I N T E R N AT I O N A L AT O M I C E N E R G Y A G E N C Y V I E N N A

I S B N 9 7 8 - 9 2 - 0 - 1 0 5 6 1 0 - 8 I S S N 1 0 1 1 - 2 6 4 2

Nuclear Power Reactors

in the World

R E f E R E N C E d ATA S E R I E S No. 2 2010 Edition

@

10-20781_IAEA-RDS-2-30_cover.indd 1 2010-05-26 08:59:05

(2)

REFERENCE DATA SERIES No. 2

NUCLEAR POWER REACTORS IN THE WORLD

2010 Edition

INTERNATIONAL ATOMIC ENERGY AGENCY

VIENNA, 2010

(3)

NUCLEAR POWER REACTORS IN THE WORLD IAEA, VIENNA, 2010

IAEA-RDS-2/30 ISBN 978–92–0–105610–8

ISSN 1011–2642

Printed by the IAEA in Austria

July 2010

(4)

CONTENTS

Introduction . . . 5 Definitions . . . 7 Table 1. Reactors in operation, long-term shutdown

and under construction, 31 Dec. 2009 . . . 10 Table 2. Type and net electrical power of reactors

connected to the grid, 31 Dec. 2009 . . . 12 Table 3. Type and net electrical power of reactors

under construction, 31 Dec. 2009 . . . 13 Table 4. Reactor years of experience,

up to 31 Dec. 2009 . . . 14 Table 5. Operating reactors and net electrical

power, 1980 to 2009 . . . 16 Table 6. Nuclear electricity production and share

from 1980 to 2009 . . . 18 Table 7. Annual construction starts and

connections to the grid, 1954 to 2009 . . . . 21 Table 8. Number of new reactors connected to the

grid and median construction time span . . 22 Table 9. Construction starts during 2009 . . . 24 Table 10. Connections to the grid during 2009 . . . 25 Table 11. Scheduled connections to the grid

during 2009 . . . 25 Table 12. Reactors planned for construction as

known on 31 Dec. 2009 . . . 26 Table 13. Reactors under construction,

31 Dec. 2009 . . . 29 Table 14. Reactors in operation, 31 Dec. 2009 . . . 32 Table 15. Long-term shutdown reactors, . . .

31 Dec. 2009 . . . 48 Table 16. Reactors permanently shutdown,

31 Dec. 2009 . . . 49 Table 17. Reactors in decommissioning process or

decommissioned, 31 Dec. 2009 . . . 54 Table 18. Performance factors by reactor category,

2007 to 2009 . . . 59

(5)

Table 19. Full outage statistics during 2009 . . . 60 Table 20. Direct causes of full outages

during 2009 . . . 61 Table 21. Direct causes of full outages,

1971 to 2009 . . . 62 Table 22. Countries - abbreviations and summary . . 63 Table 23. Reactor types - abbreviations and

summary . . . 65 Table 24. Operators - abbreviations and summary . 66 Table 25. NSSS suppliers - abbreviations and

summary . . . 72 Figure 1. Nuclear reactors by type and net electrical

power (as of 31 Dec. 2009) . . . 75 Figure 2. Reactors under construction by type and

net electrical power (as of 31 Dec. 2009) . 76 Figure 3. Nuclear share of electricity generation

(as of 31 Dec. 2009) . . . 77 Figure 4. Worldwide median construction time span

(as of 31 Dec. 2009) . . . 78 Figure 5. Number of reactors in operation by age

(as of 31 Dec. 2009) . . . 79 Figure 6. Annual construction starts and connections

to the Grid (1954-2009) . . . 80

(6)

INTRODUCTION

This is the thirtieth edition of Reference Data Series No. 2, Nuclear Power Reactors in the World, which is published once per year, to present the most recent reactor data available to the Agency. It contains the following summarized information:

— General and technical information as of the end of 2009 on power reactors operating or under construction, and shut down;

— Performance data on reactors operating in the Agency's Member States, as reported to the IAEA.

The Agency's Power Reactor Information System (PRIS) is a comprehensive data source on nuclear power reactors in the World. It includes specification and performance history data of operating reactors as well as reactors under construction or reactors being decommissioned. PRIS data are collected by the Agency through the designated national correspondents of Member States.

PRIS outputs are available in the annual publications and on the PRIS web site (http://www.iaea.org/pris). Detail outputs are accessible to registered users through on-line applications. Enquiries should be addressed to:

Director

Division of Nuclear Power

International Atomic Energy Agency Vienna International Centre

PO Box 100

1400 Vienna, Austria

Email: PrisAdmin@iaea.org

(7)
(8)

DEFINITIONS

Performance factors

(REG – PEL – UEL – XEL) EAF (%) =  100

REG

(REG – PEL – UEL) UCF (%) =  100

REG

UEL

UCL (%) =  100

REG

PEL

PCL (%) =  100

REG

EG

LF (%) =  100

REG

On-line Hours

OF (%) =  100 Total Hours

where

EAF is the Energy Availability Factor, expressed in per cent.

UCF is the Unit Capability Factor, expressed in per cent.

UCL is the Unplanned Capability Loss Factor, ex- pressed in per cent.

PCL is the Planned Capability Loss Factor, expressed in per cent.

LF is the Load Factor, expressed in per cent.

OF is the Operating Factor, expressed in per cent.

REG reference energy generation: is the net electri-

cal energy [MW·h], which would have been

supplied when a unit is continuously operated

at the reference unit power during the entire ref-

erence period.

(9)

8

PEL planed energy loss: is the energy [MW·h] that was not supplied during the period because of planned shutdowns or load reductions due to causes under plant management control.

Energy losses are considered planned if they are scheduled at least four weeks in advance.

UEL unplanned energy loss: the energy [MW·h] that was not supplied during the period because of unplanned shutdowns, outage extensions, or load reductions due to causes under plant man- agement control. Energy losses are considered to be unplanned if they are not scheduled at least four weeks in advance.

XEL external energy loss: the energy [MW·h], that was not supplied due to constraints reducing plant availability and being beyond plant man- agement control.

EG the net electrical energy supplied during the ref- erence period as measured at the unit outlet terminals, i.e. after deducting the electrical energy taken by unit auxiliaries and the losses in transformers that are considered integral parts of the unit.

Construction Start

Date when first major placing of concrete, usually for the base mat of the reactor building, is done.

First Criticality

Date when the reactor is made critical for the first time.

Grid Connection

Date when the plant is first connected to the electrical grid for the supply of power. After this date, the plant is consid- ered to be in operation.

Commercial Operation

Date when the plant is handed over by the contractors to the owner and declared officially in commercial operation.

Permanent Shutdown

Date when the plant is officially declared to be shut down

by the owner and taken out of operation permanently.

(10)

Long-term Shutdown

A unit is considered in the long-term shutdown status, if it has been shut down for an extended period (usually sev- eral years) without any firm recovery schedule at the beginning but there is the intention to re-start the unit eventually.

Units and Energy Conversion

1 terawatt-hour [TW·h] = 10 6 megawatt-hours [MW·h].

For an average power plant,

1 TW·h = 0.39 megatonnes of coal equivalent (input)

= 0.23 megatonnes of oil equivalent (input).

(11)

10

TABLE 1. REACTORS IN OPERATION, LONG-TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2009 No of Total No of Total No of Total % of Units MW (e ) Units MW (e ) Units MW (e ) Total

ARGENTINA 2 935 1 692 7.596.95 ARMENIA 1 375 2.2944.95 BELGIUM 7 5902 44.9651.65 BRAZIL 2 1884 12.222.93 BULGARIA CANADA 2 18 1906 12569 2 2726 1906 14.22 85.1335.90 14.834 CHINA 11 8438 20 19920 65.711.89 CZECH REP. 6 3678 25.6633.77 FINLAND 4 2696 1 1600 22.6032.87 FRANCE 59 63260 1 1600 391.7575.17 GERMANY 17 20480 127.7226.12 HUNGARY 4 1889 14.3042.98 INDIA 18 3987 5 2708 14.752.16 IRAN,ISL.REP. 1 915 NA NA JAPAN 54 46823 1 246 1 1325 263.0728.89 KOREA REP. 20 17705 6 6520 141.1234.79 MEXICO 2 1300 10.114.80 NETHERLANDS 1 487 4.023.70 PAKISTAN 2 425 1 300 2.642.74 ROMANIA 2 1300 10.8220.62 RUSSIA 31 21743 9 6996 152.7817.82 SLOVAKIA 4 1762 2 782 13.0853.50 SLOVENIA 1 666 5.4637.83 SOUTH AFRICA 2 1800 11.574.84 SPAIN 8 7450 50.5817.49 SWEDEN 10 9036 50.0437.43 SWITZERLAND 5 3238 26.2739.50 UK 19 10137 62.8617.92

Reactors under Construction Nuclear Electricity Supplied in 2009 Country Reactors in Operation Long-term Shutdown Reactors TW(e).h

(12)

TABLE 1. REACTORS IN OPERATION, LONG-TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2009 — continued No o f Total No o f Total No o f Total % o f Units MW (e ) Units MW (e ) Units MW (e ) Total

UKRAINE 15 13107 2 1900 77.9548.59 USA 104 100747 1 1165 796.8920.17 Total 437 370705 5 2972 55 50929 2558.08NA Note: The total includes the following data from Lithuania and Taiwan, China: Lithuania — 1 unit, 1185 MW in operation; — 10.03 TW.h of nuclear electricity generation, representing 76.23% of the total electricity generated there; Taiwan, China — 6 units, 4980 MW in operation; 2 units, 2600 MW under construction; — 39.89 TW.h of nuclear electricity generation, representing 20.65% of the total electricity generated there;

Nuclear Electricit y S upplied in 2009 TW(e).h Country Reactors in Operation Long-term Shutdown Reactors Reactors under Construction

(13)

12

TABLE 2. TYPE AND NET ELECTRICAL POWER OF REACTORS CONNECTED TO THE GRID, 31 DEC. 2009 No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e )

ARGENTINA 2 935 2 935 ARMENIA 1 375 1 375 BELGIUM 7 5902 7 5902 BRAZIL 2 1884 2 1884 BULGARIA 2 1906 2 1906 CANADA 18 12569 18 12569 CHINA9 7138 2 1300 11 8438 CZECH REP. 6 3678 6 3678 FINLAND 2 976 2 1720 4 2696 FRANCE 58 63130 1 130 59 63260 GERMANY 11 14023 6 6457 17 20480 HUNGARY 4 1889 4 1889 INDIA 2 300 16 3687 18 3987 JAPAN 24 19286 30 27537 54 46823 KOREA REP. 16 14983 4 2722 20 17705 MEXICO 2 1300 2 1300 NETHERLANDS 1 487 1 487 PAKISTAN 1 300 1 125 2 425 ROMANIA 2 1300 2 1300 RUSSIA 15 10964 15 10219 1 560 31 21743 SLOVAKIA 4 1762 4 1762 SLOVENIA 1 666 1 666 SOUTH AFRICA 2 1800 2 1800 SPAIN 6 5940 2 1510 8 7450 SWEDEN 3 2793 7 6243 10 9036 SWITZERLAND 3 1700 2 1538 5 3238 UK 1 1188 18 8949 19 10137 UKRAINE 15 13107 15 13107 USA 69 66945 35 33802 104 100747 TOTAL 265 244661 92 83548 18 8949 45 22638 15 10219 2 690 437 370705 The totals include 6 units, 4980 MW in Taiwan, China. During 2009, 2 reactors, 1068 MW were newly connected to the grid.

