 BENNC1980-81988-51988-573.275.2- GB -23BTORNESS 2GCRAGR1623682615 BENNC1980-81989-21989-273.374.4- GB -13AWYLFA 1GCRMAGNOX1920540490 MELEE/B&W/T1963-91971-11971-1171.271.7- GB -13BWYLFA 2GCRMAGNOX1920540490 MELEE/B&W/T1963-91971-71972-169.269.4- UKRAINE UA -40KHMELNITSKI-1PWRVVER V-32030001000950 NNEGCPAIP1981-111987-121988-872.873.7DH UA -41KHMELNITSKI-2PWRVVER V-32030001000950 NNEGCPAIP1985-22004-82005-1278.379.4DH UA -27ROVNO-1PWRVVER V-2131375420381 NNEGCPAIP1973-81980-121981-979.880.5DH UA -28ROVNO-2PWRVVER V-2131375415376 NNEGCPAIP1973-101981-121982-780.081.1DH UA -29ROVNO-3PWRVVER V-32030001000950 NNEGCPAIP1980-21986-121987-570.872.6DH UA -69ROVNO-4PWRVVER V-32030001000950 NNEGCPAA1986-82004-102006-464.767.4DH UA -44SOUTH UKRAINE-1PWRVVER V-30230001000950 NNEGCPAA1977-31982-121983-1066.767.4DH UA -45SOUTH UKRAINE-2PWRVVER V-33830001000950 NNEGCPAA1979-101985-11985-463.164.3DH UA -48SOUTH UKRAINE-3PWRVVER V-32030001000950 NNEGCPAA1985-21989-91989-1270.371.5DH UA -54ZAPOROZHE-1PWRVVER V-32030001000950 NNEGCPAIP1980-41984-121985-1263.465.7DH UA -56ZAPOROZHE-2PWRVVER V-32030001000950 NNEGCPAIP1981-11985-71986-267.969.5DH UA -78ZAPOROZHE-3PWRVVER V-32030001000950 NNEGCPAIP1982-41986-121987-369.872.6DH UA -79ZAPOROZHE-4PWRVVER V-32030001000950 NNEGCPAIP1983-41987-121988-473.576.1DH UA -126ZAPOROZHE-5PWRVVER V-32030001000950 NNEGCPAIP1985-111989-81989-1073.975.5DH UA -127ZAPOROZHE-6PWRVVER V-32030001000950 NNEGCPAIP1986-61995-101996-979.181.2DH USA US -313ARKANSAS ONE-1PWRB&W (L-loop) D2568880843 ENTGARKSB&W1968-121974-81974-1278.879.1- US -368ARKANSAS ONE-2PWRCE (2-loop) DR30261040995 ENTERGYCE1968-121978-121980-383.083.2- US -334BEAVER VALLEY-1PWRW (3-loop)2689923892 FENOCWH1970-61976-61976-1072.372.3- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

Grid Connection Commercial OperationCountryReactor TypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

