• Aucun résultat trouvé

SCHEDULE II / ITEM 2

N/A
N/A
Protected

Academic year: 2022

Partager "SCHEDULE II / ITEM 2"

Copied!
2
0
0

Texte intégral

(1)

Exam II-2 Hydrography 2009 10 1 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS

SCHEDULE II / ITEM 2 October 2009 HYDROGRAPHIC SURVEYING & OCEANOGRAPHY

Note: This examination consists of 7 questions on 2 pages. Marks

Q. No Time: 3 hours Value Earned

1.

Define each of the following terms:

a) avulsion

b) foul bottom (or foul ground) c) cavitation

d) groin (or groyne) e) kelp

f) seiche g) thermocline h) windward i) sea mile j) abyssal

20

2.

a) Describe the factors that affect the speed of sound of an acoustic wave in water.

b) Describe the process of calibrating a single beam echo sounder.

c) Why would you use a 200 kHz transducer rather than a 28 kHz transducer (single beam echo sounder)?

5

5

5

3.

a) How do you determine whether a co-tidal chart is required for a designated sounding survey?

b) Normally, in taking water level measurements over medium-long periods, both an automatic water level gauge and a tide staff are installed. Why?

c) Explain harmonic and non-harmonic tidal constituents.

5

5

5

4.

During the course of a hydrographic survey, an underwater feature was discovered at a harbour entrance. During the shoal examination process it is determined that the least depth obtained by lead line was 5.3 metres and the least depth obtained using a 30 kHz single-beam echo sounder was 4.7 metres. Explain why this discrepancy may occur.

15

5.

a) Why is the (vessel) line spacing different for a hydrographic survey being conducted using a single beam echo sounder rather than a multibeam echo sounding system?

b) What are some of the main differences between an electronic chart system utilizing raster data and a system using vector data?

5

5

(2)

Exam II-2 Hydrography 2009 10 2 6.

a) Why is it essential that a hydrographic surveyor know the heave, roll and pitch of a vessel in conducting a hydrographic survey?

b) During the conduct of a hydrographic survey, it is determined that large amounts of underwater growth (eel grass, weeds, kelp) is hampering the echo sounder in obtaining true depth. In these areas of heavy underwater growth, what methods could you use to obtain true depth? Why?

5

5

7.

A major charting program is required in Lewisporte, Newfoundland to facilitate recreational boating, commercial shipping, and the fishing industry. A

hydrographic survey is being conducted to produce a chart at a scale of 1:60,000.

Two chart insets, each at a scale of 1:5,000, is required for berthing/docking many different types of vessels.

Your company is going to submit a proposal (bid) to conduct the surveys, and you are part of a team preparing the submission.

Compile a list of questions/issues you have to address in order to prepare the documentation.

15

Total Marks: 100

Références

Documents relatifs

Land surveyors are often called as witnesses in survey or boundary related legal proceedings.. In some cases, the land surveyor will give individual (or lay) testimony and, in

The major residential and commercial areas of Whitehorse are serviced with water and sewer mains buried at an average 3 metre depth to avoid winter freezing.. Gas distribution

An absolute accuracy of better than 5 cm with respect to NAD83(CSRS) and a relative accuracy better than 1 cm are requested. A field trip of one week with 3 GPS receivers

The 15 hectare site encloses a long and narrow esker that generally parallels a rural arterial road and that has its nearest side approximately 300 metres south of the centre line

Note: The use of calculators or similar devices is not permitted in this exam. Note: This examination consists of 9 questions on 1 page. a) Define geometries and attributes as the

Exam II-6 Business Law 2010 03 1 of 1 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS.. SCHEDULE II / ITEM 6 March 2010 BUSINESS LAW, ADMINISTRATION

A production decision has been made and the mining company's engineers and planners commence planning for construction of a 200-person permanent camp in closer proximity to the

Describe four key software components (groups of functions) of a GIS and identify any one of these which makes GIS different than simply a combination of CAD and Database