Country FBR Total PWR BWR PHWR LWGR GCR

(14)

TABLE 3. TYPE AND NET ELECTRICAL POWER OF REACTORS UNDER CONSTRUCTION, 31 DEC. 2009 No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e )

ARGENTINA 1 692 1 692 BULGARIA 2 1906 2 1906 CHINA 20 19920 20 19920 FINLAND 1 1600 1 1600 FRANCE 1 1600 1 1600 INDIA 2 1834 2 404 1 470 5 2708 IRAN,ISL.REP. 1 915 1 915 JAPAN 1 1325 1 1325 KOREA REP. 6 6520 6 6520 PAKISTAN 1 300 1 300 RUSSIA 7 5277 1 915 1 804 9 6996 SLOVAKIA 2 782 2 782 UKRAINE 2 1900 2 1900 USA 1 1165 1 1165 TOTAL46 43719 (*) 33925 3 1096 1 915 2 1274 55 50929 (*) The totals include 2 unit s ( 2xBWR), 2600 MW in Taiwan, China. During 2009, 11 reactors, 12154 MW started construction.

Total FBR Country PHWR LWGR PWR BWR

(15)

14

TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2009

CapacityCapacityCapacityCapacity NoMW(e) NetNoMW(e) NetNoMW(e) NetNoMW(e) NetYearsMonths ARGENTINA 2 935 2 935 62 7 ARMENIA 1 375 1 376 2 751 35 8 BELGIUM 7 5902 1 10 8 5912 233 7 BRAZIL 2 1884 2 1884 37 3 BULGARIA 2 1906 4 1632 6 3538 147 3 CANADA 18 12569 4 2726 3 478 25 15773 582 2 CHINA 11 8438 11 8438 99 3 CZECH REP. 6 3678 6 3678 110 10 FINLAND 4 2696 4 2696 123 4 FRANCE 59 63260 11 3659 70 66919 1700 2 GERMANY 17 20480 19 5879 36 26359 751 5 HUNGARY 4 1889 4 1889 98 2 INDIA 18 3987 18 3987 318 5 ITALY 4 1423 4 1423 81 JAPAN 54 46823 1 246 5 1618 60 48687 1440 8 KAZAKHSTAN 1 52 1 52 25 10 KOREA REP. 20 17705 20 17705 339 7 LITHUANIA 2 2370 2 2370 43 6 MEXICO 2 1300 2 1300 35 11 NETHERLANDS 1 487 1 55 2 542 65 PAKISTAN 2 425 2 425 47 10 ROMANIA 2 1300 2 1300 15 11 RUSSIA 31 21743 5 786 36 22529 994 7 SLOVAKIA 4 1762 3 909 7 2671 132 7 SLOVENIA 1 666 1 666 28 3 SOUTH AFRICA 2 1800 2 1800 50 3 SPAIN 8 7450 2 621 10 8071 269 6 SWEDEN 10 9036 3 1210 13 10261 372 6

CountryExperience

Reactors Connected to the GridLong-term Shutdown ReactorsPermanently Shutdown ReactorsTotal, Operating and Shutdown Reactors

(16)

TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2009 — continued

CapacityCapacityCapacityCapacity NoMW(e) NetNoMW(e) NetNoMW(e) NetNoMW(e) NetYearsMonths SWITZERLAND 5 3238 5 3238 173 10 UK 19 10137 26 3301 45 13438 1457 8 UKRAINE 15 13107 4 3515 19 16622 368 6 USA 104 100747 28 9764 132 110511 3499 11 Total 437 370705 5 2972 123 37658 565 411350 13913 Notes: 1. The total includes the following data from Taiwan, China: — reactors connected to the grid: 6 units, 4980 MW, 170 years 1 month. 2. Operating Experience is counted from the grid connection excluding a long-term shutdown period.

Experience

Total, Operating to the GridReactorsReactorsand Shutdown Reactors Country

Reactors ConnectedLong-term ShutdownPermanently Shutdown

(17)

16

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, 1980 TO 2009 No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e )

ARGENTINA 1 335 2 935 2 935 2 935 2 978 2 935 2 935 2 935 ARMENIA 2 816 2 816 1 376 1 376 1 376 1 376 1 375 BELGIUM 4 1670 8 5464 7 5501 7 5631 7 5712 7 5801 7 5824 7 5902 BRAZIL 1 626 1 626 1 626 2 1976 2 1901 2 1766 2 1884 BULGARIA 3 1224 4 1632 5 2585 6 3538 6 3760 4 2722 2 1906 2 1906 CANADA 10 5172 16 9741 20 13993 21 14902 14 9998 18 12584 18 12577 18 12569 CHINA 3 2188 3 2188 9 6587 11 8438 11 8438 CZECH REP. 1 391 4 1632 4 1782 5 2611 6 3373 6 3634 6 3678 FINLAND 4 2208 4 2300 4 2310 4 2310 4 2656 4 2676 4 2696 4 2696 FRANCE 22 14388 43 37478 56 55808 56 58573 59 63080 59 63260 59 63260 59 63260 GERMANY 19 10323 24 18110 21 21250 19 20972 19 21283 17 20339 17 20470 17 20480 HUNGARY 2 825 4 1710 4 1729 4 1729 4 1755 4 1859 4 1889 INDIA 4 832 6 1143 7 1324 10 1746 14 2508 15 2993 17 3782 18 3987 ITALY 4 1112 3 1273 JAPAN 23 14918 33 23612 41 30867 50 39625 52 43245 55 47593 55 47278 54 46823 KAZAKHSTAN 1 135 1 135 1 135 1 50 KOREA REP. 1 564 5 3580 9 7220 11 9115 16 12990 20 16810 20 17647 20 17705 LITHUANIA 1 1380 2 2760 2 2370 2 2370 1 1185 1 1185 MEXICO 1 640 2 1256 2 1290 2 1360 2 1300 2 1300 NETHERLANDS 2 498 2 508 2 539 2 510 1 449 1 450 1 482 1 487 PAKISTAN 1 125 1 137 1 125 1 125 2 425 2 425 2 425 2 425 ROMANIA 1 655 1 655 2 1300 2 1300 RUSSIA 20 8596 28 15841 29 18898 30 19848 30 19848 31 21743 31 21743 31 21743 SLOVAKIA 2 780 4 1632 4 1632 4 1632 6 2440 6 2442 4 1711 4 1762 SLOVENIA 1 632 1 620 1 620 1 676 1 656 1 666 1 666 SOUTH AFRICA 2 1840 2 1840 2 1840 2 1840 2 1800 2 1800 2 1800 SPAIN 3 1073 8 5608 9 7099 9 7097 9 7468 9 7591 8 7450 8 7450 SWEDEN 8 5510 12 9455 12 9819 12 10043 11 9412 10 8905 10 8996 10 9036 SWITZERLAND 4 1940 5 2881 5 2942 5 3056 5 3170 5 3220 5 3220 5 3238

2008 2005 1980 Country Number of Units and Net Capacity (MW(e)) Connected to the Grid at 31st Dec. of Each Year 2000 1995 1990 1985 2009

(18)

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, 1980 TO 2009 — continued No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e ) No. MW (e )

UK 33 6423 38 10077 37 11360 35 12910 33 12490 23 11852 19 10097 19 10137 UKRAINE 3 2286 10 8324 15 13020 15 13045 13 11195 15 13107 15 13107 15 13107 USA 69 50881 90 74401 108 96228 108 98068 103 96297 103 98145 104 100683 104 100747 WORLD 245 133017 363 245667 416 318246 434 341402 435 349999 441 368125 438 371562 437 370705 Note: The world total includes the following data in Taiwan, China: - 1980: 2 units, 1208 MW, 1985: 6 units, 4890 MW, 1990: 6 units, 4828 MW, 1995: 6 units, 4884 MW, 2000: 6 units, 4884 MW, 2005: 6 units, 4884 MW, 2008: 6 units, 4949 MW, 2009: 6 units, 4980 MW.

Country Number of Units and Net Capacity (MW(e)) Connected to the Grid at 31st Dec. of Each Year 1980 1985 1990 1995 2000 2005 2008 2009

(19)

18

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE FROM 1980 TO 2009 TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total

ARGENTINA2.18 NA 5.25 11.7 6.72 19.8 6.57 11.8 5.74 7.3 6.37 6.9 6.85 6.2 7.59 7.0 ARMENIA1.84 33.0 2.50 42.7 2.27 39.4 2.29 45.0 BELGIUM11.86 NA 29.25 59.8 40.59 60.1 39.30 55.5 45.81 56.8 45.34 55.6 43.36 53.3 44.96 51.7 BRAZIL3.17 1.7 2.06 1.0 2.33 1.0 5.59 1.9 9.20 2.5 13.21 3.1 12.22 2.9 BULGARIA5.71 NA 12.17 31.6 13.51 35.7 16.22 46.4 16.79 45.0 17.38 44.1 14.74 32.9 14.22 35.9 CANADA38.02 NA 59.47 12.7 69.87 14.8 93.98 17.3 69.12 11.8 86.83 14.5 88.30 14.8 85.13 14.8 CHINA12.13 1.2 16.02 1.2 50.33 2.0 65.32 2.2 65.71 1.9 CZECH REP.1.99 NA 11.77 NA 12.23 20.0 12.71 18.7 23.25 30.5 25.02 32.5 25.66 33.8 FINLAND6.68 NA 17.98 38.2 18.13 35.1 18.13 29.9 21.58 32.2 22.36 32.9 22.05 29.7 22.60 32.9 FRANCE57.31 NA 213.26 64.8 297.61 74.5 358.71 76.1 395.39 76.4 431.18 78.5 419.80 76.2 391.75 75.2 GERMANY41.44 NA 119.59 31.2 139.37 33.1 146.13 29.6 160.66 30.6 154.61 31.1 140.89 28.8 127.72 26.1 HUNGARY6.10 23.6 12.89 51.4 13.20 42.3 13.35 40.6 13.02 37.2 13.87 37.2 14.30 43.0 INDIA2.77 NA 3.87 2.2 5.29 2.2 6.99 1.9 14.23 3.1 15.73 2.8 13.18 2.0 14.75 2.2 ITALY2.11 NA 6.46 3.8 JAPAN79.11 NA 145.37 22.7 187.19 27.1 274.71 33.4 305.67 33.8 280.50 29.3 241.25 24.9 263.07 28.9 KAZAKHSTAN0.08 0.1 KOREA REP.3.26 NA 12.14 23.2 50.26 49.1 60.21 36.1 103.54 40.7 137.59 44.7 144.25 35.6 141.12 34.8 LITHUANIA8.75 NA 15.70 NA 10.64 86.1 7.42 73.9 9.54 70.3 9.14 72.9 10.03 76.2 MEXICO2.78 2.6 7.53 6.0 7.92 3.9 10.32 5.0 9.36 4.0 10.11 4.8 NETHERLANDS3.97 NA 3.69 6.1 3.29 4.9 3.78 4.9 3.70 4.3 3.77 3.9 3.93 3.8 4.02 3.7 PAKISTAN0.07 0.5 0.26 1.0 0.38 1.1 0.46 0.9 0.90 1.7 2.41 2.8 1.74 1.9 2.64 2.7 ROMANIA5.05 10.9 5.11 8.6 10.33 17.5 10.82 20.6 RUSSIA43.78 NA 88.26 NA 109.62 NA 91.59 11.8 120.10 15.0 137.64 15.8 152.06 16.9 152.78 17.8 SLOVAKIA4.52 NA 8.70 NA 11.16 NA 11.35 44.1 15.17 53.4 16.34 56.1 15.45 56.4 13.08 53.5 SLOVENIA3.85 NA 4.39 NA 4.57 39.5 4.55 37.4 5.61 42.4 5.97 41.7 5.46 37.8 SOUTH AFRICA5.39 4.2 8.47 5.6 11.29 6.5 13.00 6.6 12.24 5.5 12.75 5.3 11.57 4.8 SPAIN4.98 NA 26.83 24.0 51.98 35.9 53.49 34.1 59.49 27.6 54.99 19.6 56.45 18.3 50.58 17.5 SWEDEN25.42 NA 55.89 42.3 65.27 45.9 67.19 46.6 51.88 39.0 69.65 44.9 61.34 42.0 50.04 37.4 SWITZERLAND13.63 NA 21.28 39.8 22.40 42.6 23.58 39.9 25.05 38.2 22.11 38.0 26.27 39.2 26.27 39.5

