• Aucun résultat trouvé

SCHEDULE II / ITEM 2 March 2007 HYDROGRAPHIC SURVEYING AND OCEANOGRAPHY Examination Results for Candidate No.:

N/A
N/A
Protected

Academic year: 2022

Partager "SCHEDULE II / ITEM 2 March 2007 HYDROGRAPHIC SURVEYING AND OCEANOGRAPHY Examination Results for Candidate No.:"

Copied!
1
0
0

Texte intégral

(1)

CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS ATLANTIC PROVINCES BOARD OF EXAMINERS FOR LAND SURVEYORS

________________________________________________________________________

SCHEDULE II / ITEM 2 March 2007 HYDROGRAPHIC SURVEYING AND OCEANOGRAPHY

Examination Results for Candidate No.:

Note: This examination consists of 7 questions on 1 page. Marks

Q. No

Time: 3 hours

Value Earned

1

Define each of the following terms:

a) cavitation b) avulsion c) bifurcation

d) escarpment (or sea scarp) e) foul bottom (or foul ground) f) draft (or draught)

g) isobathytherm h) groin (or groyne) i) hachures j) kelp k) limnology l) quay m) seiche n) strand o) thermocline

30

2

Describe the factors that affect the speed of sound of an underwater acoustic wave in water.

Why is it critical that a hydrographic surveyor know the speed of sound in water?

6

4

3 Describe in detail the forces and factors that affect the strength and extent of tidal streams.

10

4

During the course of a hydrographic survey, it is often required to establish both a sounding datum and subsequently a chart datum. Explain each and describe why this is so.

10

5 Describe the operation of a single beam echo sounder, naming and sketching each

component. 10

6

Normally in taking water level measurements over medium-long periods both an automatic water level gauge and a tide staff are installed. Why?

Explain harmonic and non-harmonic tidal constituents.

5

5

7

During the course of a hydrographic survey, a pinnacle was discovered in a shipping lane. During a quality control process it is determined that the least depth obtained by lead line was 4.6 metres and the least depth obtained using a 30 KHz single-beam echo sounder was 4.1 metres. Explain why this discrepancy may occur.

What would you do to resolve the difference and why?

15

5 Total Marks: 100

Références

Documents relatifs

a) Name and describe two main factors that contribute to the propagation loss of acoustic waves as they travel through sea water. b) Describe ambient noise and reverberation as

3 Describe the process of installing a tide staff and automatic tide gauge as well as the data collection necessary to establish a sounding datum. 155. a) How do you determine

Include in your answer the nature of the echo pulse (frequency/duration), beam forming, transducer types, etc. b) To obtain true depth with an echo sounder, various corrections

Periodic vertical movements of the waters on the earth’s surface are called Tides. Describe in detail, using diagrams, why and how tides occur, and how tides are affected by

A detailed large scale hydrographic survey is required for the construction of a pier to be used mainly for loading/offloading container vessels and bulk carriers. Your company

a) In the course of researching an old hydrographic survey you locate a bathymetric plan/field sheet, original field notes and a field report. b) What is an echo sounder? List

2 Describe in detail the effect of water temperature, salinity, and pressure changes on the speed of an underwater acoustic wave.. 10 3 Sketch and describe the operation of

b) Bathymetric sounding surveys utilizing a single beam echo sounder are normally conducted by running a pattern of parallel straight lines. What factors may determine the