(1)

Nuclear Power Reactors

in the World

R E F E R E N C E D A T A S E R I E S No. 2 2008 Edition

(2)

REFERENCE DATA SERIES No. 2

NUCLEAR POWER REACTORS IN THE WORLD

2008 Edition

INTERNATIONAL ATOMIC ENERGY AGENCY

VIENNA, 2008

(3)

NUCLEAR POWER REACTORS IN THE WORLD IAEA, VIENNA, 2008

IAEA-RDS-2/28 ISBN 978–92–0–107708–0

ISSN 1011–2642

Printed by the IAEA in Austria

July 2008

(4)

CONTENTS

Introduction. . . 5 Definitions. . . 7 Table 1. Reactors in operation, long-term shut down

and under construction, 31 Dec. 2007 . . . 10 Table 2. Type and net electrical power of

reactors connected to the grid,

31 Dec. 2007 . . . 12 Table 3. Type and net electrical power of

reactors under construction,

31 Dec. 2007 . . . 13 Table 4. Reactor years of experience,

up to 31 Dec. 2007 . . . 14 Table 5. Operating reactors and net electrical power,

1980 to 2007 . . . 16 Table 6. Nuclear electricity production and share

from 1980 to 2007. . . 18 Table 7. Annual construction starts and

connections to the grid, 1954 to 2007 . . . 21 Table 8. Number of new reactors connected to the

grid and median construction time span . . . . 22 Table 9. Construction starts during 2007 . . . 24 Table 10. Connections to the grid during 2007 . . . 25 Table 11. Scheduled connections to the grid

during 2008 . . . 25 Table 12. Reactors planned for construction

as known on 31 Dec. 2007 . . . 26 Table 13. Reactors under construction

31 Dec. 2007 . . . 28 Table 14. Reactors in operation,

31 Dec. 2007 . . . 30 Table 15. Long-term shut down reactors,

31 Dec. 2007 . . . 46 Table 16. Reactors permanently shut down,

31 Dec. 2007 . . . 47 Table 17. Reactors in decommissioning process

or decommissioned, 31 Dec. 2007 . . . 52 Table 18. Performance factors by

reactor category, 2005 to 2007 . . . 55

Table 19. Full outage statistics during 2007 . . . 56

Table 20. Direct causes of full outages during 2007 . . 57

(5)

Table 21. Direct causes of full outages,

1971 to 2007 . . . 58 Table 22. Countries – abbreviations

and summary . . . 59 Table 23. Reactor types – abbreviations

and summary . . . 61 Table 24. Operators – abbreviations

and summary . . . 62 Table 25. NSSS suppliers – abbreviations

and summary . . . 68 Figure 1. Nuclear reactors by type and

net electrical power (as of 31 Dec. 2007) . . . 72 Figure 2. Reactors under construction by type and

net electrical power (as of 31 Dec. 2007) . . . 73 Figure 3. Nuclear share of electricity generation

(as of 31 Dec. 2007) . . . 74 Figure 4. Worldwide median construction time span

(as of 31 Dec. 2007) . . . 75 Figure 5. Number of reactors in operation by age

(as of 31 Dec. 2007) . . . 76 Figure 6. Annual construction starts and

connections to the grid (1954–2007) . . . 77

(6)

INTRODUCTION

This is the twenty-eighth edition of Reference Data Series No. 2, Nuclear Power Reactors in the World, which is published once per year, to present the most recent reactor data available to the Agency. It contains the fol- lowing summarized information:

– General information as of the end of 2007 on power reactors operating or under construction, and shut down;

– Performance data on reactors operating in the Agency’s Member States, as reported to the IAEA.

The Agency’s Power Reactor Information System (PRIS) is a comprehensive data source on nuclear power reactors in the World. It includes specification and per- formance history data of operating reactors as well as reactors under construction or reactors being decommis- sioned. PRIS data are collected by the Agency through the designated national correspondents of Member States.

PRIS outputs are available in the annual publications and on the PRIS web site

http://www.iaea.org/dbpage.

Detail outputs are accessible to registered users through on-line applications. Enquiries should be addressed to:

Director

Division of Nuclear Power

International Atomic Energy Agency

Wagramer Strasse 5, P.O. Box 100

A-1400 Vienna, Austria

(7)
(8)

DEFINITIONS

Performance Factors

(REG – PEL – UEL – XEL)

EAF (%) = × 100

REG (REG – PEL – UEL)

UCF (%) = × 100

REG UCL (%) = UEL × 100

REG PCL (%) = PEL × 100

REG

LF (%) = EG × 100

REG

Online Hours OF (%) = _______ × 100

Total Hours where

EAF is the energy availability factor, expressed in per cent.

UCF is the unit capability factor, expressed in per cent.

UCL is the unplanned capability loss factor, ex- pressed in per cent.

PCL is the planned capability loss factor, expressed in per cent.

LF is the load factor, expressed in per cent.

OF is the operating factor, expressed in per cent.

REG reference energy generation: is the net electri-

cal energy [MW·h], which would have been

supplied when a unit is continuously operated

at the reference unit power during the entire ref-

erence period.

(9)

8

PEL planned energy loss: is the energy [MW·h] that was not supplied during the period because of planned shutdowns or load reductions due to causes under plant management control.

Energy losses are considered planned if they are scheduled at least four weeks in advance.

UEL unplanned energy loss: the energy [MW·h] that was not supplied during the period because of unplanned shutdowns, outage extensions, or load reductions due to causes under plant man- agement control. Energy losses are considered to be unplanned if they are not scheduled at least four weeks in advance.

XEL external energy loss: the energy [MW·h], that was not supplied due to constraints reducing plant availability and being beyond plant man- agement control.

EG the net electrical energy supplied during the ref- erence period as measured at the unit outlet terminals, i.e. after deducting the electrical energy taken by unit auxiliaries and the losses in transformers that are considered integral parts of the unit.

Construction Start

Date when first major placing of concrete, usually for the base mat of the reactor building, is done.

First Criticality

Date when the reactor is made critical for the first time.

Grid Connection

Date when the plant is first connected to the electrical grid for the supply of power. After this date, the plant is consid- ered to be in operation.

Commercial Operation

Date when the plant is handed over by the contractors to the owner and declared officially to be in commercial operation.

Permanent Shutdown

Date when the plant is officially declared to be shut down

by the owner and taken out of operation permanently.

(10)

Long-term Shutdown

A unit is considered in the long-term shutdown status, if it has been shut down for an extended period (usually sev- eral years) without any firm recovery schedule at the beginning but there is the intention to re-start the unit eventually.

Units and Energy Conversion

1 terawatt-hour [TW·h] = 10 6 megawatt-hours [MW·h].

For an average power plant,

1 TW·h = 0.39 megatonnes of coal equivalent (input)

= 0.23 megatonnes of oil equivalent (input).

(11)

10

TABLE 1. REACTORS IN OPERATION, LONG-TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2007

No ofTotalNo ofTotalNo ofTotal% of UnitsMW(e)UnitsMW(e)UnitsMW(e)Total ARGENTINA2 935 1 692 6.726.20 ARMENIA1 376 2.3543.48 BELGIUM7 5824 45.8554.05 BRAZIL2 1795 11.652.84 BULGARIA2 1906 2 1906 13.6932.10 CANADA18 12610 4 2726 88.1914.70 CHINA11 8572 5 4220 59.301.92 CZECH REP.6 3619 24.6430.25 FINLAND4 2696 1 1600 22.5128.94 FRANCE59 63260 1 1600 420.1376.85 GERMANY17 20430 133.2127.28 HUNGARY4 1829 13.8636.81 INDIA17 3782 6 2910 15.762.52 IRAN, ISL. REP.1 915 NANA JAPAN55 47587 1 246 1 866 267.3427.54 KOREA REP.20 17451 3 2880 136.6035.34 LITHUANIA1 1185 9.0764.36 MEXICO2 1360 9.954.56 NETHERLANDS1 482 3.994.10 PAKISTAN2 425 1 300 2.312.34 ROMANIA2 1305 7.0813.02 RUSSIAN FED.31 21743 6 3639 147.9915.97 SLOVAKIA5 2034 14.1654.30 SLOVENIA1 666 5.4341.57 SOUTH AFRICA2 1800 12.605.45 SPAIN8 7450 52.7117.44 SWEDEN10 9034 64.3146.12 SWITZERLAND5 3220 26.4940.03 Reactors under ConstructionNuclear Electricity Supplied in 2007 CountryReactors in OperationLong-term Shutdown Reactors TW(e).h

(12)

TABLE 1. REACTORS IN OPERATION, LONG-TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2007 — continued No o f Total N o o f Total N o o f Total % o f Units M W (e ) Units M W (e ) Units M W (e ) Total

UK19 10222 57.5215.12 UKRAINE15 13107 2 1900 87.2248.09 USA104 100582 1 1165 806.5519.39 TOTAL439 372208 5 2972 33 27193 2608.14NA Note: The total includes the following data from Taiwan, China: — 6 units, 4921 MW(e) in operation; 2 units, 2600 MW(e) under construction; — 38.96 TW(e).h of nuclear electricity generation, representing 19.30% of the total electricity generated there; The total share is related only to the countries with NPPs in operation

Nuclear Electricit y S upplied in 2007 TW(e).h Country Reactors in Operation Long-term Shutdown Reactors R eactors under Construction

(13)

12

TABLE 2. TYPE AND NET ELECTRICAL POWER OF REACTORS CONNECTED TO THE GRID, 31 DEC. 2007 No. M W (e ) No. M W (e ) No. M W (e ) No. M W (e ) No. M W (e ) No. M W (e ) No. M W (e )

ARGENTINA2 935 2 935 ARMENIA 1 376 1 376 BELGIUM7 5824 7 5824 BRAZIL2 1795 2 1795 BULGARIA2 1906 2 1906 CANADA18 12610 18 12610 CHINA9 7272 2 1300 11 8572 CZECH REP.6 3619 6 3619 FINLAND2976 2 1720 4 2696 FRANCE58 63130 1 130 59 63260 GERMANY11 13973 6 6457 17 20430 HUNGARY4 1829 4 1829 INDIA2300 15 3482 17 3782 JAPAN23 18420 32 29167 55 47587 KOREA REP.16 14824 4 2627 20 17451 LITHUANIA1 1185 1 1185 MEXICO21360 2 1360 NETHERLANDS1482 1 482 PAKISTAN1300 1 125 2 425 ROMANIA2 1305 2 1305 RUSSIA15 10964 15 10219 1 560 31 21743 SLOVAKIA52034 5 2034 SLOVENIA1666 1 666 SOUTH AFRICA21800 2 1800 SPAIN65940 2 1510 8 7450 SWEDEN32819 7 6215 10 9034 SWITZERLAND31700 2 1520 5 3220 UK1 1188 18 9034 19 10222 UKRAINE15 13107 15 13107 USA69 66697 35 33885 104 100582 TOTAL265 243421 94 85275 18 9034 44 22384 16 11404 2 690 439 372208 The totals include 6 units, 4921 MW(e) in Taiwan, China. During 2007, 3 reactors, 1852 MW(e) were newly connected to the grid.

Country FBR Total PWR B WR PHWR LWGR GCR

(14)

TABLE 3. TYPE AND NET ELECTRICAL POWER OF REACTORS UNDER CONSTRUCTION, 31 DEC. 2007 No. M W (e ) No. M W (e ) No. M W (e ) No. M W (e ) No. M W (e ) No. M W (e )

ARGENTINA1 692 1 692 BULGARIA2 1906 2 1906 CHINA5 4220 5 4220 FINLAND1 1600 1 1600 FRANCE1 1600 1 1600 INDIA2 1834 3 606 1 470 6 2910 IRAN,ISL.REP1 915 1 915 JAPAN1866 1 866 KOREA REP.32880 3 2880 PAKISTAN1 300 1 300 RUSSIAN FEDERATION4 1964 1 925 1 950 6 3839 UKRAINE2 1900 2 1900 USA1 1165 1 1165 TOTAL24 21150 (*) 22600 4 1298 1 925 2 1420 33 27393 (*) The totals include 2 units (2xBWR), 2600 MW(e) in Taiwan, China. During 2007, 7 reactors, 5194 MW(e) started construction.