2008 2005 1980 Country Nuclear production (TW(e).h) of reactors connected to the Grid at 31st Dec. of the year 2000 1995 1990 1985 2009

(20)

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE FROM 1980 TO 2009 — continued TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total TW (e ).h % of Total

UK32.32 NA 53.73 19.6 58.77 19.7 70.64 25.4 72.99 21.9 75.34 20.0 48.21 13.0 62.86 17.9 UKRAINE6.38 NA 35.81 NA 71.26 NA 65.78 37.8 72.56 47.3 83.40 48.5 84.47 47.4 77.95 48.6 USA249.84 NA 378.68 15.5 578.08 20.6 673.52 22.5 755.55 19.8 783.35 19.3 806.68 19.6 796.89 20.2 WORLD635.36 1327.19 1890.35 2190.13 2440.37 2626.41 2597.81 2558.08 Note: The world total includes the following data from Taiwan, China: 1990: 31.54 TW.h of nuclear electricity generation, representing 38.32% of the total electricity generated there 1995: 33.8 TW.h of nuclear electricity generation, representing 28.79% of the total electricity generated there 2000: 37 TW.h of nuclear electricity generation, representing 21.19% of the total electricity generated there 2005: 38.4 TW.h of nuclear electricity generation, representing 17.93% of the total electricity generated there 2008: 39.3 TW.h of nuclear electricity generation, representing 17.45% of the total electricity generated there 2009: 39.89 TW.h of nuclear electricity generation, representing 20.65% of the total electricity generated there

Country Nuclear production (TW(e).h) of reactors connected to the Grid at 31st Dec. of the year 1980 1985 1990 1995 2000 2005 2008 2009

(21)
(22)

TABLE 7. ANNUAL CONSTRUCTION STARTS AND CONNECTIONS TO THE GRID, 1954 TO 2009

Number of Units

Design Capacity MW(e)

Number of Units

Design Capacity MW(e)

Number of Units

Updated Capacity MW(e)

1954 1 60 1 5 1 5

1955 8 260 1 5

1956 5 577 1 35 2 65

1957 13 1836 3 119 5 209

1958 6 476 1 35 6 269

1959 7 976 5 176 11 548

1960 11 1010 4 438 15 1010

1961 7 1531 1 15 16 1026

1962 7 1373 9 955 25 2105

1963 5 1722 9 500 33 2537

1964 9 2866 8 1022 40 3538

1965 9 3291 8 1879 48 5742

1966 15 7052 8 1530 55 7335

1967 25 16287 11 2165 64 9369

1968 32 22606 6 1014 68 10388

1969 16 11839 10 3670 78 14058

1970 36 24653 6 3410 84 17579

1971 17 11206 16 7711 99 24314

1972 31 23993 16 8880 113 32975

1973 31 25852 20 12727 132 43672

1974 36 32809 26 17149 154 60994

1975 37 35518 15 10236 169 70414

1976 44 42749 19 14269 186 84024

1977 25 23865 18 13243 200 96388

1978 23 21735 20 15782 219 111925

1979 28 23909 8 6909 225 117814

1980 20 19134 21 15088 245 133017

1981 16 15149 23 20389 267 153832

1982 19 19765 19 15288 284 168377

1983 16 12218 23 19253 306 187656

1984 10 9528 33 30953 336 218452

1985 20 16286 33 31042 363 245667

1986 8 6471 27 27212 389 272012

1987 13 11019 22 22191 407 295812

1988 7 7722 14 13621 416 305212

1989 6 4018 12 10457 420 311942

1990 5 3366 10 10543 416 318246

1991 2 2246 4 3668 415 321924

1992 3 3105 6 4809 418 325261

1993 4 3715 9 9012 427 333914

1994 2 1330 5 4176 429 336934

1995 5 3635 434 341402

1996 1 610 6 7080 438 347296

1997 5 4386 3 3568 434 347895

1998 3 2096 4 3152 430 344915

1999 4 4583 4 2704 432 347368

2000 6 5379 6 3063 435 349999

2001 1 1304 3 2696 438 352730

2002 6 3440 6 4998 439 357255

2003 1 202 2 1700 437 359806

2004 2 1336 5 4785 438 364693

2005 3 2900 4 3923 441 368125

2006 4 3374 2 1435 435 369671

2007 8 6519 3 1785 439 371758

2008 10 10499 438 371562

2009 11 12154 2 1068 437 370705

Year

Construction Starts

Reactors in operation Connections

to the Grid

(23)

22

TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN OF CONSTRUCTION TIME SPAN No. Months No. Months No. Months No. Months No. Months No. Months No. Months No. Months

ARGENTINA1 109 ARMENIA2 73 BELGIUM4 80 BRAZIL1 132 1 176 BULGARIA1 87 1 104 1 89 1 113 CANADA4 69 7 98 5 101 2 97 CHINA3 73 6 60 2 80 CZECH REP.1 74 3 93 1 167 1 191 FINLAND4 63 FRANCE13 66 24 68 15 86 3 93 4 124 GERMANY9 68 7 100 6 103 HUNGARY2 112 2 90 INDIA1 152 2 154 1 152 3 120 4 122 1 64 2 68 1 88 ITALY1 101 JAPAN11 61 10 46 8 49 10 46 3 42 4 47 1 53 KOREA REP.1 63 4 65 4 62 2 61 5 59 4 54 LITHUANIA1 80 1 116 MEXICO1 151 1 210 PAKISTAN 1 83 ROMANIA 1 169 1 161 RUSSIA6 74 9 73 4 72 1 109 2 233 SLOVAKIA2 89 2 99 2 119 SLOVENIA1 80 SOUTH AFRICA2 102 SPAIN5 112 2 96 SWEDEN3 85 4 74 SWITZERLAND1 63 1 125 UK4 106 6 186 4 98 1 80

Country 2009 2001 to 2005

1996 to 2000

1976 to 1980

1991 to 1995

1986 to 1990

2006 to 2008

1981 to 1985

(24)

TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN OF CONSTRUCTION TIME SPAN — continued No. Months No. Months No. Months No. Months No. Months No. Months No. Months No. Months

UKRAINE3 89 7 64 6 57 1 113 2 227 USA18 95 25 115 22 144 1 221 1 278 TOTAL86 74 131 99 85 95 29 103 23 123 20 64 5 80 2 71 Note: Construction time is from the first pouring of concrete to the connection of the unit to the grid. The totals include the following data from Taiwan, China: — 1976 to 1980: 2 units, 64 Months — 1981 to 1985: 4 units, 72 Months

Country

1976 1981 1986 1990

1991 1996 2001 2006 2009 to to to to to to to 1980 1985 1995 2000 2005 2008

(25)

24

TABLE 9. CONSTRUCTION STARTS DURING 2009

TypeModel CodeNameThermal Gross Net CHINA CN -16SANMEN 1PWRAP-10003415 1115 1000 SMNPCWH/MHI 2009-4—— CN -17SANMEN 2PWRAP-10003415 1115 1000 SMNPCWH/MHI 2009-12—— CN -19YANGJIANG 2PWRCPR-10002905 1087 1000 YJNPCDFEC 2009-6—— CN -22HONGYANHE 3PWRCPR-10002905 1080 1000 LHNPCDFEC 2009-3—— CN -23HONGYANHE 4PWRCPR-10002905 1080 1000 LHNPCDFEC 2009-8—— CN -24HAIYANG 1PWRAP-10003415 1115 1000 SNPCWH 2009-9—— CN -29FANGJIASHAN 2PWRCPR-10002905 1087 1000 QNPCDFEC 2009-7—— CN -31FUQING 2PWRCPR-10002905 1087 1000 FQNPDFEC 2009-6—— CN -34TAISHAN 1PWREPR4500 1750 1700 TNPCAREVA 2009-10—— KOREA REP. KR -26SHIN-KORI-4PWRAPR-14003938 1400 1340 KHNPDHICKOPC 2009-9—2014-9 RUSSIA RU -162NOVOVORONEZH 2-2PWRVVER AES-23200 1200 1114 REAROSATOM 2009-7—— During 2009, 11 reactors (12154 MW) started construction..

CountryReactorDesign Capacity [MW] OperatorCommercial OperationNSSS Supplier Construction startGrid Connection

(26)

TABLE 10. CONNECTIONS TO THE GRID DURING 2009

CodeNameThermalGrossNet INDIA IN -19RAJASTHAN-5PHWRHorizontal Pre801220202 NPCILNPCIL2002-92009-112009-12 JAPAN JP -64TOMARI-3PWRM (3-loop)2660912866 HEPCOMHI2004-112009-32009-3 During 2009, 2 reactors (1068 MW) were newly connected to the grid.

OperatorGrid ConnectionNSSS Supplier Construction StartFirst CriticalityCapacity [MW]CountryReactorTypeModel

TABLE 11. SCHEDULED CONNECTIONS TO THE GRID DURING 2010

CodeNameThermalGrossNet CHINA CN -12LINGAO 3PWRM310290510871000 LDNPCDFEC 2005-122010-72010-8 CN -14QINSHAN 2-3PWRCNP6001930650610 NPQJVCCNNC 2006-32010-112010-12 INDIA IN -16KAIGA-4PHWRHorizontal Pre800220202 NPCILNPCIL 2002-52010-32010-4 IN -20RAJASTHAN-6PHWRHorizontal Pre801220202 NPCILNPCIL 2003-12010-12010-3 IRAN,ISL.REP. IR -1BUSHEHR 1PWRVVER V-44630001000915 NPPDCOASE 1975-52010-52010-7 KOREA REP. KR -21SHIN-KORI-1PWROPR-100028251000960 KHNPDHICKOPC 2006-62010-72010-8 RUSSIA RU -62VOLGODONSK-2PWRVVER V-320I32001000950 REAROSATOM 1983-52010-12010-3 During 2010, 7 reactors (4839 MW) are expected to achieve grid connection.

