WP3
“CMS Requirements”
NOT
!
Test Summary
WP3• Need to simultaneously track progress of 000’s of jobs scattered across Grid
• R-GMA performance is now of correct
EDG WP3 Meeting 14/01/04 – 16/01/04
order of magnitude
• Batches of 3000 fakejobs with occasional lost message
• Hear Rob’s talk tomorrow
LCG 2
WP3• Need to get into LCG distribution
• Get past: not Ian Bird, now John Gordon
• LCG2 deadline Feb. 9th
• LCG2 deadline Feb. 9th
Next step
WP3• Create LCFGng objects
Test on LCG1 testbed with CMS apps (DC/BM/ST)
EDG WP3 Meeting 14/01/04 – 16/01/04
“Criteria”
WP3• Doesn’t break other parts of the testbed!
• ?
… and Finally
WP3• Need to be UK driven
EDG WP3 Meeting 14/01/04 – 16/01/04