SCHEDULE II / ITEM 2 March 2002 HYDROGRAPHIC SURVEYING AND OCEANOGRAPHY Note: This examination consists of 5 (five) questions on 2 (two) pages. Marks

N/A
N/A
Protected

Academic year: 2022

Partager "SCHEDULE II / ITEM 2 March 2002 HYDROGRAPHIC SURVEYING AND OCEANOGRAPHY Note: This examination consists of 5 (five) questions on 2 (two) pages. Marks"

Copied!
2
0
0

Texte intégral

(1)

ASSOCIATION OF CANADA LANDS SURVEYORS - BOARD OF EXAMINERS WESTERN CANADIAN BOARD OF EXAMINERS FOR LAND SURVEYORS ATLANTIC PROVINCES BOARD OF EXAMINERS FOR LAND SURVEYORS ________________________________________________________________________

SCHEDULE II / ITEM 2 March 2002 HYDROGRAPHIC SURVEYING AND OCEANOGRAPHY

Note: This examination consists of 5 (five) questions on 2 (two) pages. Marks

Q. No Time: 3 hours Value Earned

1

The hydrographic surveyor must understand the characteristics of tides and allow for their vertical movement.

a) With the aid of diagram(s), and using the relative movements of the Earth, Moon and Sun, explain the tide producing forces, and the combined effects of the sun and the moon on the earth. In your explanation, clearly demonstrate your understanding of the terms apogee, perigee, aphelion, perihelion and lunar day.

b) Explain the difference between a diurnal and a semi-diurnal tide.

c) Elaborate on meteorological effects on wave forms similar to tides.

d) Define a datum, and describe the difference between a sounding datum and a chart datum.

e) Why are tides much higher in certain areas such as the Bay of Fundy?

f) Define an amphidrome, co-tidal chart, and Beaufort Scale.

g) Explain Harmonic Analysis and its Application to Tides.

10

4 4 4 4 6 4

2

Sounding operations are perhaps the most important part of the hydrographic surveyor’s work. Today, most sounding is carried out by the use of echo- sounders.

a) Describe the general principles of an echo sounder. Include in your answer the nature of the echo pulse (frequency/duration), beam forming, transducer types, etc.

b) To obtain true depth with an echo sounder, various corrections must generally be applied to the sounder depth. Explain by giving examples.

c) It is not uncommon to get “a false echo” (erroneous depth) with an echo sounder. List and describe five such false echoes.

d) Describe the effect of water temperature, salinity, and pressure changes in the speed of an underwater acoustic wave.

e) Describe two non-acoustic sounding methods and under which conditions you would possibly use them.

10 10 5 8 4

(2)

3

Planned lines of soundings must cover the sea-bed in a methodical manner.

a) What are two basic requirements the plan must fulfill?

b) Why could the plan be different if you were using a Multibeam Swath System rather than a single beam echo sounder?

c) Explain the process of “shoal” examination or searching, focusing on different sounding line patterns.

d) Why is it sometimes necessary to use side-scan sonar in conjunction with single beam echo sounding.

4 4 4 4

4

With the aid of diagrams explain the difference between an acoustic sweep system and a multibeam swath system. Give examples when it would be more beneficial to use one or the other.

5

5 Explain why the Mercator projection would or would not be the projection of

choice for a nautical chart. 6

Total Marks: 100

Références

Documents relatifs

A detailed large scale hydrographic survey is required for the construction of a pier to be used mainly for loading/offloading container vessels and bulk carriers. Your company

a) In the course of researching an old hydrographic survey you locate a bathymetric plan/field sheet, original field notes and a field report. b) What is an echo sounder? List

2 Describe in detail the effect of water temperature, salinity, and pressure changes on the speed of an underwater acoustic wave.. 10 3 Sketch and describe the operation of

Through a long history of decisions, the courts have established the hierarchy of evidence to be considered by a land surveyor when re-establishing boundaries. In alphabetical

What are the steps involved in designing a computer-based LIS database using a particular piece of GIS software, starting with a conceptual database design without regard to

You have a special budget of 150 k$Can for the infrastructure (GPS-receivers, antennas, installations, etc.) and 6 months time. The salaries of your team consisting of 5

a) Tidal data analysis involves both harmonic and non-harmonic constituents. d) Use a sounding pole rather than either a lead line or echo sounder to perform sounding operations.

applied to a sounding) at any point within the area covered by the co-tidal chart. b) Using diagrams and description, explain neap and spring tides. c) Explain two methods