OperatorGrid DateNSSS Supplier Construction StartFirst CriticalityDesign Capacity [MW] CountryReactor ModelType

(27)

26

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN AT 31 DEC. 2009 Code Name Thermal Gross Net

BRAZIL BR -3ANGRA-3 PWR376513501245 ELETRONUKWU — CHINA CN -42BAMAOSHANPWRCRP-10001080900 — CN -51CHANGJIANG 1650 — CN -52CHANGJIANG 2650 — CN -53CHANGJIANG 3650 — CN -54CHANGJIANG 4650 — CN -55FANGCHENGGANG 11000 — CN -56FANGCHENGGANG 21000 — CN -57FANGCHENGGANG 31000 — CN -58FANGCHENGGANG 41000 — CN -59FANGCHENGGANG 51000 — CN -60FANGCHENGGANG 61000 — CN -47FUQING 3CPR-1000290510871000 FQNPDFEC — CN -48FUQING 4CPR-1000290510871000 FQNPDFEC — CN -49FUQING 5CPR-1000290510871000 FQNPDFEC — CN -50FUQING 6CPR-1000290510871000 FQNPDFEC — CN -25HAIYANG 2PWRAP10001000WH — CN -26HONGSHIDING 1PWR — CN -27HONGSHIDING 2PWR HONGYANHDFEC — CN -65JIYANG 11000 — CN -66JIYANG 21000 — CN -67JIYANG 31000 — CN -68JIYANG 41000 — CN -38NINGDE 3PWRM310290510801000 NDNPCDFEC 2010-1 CN -39NINGDE 4PWRM310290510801000 — CN -61PENGZE 11250 — CN -62PENGZE 21250 — CN -63PENGZE 31250 —

Country Reactor Type Model Design Capacity [MW] Operator Expected Construction Start

NSSS Supplier

(28)

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN AT 31 DEC. 2009 — continued Code Name Thermal Gross Net

CN -64PENGZE 41250 — CN -69SHIDAOWAN 1200 — CN -35TAISHAN 2PWREPR450017501700 — CN -32TAOHUAJIANG 1PWR — CN -33TAOHUAJIANG 2PWR — CN -40XIANNING 1PWR — CN -41XIANNING 2PWR — CN -43YANGJIANG 3PWRCPR1000290510871000 YJNPCDFEC — CN -44YANGJIANG 4PWRCPR1000290510871000 YJNPCDFEC — CN -45YANGJIANG 5PWRCPR1000290510871000 YJNPCDFEC — CN -46YANGJIANG 6PWRCPR1000290510871000 YJNPCDFEC — IRAN,ISL.REP. IR -2BUSHEHR 2PWRVVER30001000915 NPPDCOTBD 2011-1 IR -5BUSHEHR 3PWRTBD30001000915 NPPDCOASE 2012-1 IR -9DARKHOVAINPWRIR-3601113360330 NPPDCO 2011-1 JAPAN JP -70FUKUSHIMA-DAIICHI-7BWRABWR392613801339 TEPCO — JP -71FUKUSHIMA-DAIICHI-8BWRABWR392613801339 TEPCO — JP -69HIGASHI DORI 1 (TEPCO)BWRABWR392613851343 TEPCO — JP -74HIGASHI DORI 2 (TEPCO)BWRABWR392613851343 TEPCO — JP -72HIGASHI DORI 2 (TOHOKU)BWRABWR1067 TOHOKU — JP -62KAMINOSEKI 1BWRABWR1373 CHUGOKU — JP -63KAMINOSEKI 2BWRABWR1373 CHUGOKU — JP -73NAMIE-ODAKABWRBWR825 TOHOKU — JP -66OHMABWRABWR392613831325 J-POWERH/G — JP -67TSURUGA-3PWRAPWR44661538 JAPCOMHI 2010-10 JP -68TSURUGA-4PWRAPWR44661538 JAPCOMHI 2010-10 KOREA REP. KR -27SHIN-ULCHIN-1PWRAPR-1400393814001340 KHNPDHICKOPC 2011-5 KR -28SHIN-ULCHIN-2PWRAPR-1400398314001340 KHNPDHICKOPC 2012-5

Capacity [MW] Operator NSSS Supplier

Expected Construction Start Country Reactor Type Model

(29)

28

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN AT 31 DEC. 2009 — continued Code Name Thermal Gross Net

RUSSIA RU -166KURSK 2-1PWRVVER-1100320011701085 REAROSATOM — RU -164LENINGRAD 2-2PWRVVER AES-2006320011701085 REAROSATOM — RU -165LENINGRAD 2-3PWRVVER AES-2006320011701085 REAROSATOM — RU -63VOLGODONSK-3PWRVVER V320320011701085 REAROSATOM — RU -64VOLGODONSK-4PWRVVER V32032001000950 REAROSATOM — TURKEY TR -1AKKUYUPWR TEAS — Status as of 31 December 2009, 61 reactorswere known as planned.

Capacity [MW] Operator NSSS Supplier

Expected Construction Start Country Reactor Type Model

(30)

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2009 Code Name Thermal Gross Net

ARGENTINA AR -3ATUCHA-2 PHWRPHWR KWU2160745692 NASASIEMENS1981-7—2012-7— BULGARIA BG -7BELENE-1PWRVVER V-46630001000953 KOZNPPASE1987-1——— BG -8BELENE-2PWRVVER V-46630001000953 KOZNPPASE1987-3——— CHINA CN -28FANGJIASHAN 1PWRCPR-1000290510871000 QNPCDFEC2008-12——— CN -29FANGJIASHAN 2PWRCPR-1000290510871000 QNPCDFEC2009-7——— CN -30FUQING 1PWRCPR-1000290510871000 FQNPDFEC2008-11——— CN -31FUQING 2PWRCPR-1000290510871000 FQNPDFEC2009-6——— CN -24HAIYANG 1PWRAP-1000341511151000 SNPCWH2009-9——— CN -20HONGYANHE 1PWRCPR-1000290510801000 LHNPCDFEC2007-8——— CN -21HONGYANHE 2PWRCPR-1000290510801000 LHNPCDFEC2008-3——— CN -22HONGYANHE 3PWRCPR-1000290510801000 LHNPCDFEC2009-3——— CN -23HONGYANHE 4PWRCPR-1000290510801000 LHNPCDFEC2009-8——— CN -12LINGAO 3PWRM310290510871000 LDNPCDFEC2005-122010-72010-82010-12 CN -13LINGAO 4PWRM310290510861000 LDNPCDFEC2006-6——— CN -36NINGDE 1PWRM310290510871000 NDNPCDFEC2008-2——— CN -37NINGDE 2PWRM310290510801000 NDNPCDFEC2008-11——— CN -14QINSHAN 2-3PWRCNP6001930650610 NPQJVCCNNC2006-32010-112010-122011-3 CN -15QINSHAN 2-4PWRCNP 6001930650610 NPQJVCCNNC2007-12009-122011-92012-1 CN -16SANMEN 1PWRAP-1000341511151000 SMNPCWH/MHI2009-4——— CN -17SANMEN 2PWRAP-1000341511151000 SMNPCWH/MHI2009-12——— CN -34TAISHAN 1PWREPR450017501700 TNPCAREVA2009-10——— CN -18YANGJIANG 1PWRCPR-1000290510871000 YJNPCDFEC2008-12——— CN -19YANGJIANG 2PWRCPR-1000290510871000 YJNPCDFEC2009-6——— FINLAND FI -5OLKILUOTO-3PWREPR430017201600 TVOAREVA2005-8——2011-6 FRANCE FR -74FLAMANVILLE-3PWREPR430016501600 EDFAREVA2007-122011-122012-5—

Design Capacity [MW] Operator Commercial Operation NSSS Supplier Construction Start Grid Connection First Criticality Country Reactor Type Model

(31)

30

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2009 — continued Code Name Thermal Gross Net

INDIA IN -16KAIGA-4PHWRHorizontal Pre800220202 NPCILNPCIL2002-52010-32010-42010-5 IN -25KUDANKULAM-1PWRVVER V-4121000917 NPCILMAEP2002-32010-122011-22011-3 IN -26KUDANKULAM-2PWRVVER V-4121000917 NPCILMAEP2002-72011-62011-82011-9 IN -29PFBRFBR1253500470 BHAVINI2004-10——— IN -20RAJASTHAN-6PHWRHorizontal Pre801220202 NPCILNPCIL2003-12010-12010-32010-3 IRAN,ISL.REP. IR -1BUSHEHR 1PWRVVER V-44630001000915 NPPDCOASE1975-52010-52010-72010-12 JAPAN JP -65SHIMANE-3BWRABWR392613731325 CHUGOKUHITACHI2007-10—2011-122011-12 KOREA REP. KR -21SHIN-KORI-1PWROPR-100028251000960 KHNPDHICKOPC2006-62010-72010-82010-12 KR -22SHIN-KORI-2PWROPR-100028251000960 KHNPDHICKOPC2007-62011-72011-82011-12 KR -25SHIN-KORI-3PWRAPR-1400398314001340 KHNPDHICKOPC2008-10——2013-9 KR -26SHIN-KORI-4PWRAPR-1400393814001340 KHNPDHICKOPC2009-9——2014-9 KR -23SHIN-WOLSONG-1PWROPR-100028251000960 KHNPDHICKOPC2007-112011-52011-52011-10 KR -24SHIN-WOLSONG-2PWROPR-100028251000960 KHNPDHICKOPC2008-92012-52012-52012-10 PAKISTAN PK -3CHASNUPP 2PWRPWR999325300 PAECCNNC2005-122011-42011-52011-8 RUSSIA RU -151AKADEMIK LOMONOSOV 1PWRKLT-40S 'Float1503532 REAROSATOM2007-4——2013-12 RU -152AKADEMIK LOMONOSOV 2PWRKLT-40S 'Float1503532 REAROSATOM2007-4——2013-12 RU -116BELOYARSKY-4 (BN-800)FBRBN-8002100880804 REAROSATOM2006-7——— RU -37KALININ-4PWRVVER V-32032001000950 REAROSATOM1986-8——— RU -120KURSK-5LWGRRBMK-10001000915 REAROSATOM1985-12——— RU -163LENINGRAD 2-1PWRVVER AES-2006320011701085 REAROSATOM2008-10——— RU -161NOVOVORONEZH 2-1PWRVVER AES-2006320012001114 REAROSATOM2008-6——2013-12 RU -162NOVOVORONEZH 2-2PWRVVER AES-2006320012001114 REAROSATOM2009-7——— RU -62VOLGODONSK-2PWRVVER V-320I32001000950 REAROSATOM1983-52010-12010-3— SLOVAKIA SK -10MOCHOVCE-3PWRVVER V-2131375440391 EMOSKODA1987-1———

First Criticality Grid Connection Commercial Operation Design Capacity [MW] Operator NSSS Supplier Construction Start Country Reactor Type Model

(32)

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2009 — continued Code Name Thermal Gross Net

SK -11MOCHOVCE-4PWRVVER V-2131375440391 EMOSKODA1987-1——— UKRAINE UA -51KHMELNITSKI-3PWRVVER V-392B32001000950 NNEGCASE1986-3—2015-1— UA -52KHMELNITSKI-4PWRVVER32001000950 NNEGCASE1987-2—2016-1— USA US -391WATTS BAR-2PWRW (4-loop) (IC342512181165 TVAWH1972-12—2012-8— Status as of 31 December 2009, 55 reactors (50929 MW) are under construction, including 2 units (2600 MW) from Taiwan, China. TAIWAN, CN TW -7LUNGMEN 1BWRABWR392613501300 TPCGE1999-32011-12011-22011-12 TAIWAN, CN TW -8LUNGMEN 2BWRABWR392613501300 TPCGE1999-82012-12012-22012-12

Construction Start First Criticality Grid Connection Commercial Operation Country Reactor Type Model Design Capacity [MW] Operator NSSS Supplier

(33)