Total FBR Country PHWR LWGR PWR BWR

(15)

14

TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2007

CapacityCapacityCapacityCapacity NoMW(e) NetNoMW(e) NetNoMW(e) NetNoMW(e) NetYearsMonths ARGENTINA29352935587 ARMENIA137613762752338 BELGIUM75824110858342197 BRAZIL2179521795333 BULGARIA2190641632635381433 CANADA181261042726347825158145461 CHINA118572118572773 CZECH REP.63619636199810 FINLAND42696426961154 FRANCE5963260113748706700815822 GERMANY172043019587936263097175 HUNGARY4182941829902 INDIA1737821737822844 ITALY414234142381 JAPAN554758712463297594813013318 KAZAKHSTAN1521522510 KOREA REP.201745120174512998 LITHUANIA111851118522370416 MEXICO21360213603111 NETHERLANDS1482155253763 PAKISTAN242524254310 ROMANIA21305213051111 RUSSIAN FED.3121743578636225299323 SLOVAKIA520342501725351237 SLOVENIA16661666263 SOUTH AFRICA2180021800463 SPAIN8745026211080712536 SWEDEN1090343122513102593526 CountryExperience

Reactors Connected to the GridLong-term Shutdown ReactorsPermanently Shutdown ReactorsTotal, Operating and Shutdown Reactors

(16)

TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2007 — continued

CapacityCapacityCapacityCapacity NoMW(e) NetNoMW(e) NetNoMW(e) NetNoMW(e) NetYearsMonths SWITZERLAND532205322016310 UK1910222263666451388814198 UKRAINE15131074351519166223386 USA10410058228976413211034632919 TOTAL439 372208 5 2972 119 35213 563 410393 13036 5 Notes: 1. The total includes the following data from Taiwan, China: — reactors connected to the grid: 6 units, 4921 MW(e), 158 years 1 month. 2. Operating Experience counted from grid connection and a long-term shutdown period is excluded.

Country

Reactors ConnectedLong-term ShutdownPermanently Shutdown Experience Total, Operating to the GridReactorsReactorsand Shutdown Reactors

(17)

16

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, 1980 TO 2007

No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e) ARGENTINA13352935293529352978293529352935 ARMENIA2816281613761376137613761376 BELGIUM4167085464755017563175712758017582475824 BRAZIL16261626162621976219012190121795 BULGARIA3122441632525856353863760427222190621906 CANADA10517216974120139932114902149998181258418126101812610 CHINA321883218896587107572118572 CZECH REP.1391416324178252578633736352363619 FINLAND4220842300423104231042656426764269642696 FRANCE22143884337478565580856585735963183596336359632605963260 GERMANY19103232418110212125019209721921283172033917203391720430 HUNGARY2825417104172941729417554175541829 INDIA48326114371324101746142508152993163577173782 ITALY4111231273 JAPAN23149183323612413086751398715243262554759355475875547587 KAZAKHSTAN113511351135150 KOREA REP.156453580972201191151612990201681020174542017451 LITHUANIA11380227602237022370111851118511185 MEXICO16402125621290213602136021360 NETHERLANDS24982508253925101449145014821482 PAKISTAN11251137112511252425242524252425 ROMANIA16551655165521305 RUSSIAN FED.2085962815841291889830198483019848312174331217433121743 SLOVAK REP.278041632416324163262440624425203452034 SLOVENIA1632162016201676165616661666 SOUTH AFRICA21840218402184021840218002180021800 SPAIN3107385608970999709797468975918745087450 SWEDEN855151294551299191210058119417108916109097109034 SWITZERLAND4194052881529425305653170532205322053220 200620051980CountryNumber of Units and Net Capacity (MW(e)) Connected to the Grid at 31st Dec. of Each Year 20001995199019852007

(18)

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, 1980 TO 2007 — continued

No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e)No.MW(e) UK3386863812485371349635137183313059231185219109651910222 UKRAINE32286108324151302015130451311195151310715131071513107 USA695088190744011089622810898068103962971039814510399257104100582 WORLD245 135285 363 248075 416 320482 435 342471 435 350660 441 368239 435 369682 439 372208 Note: The world total includes the following data from Taiwan, China: - 1980: 2 units, 1208 MW(e), 1985: 6 units, 4890 MW(e), 1990: 6 units, 4828 MW(e), 1995: 6 units, 4884 MW(e), 2000: 6 units, 4884 MW(e), 2005: 6 units, 4884 MW(e), 2006: 6 units, 4921 MW(e), 2007: 6 units, 4921 MW(e). Estimates for 2008 based on current expected grid connection dates for reactors under construction as of 31 December 2007.

CountryNumber of Units and Net Capacity (MW(e)) Connected to the Grid at 31st Dec. of Each Year 19801985199019952000200520062007

(19)

18

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE FROM 1980 TO 2007

TW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of Total ARGENTINA2.18NA5.2511.736.7219.786.5711.795.747.266.376.927.156.936.726.20 ARMENIA1.8433.002.5042.742.4241.952.3543.48 BELGIUM11.86NA29.2559.7840.5960.1239.3055.5245.8156.7545.3455.6344.3154.4345.8554.05 BRAZIL3.171.652.060.962.330.975.591.879.202.4612.983.3111.652.84 BULGARIA5.71NA12.1731.6013.5135.7316.2246.4316.7945.0017.3844.1018.1543.6413.6932.10 CANADA38.02NA59.4712.7369.8714.7793.9817.2669.1211.7786.8314.5492.4415.8088.1914.70 CHINA12.131.2416.021.1950.332.0351.811.9359.301.92 CZECH REP.1.99NA11.77NA12.2320.0412.7018.6923.2530.5224.5031.4824.6430.25 FINLAND6.68NA17.9838.1918.1335.0518.1329.9121.5832.1522.3632.9122.0027.9922.5128.94 FRANCE57.31NA213.2664.82297.6174.52358.7176.14395.3976.40431.1778.46429.8278.07420.1376.85 GERMANY41.44NA119.5931.21139.3733.10146.1329.64160.6630.57154.6131.08158.7131.42133.2125.86 HUNGARY6.1023.6212.8951.4213.2042.3013.3540.6013.0237.1512.5137.7013.8636.81 INDIA2.77NA3.872.195.292.156.991.8914.233.1415.732.8315.592.6215.762.52 ITALY2.11NA6.463.80 JAPAN79.11NA145.3722.67187.1927.10274.7133.40305.6733.82280.5029.33291.5429.97267.3427.54 KAZAKHSTAN0.080.13 KOREA REP.3.26NA12.1423.2150.2649.1160.2136.10103.5440.74137.5944.67141.1838.64136.6035.34 LITHUANIA8.75NA15.70NA10.6486.087.4273.889.5470.267.9469.749.0764.36 MEXICO2.782.577.536.007.923.8610.325.0110.404.869.954.56 NETHERLANDS3.97NA3.696.093.294.853.784.893.704.313.773.923.273.473.994.10 PAKISTAN0.070.450.261.020.381.060.460.880.901.652.412.802.552.742.312.34 ROMANIA5.0510.865.118.585.189.007.0813.02 RUSSIAN FED.43.78NA88.26NA109.62NA91.5911.79120.1014.95137.6415.78144.6515.91147.9915.97 SLOVAK REP.4.52NA8.70NA11.16NA11.3544.1415.1753.4316.3456.0616.6057.1614.1654.30 SLOVENIA3.85NA4.39NA4.5739.464.5537.385.6142.365.2940.265.4341.57 SOUTH AFRICA5.394.228.475.5611.296.4813.006.5812.245.5210.074.4112.605.45 SPAIN4.98NA26.8324.0351.9835.8753.4934.0659.4927.6354.9919.5657.4319.8252.7117.44 SWEDEN25.42NA55.9542.3365.2745.9267.1946.5551.8839.0069.6444.9365.0547.9864.3146.12 SWITZERLAND13.63NA21.2839.8122.4042.5623.5839.9225.0538.1822.1138.0226.3742.2326.4940.03 200620051980CountryNuclear capacity (TW(e).h) of reactors connected to the Grid at 31st Dec. of the year 20001995199019852007

(20)

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE FROM 1980 TO 2007 — continued

TW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of TotalTW(e).h% of Total UK32.32NA53.7319.5958.7719.7270.6425.3872.9921.9375.3419.8669.3818.1157.5215.12 UKRAINE6.38NA35.81NA71.26NA65.7837.8372.5647.2883.4048.4884.9147.5387.2248.09 USA249.84NA378.6815.54578.1220.56673.5222.49755.5519.83783.3519.28788.3119.42806.5519.39 WORLD635.36 1327.25 1890.39 2190.13 2440.36 2626.39 2660.83 2608.14 Note: The world total includes the following data from Taiwan, China: 1990: 31.54 TW(e).h of nuclear electricity generation, representing 38.32% of the total electricity generated there 1995: 33.8 TW(e).h of nuclear electricity generation, representing 28.79% of the total electricity generated there 2000: 37 TW(e).h of nuclear electricity generation, representing 23.64% of the total electricity generated there 2005: 38.4 TW(e).h of nuclear electricity generation, representing 20.25% of the total electricity generated there 2006: 38.32 TW(e).h of nuclear electricity generation, representing 19.49% of the total electricity generated there 2007: 38.96 TW(e).h of nuclear electricity generation, representing 19.3% of the total electricity generated there CountryNuclear capacity (TW(e).h) of reactors connected to the Grid at 31st Dec. of the year 19801985199019952000200520062007

(21)
(22)

TABLE 7. ANNUAL CONSTRUCTION STARTS AND CONNECTIONS TO THE GRID, 1954 TO 2007

Units MW(e) Units MW(e) Units MW(e)

1954 1 60 1 5 1 5

1955 8 352 1 5

1956 5 581 1 50 2 55

1957 13 1747 3 134 5 189

1958 6 434 1 50 6 239

1959 7 906 5 238 11 477

1960 11 918 4 452 15 929

1961 7 1391 1 15 16 946

1962 7 1237 9 893 25 1839

1963 5 2100 9 456 33 2271

1964 9 2826 8 1036 40 3232

1965 9 3174 8 1681 48 4913

1966 15 7070 8 1375 55 6279

1967 25 15019 11 2107 64 8310

1968 32 22409 6 1063 68 9334

1969 18 12499 10 3670 78 13004

1970 34 23456 6 3539 84 18986

1971 14 8626 16 7768 99 26631

1972 30 23353 16 8538 113 35286

1973 27 23280 20 11696 132 45953

1974 27 23577 26 16878 154 63290

1975 32 30183 15 9760 169 72709

1976 33 30817 19 13533 186 86162

1977 19 16766 18 12889 200 98696

1978 14 13103 20 15496 219 114213

1979 25 22127 8 6889 225 120102

1980 20 19254 21 15170 245 135285

1981 15 14123 23 20391 267 156098

1982 14 15629 19 14997 284 170790

1983 9 7569 23 18921 306 190067

1984 7 7045 33 30878 336 220865

1985 13 11224 33 30631 363 248075

1986 7 5442 27 26876 389 274438

1987 7 6820 22 22002 407 298233

1988 5 5836 14 13618 416 307457

1989 6 4014 12 10397 420 314333

1990 4 2417 10 10531 416 320482

1991 2 2246 4 3668 415 323865

1992 3 3092 6 4799 418 327202

1993 4 3535 9 9026 427 335853

1994 2 1300 5 4164 429 338860

1995 5 3529 434 342225

1996 1 610 6 6974 438 348140

1997 5 4386 3 3555 433 348321

1998 3 2111 4 2978 430 345859

1999 4 4560 4 2704 432 348297

2000 6 5332 6 3180 435 350660

2001 1 1304 3 2696 438 353424

2002 5 2440 6 5036 439 357831

2003 1 202 2 1625 437 360084

2004 2 1336 5 4785 438 364807

2005 3 2900 4 3821 441 368239

2006 4 3520 2 1490 435 369682

2007 7 5194 3 1852 439 372208

Year

Construction Starts

Reactors in operation Connections

to the Grid

(23)

22

TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME SPAN No. Months No. Months No. Months No. Months No. M onths N o. Months No. M onths N o. Months

ARGENTINA1109 ARMENIA273 BELGIUM480 BRAZIL11321295 BULGARIA18711041891113 CANADA4697985101297 CHINA373660180180 CZECH REP.17439311671191 FINLAND463 FRANCE1366246815863934124 GERMANY96871006103 HUNGARY2112290 INDIA11522154115231204122164174162 ITALY1101 JAPAN116110468491046342447 KOREA REP.159465462261556454 LITHUANIA1801116 MEXICO11511210 PAKISTAN183 ROMANIA11691290 RUSSIAN FED.67497347211102233 SLOVAKIA2892992187 SLOVENIA180 SOUTH AFRICA2102 SPAIN5112296 SWEDEN385474 SWITZERLAND1631125 Note: Construction time is measured from the first pouring of basement concrete to the first grid connection of the unit.

