• Aucun résultat trouvé

Robust material requirement planning with cumulative demand under uncertainty

N/A
N/A
Protected

Academic year: 2021

Partager "Robust material requirement planning with cumulative demand under uncertainty"

Copied!
23
0
0

Texte intégral

Loading

Figure

Table 2. The parameters and decision variables in model (23)–(28).

Références

Documents relatifs

Quantitative Analysis of grafted CNT dispersion and of their stiffening of polyurethane (PU)M. Diguet,

• Francesca Arcelli Fontana, University of Milano Bicocca (Italy) • Xavier Devroey, Delft University of Technology (Netherlands) • Benoît Frenay, University of Namur (Belgium).

Au  vu  de  cet  aperçu,  certes  schématique,  plusieurs  tendances  émergent  :  d'une  part,  le  souci 

Next, the chapter described the Chimeria:Grayscale Framework Study and the Comparison Study of Reflection- Enabling Methods in HCI which, respectively, established a baseline set

Well placement problems under geological uncertainty are formulated as optimization problems in which the objective function is evaluated using a reservoir simulator on a number

We present a step towards more realistic communication models for Dec-POMDPs by proposing a model that: (1) allows that communication might be delayed by one or more time steps, and

Aujourd’hui, ils sont des témoins de glace de ce qui s’est produit à mi- chemin dans la formation d’une planète, à l’étape où les gros amas de matière doivent normalement

Overall, the flow field contains two zones of boundary layer separation and consequent flow recirculation, labeled zones A and B in Figure 5.2. Figure 5.3 is a close-up