32

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics ARGENTINA AR -1ATUCHA-1PHWRPHWR KWU1179357335 NASASIEMENS1968-61974-31974-670.472.0- AR -2EMBALSEPHWRCANDU 62015648600 NASAAECL1974-41983-41984-187.987.9- ARMENIA AM -19ARMENIA-2PWRVVER V-2701375408375 ANPPJSCFAEA1975-71980-11980-566.467.4- BELGIUM BE -2DOEL-1PWRWE (2 loops)1192412392 ELECTRABACECOWEN1969-71974-81975-287.388.5- BE -4DOEL-2PWRWE (2 loops)1311454433 ELECTRABACECOWEN1971-91975-81975-1289.090.0- BE -5DOEL-3PWRWE 3-loops305410661006 ELECTRABFRAMACEC1975-11982-61982-1088.088.5- BE -7DOEL-4PWRWE 3-loops298810941047 ELECTRABACECOWEN1978-121985-41985-788.788.9- BE -3TIHANGE-1PWRFramatome 3 lo28731009962 ELECTRABACLF1970-61975-31975-1089.390.9- BE -6TIHANGE-2PWRWE 3-loops306410551008 ELECTRABFRAMACEC1976-41982-101983-687.788.4- BE -8TIHANGE-3PWRWE 3-loops300011021054 ELECTRABACECOWEN1978-111985-61985-988.590.0- BRAZIL BR -1ANGRA-1PWR2-loop WE1484657609 ELETRONUWH1971-51982-41985-170.172.1- BR -2ANGRA-2PWRPRE KONVOI376413501275 ELETRONUKWU1976-12000-72001-283.585.5- BULGARIA BG -5KOZLODUY-5PWRVVER V-32030001000953 KOZNPPAEE1980-71987-111988-1276.778.3DH BG -6KOZLODUY-6PWRVVER V-32030001000953 KOZNPPAEE1982-41991-81993-1273.276.3DH CANADA CA -10BRUCE-3PHWRCANDU 750A2832805730 BRUCEPOWNEI.P1972-71977-121978-278.378.7- CA -11BRUCE-4PHWRCANDU 750A2832805730 BRUCEPOWNEI.P1972-91978-121979-182.482.9- CA -18BRUCE-5PHWRCANDU 750B2832872817 BRUCEPOWOH/AECL1978-61984-121985-386.386.5- CA -19BRUCE-6PHWRCANDU 750B2690891817 BRUCEPOWOH/AECL1978-11984-61984-982.982.9- CA -20BRUCE-7PHWRCANDU 750B2832872817 BRUCEPOWOH/AECL1979-51986-21986-487.787.9- CA -21BRUCE-8PHWRCANDU 750B2690845782 BRUCEPOWOH/AECL1979-81987-31987-586.886.9- CA -22DARLINGTON-1PHWRCANDU 8502776934878 OPGOH/AECL1982-41990-121992-1186.087.2- CA -23DARLINGTON-2PHWRCANDU 8502776934878 OPGOH/AECL1981-91990-11990-1087.689.0- CA -24DARLINGTON-3PHWRCANDU 8502776934878 OPGOH/AECL1984-91992-121993-286.487.3- CA -25DARLINGTON-4PHWRCANDU 8502776934878 OPGOH/AECL1985-71993-41993-689.089.8- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

CountryReactor TypeModelCapacity [MW]Grid ConnectionCommercial Operation OperatorNSSS SupplierConstruction Start

(34)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics CA -12GENTILLY-2PHWRCANDU 62156675635 HQBBC1974-41982-121983-1079.380.3- CA -4PICKERING-1PHWRCANDU 500A1744542515 OPGOH/AECL1966-61971-41971-769.569.6- CA -7PICKERING-4PHWRCANDU 500A1744542515 OPGOH/AECL1968-51973-51973-661.261.9- CA -13PICKERING-5PHWRCANDU 500B1744540516 OPGOH/AECL1974-111982-121983-570.170.8- CA -14PICKERING-6PHWRCANDU 500B1744540516 OPGOH/AECL1975-101983-111984-273.473.9- CA -15PICKERING-7PHWRCANDU 500B1744540516 OPGOH/AECL1976-31984-111985-170.370.6- CA -16PICKERING-8PHWRCANDU 500B1744540516 OPGOH/AECL1976-91986-11986-275.876.8- CA -17POINT LEPREAUPHWRCANDU 62180680635 NBEPCAECL1975-51982-91983-267.069.2- CHINA CN -2GUANGDONG-1PWRM3102905984944 GNPJVCGEC1987-81993-81994-290.090.4- CN -3GUANGDONG-2PWRM3102905984944 GNPJVCGEC1988-41994-21994-587.387.6- CN -6LINGAO 1PWRM3102895990938 LANPCFRAM1997-52002-22002-587.587.9- CN -7LINGAO 2PWRM3102895990938 LANPCFRAM1997-112002-122003-188.088.1- CN -1QINSHAN 1PWRCNP-300966310288 QNPCCNNC1985-31991-121994-486.887.3- CN -4QINSHAN 2-1PWRCNP6001930650610 NPQJVCCNNC1996-62002-22002-477.377.3- CN -5QINSHAN 2-2PWRCNP6001930650610 NPQJVCCNNC1997-42004-32004-587.687.6- CN -8QINSHAN 3-1PHWRCANDU 62064700650 TQNPCAECL1998-62002-112002-1287.287.7- CN -9QINSHAN 3-2PHWRCANDU 62064700650 TQNPCAECL1998-92003-62003-789.990.0- CN -10TIANWAN 1PWRVVER V-42830001000933 JNPCIZ1999-102006-52007-574.874.8- CN -11TIANWAN 2PWRVVER V-42830001000933 JNPCIZ2000-102007-52007-883.783.7- CZECH REP. CZ -4DUKOVANY-1PWRVVER V-2131375456427 CEZSKODA1979-11985-21985-588.088.5- CZ -5DUKOVANY-2PWRVVER V-2131375456427 CEZSKODA1979-11986-11986-387.588.0- CZ -8DUKOVANY-3PWRVVER V-2131444498471 CEZSKODA1979-31986-111986-1286.687.3- CZ -9DUKOVANY-4PWRVVER V-2131375456427 CEZSKODA1979-31987-61987-787.187.9- CZ -23TEMELIN-1PWRVVER V-32030001013963 CEZSKODA1987-22000-122002-666.666.6DH CZ -24TEMELIN-2PWRVVER V-32030001013963 CEZSKODA1987-22002-122003-475.275.6DH FINLAND FI -1LOVIISA-1PWRVVER V-2131500510488 FORTUMPHAEE1971-51977-21977-590.591.3- FI -2LOVIISA-2PWRVVER V-2131500510488 FORTUMPHAEE1972-81980-111981-191.092.2- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

Grid ConnectionCommercial OperationCapacity [MW] OperatorNSSS SupplierConstruction StartCountryReactorTypeModel

(35)

34

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics FI -3OLKILUOTO-1BWRBWR 25002500890860 TVOASEASTAL1974-21978-91979-1095.596.0- FI -4OLKILUOTO-2BWRBWR 25002500890860 TVOASEASTAL1975-111980-21982-795.295.7- FRANCE FR -54BELLEVILLE-1PWRP'4 REP 1300381713631310 EDFFRAM1980-51987-101988-678.279.3- FR -55BELLEVILLE-2PWRP'4 REP 1300381713631310 EDFFRAM1980-81988-71989-183.685.0- FR -32BLAYAIS-1PWRCP12785951910 EDFFRAM1977-11981-61981-1272.876.7- FR -33BLAYAIS-2PWRCP12785951910 EDFFRAM1977-11982-71983-278.281.0- FR -34BLAYAIS-3PWRCP12785951910 EDFFRAM1978-41983-81983-1180.684.0- FR -35BLAYAIS-4PWRCP12785951910 EDFFRAM1978-41983-51983-1077.880.2- FR -13BUGEY-2PWRCP02785945910 EDFFRAM1972-111978-51979-379.981.7- FR -14BUGEY-3PWRCP02785945910 EDFFRAM1973-91978-91979-374.277.2- FR -15BUGEY-4PWRCP02785917880 EDFFRAM1974-61979-31979-778.179.5- FR -16BUGEY-5PWRCP02785917880 EDFFRAM1974-71979-71980-182.184.4- FR -50CATTENOM-1PWRP'4 REP 1300381713621300 EDFFRAM1979-101986-111987-482.084.0- FR -53CATTENOM-2PWRP'4 REP 1300381713621300 EDFFRAM1980-71987-91988-282.584.6- FR -60CATTENOM-3PWRP'4 REP 1300381713621300 EDFFRAM1982-61990-71991-278.880.1- FR -65CATTENOM-4PWRP'4 REP 1300381713621300 EDFFRAM1983-91991-51992-186.187.5- FR -40CHINON-B-1PWRCP22785954905 EDFFRAM1977-31982-111984-277.278.6- FR -41CHINON-B-2PWRCP22785954905 EDFFRAM1977-31983-111984-877.979.4- FR -56CHINON-B-3PWRCP22785954905 EDFFRAM1980-101986-101987-378.279.6- FR -57CHINON-B-4PWRCP22785954905 EDFFRAM1981-21987-111988-478.079.1- FR -62CHOOZ-B-1PWRN4 REP 1450427015601500 EDFFRAM1984-11996-82000-580.282.1- FR -70CHOOZ-B-2PWRN4 REP 1450427015601500 EDFFRAM1985-121997-42000-980.182.9- FR -72CIVAUX-1PWRN4 REP 1450427015611495 EDFFRAM1988-101997-122002-177.979.1- FR -73CIVAUX-2PWRN4 REP 1450427015611495 EDFFRAM1991-41999-122002-482.784.3- FR -42CRUAS-1PWRCP22785956915 EDFFRAM1978-81983-41984-475.877.1- FR -43CRUAS-2PWRCP22785956915 EDFFRAM1978-111984-91985-477.979.7- FR -44CRUAS-3PWRCP22785956915 EDFFRAM1979-41984-51984-976.177.7- FR -45CRUAS-4PWRCP22785956915 EDFFRAM1979-101984-101985-276.177.6- FR -22DAMPIERRE-1PWRCP12785937890 EDFFRAM1975-21980-31980-980.381.7-

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(36)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics FR -29DAMPIERRE-2PWRCP12785937890 EDFFRAM1975-41980-121981-279.681.3- FR -30DAMPIERRE-3PWRCP12785937890 EDFFRAM1975-91981-11981-577.979.5- FR -31DAMPIERRE-4PWRCP12785937890 EDFFRAM1975-121981-81981-1176.478.3- FR -11FESSENHEIM-1PWRCP02660920880 EDFFRAM1971-91977-41978-171.472.4- FR -12FESSENHEIM-2PWRCP02660920880 EDFFRAM1972-21977-101978-470.271.4- FR -46FLAMANVILLE-1PWRP4 REP 1300381713821330 EDFFRAM1979-121985-121986-1275.276.6- FR -47FLAMANVILLE-2PWRP4 REP 1300381713821330 EDFFRAM1980-51986-71987-381.282.5- FR -61GOLFECH-1PWRP'4 REP 1300381713631310 EDFFRAM1982-111990-61991-285.186.8- FR -68GOLFECH-2PWRP'4 REP 1300381713631310 EDFFRAM1984-101993-61994-384.386.4- FR -20GRAVELINES-1PWRCP12785951910 EDFFRAM1975-21980-31980-1181.883.3- FR -21GRAVELINES-2PWRCP12785951910 EDFFRAM1975-31980-81980-1282.083.7- FR -27GRAVELINES-3PWRCP12785951910 EDFFRAM1975-121980-121981-679.981.7- FR -28GRAVELINES-4PWRCP12785951910 EDFFRAM1976-41981-61981-1079.481.3- FR -51GRAVELINES-5PWRCP12785951910 EDFFRAM1979-101984-81985-181.683.4- FR -52GRAVELINES-6PWRCP12785951910 EDFFRAM1979-101985-81985-1082.283.3- FR -58NOGENT-1PWRP'4 REP 1300381713631310 EDFFRAM1981-51987-101988-282.283.6- FR -59NOGENT-2PWRP'4 REP 1300381713631310 EDFFRAM1982-11988-121989-580.581.8- FR -36PALUEL-1PWRP4 REP 1300381713821330 EDFFRAM1977-81984-61985-1279.681.0- FR -37PALUEL-2PWRP4 REP 1300381713821330 EDFFRAM1978-11984-91985-1277.879.1- FR -38PALUEL-3PWRP4 REP 1300381713821330 EDFFRAM1979-21985-91986-272.574.1- FR -39PALUEL-4PWRP4 REP 1300381713821330 EDFFRAM1980-21986-41986-680.482.9- FR -63PENLY-1PWRP'4 REP 1300381713821330 EDFFRAM1982-91990-51990-1284.184.8- FR -64PENLY-2PWRP'4 REP 1300381713821330 EDFFRAM1984-81992-21992-1184.685.5- FR -10PHENIXFBRPH-250345142130 CEA/EDFCNCLNEY1968-111973-121974-731.731.9- FR -48ST. ALBAN-1PWRP4 REP 1300381713811335 EDFFRAM1979-11985-81986-575.777.2- FR -49ST. ALBAN-2PWRP4 REP 1300381713811335 EDFFRAM1979-71986-71987-378.781.4- FR -17ST. LAURENT-B-1PWRCP22785956915 EDFFRAM1976-51981-11983-880.282.2- FR -23ST. LAURENT-B-2PWRCP22785956915 EDFFRAM1976-71981-61983-878.079.5- FR -18TRICASTIN-1PWRCP12785955915 EDFFRAM1974-111980-51980-1280.984.6- FR -19TRICASTIN-2PWRCP12785955915 EDFFRAM1974-121980-81980-1278.180.6-