2007 2001 to 2005 to 1980

1991 to 1995

1986 to 1990

1976 1981 to 1985

1996 to 2000 2006 Country

(24)

TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME SPAN — continued No. Months No. Months No. Months No. Months No. M onths N o. Months No. M onths N o. Months

UK41066186498180 UKRAINE38976465711132227 USA1895251152214412211278 TOTAL86 74 131 99 85 95 29 104 23 146 20 64 2 77 3 80 Note: Construction time is measured from the first pouring of basement concrete to the first grid connection of the unit. The totals include the following data from Taiwan, China: — 1976 to 1980: 2 units, 64 Months — 1981 to 1985: 4 units, 72 Months

2005 1980 1985 1990 1995 to to to to 2006 to to 2000 2007 Country

1976 1981 1986 1991 1996 2001

(25)

24

TABLE 9. CONSTRUCTION STARTS DURING 2007

TypeModel CodeNameThermalGrossNet CHINA CN -15QINSHAN 2-4PWRCNP 6001930650610 NPQJVCCNNC 2007-12011-92012-1 CN -20HONGYANHE 1PWRCPR-1000290510801000 LHNPCDFEC 2007-8—— FRANCE FR -74FLAMANVILLE-3PWREPR430016501600 EDFFRAM 2007-122012-5— KOREA REP. KR -22SHIN-KORI-2PWROPR-100028251000960 KHNPDHICKOPC 2007-62011-82011-12 KR -23SHIN-WOLSONG-1PWROPR-100028251000960 KHNPDHICKOPC 2007-112011-52011-10 RUSSIAN FED. RU -151SEVERODVINSK 1PWRKLT-40S 'Flo1503532 REAFAEA 2007-4—2010-12 RU -152SEVERODVINSK 2PWRKLT-40S 'Flo1503532 REAFAEA 2007-4—2010-12 During 2007, 7 reactors (5194 MW) started construction.

Commercial OperationNSSS Supplier Construction startGrid ConnectionCountryReactorCapacity [MW] Operator

(26)

TABLE 10. CONNECTIONS TO THE GRID DURING 2007

CodeNameThermalGrossNet CHINA CN -11TIANWAN 2PWRVVER V-428300010001000 JNPCIZ 2000-102007-52007-5 INDIA IN -15KAIGA-3PHWRHorizontal Pre800220202 NPCILNPCIL 2002-32007-22007-4 ROMANIA RO -2CERNAVODA-2PHWRCANDU 62180706650 SNNAECL 1983-72007-52007-8 During 2007, 3 reactors (1852 MW(e)) were newly connected to the grid.

Capacity [MW]CountryReactorTypeModel OperatorGrid ConnectionNSSS Supplier Construction Start

First Criticality

TABLE 11. SCHEDULED CONNECTIONS TO THE GRID DURING 2008 Code Name Thermal Gross Net

INDIA IN -16KAIGA-4PHWR800220202 NPCILNPCIL 2002-52008-62008-7 IN -19RAJASTHAN-5PHWR0220202 NPCILNPCIL 2002-92008-52008-6 IN -20RAJASTHAN-6PHWR0220202 NPCILNPCIL 2003-12008-112008-12 During 2008, 3 reactors (606 MW(e)) are expected to achieve grid connection.

Capacity [MW] Country Reactor Type Operator Grid Date NSSS Supplier Construction Start First Criticality

(27)

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2007

CodeNameThermalGrossNet BRAZIL BR -3ANGRA-3 PWR376513501275 ELETRONUKWU — CHINA CN -28FANGJIASHAN 1PWRCPR-1000 — CN -29FANGJIASHAN 2PWRCPR-1000 — CN -30FUQING 1PWRCPR-1000 — CN -31FUQING 2PWRCPR-1000 — CN -24HAIYANG 1PWRAP10001000 SNPCWH — CN -25HAIYANG 2PWRAP10001000WH — CN -26HONGSHIDING 1PWR — CN -27HONGSHIDING 2PWR — CN -21HONGYANHE 2PWRCPR-1000290510801000 LHNPCDFEC — CN -22HONGYANHE 3PWRCPR-100029051080 LHNPCDFEC — CN -23HONGYANHE 4PWRCPR-100029051080 — CN -37NINGDE 1PWRM310290510871000 NDNPCDFEC 2008-2 CN -37NINGDE 2PWRM310290510801000 — CN -38NINGDE 3PWRM310290510801000 — CN -39NINGDE 4PWRM310290510801000 — CN -16SANMEN 1PWR1000 — CN -17SANMEN 2PWR1000 — CN -34TAISHAN 1PWREPR1000 — CN -35TAISHAN 2PWREPR1700 — CN -32TAOHUAJIANG 1PWR — CN -33TAOHUAJIANG 2PWR — CN -40XIANNING 1PWR — CN -41XIANNING 2PWR — CN -18YANGJIANG 1PWRCPR-1000900 — CN -19YANGJIANG 2PWRCPR-1000900 — Capacity [MW] Operator

Expected Construction Start

NSSS SupplierCountryReactor TypeModel

26

(28)

TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2007 — continued

CodeNameThermalGrossNet IRAN,ISL.REP IR -2BUSHEHR 2PWRWWER30001000915 NPPDCOASE 2011-1 IR -5BUSHEHR 3PWRTBD30001000915 NPPDCOASE 2012-1 IR -9DARKHOVAINPWRIR-3601113360 NPPDCO 2010-1 JAPAN JP -70FUKUSHIMA-DAIICHI-7BWRABWR392613801325 — JP -71FUKUSHIMA-DAIICHI-8BWRABWR392613801325 — JP -69HIGASHI DORI 1 (TEPCO)BWRABWR392613851325 TEPCO — JP -62KAMINOSEKI 1BWRABWR1373 CHUGOKU — JP -63KAMINOSEKI 2BWRABWR1373 CHUGOKU — JP -66OMABWRABWR392613831325 J-POWER — JP -65SHIMANE-3BWRABWR392613731325 CHUGOKUHITACHI 2008-10 JP -67TSURUGA-3PWRAPWR44661538 JAPCO — JP -68TSURUGA-4PWRAPWR44661538 JAPCO — KOREA REP. KR -25SHIN-KORI-3PWRAPR-1400398314001340 KHNPDHICKOPC 2008-10 KR -26SHIN-KORI-4PWRAPR-1400393814001340 KHNPDHICKOPC 2009-10 KR -27SHIN-ULCHIN-1PWRAPR-1400393814001340 KHNPDHICKOPC 2011-5 KR -28SHIN-ULCHIN-2PWRAPR-1400398314001340 KHNPDHICKOPC 2012-5 KR -24SHIN-WOLSONG-2PWROPR-100028251000960 KHNPDHICKOPC 2008-6 RUSSIAN FED. RU -166KURSK 2-1PWRWWER-1100320011701000 REANIAEP — RU -163LENINGRAD 2-1PWRWWER-AES-2006320011701085 REAFAEA 2008-8 RU -164LENINGRAD 2-2PWRWWER-1100320011701000 REANIAEP — RU -165LENINGRAD 2-3PWRWWER-1100320011701000 REANIAEP — RU -161NOVOVORONEZH 2-1PWRWWER-1100320011701085 REAFAEA 2008-6 RU -162NOVOVORONEZH 2-2PWRWWER-110032001170950 REANIAEP — TURKEY TR -1AKKUYU TEAS — Status as of 31 December 2007, 50 reactors (34670 MW(e))) are planned.

CountryReactor TypeModelCapacity [MW] OperatorNSSS Supplier Expected Construction Start

(29)

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2007 Code Name Thermal G ross Net

ARGENTINA AR -3ATUCHA-2 PHWR2160745692 NASASIEMENS1981-7—2010-10— BULGARIA BG -7BELENE-1PWRWWER V-46630001000953 KOZNPPASE1987-1——— BG -8BELENE-2PWRWWER V-46630001000953 KOZNPPASE1987-3——— CHINA CN -20HONGYANHE 1PWRCPR-1000290510801000 LHNPCDFEC2007-8——— CN -12LINGAO 3PWRM310290510871000 LDNPCDFEC2005-122010-72010-82010-12 CN -13LINGAO 4PWRM310290510861000 LDNPCDFEC2006-6——— CN -14QINSHAN 2-3PWRCNP6001930650610 NPQJVCCNNC2006-32010-112010-122011-3 CN -15QINSHAN 2-4PWRCNP 6001930650610 NPQJVCCNNC2007-12009-122011-92012-1 FINLAND FI -5OLKILUOTO-3PWREPR430017201600 TVOAREVA2005-8——2011-6 FRANCE FR -74FLAMANVILLE-3PWREPR430016501600 EDFFRAM2007-122011-122012-5— INDIA IN -16KAIGA-4PHWRHorizontal Pre800220202 NPCILNPCIL2002-52008-62008-72008-9 IN -25KUDANKULAM-1PWRWWER V-4121000917 NPCILMAEP2002-32008-122009-12009-3 IN -26KUDANKULAM-2PWRWWER V-4121000917 NPCILMAEP2002-72009-62009-72009-9 IN -29PFBRFBR1253500470 BHAVINI2004-10——— IN -19RAJASTHAN-5PHWRHorizontal Pre220202 NPCILNPCIL2002-92008-52008-62008-8 IN -20RAJASTHAN-6PHWRHorizontal Pre220202 NPCILNPCIL2003-12008-112008-122009-2 IRAN,ISL.REP IR -1BUSHEHR 1PWRWWER V-44630001000915 NPPDCOASE1975-52008-92009-82009-8 JAPAN JP -64TOMARI-3PWRPWR2652912866 HEPCOMHI2004-11——2009-12 KOREA REP. KR -21SHIN-KORI-1PWROPR-100028251000960 KHNPDHICKOPC2006-62010-72010-82010-12 KR -22SHIN-KORI-2PWROPR-100028251000960 KHNPDHICKOPC2007-62011-72011-82011-12 KR -23SHIN-WOLSONG-1PWROPR-100028251000960 KHNPDHICKOPC2007-112011-52011-52011-10

Capacity [MW] Operator Commercial Operation

NSSS Supplier Construction Start Grid Connection First Criticality Country Reactor Type Model

28

(30)

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2007 — continued Code Name Thermal G ross Net

PAKISTAN PK -3CHASNUPP 2PWRPWR999325300 PAECCNNC2005-122011-42011-52011-8 RUSSIAN FED. RU -116BELOYARSKY-4 (BN-800)FBRBN-80021001000950 REAFAEA2006-7——— RU -37KALININ-4PWRWWER V-32032001000950 REAFAEA1986-8——— RU -120KURSK-5LWGRRBMK-10001000925 REAFAEA1985-12——— RU -151SEVERODVINSK 1PWRKLT-40S 'Float1503532 REAFAEA2007-4——2010-12 RU -152SEVERODVINSK 2PWRKLT-40S 'Float1503532 REAFAEA2007-4——2010-12 RU -62VOLGODONSK-2PWRWWER V-320I32001000950 REAFAEA1983-5——— UKRAINE UA -51KHMELNITSKI-3PWRWWER32001000950 NNEGC1986-3—2015-1— UA -52KHMELNITSKI-4PWRWWER32001000950 NNEGC1987-2—2016-1— USA US -391WATTS BAR-2PWRW (4-loop) (IC342512181165 TVAWH1972-12——— Status as of 31 December 2007, 33 reactors (27393 MW(e)) are under construction, including 2 units (2600 MW(e)) in Taiwan, China. TWN, CHINA TW -7LUNGMEN 1BWRABWR392613501300 TPCGE1999-32008-122009-12009-7 TWN, CHINA TW -8LUNGMEN 2BWRABWR392613501300 TPCGE1999-82009-122010-12010-7

