Exam II-1 Geodetic Positioning 2009 March 1 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS

SCHEDULE II / ITEM 1 March 2009 GEODETIC POSITIONING

Although programmable calculators may be used, candidates must show all formulae used, the substitution of values into them, and any intermediate values to 2 more significant figures than warranted by the answer. Otherwise, full marks may not be awarded even though the answer is numerically correct.

Note: This examination consists of 4 questions on 2 pages Marks

Q. No Time: 3 hours Value Earned

a) How is the International Terrestrial Reference System (ITRS) defined, realized and maintained. Enumerate the different observation techniques used and comment on the difference between a specific ITRF and the ITRS. 15 b) What is the difference between ITRS and NAD83(CSRS) ?

Explain the transformation between ITRF2000 and NAD83(CSRS)

3D Cartesian coordinates. 11

1

c) If one looks back, an important realization of NAD was NAD27. Enumerate and explain 3 major differences in the definition and/or realization of NAD27

and NAD83(CSRS). 9

2

a) What are the characteristics, the applications and attainable accuracy of:

- Dual-frequency Real Time Kinematic (RTK)?

- Precise Point Positioning (PPP)?

- Single frequency Differential GPS (DGPS)?

12

b) Comment on the disturbing potential of the troposphere and the ionosphere

on the above mentioned methods i.e.: RTK, PPP, DGPS. 8

3

a) Nowadays GPS is widely used for positioning purposes. The height obtained from GPS is basically a height above the ellipsoid. Would it not therefore be more suitable to drop the geoid as a reference surface completely and to switch to the ellipsoid as vertical datum using ellipsoidal heights only?

Argue.

5

(2)

Exam II-1 Geodetic Positioning 2009 March 2 5 km

5 km 5 km 5 km tunnel axis

A

B

You are the responsible surveyor in chief involved in the

construction of a tunnel.

Tunneling will be done starting simultaneously at both portals and the break-through will be at midway. The civil engineer in charge wants you to guarantee an error less than 3 cm

horizontally and 1 cm vertically at the break-through. He hands you out the UTM coordinates of the points A and B,

corresponding to the starting and end point of the planned tunnel (see sketch).

a)Your first task is to establish a reference network of a total of 8 markers (2 times 4 markers at each end) using GPS. Based on the above requirements, which procedure would you suggest: choice of receivers, schedule of site occupation, observation techniques, and strategy of data analysis? What will be your final result in terms of type of coordinates and datum they refer to?

20

b) Theoretical questions : What is the difference between an astronomical azimuth and a geodetic azimuth? What is the difference between a geodetic

azimuth and a grid bearing with respect to UTM ? 10

c) Applied to the tunnel : You have UTM coordinates of A and B and the GPS results for all your markers. From now on you use a theodolite for controlling the direction of the heading since GPS will not work in the tunnel. Explain in details how you proceed. Comment on the influence of the deviation of the vertical.

10 4

100

Références

Documents relatifs

The 15 hectare site encloses a long and narrow esker that generally parallels a rural arterial road and that has its nearest side approximately 300 metres south of the centre line

Note: The use of calculators or similar devices is not permitted in this exam. Note: This examination consists of 9 questions on 1 page. a) Define geometries and attributes as the

Exam II-6 Business Law 2010 03 1 of 1 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS.. SCHEDULE II / ITEM 6 March 2010 BUSINESS LAW, ADMINISTRATION

Exam I-1 Mathematics 2008 10 1 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS ATLANTIC PROVINCES BOARD OF EXAMINERS FOR LAND SURVEYORS.. SCHEDULE I / ITEM 1 October 2008

A production decision has been made and the mining company's engineers and planners commence planning for construction of a 200-person permanent camp in closer proximity to the

Describe four key software components (groups of functions) of a GIS and identify any one of these which makes GIS different than simply a combination of CAD and Database

Evaluate the first 3

a) One bench mark has orthometric height equal to 50.377 m. This benchmark serve as reference for a baseline determined with GPS. Geodetic heights determined from this bench mark