(44)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics US -412BEAVER VALLEY-2PWRW (3-loop)2689923890 FENOCWH1974-51987-81987-1186.086.0- US -456BRAIDWOOD-1PWRW (4-loop)358712401178 EXELONWH1975-121987-71988-787.587.5- US -457BRAIDWOOD-2PWRW (4-loop) DRY358712131152 EXELONWH1975-121988-51988-1090.590.6- US -259BROWNS FERRY-1BWRBWR-4345811521065 TVAGE1967-51973-101974-861.061.0- US -260BROWNS FERRY-2BWRBWR-4 (Mark 1)345811551104 TVAGE1967-51974-81975-378.978.9- US -296BROWNS FERRY-3BWRBWR-4 (Mark 1)345814001230 TVAGE1968-71976-91977-380.880.8- US -325BRUNSWICK-1BWRBWR-4 (Mark 1)2923990938 PROGENGCGE1970-21976-121977-373.573.8- US -324BRUNSWICK-2BWRBWR-4 (Mark 1)2923989937 PROGENGCGE1970-21975-41975-1172.472.8- US -454BYRON-1PWRW (4-loop) (DR358712251164 EXELONWH1975-121985-31985-987.387.3- US -455BYRON-2PWRW (4-Loop) (DR358711961136 EXELONWH1975-121987-21987-891.691.6- US -483CALLAWAY-1PWRW (4-loop) DRY356512361190 AMERGENEWH1976-41984-101984-1288.188.1- US -317CALVERT CLIFFS-1PWRCE (2-loop) (D2700918873 CCNPPCE1969-71975-11975-577.277.5- US -318CALVERT CLIFFS-2PWRCE (2-loop) (D2700911862 CCNPPCE1969-71976-121977-480.981.0- US -413CATAWBA-1PWRW (4-loop) (IC341111881129 DUKEWH1975-81985-11985-683.983.9- US -414CATAWBA-2PWRW (4-loop) (IC341111881129 DUKEWH1975-81986-51986-885.085.0- US -461CLINTON-1BWRBWR-6 (Mark 3)347310981043 AMERGENEGE1976-21987-41987-1174.574.6- US -397COLUMBIABWRBWR-5 (Mark 2)348612001131 ENERGYNWGE1972-21984-51984-1277.878.6- US -445COMANCHE PEAK-1PWRW (4-loop) DRY345811891150 TXUWH1974-121990-41990-888.588.5- US -446COMANCHE PEAK-2PWRW (4-loop) DRY345811891150 TXUWH1974-121993-41993-890.590.6- US -298COOPERBWRBWR-4 (Mark 1)2381801770 NPPDGE1968-61974-51974-775.375.3- US -302CRYSTAL RIVER-3PWRB&W (L-loop)2568890838 PROGRESSB&W1968-91977-11977-373.073.1- US -346DAVIS BESSE-1PWRB&W (R-loop)2772925894 FENOCB&W1971-31977-81978-768.168.2- US -275DIABLO CANYON-1PWRW (4-loop)333811361122 PGEWH1968-41984-111985-586.386.4- US -323DIABLO CANYON-2PWRW (4-loop)341111641118 PGEWH1970-121985-101986-388.388.4- US -315DONALD COOK-1PWRW (4-loop) ICE330410771009 IMPCOWH1969-31975-21975-869.569.6- US -316DONALD COOK-2PWRW (4-loop) ICE346811331060 IMPCOWH1969-31978-31978-768.368.5- US -237DRESDEN-2BWRBWR-3 (Mark 1)2527913867 EXELONGE1966-11970-41970-677.277.3- US -249DRESDEN-3BWRBWR-3 (Mark 1)2527913867 EXELONGE1966-101971-71971-1173.573.5- US -331DUANE ARNOLD-1BWRBWR-4 (Mark 1)1912614580 FPLDUANEGE1970-61974-51975-278.578.6- US -341ENRICO FERMI-2BWRBWR-4 (Mark 1)343011541122 DETEDGE1972-91986-91988-177.977.9- Grid Connection

Commercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

42

(45)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics US -348FARLEY-1PWRW (3-loop)2775895851 ALPWH1972-81977-81977-1283.083.2- US -364FARLEY-2PWRW (3-loop) DRY2775905860 ALPWH1972-81981-51981-787.287.3- US -333FITZPATRICKBWRBWR-4 (Mark 1)2536882852 ENTERGYGE1970-51975-21975-776.676.8- US -285FORT CALHOUN-1PWRCE (2-loop)1500512482 OPPDCE1968-61973-81973-980.280.2- US -416GRAND GULF-1BWRBWR-6 (Mark 3)383313331268 ENTERGYGE1974-91984-101985-786.586.6- US -261H.B. ROBINSON-2PWRW (3-loop) DRY2339745710 PROGRESSWH1967-41970-91971-378.478.6- US -321HATCH-1BWRBWR-4 (Mark 1)2804898876 SOUTHGE1969-91974-111975-1279.979.9- US -366HATCH-2BWRBWR-4 (Mark 1)2804921883 SOUTHGE1972-121978-91979-982.582.6- US -354HOPE CREEK-1BWRBWR-4 (Mark 1)333913761186 PSEGGE1976-31986-81986-1285.485.4- US -247INDIAN POINT-2PWRW (4-loop) DRY321610621020 ENTERGYWH1966-101973-61974-871.871.9- US -286INDIAN POINT-3PWRW (4-loop) DRY321610651025 ENTERGYWH1969-81976-41976-868.168.1- US -305KEWAUNEEPWRW (2-loop) DRY1772581556 DOMENGYWH1968-81974-41974-682.982.9- US -373LASALLE-1BWRBWR-5 (Mark 2)348911771118 EXELONGE1973-91982-91984-175.275.2- US -374LASALLE-2BWRBWR-5 (Mark 2)348911791120 EXELONGE1973-91984-41984-1074.374.3- US -352LIMERICK-1BWRBWR-4 (Mark 2)345811941134 EXELONGE1974-61985-41986-289.589.5- US -353LIMERICK-2BWRBWR-4 (Mark 2)345811941134 EXELONGE1974-61989-91990-192.992.9- US -369MCGUIRE-1PWRW (4-loop) ICE341111581100 DUKEWH1973-21981-91981-1279.980.3- US -370MCGUIRE-2PWRW (4-loop) (IC341111581100 DUKEWH1973-21983-51984-384.084.0- US -336MILLSTONE-2PWRCOMB CE DRYA2700910877 DOMINCE1970-121975-111975-1265.966.7- US -423MILLSTONE-3PWRW (4-loop) DRY341112531145 DOMINWH1974-81986-21986-474.874.8- US -263MONTICELLOBWRBWR-31775600572 NORTHERNGE1967-61971-31971-684.684.6- US -220NINE MILE POINT-1BWRBWR-2 (Mark 1)1850642621 NMPNSLLCGE1965-41969-111969-1274.074.0- US -410NINE MILE POINT-2BWRBWR-5 (Mark 2)346712051140 NMPNSLLCGE1974-61987-81988-382.782.7- US -338NORTH ANNA-1PWRW (3-loop)2893973903 VEPCOWH1971-21978-41978-681.981.9- US -339NORTH ANNA-2PWRW (3-loop)2893958903 VEPCOWH1971-21980-81980-1285.385.3- US -269OCONEE-1PWRB&W (L-loop)2568891846 DUKEB&W1967-111973-51973-779.579.8- US -270OCONEE-2PWRB&W (L-loop)2568891846 DUKEB&W1967-111973-121974-980.881.1- US -287OCONEE-3PWRB&W (L-loop)2568891846 DUKEB&W1967-111974-91974-1279.679.9- US -219OYSTER CREEKBWRBWR-2 (Mark 1)1930652619 AMERGENGE1964-121969-91969-1274.974.9- US -255PALISADESPWRCE (2-loop) DR2565842778 