First Criticality Grid Connection

Commercial Operation

Capacity [MW] Operator NSSS Supplier

Construction Start Country Reactor Type Model

(31)

30

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics ARGENTINA AR -1ATUCHA-1PHWRPHWR KWU1179357335 NASASIEMENS1968-61974-31974-671.672.9- AR -2EMBALSEPHWRCANDU 62015648600 NASAAECL1974-41983-41984-186.987.3- ARMENIA AM -19ARMENIA-2PWRWWER V-2701375408376 ANPPJSCFAEA1975-71980-11980-564.166.3- BELGIUM BE -2DOEL-1PWR1192412392 ELECTRABACECOWEN1969-71974-81975-285.486.4- BE -4DOEL-2PWR1311454433 ELECTRABACECOWEN1971-91975-81975-1281.282.0- BE -5DOEL-3PWR277510561006 ELECTRABFRAMACEC1975-11982-61982-1086.287.6- BE -7DOEL-4PWR298810411008 ELECTRABACECOWEN1978-121985-41985-784.184.9- BE -3TIHANGE-1PWRFramatome 3 lo28731009962 ELECTRABACLF1970-61975-31975-1083.486.0- BE -6TIHANGE-2PWRWE 3-loops306410551008 ELECTRABFRAMACEC1976-41982-101983-687.788.9- BE -8TIHANGE-3PWRWE 3-loops300010651015 ELECTRABACECOWEN1978-111985-61985-987.589.2- BRAZIL BR -1ANGRA-1PWR2-loop PWR1876657520 ELETRONUWH1971-51982-41985-152.359.9- BR -2ANGRA-2PWRPRE KONVOI376413501275 ELETRONUKWU1976-12000-72001-281.583.8- BULGARIA BG -5KOZLODUY-5PWRWWER V-32030001000953 KOZNPPAEE1980-71987-111988-1262.465.6DH BG -6KOZLODUY-6PWRWWER V-32030001000953 KOZNPPAEE1982-41991-81993-1270.373.1DH CANADA CA -10BRUCE-3PHWRCANDU 750A2832805750 BRUCEPOWNEI.P1972-71977-121978-272.673.4- CA -11BRUCE-4PHWRCANDU 750A2832805750 BRUCEPOWNEI.P1972-91978-121979-170.471.4- CA -18BRUCE-5PHWRCANDU 750B2832840795 BRUCEPOWOH/AECL1978-61984-121985-383.784.3- CA -19BRUCE-6PHWRCANDU 750B2690891822 BRUCEPOWOH/AECL1978-11984-61984-979.980.7- CA -20BRUCE-7PHWRCANDU 750B2832872822 BRUCEPOWOH/AECL1979-51986-21986-483.985.0- CA -21BRUCE-8PHWRCANDU 750B2690845795 BRUCEPOWOH/AECL1979-81987-31987-581.783.1- CA -22DARLINGTON-1PHWRCANDU 8502776934878 OPGOH/AECL1982-41990-121992-1183.884.8- CA -23DARLINGTON-2PHWRCANDU 8502776934878 OPGOH/AECL1981-91990-11990-1075.476.4- CA -24DARLINGTON-3PHWRCANDU 8502776934878 OPGOH/AECL1984-91992-121993-284.885.7- CA -25DARLINGTON-4PHWRCANDU 8502776934878 OPGOH/AECL1985-71993-41993-684.885.5- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

CountryReactorTypeModelCapacity [MW]Grid Connection Commercial Operation OperatorNSSS Supplier

Construction Start

(32)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics CA -12GENTILLY-2PHWRCANDU 62156675635 HQBBC1974-41982-121983-1082.284.0- CA -4PICKERING-1PHWRCANDU 500A1744542515 OPGOH/AECL1966-61971-41971-765.665.7- CA -7PICKERING-4PHWRCANDU 500A1744542515 OPGOH/AECL1968-51973-51973-666.066.4- CA -13PICKERING-5PHWRCANDU 500B1744540516 OPGOH/AECL1974-111982-121983-572.873.4- CA -14PICKERING-6PHWRCANDU 500B1744540516 OPGOH/AECL1975-101983-111984-276.477.1- CA -15PICKERING-7PHWRCANDU 500B1744540516 OPGOH/AECL1976-31984-111985-178.879.5- CA -16PICKERING-8PHWRCANDU 500B1744540516 OPGOH/AECL1976-91986-11986-276.176.8- CA -17POINT LEPREAUPHWRCANDU 62180680635 NBEPCAECL1975-51982-91983-282.683.8- CHINA CN -2GUANGDONG-1PWRM3102905984944 GNPJVCGEC1987-81993-81994-281.285.8- CN -3GUANGDONG-2PWRM3102905984944 GNPJVCGEC1988-41994-21994-581.583.6- CN -6LINGAO 1PWRM3102895990938 LANPCFRAM1997-52002-22002-586.386.7- CN -7LINGAO 2PWRM3102895990938 LANPCFRAM1997-112002-122003-188.088.2- CN -1QINSHAN 1PWRCNP-300966310288 QNPCCNNC1985-31991-121994-475.877.6- CN -4QINSHAN 2-1PWRCNP6001930650610 NPQJVCCNNC1996-62002-22002-474.974.9- CN -5QINSHAN 2-2PWRCNP6001930650610 NPQJVCCNNC1997-42004-32004-588.188.1- CN -8QINSHAN 3-1PHWRCANDU 62064700650 TQNPCAECL1998-62002-112002-1285.586.1- CN -9QINSHAN 3-2PHWRCANDU 62064700650 TQNPCAECL1998-92003-62003-789.289.3- CN -10TIANWAN 1PWRVVER V-428300010001000 JNPCIZ1999-102006-52007-583.683.6- CN -11TIANWAN 2PWRVVER V-428300010001000 JNPCIZ2000-102007-52007-8100.0100.0- CZECH REP. CZ -4DUKOVANY-1PWRWWER V-2131375456427 CEZSKODA1979-11985-21985-582.383.2- CZ -5DUKOVANY-2PWRWWER V-2131375440412 CEZSKODA1979-11986-11986-383.284.1- CZ -8DUKOVANY-3PWRWWER V-2131375456427 CEZSKODA1979-31986-111986-1282.484.2- CZ -9DUKOVANY-4PWRWWER V-2131375456427 CEZSKODA1979-31987-61987-783.484.4- CZ -23TEMELIN-1PWRWWER V-32030001013963 CEZSKODA1987-22000-122002-670.170.1DH CZ -24TEMELIN-2PWRWWER V-32030001013963 CEZSKODA1987-22002-122003-471.671.8DH FINLAND FI -1LOVIISA-1PWRWWER V-2131500510488 FORTUMPHAEE1971-51977-21977-586.887.2- FI -2LOVIISA-2PWRWWER V-2131500510488 FORTUMPHAEE1972-81980-111981-188.689.3- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

CountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier Construction Start Grid Connection Commercial Operation

(33)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics FI -3OLKILUOTO-1BWRBWR 25002500890860 TVOASEASTAL1974-21978-91979-1092.492.7- FI -4OLKILUOTO-2BWRBWR 25002500890860 TVOASEASTAL1975-81980-21982-793.794.1- FRANCE FR -54BELLEVILLE-1PWRP'4 REP 1300381713631310 EDFFRAM1980-51987-101988-676.277.6- FR -55BELLEVILLE-2PWRP'4 REP 1300381713631310 EDFFRAM1980-81988-71989-177.579.3- FR -32BLAYAIS-1PWRCP12785951910 EDFFRAM1977-11981-61981-1276.879.2- FR -33BLAYAIS-2PWRCP12785951910 EDFFRAM1977-11982-71983-280.182.2- FR -34BLAYAIS-3PWRCP12785951910 EDFFRAM1978-41983-81983-1180.482.4- FR -35BLAYAIS-4PWRCP12785951910 EDFFRAM1978-41983-51983-1079.982.1- FR -13BUGEY-2PWRCP02785945910 EDFFRAM1972-111978-51979-372.174.0- FR -14BUGEY-3PWRCP02785945910 EDFFRAM1973-91978-91979-373.475.5- FR -15BUGEY-4PWRCP02785917880 EDFFRAM1974-61979-31979-772.474.7- FR -16BUGEY-5PWRCP02785917880 EDFFRAM1974-71979-71980-175.377.6- FR -50CATTENOM-1PWRP'4 REP 1300381713621300 EDFFRAM1979-101986-111987-472.673.9- FR -53CATTENOM-2PWRP'4 REP 1300381713621300 EDFFRAM1980-71987-91988-278.280.2- FR -60CATTENOM-3PWRP'4 REP 1300381713621300 EDFFRAM1982-61990-71991-280.882.8- FR -65CATTENOM-4PWRP'4 REP 1300381713621300 EDFFRAM1983-91991-51992-183.585.2- FR -40CHINON-B-1PWRCP22785954905 EDFFRAM1977-31982-111984-278.379.5- FR -41CHINON-B-2PWRCP22785954905 EDFFRAM1977-31983-111984-878.980.1- FR -56CHINON-B-3PWRCP22785954905 EDFFRAM1980-101986-101987-379.280.9- FR -57CHINON-B-4PWRCP22785954905 EDFFRAM1981-21987-111988-480.682.3- FR -62CHOOZ-B-1PWRN4 REP 1450427015601500 EDFFRAM1984-11996-82000-580.082.0- FR -70CHOOZ-B-2PWRN4 REP 1450427015601500 EDFFRAM1985-121997-42000-982.085.1- FR -72CIVAUX-1PWRN4 REP 1450427015611495 EDFFRAM1988-101997-122002-179.080.3- FR -73CIVAUX-2PWRN4 REP 1450427015611495 EDFFRAM1991-41999-122002-482.083.5- FR -42CRUAS-1PWRCP22785956915 EDFFRAM1978-81983-41984-479.381.0- FR -43CRUAS-2PWRCP22785956915 EDFFRAM1978-111984-91985-478.981.1- FR -44CRUAS-3PWRCP22785956915 EDFFRAM1979-41984-51984-980.383.0- FR -45CRUAS-4PWRCP22785956915 EDFFRAM1979-101984-101985-278.180.2- FR -22DAMPIERRE-1PWRCP12785937890 EDFFRAM1975-21980-31980-975.976.9- CountryReactor TypeModelCapacity [MW] OperatorNSSS SupplierConstruction StartGrid ConnectionCommercial Operation

