Exam II-4 Land Use Planning 2010 03 1 of 2 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS

SCHEDULE II / ITEM 4

March 2010

LAND USE PLANNING AND ENVIRONMENTAL MANAGEMENT

Note: The use of calculators or similar devices is not permitted in this exam.

Note: This examination consists of 10 questions on 2 pages. Marks

Q. No Time: 3 hours Value Earned

1.

You are requested by a developer to explain in writing the procedures and planning steps the developer should follow in the development of a 75 ha parcel of land for residential purposes. Outline your response in point form.

15

2.

In many regions in Canada, lifestyle and financial factors are contributing to the transformation of summer recreational properties into permanent residences. List in point form some of the problems resulting from this practice and suggest some steps that municipal or regional jurisdictions can take to mitigate them.

10

3.

It has often been said that every crisis is an opportunity for change. Natural

disasters such as the January 2010 earthquake in Haiti have an everlasting effect on the lives of those affected by the devastation. Authorities, to the extent that they are still capable of functioning, have responsibility for responding to the emergency, short-term and long-term needs of the population.

List some of the short-term considerations and actions that land use and

environmental planners will have to take in order to address the long-term recovery for the affected areas.

8

4.

You are the Land Use Coordinator for a regional municipality which has an ongoing requirement for both pit run and crushed gravel for the construction and maintenance of roads for rural residential subdivisions. Granular materials are in scare supply in the region, but test drilling has identified a source of acceptable material in a rural area that will meet the projected needs for the next 15 years. The 15 hectare site encloses a long and narrow esker that generally parallels a rural arterial road and that has its nearest side approximately 300 metres south of the centre line of the arterial road. The prevailing wind in the area is from the south 80% of the time. The nearest land use occupation, a residence, is 700 metres east of the closest boundary of the proposed pit excavation. Early rumors circulating about the possibility of a pit has other area residents mounting a NIMBY opposition to the proposed development.

Describe the mitigative actions you would propose to the regional government in order to minimize negative impacts before, during and after the proposed

operations.

6

(2)

Exam II-4 Land Use Planning 2010 03 2 of 2 5.

Give a concise definition of each of the following terms as they apply to site planning and/or environmental management:

a) sustainable yield b) detached housing c) leaching

d) pH e) biomass f) food chain g) floor area ratio h) wetland

2 2 2 2 2 2 2 2

6.

The issue of climate change and its causes and effects do not enjoy universal consensus from environmental scientists. Identify in point form some of the challenges, opportunities and threats that you can foresee from climate change as a practicing land surveyor in Canada.

7

7. List the stages for a typical site planning cycle in which the designer is properly

involved. 12

8. What are some techniques available for spring runoff erosion control in the ditches

of a gravel-surfaced mining haul road? 6

9. Prepare a checklist for site data that will be required as part of a comprehensive site

analysis. 10

10.

You have been asked to consider site design alternatives for the development of six adjoining rectangular residential lots in a municipality on an existing public road with buried service mains. Each single-family dwelling will have a footprint of approximately 130 square metres. Draw a sketch of the lots, including typical dimensions and building setbacks, that you would propose for:

a) a conventional subdivision b) a zero lot line subdivision

5 5 Total: 100

Références

Documents relatifs

Note: The use of calculators or similar devices is not permitted in this exam. Note: This examination consists of 9 questions on 1 page. a) Define geometries and attributes as the

Exam II-6 Business Law 2010 03 1 of 1 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS.. SCHEDULE II / ITEM 6 March 2010 BUSINESS LAW, ADMINISTRATION

A production decision has been made and the mining company's engineers and planners commence planning for construction of a 200-person permanent camp in closer proximity to the

Describe four key software components (groups of functions) of a GIS and identify any one of these which makes GIS different than simply a combination of CAD and Database

Your geomatics consulting firm has been selected by the Regional District in your province to provide mapping and land information services, as part of a project team,

Exam II-6 Business Law 2009 10 1 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS.. SCHEDULE II / ITEM 6 October 2009

Outline the substance of one of these cases or another case (provide case citing) and discuss what effect it has had on the way land surveyors treat water boundaries.. What are

c) Explain harmonic and non-harmonic tidal constituents. During the course of a hydrographic survey, an underwater feature was discovered at a harbour entrance. During the