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(37)

36

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics FR -25TRICASTIN-3PWRCP12785955915 EDFFRAM1975-41981-21981-579.382.0- FR -26TRICASTIN-4PWRCP12785955915 EDFFRAM1975-51981-61981-1179.581.5- GERMANY DE -12BIBLIS-A (KWB A)PWRPWR351712251167 RWEKWU1970-11974-81975-259.059.6- DE -18BIBLIS-B (KWB B)PWRPWR373313001240 RWEKWU1972-21976-41977-167.768.8- DE -32BROKDORF (KBR)PWRPWR390014801410 E.ONKWU1976-11986-101986-1294.394.5- DE -13BRUNSBUETTEL (KKB)BWRBWR '692292806771 KKBKWU1970-41976-71977-255.956.8- DE -33EMSLAND (KKE)PWRKonvoi385014001329 KLEKWU1982-81988-41988-694.895.0- DE -23GRAFENRHEINFELD (KKG)PWRPWR376513451275 E.ONKWU1975-11981-121982-691.391.5- DE -27GROHNDE (KWG)PWRPWR390014301360 KWGKWU1976-61984-91985-293.694.0- DE -26GUNDREMMINGEN-B (GUN-B)BWRBWR 72384013441284 KGGKWU1976-71984-31984-791.291.5- DE -28GUNDREMMINGEN-C (GUN-C)BWRBWR 72384013441288 KGGKWU1976-71984-111985-188.889.5- DE -16ISAR-1 (KKI 1)BWRBWR '692575912878 E.ONKWU1972-51977-121979-390.291.4- DE -31ISAR-2 (KKI 2)PWRKonvoi395014851410 E.ONKWU1982-91988-11988-494.694.8- DE -20KRUEMMEL (KKK)BWRBWR 69369014021346 KKKKWU1974-41983-91984-363.163.4- DE -15NECKARWESTHEIM-1 (GKN 1)PWRPWR2497840785 EnKKKWU1972-21976-61976-1290.090.3- DE -44NECKARWESTHEIM-2 (GKN 2)PWRKonvoi385014001310 EnKKKWU1982-111989-11989-493.794.0- DE -14PHILIPPSBURG-1 (KKP 1)BWRBWR '692575926890 EnKKKWU1970-101979-51980-386.887.4- DE -24PHILIPPSBURG-2 (KKP 2)PWRPWR395014581392 EnKKKWU1977-71984-121985-489.592.3- DE -17UNTERWESER (KKU)PWRPWR390014101345 E.ONKWU1972-71978-91979-982.084.1- HUNGARY HU -1PAKS-1PWRVVER V-2131485500470 PAKS ZrtAEE1974-81982-121983-887.387.4- HU -2PAKS-2PWRVVER V-2131485500473 PAKS ZrtAEE1974-81984-91984-1170.170.1DH HU -3PAKS-3PWRVVER V-2131485500473 PAKS ZrtAEE1979-101986-91986-1286.287.0DH HU -4PAKS-4PWRVVER V-2131485500473 PAKS ZrtAEE1979-101987-81987-1188.788.8DH INDIA IN -13KAIGA-1PHWRHorizontal Pre801220202 NPCILNPCIL1989-92000-102000-1169.689.3- IN -14KAIGA-2PHWRHorizontal Pre801220202 NPCILNPCIL1989-121999-122000-370.990.2- IN -15KAIGA-3PHWRHorizontal Pre800220202 NPCILNPCIL2002-32007-42007-530.961.0- IN -9KAKRAPAR-1PHWRHorizontal Pre801220202 NPCILNPCIL1984-121992-111993-565.376.2- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(38)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics IN -10KAKRAPAR-2PHWRHorizontal Pre801220202 NPCILNPCIL1985-41995-31995-974.891.4- IN -5MADRAS-1PHWRHorizontal Pre801220205 NPCILNPCIL1971-11983-71984-145.860.1DS IN -6MADRAS-2PHWRHorizontal Pre801220205 NPCILNPCIL1972-101985-91986-359.878.6DS IN -7NARORA-1PHWRHorizontal Pre801220202 NPCILNPCIL1976-121989-71991-154.067.6- IN -8NARORA-2PHWRHorizontal Pre801220202 NPCILNPCIL1977-111992-11992-757.267.6- IN -3RAJASTHAN-1PHWRHorizontal Pre69310090 NPCILAECL1965-81972-111973-1215.415.6PH IN -4RAJASTHAN-2PHWRHorizontal Pre693200187 NPCILAECL/DAE1968-41980-111981-464.267.0PH IN -11RAJASTHAN-3PHWRHorizontal Pre801220202 NPCILNPCIL1990-22000-32000-672.289.1PH IN -12RAJASTHAN-4PHWRHorizontal Pre801220202 NPCILNPCIL1990-102000-112000-1272.090.7PH IN -19RAJASTHAN-5PHWRHorizontal Pre801220202 NPCILNPCIL2002-92009-122010-2- IN -1TARAPUR-1BWRBWR-1, Mark 2 530160150 NPCILGE1964-101969-41969-1084.685.6- IN -2TARAPUR-2BWRBWR-1, Mark 2 530160150 NPCILGE1964-101969-51969-1086.587.3- IN -23TARAPUR-3PHWRHorizontal Pre1730540490 NPCILNPCIL2000-52006-62006-857.188.7- IN -24TARAPUR-4PHWRHorizontal Pre1730540490 NPCILNPCIL2000-32005-62005-952.182.5- JAPAN JP -5FUKUSHIMA-DAIICHI-1BWRBWR-31380460439 TEPCOGE/GETSC1967-71970-111971-347.647.6- JP -9FUKUSHIMA-DAIICHI-2BWRBWR-42381784760 TEPCOGE/T1969-61973-121974-767.467.4- JP -10FUKUSHIMA-DAIICHI-3BWRBWR-42381784760 TEPCOTOSHIBA1970-121974-101976-369.069.0- JP -16FUKUSHIMA-DAIICHI-4BWRBWR-42381784760 TEPCOHITACHI1973-21978-21978-1061.862.2- JP -17FUKUSHIMA-DAIICHI-5BWRBWR-42381784760 TEPCOTOSHIBA1972-51977-91978-467.367.4- JP -18FUKUSHIMA-DAIICHI-6BWRBWR-5329311001067 TEPCOGE/T1973-101979-51979-1067.167.3- JP -25FUKUSHIMA-DAINI-1BWRBWR-5329311001067 TEPCOTOSHIBA1976-31981-71982-475.075.0- JP -26FUKUSHIMA-DAINI-2BWRBWR-5329311001067 TEPCOHITACHI1979-51983-61984-265.165.1- JP -35FUKUSHIMA-DAINI-3BWRBWR-5329311001067 TEPCOTOSHIBA1981-31984-121985-659.859.8- JP -38FUKUSHIMA-DAINI-4BWRBWR-5329311001067 TEPCOHITACHI1981-51986-121987-858.658.6- JP -12GENKAI-1PWRM (2-loop)1650559529 KYUSHUMHI1971-91975-21975-1080.980.9- JP -27GENKAI-2PWRM (2-loop)1650559529 KYUSHUMHI1977-21980-61981-376.376.3- JP -45GENKAI-3PWRM (4-loop)342311801127 KYUSHUMHI1988-61993-61994-384.884.8DS JP -46GENKAI-4PWRM (4-loop)342311801127 KYUSHUMHI1992-71996-111997-784.684.6DS JP -36HAMAOKA-3BWRBWR-5329311001056 CHUBUTOSHIBA1983-41987-11987-871.371.5- The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, PH process heating.

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(39)

38

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics JP -49HAMAOKA-4BWRBWR-5329311371092 CHUBUTOSHIBA1989-101993-11993-975.676.7- JP -60HAMAOKA-5BWRABWR392612671212 CHUBUTOSHIBA2000-72004-42005-154.762.3- JP -58HIGASHI DORI 1 (TOHOKU)BWRBWR-5329311001067 TOHOKUTOSHIBA2000-112005-32005-1277.377.4- JP -23IKATA-1PWRM (2-loop)1650566538 SHIKOKUMHI1973-91977-21977-977.777.8DS JP -32IKATA-2PWRM (2-loop)1650566538 SHIKOKUMHI1978-81981-81982-378.778.8DS JP -47IKATA-3PWRM (3-loop)2660890846 SHIKOKUMHI1990-101994-31994-1287.087.0DS JP -33KASHIWAZAKI KARIWA-1BWRBWR-5329311001067 TEPCOTOSHIBA1980-61985-21985-942.845.7- JP -39KASHIWAZAKI KARIWA-2BWRBWR-5329311001067 TEPCOTOSHIBA1985-111990-21990-947.147.1- JP -52KASHIWAZAKI KARIWA-3BWRBWR-5329311001067 TEPCOTOSHIBA1989-31992-121993-848.950.7- JP -53KASHIWAZAKI KARIWA-4BWRBWR-5329311001067 TEPCOHITACHI1990-31993-121994-850.154.8- JP -40KASHIWAZAKI KARIWA-5BWRBWR-5329311001067 TEPCOHITACHI1985-61989-91990-450.855.9- JP -55KASHIWAZAKI KARIWA-6BWRABWR392613561315 TEPCOTOSHIBA1992-111996-11996-1163.467.6- JP -56KASHIWAZAKI KARIWA-7BWRABWR392613561315 TEPCOHITACHI1993-71996-121997-763.266.9- JP -4MIHAMA-1PWRW (2-loop)1031340320 KEPCOWH1967-21970-81970-1169.970.0- JP -6MIHAMA-2PWRM (2-loop)1456500470 KEPCOMHI1968-51972-41972-773.473.4- JP -14MIHAMA-3PWRM (3-loop)2440826780 KEPCOMHI1972-81976-21976-1264.064.0- JP -15OHI-1PWRW (4-loop)342311751120 KEPCOWH1972-101977-121979-378.778.8DS JP -19OHI-2PWRW (4-loop)342311751120 KEPCOWH1972-121978-101979-1279.179.1DS JP -50OHI-3PWRM (4-loop)342311801127 KEPCOMHI1987-101991-61991-1275.475.4- JP -51OHI-4PWRM (4-loop)342311801127 KEPCOMHI1988-61992-61993-287.387.3- JP -22ONAGAWA-1BWRBWR-41593524498 TOHOKUTOSHIBA1980-71983-111984-651.856.1- JP -54ONAGAWA-2BWRBWR-52436825796 TOHOKUTOSHIBA1991-41994-121995-767.571.6- JP -57ONAGAWA-3BWRBWR-52436825796 TOHOKUTOSHIBA1998-12001-52002-165.667.2- JP -28SENDAI-1PWRM (3-loop)2660890846 KYUSHUMHI1979-121983-91984-784.584.5- JP -37SENDAI-2PWRM (3-loop)2660890846 KYUSHUMHI1981-101985-41985-1186.286.2- JP -48SHIKA-1BWRBWR 51593540505 HOKURIKUHITACHI1989-71993-11993-763.663.6- JP -59SHIKA-2BWRABWR392612061108 HOKURIKUHITACHI2001-82005-72006-336.136.1- JP -7SHIMANE-1BWRBWR-31380460439 CHUGOKUHITACHI1970-71973-121974-370.670.6- JP -41SHIMANE-2BWRBWR-52436820789 CHUGOKUHITACHI1985-21988-71989-278.978.9- JP -8TAKAHAMA-1PWRM (3-loop)2440826780 KEPCOWH/MHI1970-41974-31974-1183.983.9- The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination.