32

(34)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics FR -29DAMPIERRE-2PWRCP12785937890 EDFFRAM1975-41980-121981-276.878.5- FR -30DAMPIERRE-3PWRCP12785937890 EDFFRAM1975-91981-11981-577.378.8- FR -31DAMPIERRE-4PWRCP12785937890 EDFFRAM1975-121981-81981-1176.678.5- FR -11FESSENHEIM-1PWRCP02660920880 EDFFRAM1971-91977-41978-170.972.1- FR -12FESSENHEIM-2PWRCP02660920880 EDFFRAM1972-21977-101978-474.775.6- FR -46FLAMANVILLE-1PWRP4 REP 1300381713821330 EDFFRAM1979-121985-121986-1274.977.5- FR -47FLAMANVILLE-2PWRP4 REP 1300381713821330 EDFFRAM1980-51986-71987-377.378.4- FR -61GOLFECH-1PWRP'4 REP 1300381713631310 EDFFRAM1982-111990-61991-282.685.5- FR -68GOLFECH-2PWRP'4 REP 1300381713631310 EDFFRAM1984-101993-61994-384.085.8- FR -20GRAVELINES-1PWRCP12785951910 EDFFRAM1975-21980-31980-1176.077.6- FR -21GRAVELINES-2PWRCP12785951910 EDFFRAM1975-31980-81980-1279.380.7- FR -27GRAVELINES-3PWRCP12785951910 EDFFRAM1975-121980-121981-679.580.9- FR -28GRAVELINES-4PWRCP12785951910 EDFFRAM1976-41981-61981-1078.880.3- FR -51GRAVELINES-5PWRCP12785951910 EDFFRAM1979-101984-81985-180.482.2- FR -52GRAVELINES-6PWRCP12785951910 EDFFRAM1979-101985-81985-1080.281.7- FR -58NOGENT-1PWRP'4 REP 1300381713631310 EDFFRAM1981-51987-101988-276.978.4- FR -59NOGENT-2PWRP'4 REP 1300381713631310 EDFFRAM1982-11988-121989-581.583.7- FR -36PALUEL-1PWRP4 REP 1300381713821330 EDFFRAM1977-81984-61985-1275.777.5- FR -37PALUEL-2PWRP4 REP 1300381713821330 EDFFRAM1978-11984-91985-1273.275.4- FR -38PALUEL-3PWRP4 REP 1300381713821330 EDFFRAM1979-21985-91986-273.174.8- FR -39PALUEL-4PWRP4 REP 1300381713821330 EDFFRAM1980-21986-41986-676.178.0- FR -63PENLY-1PWRP'4 REP 1300381713821330 EDFFRAM1982-91990-51990-1281.182.6- FR -64PENLY-2PWRP'4 REP 1300381713821330 EDFFRAM1984-81992-21992-1182.783.9- FR -10PHENIXFBRPH-250350140130 CEA/EDFCNCLNEY1968-111973-121974-751.752.0- FR -48ST. ALBAN-1PWRP4 REP 1300381713811335 EDFFRAM1979-11985-81986-574.976.6- FR -49ST. ALBAN-2PWRP4 REP 1300381713811335 EDFFRAM1979-71986-71987-374.677.1- FR -17ST. LAURENT-B-1PWRCP22785956915 EDFFRAM1976-51981-11983-875.877.4- FR -23ST. LAURENT-B-2PWRCP22785956915 EDFFRAM1976-71981-61983-876.478.1- FR -18TRICASTIN-1PWRCP12785955915 EDFFRAM1974-111980-51980-1276.979.7- FR -19TRICASTIN-2PWRCP12785955915 EDFFRAM1974-121980-81980-1277.079.5- CountryReactor TypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start Grid Connection Commercial Operation

(35)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics FR -25TRICASTIN-3PWRCP12785955915 EDFFRAM1975-41981-21981-579.181.4- FR -26TRICASTIN-4PWRCP12785955915 EDFFRAM1975-51981-61981-1179.382.1- GERMANY DE -12BIBLIS-A (KWB A)PWRPWR351712251167 RWEKWU1970-11974-81975-269.069.4- DE -18BIBLIS-B (KWB B)PWRPWR373313001240 RWEKWU1972-21976-41977-173.373.5- DE -32BROKDORF (KBR)PWRPWR390014801370 E.ONKWU1976-11986-101986-1290.190.4- DE -13BRUNSBUETTEL (KKB)BWRBWR '692292806771 KKBKWU1970-41976-71977-260.962.0- DE -33EMSLAND (KKE)PWRKonvoi385014001329 KLEKWU1982-81988-41988-693.493.4- DE -23GRAFENRHEINFELD (KKG)PWRPWR376513451275 E.ONKWU1975-11981-121982-688.188.1- DE -27GROHNDE (KWG)PWRPWR390014301360 KWGKWU1976-61984-91985-292.492.5- DE -26GUNDREMMINGEN-B (GUN-B)BWRBWR 72384013441284 KGGKWU1976-71984-31984-788.588.7- DE -28GUNDREMMINGEN-C (GUN-C)BWRBWR 72384013441288 KGGKWU1976-71984-111985-186.887.1- DE -16ISAR-1 (KKI 1)BWRBWR '692575912878 E.ONKWU1972-51977-121979-382.282.6- DE -31ISAR-2 (KKI 2)PWRKonvoi395014751400 E.ONKWU1982-91988-11988-491.792.0- DE -20KRUEMMEL (KKK)BWRBWR 69369014021346 KKKKWU1974-41983-91984-378.779.1- DE -15NECKARWESTHEIM-1 (GKN 1)PWRPWR2497840785 EnKKKWU1972-21976-61976-1283.183.2- DE -44NECKARWESTHEIM-2 (GKN 2)PWRKonvoi385014001310 EnKKKWU1982-111989-11989-493.493.6- DE -14PHILIPPSBURG-1 (KKP 1)BWRBWR '692575926890 EnKKKWU1970-101979-51980-379.579.6- DE -24PHILIPPSBURG-2 (KKP 2)PWRPWR395014581392 EnKKKWU1977-71984-121985-489.290.4- DE -17UNTERWESER (KKU)PWRPWR390014101345 E.ONKWU1972-71978-91979-982.182.6- HUNGARY HU -1PAKS-1PWRWWER V-2131485500470 PAKS ZrtAEE1974-81982-121983-885.485.5- HU -2PAKS-2PWRWWER V-2131375470443 PAKS ZrtAEE1974-81984-91984-1179.079.1DH HU -3PAKS-3PWRWWER V-2131375470443 PAKS ZrtAEE1979-101986-91986-1286.386.7DH HU -4PAKS-4PWRWWER V-2131375500473 PAKS ZrtAEE1979-101987-81987-1187.687.8DH INDIA IN -13KAIGA-1PHWRHorizontal Pre801220202 NPCILNPCIL1989-92000-102000-1173.489.1- IN -14KAIGA-2PHWRHorizontal Pre801220202 NPCILNPCIL1989-121999-122000-375.989.7- IN -15KAIGA-3PHWRHorizontal Pre800220202 NPCILNPCIL2002-32007-42007-525.329.6- IN -9KAKRAPAR-1PHWRHorizontal Pre801220202 NPCILNPCIL1984-121992-111993-570.178.4- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

CountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier Construction Start Grid Connection Commercial Operation

34

(36)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics IN -10KAKRAPAR-2PHWRHorizontal Pre801220202 NPCILNPCIL1985-41995-31995-979.587.6- IN -5MADRAS-1PHWRHorizontal Pre801220205 NPCILNPCIL1971-11983-71984-154.458.4DS IN -6MADRAS-2PHWRHorizontal Pre801220202 NPCILNPCIL1972-101985-91986-360.265.6DS IN -7NARORA-1PHWRHorizontal Pre801220202 NPCILNPCIL1976-121989-71991-156.360.9- IN -8NARORA-2PHWRHorizontal Pre801220202 NPCILNPCIL1977-111992-11992-767.175.9- IN -3RAJASTHAN-1PHWRHorizontal Pre69310090 NPCILAECL1965-81972-111973-1224.625.6PH IN -4RAJASTHAN-2PHWRHorizontal Pre693200187 NPCILAECL/DAE1968-41980-111981-456.459.9PH IN -11RAJASTHAN-3PHWRHorizontal Pre801220202 NPCILNPCIL1990-22000-32000-674.588.4PH IN -12RAJASTHAN-4PHWRHorizontal Pre801220202 NPCILNPCIL1990-102000-112000-1274.490.2PH IN -1TARAPUR-1BWRBWR-1, Mark 2 530160150 NPCILGE1964-101969-41969-1068.569.2- IN -2TARAPUR-2BWRBWR-1, Mark 2 530160150 NPCILGE1964-101969-51969-1067.167.8- IN -23TARAPUR-3PHWRto be specifie1730540490 NPCILNPCIL2000-52006-62006-864.388.9- IN -24TARAPUR-4PHWR1730540490 NPCILNPCIL2000-32005-62005-950.773.6- JAPAN JP -5FUKUSHIMA-DAIICHI-1BWR1380460439 TEPCOGE/GETSC1967-71970-111971-352.952.9- JP -9FUKUSHIMA-DAIICHI-2BWR2381784760 TEPCOGE/T1969-61973-121974-760.460.4- JP -10FUKUSHIMA-DAIICHI-3BWR2381784760 TEPCOTOSHIBA1970-121974-101976-364.764.7- JP -16FUKUSHIMA-DAIICHI-4BWR2381784760 TEPCOHITACHI1973-21978-21978-1070.170.2- JP -17FUKUSHIMA-DAIICHI-5BWR2381784760 TEPCOTOSHIBA1972-51977-91978-471.371.4- JP -18FUKUSHIMA-DAIICHI-6BWR329311001067 TEPCOGE/T1973-101979-51979-1070.170.2- JP -25FUKUSHIMA-DAINI-1BWR329311001067 TEPCOTOSHIBA1976-31981-71982-475.275.2- JP -26FUKUSHIMA-DAINI-2BWR329311001067 TEPCOHITACHI1979-51983-61984-273.373.3- JP -35FUKUSHIMA-DAINI-3BWR329311001067 TEPCOTOSHIBA1981-31984-121985-665.365.3- JP -38FUKUSHIMA-DAINI-4BWR329311001067 TEPCOHITACHI1981-51986-121987-872.272.2- JP -12GENKAI-1PWR1650559529 KYUSHUMHI1971-91975-21975-1072.772.7- JP -27GENKAI-2PWR1650559529 KYUSHUMHI1977-21980-61981-381.081.0- JP -45GENKAI-3PWR342311801127 KYUSHUMHI1988-61993-61994-385.085.0DS JP -46GENKAI-4PWR342311801127 KYUSHUMHI1992-71996-111997-786.686.6DS JP -11HAMAOKA-1BWRBWR41593540515 CHUBUTOSHIBA1971-61974-81976-349.949.9- JP -24HAMAOKA-2BWRBWR42436840806 CHUBUTOSHIBA1974-61978-51978-1161.761.8- The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, PH process heating.

CountryReactor TypeModelCapacity [MW] OperatorNSSS SupplierConstruction StartGrid ConnectionCommercial Operation

(37)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics JP -36HAMAOKA-3BWRBWR5329311001056 CHUBUTOSHIBA1983-41987-11987-878.278.3- JP -49HAMAOKA-4BWRBWR5329311371092 CHUBUTOSHIBA1989-101993-11993-980.981.0- JP -60HAMAOKA-5BWRABWR392613801325 CHUBUTOSHIBA2000-72004-42005-163.863.8- JP -58HIGASHI DORI 1 (TOHOKU)BWR329311001067 TOHOKUTOSHIBA2000-112005-32005-1283.083.1- JP -23IKATA-1PWR1650566538 SHIKOKUMHI1973-61977-21977-978.178.1DS JP -32IKATA-2PWR1650566538 SHIKOKUMHI1978-21981-81982-382.482.5DS JP -47IKATA-3PWR2660890846 SHIKOKUMHI1986-111994-31994-1285.585.5DS JP -33KASHIWAZAKI KARIWA-1BWR329311001067 TEPCOTOSHIBA1980-61985-21985-971.372.6- JP -39KASHIWAZAKI KARIWA-2BWR329311001067 TEPCOTOSHIBA1985-111990-21990-973.073.0- JP -52KASHIWAZAKI KARIWA-3BWR329311001067 TEPCOTOSHIBA1989-31992-121993-872.974.1- JP -53KASHIWAZAKI KARIWA-4BWR329311001067 TEPCOHITACHI1990-31993-121994-871.975.4- JP -40KASHIWAZAKI KARIWA-5BWR329311001067 TEPCOHITACHI1985-61989-91990-475.478.3- JP -55KASHIWAZAKI KARIWA-6BWRABWR392613561315 TEPCOTOSHIBA1992-111996-11996-1179.383.0- JP -56KASHIWAZAKI KARIWA-7BWRABWR392613561315 TEPCOHITACHI1993-71996-121997-775.579.1- JP -4MIHAMA-1PWR1031340320 KEPCOWH1967-21970-81970-1150.550.7- JP -6MIHAMA-2PWR1456500470 KEPCOMHI1968-51972-41972-761.961.9- JP -14MIHAMA-3PWR2440826780 KEPCOMHI1972-81976-21976-1269.369.3- JP -15OHI-1PWR342311751120 KEPCOWH1972-101977-121979-366.066.1DS JP -19OHI-2PWR342311751120 KEPCOWH1972-121978-101979-1272.072.2DS JP -50OHI-3PWR342311801127 KEPCOMHI1987-101991-61991-1284.484.4- JP -51OHI-4PWRPWR342311801127 KEPCOMHI1988-61992-61993-285.285.2- JP -22ONAGAWA-1BWR1593524498 TOHOKUTOSHIBA1980-71983-111984-669.371.2- JP -54ONAGAWA-2BWR2436825796 TOHOKUTOSHIBA1991-41994-121995-773.676.9- JP -57ONAGAWA-3BWR2436825796 TOHOKUTOSHIBA1998-12001-52002-164.566.6- JP -28SENDAI-1PWR2660890846 KYUSHUMHI1979-121983-91984-782.282.2- JP -37SENDAI-2PWR2660890846 KYUSHUMHI1981-101985-41985-1183.383.3- JP -48SHIKA-1BWR1593540505 HOKURIKUHITACHI1989-71993-11993-775.875.8- JP -59SHIKA-2BWRABWR392613581304 HOKURIKUHITACHI2001-82005-72006-314.814.8- JP -7SHIMANE-1BWR1380460439 CHUGOKUHITACHI1970-71973-121974-373.173.3- JP -41SHIMANE-2BWR2436820789 CHUGOKUHITACHI1985-21988-71989-282.782.7- The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination.

CountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction StartGrid ConnectionCommercial Operation

36

(38)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics JP -8TAKAHAMA-1PWR2440826780 KEPCOWH/MHI1970-41974-31974-1168.168.2- JP -13TAKAHAMA-2PWR2440826780 KEPCOMHI1971-31975-11975-1167.968.0- JP -29TAKAHAMA-3PWR2660870830 KEPCOMHI1980-121984-51985-183.783.8DS JP -30TAKAHAMA-4PWR2660870830 KEPCOMHI1981-31984-111985-684.284.2DS JP -21TOKAI-2BWRBWR329311001060 JAPCOGE1973-101978-31978-1173.974.0- JP -43TOMARI-1PWR1650579550 HEPCOMHI1985-71988-121989-685.385.3- JP -44TOMARI-2PWR1650579550 HEPCOMHI1986-51990-81991-484.584.5- JP -3TSURUGA-1BWRBWR1070357340 JAPCOGE1966-111969-111970-368.168.3- JP -34TSURUGA-2PWRPWR341111601110 JAPCOMHI1982-111986-61987-280.881.0- KOREA REP. KR -1KORI-1PWRWH △601723603569 KHNPWH1972-81977-61978-477.778.6- KR -2KORI-2PWRWH F1876675637 KHNPWH1977-121983-41983-785.986.0- KR -5KORI-3PWRWH F27751004964 KHNPWH1979-101985-11985-985.485.5- KR -6KORI-4PWRWH F27751006966 KHNPWH1980-41985-111986-486.887.0- KR -9ULCHIN-1PWRFrance CPI2775985940 KHNPFRAM1983-11988-41988-985.585.8- KR -10ULCHIN-2PWRFrance CPI2775984937 KHNPFRAM1983-71989-41989-986.887.0- KR -13ULCHIN-3PWROPR-100028251047995 KHNPDHICKOPC1993-71998-11998-890.590.7- KR -14ULCHIN-4PWROPR-100028251045992 KHNPDHICKOPC1993-111998-121999-1289.689.7- KR -19ULCHIN-5PWROPR-100028251048995 KHNPDHICKOPC1999-102003-122004-789.989.9- KR -20ULCHIN-6PWROPR-100028251048994 KHNPDHICKOPC2000-92005-12005-690.891.1- KR -3WOLSONG-1PHWRCANDU 62064622578 KHNPAECL1977-101982-121983-483.984.3- KR -4WOLSONG-2PHWRCANDU 62061730683 KHNPAECL/DHI1992-91997-41997-790.990.9- KR -15WOLSONG-3PHWRCANDU 62061729681 KHNPAECL/DHI1994-31998-31998-792.492.4- KR -16WOLSONG-4PHWRCANDU 62061730685 KHNPAECL/DHI1994-71999-51999-1093.793.7- KR -7YONGGWANG-1PWRWH F2775985942 KHNPWH1981-61986-31986-886.886.8- KR -8YONGGWANG-2PWRWH F2775978936 KHNPWH1981-121986-111987-685.285.3- KR -11YONGGWANG-3PWROPR-100028251039987 KHNPDHICKAEC1989-121994-101995-389.289.2- KR -12YONGGWANG-4PWROPR-100028251039987 KHNPDHICKAEC1990-51995-71996-189.289.3- KR -17YONGGWANG-5PWROPR-100028251046990 KHNPDHICKOPC1997-62001-122002-585.285.2- KR -18YONGGWANG-6PWROPR-100028251050993 KHNPDHICKOPC1997-112002-92002-1286.486.5- The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination.

CountryReactor TypeModelCapacity [MW] OperatorNSSS Supplier Construction Start Grid Connection Commercial Operation

(39)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics LITHUANIA LT -47IGNALINA-2LWGRRBMK-1500480013001185 INPPMAEP1978-11987-81987-863.773.7- MEXICO MX -1LAGUNA VERDE-1BWRBWR-52027682680 CFEGE1976-101989-41990-782.082.7- MX -2LAGUNA VERDE-2BWRBWR-52027682680 CFEGE1977-61994-111995-483.684.3- NETHERLANDS NL -2BORSSELEPWR2 loops PWR1366515482 EPZS/KWU1969-71973-71973-1084.284.6- PAKISTAN PK -2CHASNUPP 1PWRCNP-300999325300 PAECCNNC1993-82000-62000-971.772.5- PK -1KANUPPPHWRCANDU433137125 PAECCGE1966-81971-101972-1228.129.3DS ROMANIA RO -1CERNAVODA-1PHWRCANDU 62180706655 SNNAECL1982-71996-71996-1287.688.7DH RO -2CERNAVODA-2PHWRCANDU 62180706650 SNNAECL1983-72007-82007-1093.093.0- RUSSIAN FED. RU -96BALAKOVO-1PWRWWER V-32030001000950 REAFAEA1980-121985-121986-566.268.9DH, PH RU -97BALAKOVO-2PWRWWER V-32030001000950 REAFAEA1981-81987-101988-164.168.0DH, PH RU -98BALAKOVO-3PWRWWER V-32030001000950 REAFAEA1982-111988-121989-469.674.5DH, PH RU -99BALAKOVO-4PWRWWER V-32032001000950 REAFAEA1984-41993-51993-1273.279.3DH, PH RU -21BELOYARSKY-3 (BN-600)FBRBN-6001470600560 REAFAEA1969-11980-41981-1173.774.4DH, PH RU -141BILIBINO-1LWGREGP-6621211 REAFAEA1970-11974-11974-468.880.4DH RU -142BILIBINO-2LWGREGP-6621211 REAFAEA1970-11974-121975-269.081.5DH RU -143BILIBINO-3LWGREGP-6621211 REAFAEA1970-11975-121976-268.280.9DH RU -144BILIBINO-4LWGREGP-6621211 REAFAEA1970-11976-121977-166.378.5DH RU -30KALININ-1PWRWWER V-33830001000950 REAFAEA1977-21984-51985-671.472.4DH, PH RU -31KALININ-2PWRWWER V-33830001000950 REAFAEA1982-21986-121987-371.074.2DH, PH RU -36KALININ-3PWRWWER V-33832001000950 REAFAEA1985-102004-122005-1180.781.2PH RU -12KOLA-1PWRWWER V-2301375440411 REAFAEA1969-51973-61973-1269.476.5DH, PH RU -13KOLA-2PWRWWER V-2301375440411 REAFAEA1969-51974-121975-270.176.3DH, PH RU -32KOLA-3PWRWWER V-2131375440411 REAFAEA1977-41981-31982-1273.882.7DH, PH RU -33KOLA-4PWRWWER V-2131375440411 REAFAEA1976-81984-101984-1272.781.8DH, PH RU -17KURSK-1LWGRRBMK-100032001000925 REAFAEA1972-61976-121977-1058.960.9DH, PH The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.

CountryReactor TypeModelCapacity [MW] OperatorNSSS SupplierConstruction StartGrid ConnectionCommercial Operation

38

(40)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics RU -22KURSK-2LWGRRBMK-100032001000925 REAFAEA1973-11979-11979-861.464.0DH, PH RU -38KURSK-3LWGRRBMK-100032001000925 REAFAEA1978-41983-101984-372.173.4DH, PH RU -39KURSK-4LWGRRBMK-100032001000925 REAFAEA1981-51985-121986-275.877.1DH, PH RU -15LENINGRAD-1LWGRRBMK-100032001000925 REAFAEA1970-31973-121974-1169.570.2DH, PH RU -16LENINGRAD-2LWGRRBMK-100032001000925 REAFAEA1970-61975-71976-269.170.0DH, PH RU -34LENINGRAD-3LWGRRBMK-100032001000925 REAFAEA1973-121979-121980-669.670.7DH, PH RU -35LENINGRAD-4LWGRRBMK-100032001000925 REAFAEA1975-21981-21981-871.773.0DH, PH RU -9NOVOVORONEZH-3PWRWWER V-1791375417385 REAFAEA1967-71971-121972-671.372.1DH, PH RU -11NOVOVORONEZH-4PWRWWER V-1791375417385 REAFAEA1967-71972-121973-377.378.8DH, PH RU -20NOVOVORONEZH-5PWRWWER V-18730001000950 REAFAEA1974-31980-51981-262.063.0DH, PH RU -23SMOLENSK-1LWGRRBMK-100032001000925 REAFAEA1975-101982-121983-971.173.6DH, PH RU -24SMOLENSK-2LWGRRBMK-100032001000925 REAFAEA1976-61985-51985-772.875.5DH, PH RU -67SMOLENSK-3LWGRRBMK-100032001000925 REAFAEA1984-51990-11990-1079.181.9DH, PH RU -59VOLGODONSK-1PWRWWER V-320I32001000950 REAFAEA1981-92001-32001-1284.785.4- SLOVAKIA SK -3BOHUNICE-2PWRWWER V-2301375440408 JAVYSAEE1972-41980-31981-175.177.3- SK -13BOHUNICE-3PWRWWER V-2131375440408 SE,plcSKODA1976-121984-81985-277.280.5DH, PH SK -14BOHUNICE-4PWRWWER V-2131375440408 SE,plcSKODA1976-121985-81985-1279.082.4DH, PH SK -6MOCHOVCE-1PWRWWER V-2131375440405 SE,plcSKODA1983-101998-71998-1081.084.1- SK -7MOCHOVCE-2PWRWWER V-2131375440405 SE,plcSKODA1983-101999-122000-482.384.4- SLOVENIA SI -1KRSKOPWRWestinghouse t1994730666 NEKWH1975-31981-101983-182.884.3- SOUTH AFRICA ZA -1KOEBERG-1PWRCP12785944900 ESKOMFRAM1976-71984-41984-770.175.1- ZA -2KOEBERG-2PWRCP12785944900 ESKOMFRAM1976-71985-71985-1170.077.4- SPAIN ES -6ALMARAZ-1PWRWE 3-loops2729977944 CNATWH1973-71981-51983-985.486.3- ES -7ALMARAZ-2PWRWE 3-loops2729980956 CNATWH1973-71983-101984-786.787.8- ES -8ASCO-1PWRWE 3-loops29311033995 ANAVWH1974-51983-81984-1285.485.9- ES -9ASCO-2PWRWE 3-loops29101027997 ANAVWH1975-31985-101986-387.688.3- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating, PH process heating.

CountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier Construction Start Grid Connection Commercial Operation

(41)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics ES -10COFRENTESBWRBWR-6323710921064 IDGE1975-91984-101985-386.287.0- ES -2SANTA MARIA DE GARONABWRBWR-31381466446 NUCLENORGE1966-51971-31971-577.077.8- ES -11TRILLO-1PWRPWR 3 loops301010661003 CNATKWU1979-81988-51988-886.586.7- ES -16VANDELLOS-2PWRWE 3-loops294110871045 ANAVWH1980-121987-121988-382.783.5- SWEDEN SE -9FORSMARK-1BWRBWR 7529281025987 FKAABBATOM1973-61980-61980-1283.785.9- SE -11FORSMARK-2BWRBWR 75292810381000 FKAABBATOM1975-11981-11981-784.486.4- SE -14FORSMARK-3BWRBWR 3000330012121170 FKAABBATOM1979-11985-31985-887.790.1- SE -2OSKARSHAMN-1BWRABB BWR1375487467 OKGABBATOM1966-81971-81972-263.063.1- SE -3OSKARSHAMN-2BWRABB BWR1800623598 OKGABBATOM1969-91974-101975-178.979.6- SE -12OSKARSHAMN-3BWRBWR 75330011971150 OKGABBATOM1980-51985-31985-887.588.3- SE -4RINGHALS-1BWR2540887843 RABABBATOM1969-21974-101976-172.973.8- SE -5RINGHALS-2PWR2660917867 RABWH1970-101974-81975-571.973.3- SE -7RINGHALS-3PWR316010371045 RABWH1972-91980-91981-977.078.6- SE -10RINGHALS-4PWR2775979907 RABWH1973-111982-61983-1185.287.0- SWITZERLAND CH -1BEZNAU-1PWRWH - 2 loops1130380365 NOKWH1965-91969-71969-984.084.3DH CH -3BEZNAU-2PWRWH - 2 loops1130380365 NOKWH1968-11971-101971-1286.987.0DH CH -4GOESGENPWR29001020970 KKGKWU1973-121979-21979-1188.389.2PH CH -5LEIBSTADTBWRBWR 6313812201165 KKLGETSCO1974-11984-51984-1284.986.8- CH -2MUEHLEBERGBWRBWR 41097372355 BKWGETSCO1967-31971-71972-1186.387.5- UK GB -18ADUNGENESS-B1GCRAGR1500615545 BEAPC1965-101983-41985-444.246.2- GB -18BDUNGENESS-B2GCRAGR1500615545 BEAPC1965-101985-121989-451.451.6- GB -19AHARTLEPOOL-A1GCRAGR1500655595 BENPC1968-101983-81989-471.771.8- GB -19BHARTLEPOOL-A2GCRAGR1500655595 BENPC1968-101984-101989-475.475.6- GB -20AHEYSHAM-A1GCRAGR1500625585 BENPC1970-121983-71989-474.574.8- GB -20BHEYSHAM-A2GCRAGR1500625575 BENPC1970-121984-101989-472.473.1- GB -22AHEYSHAM-B1GCRAGR1550680615 BENPC1980-81988-71989-476.377.1- GB -22BHEYSHAM-B2GCRAGR1550680615 BENPC1980-81988-111989-475.576.7- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating, PH process heating.

CountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction StartGrid ConnectionCommercial Operation

40

(42)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics GB -16AHINKLEY POINT-B1GCRAGR1494655430 BEGTNPG1967-91976-101978-1075.376.0- GB -16BHINKLEY POINT-B2GCRAGR1494655430 BETNPG1967-91976-21976-972.773.9- GB -17AHUNTERSTON-B1GCRAGR1496644420 BETNPG1967-111976-21976-270.470.7- GB -17BHUNTERSTON-B2GCRAGR1496644420 BETNPG1967-111977-31977-370.971.0- GB -11AOLDBURY-A1GCRMAGNOX730230217 MELTNPG1962-51967-111967-1281.181.5- GB -11BOLDBURY-A2GCRMAGNOX660230217 MELTNPG1962-51968-41968-977.477.4- GB -24SIZEWELL-BPWR342512501188 BEPPC1988-71995-21995-986.186.2- GB -23ATORNESS 1GCRAGR1623682625 BENNC1980-81988-51988-572.774.8- GB -23BTORNESS 2GCRAGR1623682625 BENNC1980-81989-21989-272.573.6- GB -13AWYLFA 1GCRMAGNOX1920540490 MELEE/B&W/T1963-91971-11971-1170.871.3- GB -13BWYLFA 2GCRMAGNOX1920540490 MELEE/B&W/T1963-91971-71972-170.871.0- UKRAINE UA -40KHMELNITSKI-1PWRWWER V-32030001000950 NNEGCPAIP1981-111987-121988-872.373.3DH UA -41KHMELNITSKI-2PWRWWER V-32030001000950 NNEGCPAIP1985-22004-82005-1287.689.3DH UA -27ROVNO-1PWRWWER V-2131375420381 NNEGCPAIP1973-81980-121981-980.080.7DH UA -28ROVNO-2PWRWWER V-2131375415376 NNEGCPAIP1973-101981-121982-780.081.1DH UA -29ROVNO-3PWRWWER V-32030001000950 NNEGCPAIP1980-21986-121987-570.572.3DH UA -69ROVNO-4PWRWWER V-32030001000950 NNEGCPAA1986-82004-102006-467.367.7DH UA -44SOUTH UKRAINE-1PWRWWER V-30230001000950 NNEGCPAA1977-31982-121983-1065.966.7DH UA -45SOUTH UKRAINE-2PWRWWER V-33830001000950 NNEGCPAA1979-101985-11985-462.363.5DH UA -48SOUTH UKRAINE-3PWRWWER V-32030001000950 NNEGCPAA1985-21989-91989-1270.972.2DH UA -54ZAPOROZHE-1PWRWWER V-32030001000950 NNEGCPAIP1980-41984-121985-1262.764.9DH UA -56ZAPOROZHE-2PWRWWER V-32030001000950 NNEGCPAIP1981-11985-71986-267.268.9DH UA -78ZAPOROZHE-3PWRWWER V-32030001000950 NNEGCPAIP1982-41986-121987-369.172.0DH UA -79ZAPOROZHE-4PWRWWER V-32030001000950 NNEGCPAIP1983-41987-121988-473.275.8DH UA -126ZAPOROZHE-5PWRWWER V-32030001000950 NNEGCPAIP1985-111989-81989-1073.274.9DH UA -127ZAPOROZHE-6PWRWWER V-32030001000950 NNEGCPAIP1986-61995-101996-978.781.0DH USA US -313ARKANSAS ONE-1PWRB&W (L-loop) D2568880836 ENTGARKSB&W1968-121974-81974-1278.678.9- US -368ARKANSAS ONE-2PWRCE (2-loop) DR30261040988 ENTERGYCE1968-121978-121980-382.682.8- The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating.

CountryReactorTypeModelCapacity [MW] OperatorNSSS SupplierConstruction StartGrid ConnectionCommercial Operation

(43)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics US -334BEAVER VALLEY-1PWRW (3-loop)2689923883 FENOCWH1970-61976-61976-1071.371.3- US -412BEAVER VALLEY-2PWRW (3-loop)2689923832 FENOCWH1974-51987-81987-1185.985.9- US -456BRAIDWOOD-1PWRW (4-loop)358712401178 EXELONWH1975-121987-71988-786.886.8- US -457BRAIDWOOD-2PWRW (4-loop) DRY358712131152 EXELONWH1975-121988-51988-1090.490.5- US -259BROWNS FERRY-1BWRBWR-4345811521170 TVAGE1967-51973-101974-858.858.8- US -260BROWNS FERRY-2BWRBWR-4 (Mark 1)345811551223 TVAGE1967-51974-81975-378.378.4- US -296BROWNS FERRY-3BWRBWR-4 (Mark 1)345811901114 TVAGE1968-71976-91977-381.081.0- US -325BRUNSWICK-1BWRBWR-4 (Mark 1)2923990938 PROGENGCGE1970-21976-121977-373.173.4- US -324BRUNSWICK-2BWRBWR-4 (Mark 1)2923989937 PROGENGCGE1970-21975-41975-1171.571.9- US -454BYRON-1PWRW (4-loop) (DR358712251164 EXELONWH1975-121985-31985-986.987.0- US -455BYRON-2PWRW (4-Loop) (DR358711961136 EXELONWH1975-121987-21987-891.491.4- US -483CALLAWAY-1PWRW (4-loop) DRY356512361190 AMERGENEWH1976-41984-101984-1288.188.1- US -317CALVERT CLIFFS-1PWRCE (2-loop) (D2700918873 CCNPPCE1969-71975-11975-576.676.9- US -318CALVERT CLIFFS-2PWRCE (2-loop) (D2700911862 CCNPPCE1969-71976-121977-480.380.3- US -413CATAWBA-1PWRW (4-loop) (IC341111881129 DUKEWH1975-81985-11985-683.883.8- US -414CATAWBA-2PWRW (4-loop) (IC341111881129 DUKEWH1975-81986-51986-884.384.3- US -461CLINTON-1BWRBWR-6 (Mark 3)347310981043 AMERGENEGE1976-21987-41987-1173.573.6- US -397COLUMBIABWRBWR-5 (Mark 2)348612001131 ENERGYNWGE1972-21984-51984-1276.977.7- US -445COMANCHE PEAK-1PWRW (4-loop) DRY345811891150 TXUWH1974-121990-41990-888.288.2- US -446COMANCHE PEAK-2PWRW (4-loop) DRY345811891150 TXUWH1974-121993-41993-890.390.3- US -298COOPERBWRBWR-4 (Mark 1)2381801760 NPPDGE1968-61974-51974-774.874.9- US -302CRYSTAL RIVER-3PWRB&W (L-loop)2568890838 PROGRESSB&W1968-91977-11977-372.372.4- US -346DAVIS BESSE-1PWRB&W (R-loop)2772925889 FENOCB&W1971-31977-81978-767.567.6- US -275DIABLO CANYON-1PWRW (4-loop)333811361122 PGEWH1968-41984-111985-585.785.8- US -323DIABLO CANYON-2PWRW (4-loop)341111641118 PGEWH1970-121985-101986-388.989.0- US -315DONALD COOK-1PWRW (4-loop) ICE330410771029 IMPCOWH1969-31975-21975-869.769.9- US -316DONALD COOK-2PWRW (4-loop) ICE346811331077 IMPCOWH1969-31978-31978-767.367.5- US -237DRESDEN-2BWRBWR-3 (Mark 1)2527913867 EXELONGE1966-11970-41970-676.676.6- US -249DRESDEN-3BWRBWR-3 (Mark 1)2527913867 EXELONGE1966-101971-71971-1172.973.0- US -331DUANE ARNOLD-1BWRBWR-4 (Mark 1)1912614581 FPLDUANEGE1970-61974-51975-277.877.9- CountryReactor TypeModelCapacity [MW] OperatorNSSS SupplierConstruction StartGrid ConnectionCommercial Operation