CONSENECCE1967-31971-121971-1268.669.6- Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(46)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics US -528PALO VERDE-1PWRCE (2-loop) DR399014141311 AZPSCOCE1976-51985-61986-176.777.0- US -529PALO VERDE-2PWRCOMB CE80 DR399014141314 AZPSCOCE1976-61986-51986-980.180.3- US -530PALO VERDE-3PWRCOMB CE80 DR399013461317 AZPSCOCE1976-61987-111988-182.883.1- US -277PEACH BOTTOM-2BWRBWR-4 (Mark 1)351411711112 EXELONGE1968-11974-21974-773.573.5- US -278PEACH BOTTOM-3BWRBWR-4 (Mark 1)351411711112 EXELONGE1968-11974-91974-1274.074.1- US -440PERRY-1BWRBWR-6 (Mark 3)375813031245 FENOCGE1977-51986-121987-1180.280.2- US -293PILGRIM-1BWRBWR-3 (Mark 1)2028711685 ENTERGYGE1968-81972-71972-1269.970.2- US -266POINT BEACH-1PWRW (2-loop) DRY1540543512 WEPWH1967-71970-111970-1282.783.1- US -301POINT BEACH-2PWRW (2-loop) DRY1540545514 WEPWH1968-71972-81972-1084.584.5- US -282PRAIRIE ISLAND-1PWRW (2-loop) DRY1650566551 NORTHERNWH1968-61973-121973-1286.186.1- US -306PRAIRIE ISLAND-2PWRW (2-loop) DRY1650640545 NUCMANWH1969-61974-121974-1287.987.9- US -254QUAD CITIES-1BWRBWR-3 (Mark 1)2957913867 EXELONGE1967-21972-41973-277.077.1- US -265QUAD CITIES-2BWRBWR-3 (Mark 1)2511913867 EXELONGE1967-21972-51973-375.376.0- US -244R.E. GINNAPWRW (2-loop)1775608498 CCNPPWH1966-41969-121970-784.484.4- US -458RIVER BEND-1BWRBWR-6 (Mark 3)30911036970 ENTGSGE1977-31985-121986-681.481.7- US -272SALEM-1PWRW (4-loop) DRY345912281174 PSEGPOWRWH1968-91976-121977-666.867.0- US -311SALEM-2PWRW (4-loop) DRY345911701156 PSEGPOWRWH1968-91981-61981-1069.369.3- US -361SAN ONOFRE-2PWRCE (2-loop) DR343811271070 SCECE1974-31982-91983-881.481.4- US -362SAN ONOFRE-3PWRCE (2-loop) DR343811271080 SCECE1974-31983-91984-481.481.4- US -443SEABROOK-1PWRW (4-loop) DRY358712961245 FPLWH1976-71990-51990-886.586.6- US -327SEQUOYAH-1PWRW (4-loop) ICE341112211148 TVAWH1970-51980-71981-771.271.2- US -328SEQUOYAH-2PWRW (4-loop) (IC341112211126 TVAWH1970-51981-121982-675.175.1- US -400SHEARON HARRIS-1PWRW (3-loop) DRY2900960900 PROGENGCWH1978-11987-11987-587.987.9- US -498SOUTH TEXAS-1PWRW (4-loop)385313541280 STPWH1975-121988-31988-880.780.7- US -499SOUTH TEXAS-2PWRW (4-loop) DRY385313541280 STPWH1975-121989-41989-681.881.8- US -335ST. LUCIE-1PWRCOMB CE DRYA2700883839 FPLCE1970-71976-51976-1281.882.1- US -389ST. LUCIE-2PWRCOMB CE DRYA2700883839 FPLCE1977-51983-61983-886.186.5- US -280SURRY-1PWRW (3-loop) DRY2546848799 VEPCOWH1968-61972-71972-1274.674.6- US -281SURRY-2PWRW (3-loop) DRY2546848799 VEPCOWH1968-61973-31973-575.675.6- US -387SUSQUEHANNA-1BWRBWR-4 (Mark 2)348911991149 PP&LGE1973-111982-111983-683.683.7- Grid Connection

Commercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start

44

(47)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2008 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20082008Applics US -388SUSQUEHANNA-2BWRBWR-4 (Mark 2)348912041140 PP&LGE1973-111984-71985-287.587.5- US -289THREE MILE ISLAND-1PWRB&W (L-loop)2568837786 AMERGENEB&W1968-51974-61974-972.186.6- US -250TURKEY POINT-3PWRW (3-loop) DRY2300729693 FPLWH1967-41972-111972-1277.677.7- US -251TURKEY POINT-4PWRW (3-loop) DRY2300729693 FPLWH1967-41973-61973-976.977.0- US -271VERMONT YANKEEBWRBWR-4 (Mark 1)1912650620 ENTERGYGE1967-121972-91972-1184.284.2- US -395VIRGIL C. SUMMER-1PWRW (3-loop) DRY29001003966 SCEGWH1973-31982-111984-184.584.5- US -424VOGTLE-1PWRW (4-loop) DRY356512031109 SOUTHWH1976-81987-31987-689.889.9- US -425VOGTLE-2PWRW (4-loop) DRY356512021127 SOUTHWH1976-81989-41989-589.889.8- US -382WATERFORD-3PWRCE (2-loop)371612001157 ENTERGYCE1974-111985-31985-986.787.0- US -390WATTS BAR-1PWRW (4-loop) (IC345912021123 TVAWH1973-11996-21996-589.689.6- US -482WOLF CREEKPWRW (4-loop)356512131166 KGECOWH1977-51985-61985-986.386.4- Status as of 31 December 2008, 438 reactors (371562 MW(e)) were connected to the grid, including 6 units (4949 MW(e)) in Taiwan, China. TWN, CHINA TW -1CHIN SHAN-1BWRBWR-41775636604 TPCGE1972-61977-111978-1281.882.9- TW -2CHIN SHAN-2BWR1775636604 TPCGE1973-121978-121979-781.582.6- TW -3KUOSHENG-1BWRBWR-629431019985 TPCGE1975-111981-51981-1282.483.1- TW -4KUOSHENG-2BWRBWR-62943985948 TPCGE1976-31982-61983-381.782.8- TW -5MAANSHAN-1PWR2785951900 TPCWH1978-81984-51984-783.685.1- TW -6MAANSHAN-2PWR2785951908 TPCWH1979-21985-21985-584.085.8- Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(48)

46

TABLE 15. LONG-TERM SHUTDOWN REACTORS, 31 DEC. 2008

CodeNameThermalGrossNet CANADA CA -8BRUCE-1 PHWRCANDU 7912832824848 BRUCEPOWOH/AECL1971-61977-11977-91997-10 CA -9BRUCE-2PHWRCANDU 7912832824848 BRUCEPOWOH/AECL1970-121976-91977-91995-10 CA -5PICKERING-2PHWRCANDU 500A1744542515 OPGOH/AECL1966-91971-101971-121997-12 CA -6PICKERING-3PHWRCANDU 500A1744542515 OPGOH/AECL1967-121972-51972-61997-12 JAPAN JP -31MONJUFBRNot specified714280246 JAEAT/H/F/M1986-51995-8—1995-12 Status as of 31 December 2008, 5 reactors (2972 MW(e)) were in long-term shutdown.

Capacity [MW] OperatorLong-term Shutdown Date NSSS SupplierConstruction StartGrid ConnectionCommercial OperationCountryReactor TypeModel

Références

Documents relatifs

To address these objectives, the conference was structured into seven sessions covering spent fuel management strategies, status and challenges of an integrated approach,

1.20. The management of fresh nuclear fuel or spent nuclear fuel, the management of other process material used during operation, and the management of radioactive waste generated

Operator codeOperationalConstructionLT shut downShut downPlanned GE GENERAL ELECTRIC1 GFNPC GUANGXI FANGCHENGGANG NUCLEAR POWER COMPANY, LTD.2 2 GPU GENERAL

OPERATORS - Abbreviations and Summary — continued Operator CodeOperationalConstructionLT Shut DownShut DownPlanned LIPA LONG ISLAND POWER AUTHORITY1 LNPC LIAONIN NUCLEAR

OPERATORS - Abbreviations and Summary — continued Operator CodeOperationalConstructionLT Shut DownShut DownPlanned LIPA LONG ISLAND POWER AUTHORITY1 MAEC-KAZ MANGISHLAK

OPERATORS - Abbreviations and Summary — continued Operator CodeOperationalConstructionLT Shut DownShut DownPlanned PSEG PUBLIC SERVICE ELECTRIC & GAS CO.1 PSEGPOWR PSEG

The report on the attached CD-ROM, The World Nuclear University: New Partnership in Nuclear Education, gives an overview of the history of the development of the World

– General information as of the end of 2006 on power reactors operating or under construction, and shut down;.. – Performance data on reactors operating in the Agency’s Member