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(40)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics JP -13TAKAHAMA-2PWRM (3-loop)2440826780 KEPCOMHI1971-31975-11975-1180.180.1- JP -29TAKAHAMA-3PWRM (3-loop)2660870830 KEPCOMHI1980-121984-51985-177.677.6DS JP -30TAKAHAMA-4PWRM (3-loop)2660870830 KEPCOMHI1981-31984-111985-684.584.5DS JP -21TOKAI-2BWRBWR-5329311001060 JAPCOGE1973-101978-31978-1173.273.5- JP -43TOMARI-1PWRM (2-loop)1650579550 HEPCOMHI1985-41988-121989-685.885.8- JP -44TOMARI-2PWRM (2-loop)1650579550 HEPCOMHI1985-61990-81991-481.181.1- JP -64TOMARI-3PWRM (3-loop)2660912866 HEPCOMHI2004-112009-32009-12- JP -3TSURUGA-1BWRBWR-21070357340 JAPCOGE1966-111969-111970-363.863.9- JP -34TSURUGA-2PWRM (4-loop)341111601110 JAPCOMHI1982-111986-61987-274.374.7- KOREA REP. KR -1KORI-1PWRWH △601729603576 KHNPWH1972-41977-61978-490.891.1- KR -2KORI-2PWRWH F1882675637 KHNPWH1977-121983-41983-790.390.4- KR -5KORI-3PWRWH F291210351007 KHNPWH1979-101985-11985-991.391.4- KR -6KORI-4PWRWH F291210351007 KHNPWH1980-41985-121986-491.791.9- KR -9ULCHIN-1PWRFrance CPI2785985945 KHNPFRAM1983-11988-41988-988.788.9- KR -10ULCHIN-2PWRFrance CPI2775984942 KHNPFRAM1983-71989-41989-988.188.3- KR -13ULCHIN-3PWROPR-100028251047994 KHNPDHICKOPC1993-71998-11998-891.691.7- KR -14ULCHIN-4PWROPR-100028251045998 KHNPDHICKOPC1993-111998-121999-1290.890.9- KR -19ULCHIN-5PWROPR-1000281510481001 KHNPDHICKOPC1999-102003-122004-791.991.9- KR -20ULCHIN-6PWROPR-1000282510481001 KHNPDHICKOPC2000-92005-12005-493.393.5- KR -3WOLSONG-1PHWRCANDU 62061622597 KHNPAECL1977-101982-121983-480.481.2- KR -4WOLSONG-2PHWRCANDU 62061730710 KHNPAECL/DHI1992-61997-41997-792.492.5- KR -15WOLSONG-3PHWRCANDU 62061729707 KHNPAECL/DHI1994-31998-31998-793.793.7- KR -16WOLSONG-4PHWRCANDU 62061730708 KHNPAECL/DHI1994-71999-51999-1093.593.5- KR -7YONGGWANG-1PWRWH F2787985953 KHNPWH1981-61986-31986-890.690.7- KR -8YONGGWANG-2PWRWH F2787978947 KHNPWH1981-121986-111987-691.391.4- KR -11YONGGWANG-3PWROPR-100028251039997 KHNPDHICKAEC1989-121994-101995-392.392.4- KR -12YONGGWANG-4PWROPR-100028251039994 KHNPDHICKAEC1990-51995-71996-190.290.3- KR -17YONGGWANG-5PWROPR-100028251046988 KHNPDHICKOPC1997-62001-122002-586.686.6- KR -18YONGGWANG-6PWROPR-100028251050996 KHNPDHICKOPC1997-112002-92002-1288.688.8- The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination.

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(41)

40

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics MEXICO MX -1LAGUNA VERDE-1BWRBWR-52027682650 CFEGE1976-101989-41990-784.184.6- MX -2LAGUNA VERDE-2BWRBWR-52027682650 CFEGE1977-61994-111995-484.685.1- NETHERLANDS NL -2BORSSELEPWR2 loops PWR1366515487 EPZS/KWU1969-71973-71973-1093.093.3- PAKISTAN PK -2CHASNUPP 1PWRCNP-300999325300 PAECCNNC1993-82000-62000-970.871.4- PK -1KANUPPPHWRCANDU-137 MW433137125 PAECCGE1966-81971-101972-1234.035.1DS ROMANIA RO -1CERNAVODA-1PHWRCANDU 62180706650 SNNAECL1982-71996-71996-1289.090.2DH RO -2CERNAVODA-2PHWRCANDU 62180706650 SNNAECL1983-72007-82007-1093.794.8DH RUSSIA RU -96BALAKOVO-1PWRVVER V-32030001000950 REAROSATOM1980-121985-121986-585.687.1DH, PH RU -97BALAKOVO-2PWRVVER V-32030001000950 REAROSATOM1981-81987-101988-180.684.5DH, PH RU -98BALAKOVO-3PWRVVER V-32030001000950 REAROSATOM1982-111988-121989-482.385.4DH, PH RU -99BALAKOVO-4PWRVVER V-32032001000950 REAROSATOM1984-41993-41993-1283.185.9DH, PH RU -21BELOYARSKY-3 (BN-600)FBRBN-6001470600560 REAROSATOM1969-11980-41981-1177.278.1DH, PH RU -141BILIBINO-1LWGREGP-6621211 REAROSATOM1970-11974-11974-445.270.8DH RU -142BILIBINO-2LWGREGP-6621211 REAROSATOM1970-11974-121975-250.880.3DH RU -143BILIBINO-3LWGREGP-6621211 REAROSATOM1970-11975-121976-253.082.1DH RU -144BILIBINO-4LWGREGP-6621211 REAROSATOM1970-11976-121977-150.479.6DH RU -30KALININ-1PWRVVER V-33830001000950 REAROSATOM1977-21984-51985-681.482.4DH, PH RU -31KALININ-2PWRVVER V-33830001000950 REAROSATOM1982-21986-121987-382.083.6DH, PH RU -36KALININ-3PWRVVER V-33832001000950 REAROSATOM1985-102004-122005-1183.784.0PH RU -12KOLA-1PWRVVER V-2301375440411 REAROSATOM1970-51973-61973-1265.083.3DH, PH RU -13KOLA-2PWRVVER V-2301375440411 REAROSATOM1970-51974-121975-265.781.7DH, PH RU -32KOLA-3PWRVVER V-2131375440411 REAROSATOM1977-41981-31982-1270.186.5DH, PH RU -33KOLA-4PWRVVER V-2131375440411 REAROSATOM1976-81984-101984-1270.986.4DH, PH RU -17KURSK-1LWGRRBMK-100032001000925 REAROSATOM1972-61976-121977-1065.468.2DH, PH RU -22KURSK-2LWGRRBMK-100032001000925 REAROSATOM1973-11979-11979-862.964.0DH, PH RU -38KURSK-3LWGRRBMK-100032001000925 REAROSATOM1978-41983-101984-368.870.2DH, PH The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(42)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics RU -39KURSK-4LWGRRBMK-100032001000925 REAROSATOM1981-51985-121986-272.373.5DH, PH RU -15LENINGRAD-1LWGRRBMK-100032001000925 REAROSATOM1970-31973-121974-1177.779.1DH, PH RU -16LENINGRAD-2LWGRRBMK-100032001000925 REAROSATOM1970-61975-71976-275.877.5DH, PH RU -34LENINGRAD-3LWGRRBMK-100032001000925 REAROSATOM1973-121979-121980-668.970.8DH, PH RU -35LENINGRAD-4LWGRRBMK-100032001000925 REAROSATOM1975-21981-21981-861.463.3DH, PH RU -9NOVOVORONEZH-3PWRVVER V-1791375417385 REAROSATOM1967-71971-121972-664.565.7DH, PH RU -11NOVOVORONEZH-4PWRVVER V-1791375417385 REAROSATOM1967-71972-121973-376.077.9DH, PH RU -20NOVOVORONEZH-5PWRVVER V-18730001000950 REAROSATOM1974-31980-51981-270.371.4DH, PH RU -23SMOLENSK-1LWGRRBMK-100032001000925 REAROSATOM1975-101982-121983-973.274.6DH, PH RU -24SMOLENSK-2LWGRRBMK-100032001000925 REAROSATOM1976-61985-51985-772.874.4DH, PH RU -67SMOLENSK-3LWGRRBMK-100032001000925 REAROSATOM1984-51990-11990-1081.081.8DH, PH RU -59VOLGODONSK-1PWRVVER V-320I32001000950 REAROSATOM1981-92001-32001-1285.986.4- SLOVAKIA SK -13BOHUNICE-3PWRVVER V-2131430475442 SE,plcSKODA1976-121984-81985-279.583.3DH, PH SK -14BOHUNICE-4PWRVVER V-2131444481448 SE,plcSKODA1976-121985-81985-1279.783.1DH, PH SK -6MOCHOVCE-1PWRVVER V-2131471470436 SE,plcSKODA1983-101998-71998-1083.485.8- SK -7MOCHOVCE-2PWRVVER V-2131471470436 SE,plcSKODA1983-101999-122000-483.885.6- SLOVENIA SI -1KRSKOPWRWestinghouse 21994730666 NEKWH1975-31981-101983-190.391.5- SOUTH AFRICA ZA -1KOEBERG-1PWRCP12775940900 ESKOMFRAM1976-71984-41984-778.079.9- ZA -2KOEBERG-2PWRCP12775940900 ESKOMFRAM1976-71985-71985-1177.281.4- SPAIN ES -6ALMARAZ-1PWRWE 3-loops29471050944 CNATWH1973-71981-51983-991.792.8- ES -7ALMARAZ-2PWRWE 3-loops2729980956 CNATWH1973-71983-101984-790.291.3- ES -8ASCO-1PWRWE 3-loops29411033995 ANAVWH1974-51983-81984-1286.287.1- ES -9ASCO-2PWRWE 3-loops29411027997 ANAVWH1975-31985-101986-388.989.9- ES -10COFRENTESBWRBWR-6323710921064 IDGE1975-91984-101985-385.086.2- ES -2SANTA MARIA DE GARONABWRBWR-31381466446 NUCLENORGE1966-91971-31971-592.993.4- ES -11TRILLO-1PWRPWR 3 loops301010661003 CNATKWU1979-81988-51988-890.290.3- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating, PH process heating.