42

(44)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics US -341ENRICO FERMI-2BWRBWR-4 (Mark 1)343011541122 DETEDGE1972-91986-91988-176.876.8- US -348FARLEY-1PWRW (3-loop)2775895851 ALPWH1972-81977-81977-1282.582.7- US -364FARLEY-2PWRW (3-loop) DRY2775905860 ALPWH1972-81981-51981-787.187.1- US -333FITZPATRICKBWRBWR-4 (Mark 1)2536882852 ENTERGYGE1970-51975-21975-776.176.3- US -285FORT CALHOUN-1PWRCE (2-loop)1500512482 OPPDCE1968-61973-81973-980.280.2- US -416GRAND GULF-1BWRBWR-6 (Mark 3)383313331266 ENTERGYGE1974-91984-101985-786.486.6- US -261H.B. ROBINSON-2PWRW (3-loop) DRY2339745710 PROGRESSWH1967-41970-91971-378.378.5- US -321HATCH-1BWRBWR-4 (Mark 1)2804898876 SOUTHGE1969-91974-111975-1279.779.7- US -366HATCH-2BWRBWR-4 (Mark 1)2804921883 SOUTHGE1972-121978-91979-982.082.0- US -354HOPE CREEK-1BWRBWR-4 (Mark 1)333911391061 PSEGGE1976-31986-81986-1284.684.6- US -247INDIAN POINT-2PWRW (4-loop) DRY321610621020 ENTERGYWH1966-101973-61974-871.271.2- US -286INDIAN POINT-3PWRW (4-loop) DRY321610651025 ENTERGYWH1969-81976-41976-867.067.0- US -305KEWAUNEEPWRW (2-loop) DRY1772581556 DOMENGYWH1968-81974-41974-682.782.7- US -373LASALLE-1BWRBWR-5 (Mark 2)348911771118 EXELONGE1973-91982-91984-174.474.4- US -374LASALLE-2BWRBWR-5 (Mark 2)348911791120 EXELONGE1973-91984-41984-1073.173.1- US -352LIMERICK-1BWRBWR-4 (Mark 2)345811941134 EXELONGE1974-61985-41986-289.389.3- US -353LIMERICK-2BWRBWR-4 (Mark 2)345811941134 EXELONGE1974-61989-91990-192.692.7- US -369MCGUIRE-1PWRW (4-loop) ICE341111581100 DUKEWH1973-21981-91981-1279.880.1- US -370MCGUIRE-2PWRW (4-loop) (IC341111581100 DUKEWH1973-21983-51984-383.983.9- US -336MILLSTONE-2PWRCOMB CE DRYA2700910882 DOMINCE1970-121975-111975-1265.366.0- US -423MILLSTONE-3PWRW (4-loop) DRY341112531155 DOMINWH1974-81986-21986-474.174.1- US -263MONTICELLOBWRBWR-31775600572 NORTHERNGE1967-61971-31971-684.384.3- US -220NINE MILE POINT-1BWRBWR-2 (Mark 1)1850642621 NMPNSLLCGE1965-41969-111969-1273.373.3- US -410NINE MILE POINT-2BWRBWR-5 (Mark 2)346712051140 NMPNSLLCGE1974-61987-81988-382.282.2- US -338NORTH ANNA-1PWRW (3-loop)2893973924 VEPCOWH1971-21978-41978-681.381.3- US -339NORTH ANNA-2PWRW (3-loop)2893958910 VEPCOWH1971-21980-81980-1285.485.4- US -269OCONEE-1PWRB&W (L-loop)2568891846 DUKEB&W1967-111973-51973-779.379.6- US -270OCONEE-2PWRB&W (L-loop)2568891846 DUKEB&W1967-111973-121974-980.781.0- US -287OCONEE-3PWRB&W (L-loop)2568891846 DUKEB&W1967-111974-91974-1279.079.4- US -219OYSTER CREEKBWRBWR-2 (Mark 1)1930652619 AMERGENGE1964-121969-91969-1274.474.5- CountryReactorTypeModelCapacity [MW] OperatorNSSS Supplier

Construction Start Grid Connection Commercial Operation

(45)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics US -255PALISADESPWRCE (2-loop) DR2565842778 CONSENECCE1967-31971-121971-1267.768.8- US -528PALO VERDE-1PWRCE (2-loop) DR399014141311 AZPSCOCE1976-51985-61986-176.376.5- US -529PALO VERDE-2PWRCOMB CE80 DR399014141314 AZPSCOCE1976-61986-51986-980.480.5- US -530PALO VERDE-3PWRCOMB CE80 DR399013461247 AZPSCOCE1976-61987-111988-182.282.6- US -277PEACH BOTTOM-2BWRBWR-4 (Mark 1)351411711112 EXELONGE1968-11974-21974-772.972.9- US -278PEACH BOTTOM-3BWRBWR-4 (Mark 1)351411711112 EXELONGE1968-11974-91974-1273.273.3- US -440PERRY-1BWRBWR-6 (Mark 3)375813031231 FENOCGE1977-51986-121987-1179.379.3- US -293PILGRIM-1BWRBWR-3 (Mark 1)2028711685 ENTERGYGE1968-81972-71972-1269.169.3- US -266POINT BEACH-1PWRW (2-loop) DRY1540543512 WEPWH1967-71970-111970-1282.783.1- US -301POINT BEACH-2PWRW (2-loop) DRY1540545514 WEPWH1968-71972-81972-1084.384.3- US -282PRAIRIE ISLAND-1PWRW (2-loop) DRY1650566551 NORTHERNWH1968-61973-121973-1286.086.0- US -306PRAIRIE ISLAND-2PWRW (2-loop) DRY1650544545 NUCMANWH1969-61974-121974-1287.987.9- US -254QUAD CITIES-1BWRBWR-3 (Mark 1)2957913867 EXELONGE1967-21972-41973-276.376.3- US -265QUAD CITIES-2BWRBWR-3 (Mark 1)2511913867 EXELONGE1967-21972-51973-374.875.6- US -244R.E. GINNAPWRW (2-loop)1775608498 CCNPPWH1966-41969-121970-784.184.1- US -458RIVER BEND-1BWRBWR-6 (Mark 3)30911036967 ENTGSGE1977-31985-121986-681.781.7- US -272SALEM-1PWRW (4-loop) DRY345912281174 PSEGPOWRWH1968-91976-121977-666.066.1- US -311SALEM-2PWRW (4-loop) DRY345911701130 PSEGPOWRWH1968-91981-61981-1068.868.8- US -361SAN ONOFRE-2PWRCE (2-loop) DR343811271070 SCECE1974-31982-91983-880.980.9- US -362SAN ONOFRE-3PWRCE (2-loop) DR343811271080 SCECE1974-31983-91984-481.881.8- US -443SEABROOK-1PWRW (4-loop) DRY358712961244 FPLWH1976-71990-51990-886.586.7- US -327SEQUOYAH-1PWRW (4-loop) ICE341112211150 TVAWH1970-51980-71981-770.170.1- US -328SEQUOYAH-2PWRW (4-loop) (IC341112211127 TVAWH1970-51981-121982-674.674.6- US -400SHEARON HARRIS-1PWRW (3-loop) DRY2900960900 PROGENGCWH1978-11987-11987-587.487.4- US -498SOUTH TEXAS-1PWRW (4-loop)385313541280 STPWH1975-121988-31988-880.080.0- US -499SOUTH TEXAS-2PWRW (4-loop) DRY385313541280 STPWH1975-121989-41989-681.381.3- US -335ST. LUCIE-1PWRCOMB CE DRYA2700883839 FPLCE1970-71976-51976-1281.681.8- US -389ST. LUCIE-2PWRCOMB CE DRYA2700883839 FPLCE1977-51983-61983-885.786.1- US -280SURRY-1PWRW (3-loop) DRY2546848799 VEPCOWH1968-61972-71972-1274.074.0- US -281SURRY-2PWRW (3-loop) DRY2546848799 VEPCOWH1968-61973-31973-575.075.1- CountryReactor TypeModelCapacity [MW] OperatorNSSS SupplierConstruction StartGrid ConnectionCommercial Operation

44

(46)

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2007 — continued

EAF %UCF %Non- 1998 to1998 toelectrical CodeNameThermalGrossNet20072007Applics US -387SUSQUEHANNA-1BWRBWR-4 (Mark 2)348911991135 PP&LGE1973-111982-111983-683.483.5- US -388SUSQUEHANNA-2BWRBWR-4 (Mark 2)348912041140 PP&LGE1973-111984-71985-286.986.9- US -289THREE MILE ISLAND-1PWRB&W (L-loop)2568837786 AMERGENEB&W1968-51974-61974-971.386.1- US -250TURKEY POINT-3PWRW (3-loop) DRY2300729693 FPLWH1967-41972-111972-1277.077.1- US -251TURKEY POINT-4PWRW (3-loop) DRY2300729693 FPLWH1967-41973-61973-976.776.7- US -271VERMONT YANKEEBWRBWR-4 (Mark 1)1912650620 ENTERGYGE1967-121972-91972-1183.883.9- US -395VIRGIL C. SUMMER-1PWRW (3-loop) DRY29001003966 SCEGWH1973-31982-111984-184.684.6- US -424VOGTLE-1PWRW (4-loop) DRY356512031152 SOUTHWH1976-81987-31987-689.989.9- US -425VOGTLE-2PWRW (4-loop) DRY356512021149 SOUTHWH1976-81989-41989-589.989.9- US -382WATERFORD-3PWRCE (2-loop)371612001152 ENTERGYCE1974-111985-31985-986.686.8- US -390WATTS BAR-1PWRW (4-loop) (IC345912021121 TVAWH1973-11996-21996-590.290.2- US -482WOLF CREEKPWRW (4-loop)356512131166 KGECOWH1977-51985-61985-986.586.5- Status as of 31 December 2007, 439 reactors (372208 MW(e)) were connected to the grid, including 6 units (4921 MW(e)) in Taiwan, China. TWN, CHINA TW -1CHIN SHAN-1BWR1775636604 TPCGE1972-61977-111978-1282.283.3- TWN, CHINA TW -2CHIN SHAN-2BWR1775636604 TPCGE1973-121978-121979-781.482.5- TWN, CHINA TW -3KUOSHENG-1BWRBWR-628941019985 TPCGE1975-111981-51981-1281.682.3- TWN, CHINA TW -4KUOSHENG-2BWR2894985948 TPCGE1976-31982-61983-381.482.5- TWN, CHINA TW -5MAANSHAN-1PWR2785951890 TPCWH1978-81984-51984-782.784.3- TWN, CHINA TW -6MAANSHAN-2PWR2785951890 TPCWH1979-21985-21985-583.685.6- Capacity [MW] OperatorNSSS SupplierConstruction StartCountryReactor TypeModelGrid ConnectionCommercial Operation

(47)

46

TABLE 15. LONG-TERM SHUT DOWN REACTORS, 31 DEC. 2007

CodeNameThermalGrossNet CANADA CA -8BRUCE-1 PHWRCANDU 7912832825848 BRUCEPOWOH/AECL1971-61977-11977-91997-11 CA -9BRUCE-2PHWRCANDU 7912832825848 BRUCEPOWOH/AECL1970-121976-91977-91995-11 CA -5PICKERING-2PHWRCANDU 500A1744542515 OPGOH/AECL1966-91971-101971-121998-1 CA -6PICKERING-3PHWRCANDU 500A1744542515 OPGOH/AECL1967-121972-51972-61998-1 JAPAN JP -31MONJUFBRNot specified714280246 JAEAT/H/F/M1986-51995-8—1996-1 Status as of 31 December 2007, 5 reactors (2972 MW(e)) were in long-term shutdown.

CountryReactor TypeModelCapacity [MW] OperatorLong-term Shutdown Date NSSS SupplierConstruction StartGrid ConnectionCommercial Operation

Références

Documents relatifs

To address these objectives, the conference was structured into seven sessions covering spent fuel management strategies, status and challenges of an integrated approach,

Operator codeOperationalConstructionLT shut downShut downPlanned GE GENERAL ELECTRIC1 GFNPC GUANGXI FANGCHENGGANG NUCLEAR POWER COMPANY, LTD.2 2 GPU GENERAL

OPERATORS - Abbreviations and Summary — continued Operator CodeOperationalConstructionLT Shut DownShut DownPlanned LIPA LONG ISLAND POWER AUTHORITY1 LNPC LIAONIN NUCLEAR

A goal of a power uprate is to increase the gross electrical output of the nuclear power plant, while maintaining adequate safety, design and operating margins.. It is important

OPERATORS - Abbreviations and Summary — continued Operator CodeOperationalConstructionLT Shut DownShut DownPlanned LIPA LONG ISLAND POWER AUTHORITY1 MAEC-KAZ MANGISHLAK

NSSS SUPPLIERS - Abbreviations and Summary NSSS Supplier CodeOperationalConstructionLTShut DownShut DownPlanned A/F/W ASSOCIATION ACEC,FRAMATOME ET WESTINGHOUSE.1 ABBATOM

performance coated fuel particles (CFPs) capable of containing radioactive fission products for the full range of operating and postulated accident conditions with a very low

– General information as of the end of 2006 on power reactors operating or under construction, and shut down;.. – Performance data on reactors operating in the Agency’s Member