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(43)

42

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics ES -16VANDELLOS-2PWRWE 3-loops294110871045 ANAVWH1980-121987-121988-377.778.6- SWEDEN SE -9FORSMARK-1BWRBWR 7529281033978 FKAABBATOM1973-61980-61980-1284.586.9- SE -11FORSMARK-2BWRBWR 7529281028990 FKAABBATOM1975-11981-11981-782.484.4- SE -14FORSMARK-3BWRBWR 3000330012121170 FKAABBATOM1979-11985-31985-886.789.0- SE -2OSKARSHAMN-1BWRABB BWR1375487473 OKGABBATOM1966-81971-81972-268.469.2- SE -3OSKARSHAMN-2BWRABB BWR1800661624 OKGABBATOM1969-91974-101975-182.083.4- SE -12OSKARSHAMN-3BWRBWR 75390014501152 OKGABBATOM1980-51985-31985-880.080.8- SE -4RINGHALS-1BWR2540887856 RABABBATOM1969-21974-101976-170.572.1- SE -5RINGHALS-2PWR2660917813 RABWH1970-101974-81975-579.982.1- SE -7RINGHALS-3PWRWE (3 loops)313511051044 RABWH1972-91980-91981-984.186.9- SE -10RINGHALS-4PWRW 3-loop2775981936 RABWH1973-111982-61983-1185.587.4- SWITZERLAND CH -1BEZNAU-1PWRWH - 2 loops1130380365 NOKWH1965-91969-71969-992.492.6DH CH -3BEZNAU-2PWRWH - 2 loops1130380365 NOKWH1968-11971-101971-1291.992.0DH CH -4GOESGENPWRPWR 3 Loop30021035970 KKGKWU1973-121979-21979-1192.793.1PH CH -5LEIBSTADTBWRBWR 6360012201165 KKLGETSCO1974-11984-51984-1286.987.9- CH -2MUEHLEBERGBWRBWR 41097390373 BKWGETSCO1967-31971-71972-1190.191.9- UK GB -18ADUNGENESS-B1GCRAGR1500615520 BEAPC1965-101983-41985-448.849.2- GB -18BDUNGENESS-B2GCRAGR1500615520 BEAPC1965-101985-121989-456.356.7- GB -19AHARTLEPOOL-A1GCRAGR1500655595 BENPC1968-101983-81989-461.061.1- GB -19BHARTLEPOOL-A2GCRAGR1500655595 BENPC1968-101984-101989-463.463.4- GB -20AHEYSHAM-A1GCRAGR1500625585 BENPC1970-121983-71989-465.565.7- GB -20BHEYSHAM-A2GCRAGR1500625575 BENPC1970-121984-101989-459.559.7- GB -22AHEYSHAM-B1GCRAGR1550680620 BENPC1980-81988-71989-482.883.0- GB -22BHEYSHAM-B2GCRAGR1550680620 BENPC1980-81988-111989-485.185.5- GB -16AHINKLEY POINT-B1GCRAGR1494655410 BETNPG1967-91976-101978-1073.673.7- GB -16BHINKLEY POINT-B2GCRAGR1494655430 BETNPG1967-91976-21976-971.271.4- GB -17AHUNTERSTON-B1GCRAGR1496644430 BETNPG1967-111976-21976-270.670.7- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating, PH process heating.

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(44)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics GB -17BHUNTERSTON-B2GCRAGR1496644430 BETNPG1967-111977-31977-373.673.7- GB -11AOLDBURY-A1GCRMAGNOX730230217 MELTNPG1962-51967-111967-1252.152.1- GB -11BOLDBURY-A2GCRMAGNOX660230217 MELTNPG1962-51968-41968-969.469.4- GB -24SIZEWELL-BPWRSNUPPS342512501188 BEPPC1988-71995-21995-987.087.1- GB -23ATORNESS 1GCRAGR1623682600 BENNC1980-81988-51988-577.578.1- GB -23BTORNESS 2GCRAGR1623682605 BENNC1980-81989-21989-273.173.8- GB -13AWYLFA 1GCRMAGNOX1920540490 MELEE/B&W/T1963-91971-11971-1165.165.5- GB -13BWYLFA 2GCRMAGNOX1920540490 MELEE/B&W/T1963-91971-71972-161.561.8- UKRAINE UA -40KHMELNITSKI-1PWRVVER V-32030001000950 NNEGCPAIP1981-111987-121988-879.581.1DH UA -41KHMELNITSKI-2PWRVVER V-32030001000950 NNEGCPAIP1985-22004-82005-1276.177.0DH UA -27ROVNO-1PWRVVER V-2131375420381 NNEGCPAIP1973-81980-121981-972.173.1DH UA -28ROVNO-2PWRVVER V-2131375415376 NNEGCPAIP1973-101981-121982-781.783.1DH UA -29ROVNO-3PWRVVER V-32030001000950 NNEGCPAIP1980-21986-121987-567.470.3DH UA -69ROVNO-4PWRVVER V-32030001000950 NNEGCPAA1986-82004-102006-465.968.9DH UA -44SOUTH UKRAINE-1PWRVVER V-30230001000950 NNEGCPAA1977-31982-121983-1071.072.7DH UA -45SOUTH UKRAINE-2PWRVVER V-33830001000950 NNEGCPAA1979-101985-11985-473.875.2DH UA -48SOUTH UKRAINE-3PWRVVER V-32030001000950 NNEGCPAA1985-21989-91989-1271.173.2DH UA -54ZAPOROZHE-1PWRVVER V-32030001000950 NNEGCPAIP1980-41984-121985-1276.778.1DH UA -56ZAPOROZHE-2PWRVVER V-32030001000950 NNEGCPAIP1981-11985-71986-279.381.0DH UA -78ZAPOROZHE-3PWRVVER V-32030001000950 NNEGCPAIP1982-41986-121987-380.283.9DH UA -79ZAPOROZHE-4PWRVVER V-32030001000950 NNEGCPAIP1983-41987-121988-481.085.0DH UA -126ZAPOROZHE-5PWRVVER V-32030001000950 NNEGCPAIP1985-111989-81989-1079.982.3DH UA -127ZAPOROZHE-6PWRVVER V-32030001000950 NNEGCPAIP1986-61995-101996-980.882.6DH USA US -313ARKANSAS ONE-1PWRB&W (L-loop) D2568880842 ENTGARKSB&W1968-121974-81974-1290.790.7- US -368ARKANSAS ONE-2PWRCE (2-loop) DR30261040997 ENTERGYCE1968-121978-121980-391.391.3- US -334BEAVER VALLEY-1PWRW (3-loop)2689923892 FENOCWH1970-61976-61976-1090.690.6- US -412BEAVER VALLEY-2PWRW (3-loop)2689923846 FENOCWH1974-51987-81987-1192.892.8- US -456BRAIDWOOD-1PWRW (4-loop)358712401178 EXELONWH1975-121987-71988-796.096.0- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

(45)

44

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2009 — continued

EAF %UCF %Non- 2000 to2000 toelectrical CodeNameThermalGrossNet 20092009Applics US -457BRAIDWOOD-2PWRW (4-loop) DRY358712131152 EXELONWH1975-121988-51988-1095.295.3- US -259BROWNS FERRY-1BWRBWR-4345811521065 TVAGE1967-51973-101974-889.289.2- US -260BROWNS FERRY-2BWRBWR-4 (Mark 1)345811551103 TVAGE1967-51974-81975-391.791.7- US -296BROWNS FERRY-3BWRBWR-4 (Mark 1)345814001104 TVAGE1968-71976-91977-393.293.2- US -325BRUNSWICK-1BWRBWR-4 (Mark 1)2923990938 PROGENGCGE1970-21976-121977-392.892.9- US -324BRUNSWICK-2BWRBWR-4 (Mark 1)2923989920 PROGENGCGE1970-21975-41975-1191.991.9- US -454BYRON-1PWRW (4-loop) (DR358712251164 EXELONWH1975-121985-31985-995.095.0- US -455BYRON-2PWRW (4-Loop) (DR358711961136 EXELONWH1975-121987-21987-896.096.0- US -483CALLAWAY-1PWRW (4-loop) DRY356512361190 AMERGENEWH1976-41984-101984-1289.389.3- US -317CALVERT CLIFFS-1PWRCE (2-loop) (D2700918873 CCNPPCE1969-71975-11975-591.791.7- US -318CALVERT CLIFFS-2PWRCE (2-loop) (D2700911862 CCNPPCE1969-71976-121977-493.993.9- US -413CATAWBA-1PWRW (4-loop) (IC341111881129 DUKEWH1975-81985-11985-691.191.1- US -414CATAWBA-2PWRW (4-loop) (IC341111881129 DUKEWH1975-81986-51986-891.591.5- US -461CLINTON-1BWRBWR-6 (Mark 3)347310981043 AMERGENEGE1976-21987-41987-1193.994.0- US -397COLUMBIABWRBWR-5 (Mark 2)348612001131 ENERGYNWGE1972-21984-51984-1289.389.3- US -445COMANCHE PEAK-1PWRW (4-loop) DRY345811891209 TXUWH1974-121990-41990-893.193.1- US -446COMANCHE PEAK-2PWRW (4-loop) DRY345811891158 TXUWH1974-121993-41993-893.693.6- US -298COOPERBWRBWR-4 (Mark 1)2381801769 NPPDGE1968-61974-51974-786.786.7- US -302CRYSTAL RIVER-3PWRB&W (L-loop)2568890860 PROGRESSB&W1968-91977-11977-391.191.2- US -346DAVIS BESSE-1PWRB&W (R-loop)2772925879 FENOCB&W1971-31977-81978-773.273.2- US -275DIABLO CANYON-1PWRW (4-loop)333811361122 PGEWH1968-41984-111985-590.190.1- US -323DIABLO CANYON-2PWRW (4-loop)341111641118 PGEWH1970-121985-101986-390.590.7- US -315DONALD COOK-1PWRW (4-loop) ICE330410771009 IMPCOWH1969-31975-21975-869.169.2- US -316DONALD COOK-2PWRW (4-loop) ICE346811331060 IMPCOWH1969-31978-31978-783.983.9- US -237DRESDEN-2BWRBWR-3 (Mark 1)2527913867 EXELONGE1966-11970-41970-693.193.1- US -249DRESDEN-3BWRBWR-3 (Mark 1)2527913867 EXELONGE1966-101971-71971-1193.893.8- US -331DUANE ARNOLD-1BWRBWR-4 (Mark 1)1912614579 FPLDUANEGE1970-61974-51975-292.492.6- US -341ENRICO FERMI-2BWRBWR-4 (Mark 1)343011541122 DETEDGE1972-91986-91988-188.288.2- US -348FARLEY-1PWRW (3-loop)2775895851 ALPWH1972-81977-81977-1290.390.3- US -364FARLEY-2PWRW (3-loop) DRY2775905860 ALPWH1972-81981-51981-791.791.7-

Grid ConnectionCommercial OperationCountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction Start

Références

Documents relatifs

To address these objectives, the conference was structured into seven sessions covering spent fuel management strategies, status and challenges of an integrated approach,

1.20. The management of fresh nuclear fuel or spent nuclear fuel, the management of other process material used during operation, and the management of radioactive waste generated

Operator codeOperationalConstructionLT shut downShut downPlanned GE GENERAL ELECTRIC1 GFNPC GUANGXI FANGCHENGGANG NUCLEAR POWER COMPANY, LTD.2 2 GPU GENERAL

OPERATORS - Abbreviations and Summary — continued Operator CodeOperationalConstructionLT Shut DownShut DownPlanned LIPA LONG ISLAND POWER AUTHORITY1 LNPC LIAONIN NUCLEAR

A goal of a power uprate is to increase the gross electrical output of the nuclear power plant, while maintaining adequate safety, design and operating margins.. It is important

NSSS SUPPLIERS - Abbreviations and Summary NSSS Supplier CodeOperationalConstructionLTShut DownShut DownPlanned A/F/W ASSOCIATION ACEC,FRAMATOME ET WESTINGHOUSE.1 ABBATOM

OPERATORS - Abbreviations and Summary — continued Operator CodeOperationalConstructionLT Shut DownShut DownPlanned PSEG PUBLIC SERVICE ELECTRIC & GAS CO.1 PSEGPOWR PSEG

– General information as of the end of 2006 on power reactors operating or under construction, and shut down;.. – Performance data on reactors operating in the Agency’s Member