Regional Totals for Reclamation and Disturbance Tracking, by YearHectares

N/A
N/A
Protected

Academic year: 2022

Partager "Regional Totals for Reclamation and Disturbance Tracking, by YearHectares"

Copied!
1
0
0

Texte intégral

(1)

Mine Site/

Facility

EPEA Approved

Footprint Mine Site Footprint Plant Site

Footprint Total Active

Footprint Cleared Disturbed: Used for

Mine or Plant Purposes Ready for Reclamation: No Longer

Used for Mine or Plant Purposes Soils Placed (Terrestrial;

Wetlands & Aquatics)Permanent Reclamation

(Terrestrial) Permanent Reclamation

(Wetlands & Aquatics) Temporary Reclamation (Terrestrial) Certified Canadian

Natural Horizon

18,683.0 9,096.0 2,551.0 11,647.0 3,202.0 7,612.0 - 12.0 477.0 79.0 266.0 -

Canadian Natural Horizon South

7,520.0 5,180.0 - 5,099.0 4,030.0 1,068.0 - - - - - -

Imperial

Kearl 26,480.0 8,150.4 279.2 8,429.6 1,348.8 6,698.5 - - 52.5 32.9 297.0 - Canadian

Natural Jackpine

7,669.2 5,419.3 271.3 5,690.6 789.5 4,805.4 0.0 0.0 33.7 4.5 57.4 0.0

Suncor Base Operations

23,954.0 21,909.6 314.4 22,224.0 2,063.9 17,503.7 121.9 210.7 2,275.5 48.2 - -

Suncor Fort

Hills 18,171.0 9,629.1 138.5 9,767.6 3,652.8 5,836.5 1.9 0.3 19.4 15.6 241.1 - Canadian

Natural Muskeg River Mine

10,942.0 8,464.4 325.7 8,790.1 1,086.9 7,112.9 0.0 148.9 292.4 0.0 149.0 0.0

Syncrude

Aurora North 9,549.0 6,674.0 107.0 6,776.0 677.0 5,506.0 0.0 14.0 250.0 0.0 335.0 0.0

Syncrude

Mildred Lake 20,707.0 22,139.0 511.0 22,650.0 1,787.0 15,489.0 0.0 961.0 2,528.0 1,111.0 774.0 104.0

Canadian Natural Joslyn North Mine

8,652.0 2,291.0 530.0 2,821.0 2,073.0 470.0 0.0 0.0 0.0 0.0 278.0 0.0

Year EPEA Approved

Footprint Mine Site Footprint Plant Site

Footprint Total Active

Footprint Cleared Disturbed: Used for

Mine or Plant Purposes Ready for Reclamation: No Longer

Used for Mine or Plant Purposes Soils Placed (Terrestrial &

Wetlands & Aquatics)Permanent Reclamation

(Terrestrial) Permanent Reclamation

(Wetlands & Aquatics)Temporary Reclamation (Terrestrial) Certified

2009 51,342.2 11,533.7 1,994.8 13,528.3 6,047.7 7,063.5 88.6 0.0 53.0 0.0 275.5 0.0

2010 51,342.2 12,383.6 2,042.5 14,426.1 4,478.8 9,519.7 31.2 116.5 56.9 0.0 223.0 0.0

2011 52,831.9 14,589.8 2,045.4 16,635.2 4,862.9 11,263.1 30.8 2.5 151.1 0.0 324.7 0.0

2012 52,832.0 16,531.0 2,107.0 18,636.0 5,609.0 12,401.0 31.0 31.0 163.0 82.0 318.3 0.0

2013 93,381.1 47,686.4 2,864.3 50,601.3 12,812.6 34,762.9 181.4 467.9 1,821.7 159.8 417.9 0.0

2014 93,381.1 50,297.0 2,945.0 53,291.0 11,871.0 37,808.0 86.0 457.0 2,163.0 160.0 483.0 0.0

2015 142,807.1 89,541.3 4,503.1 94,095.0 18,064.8 66,559.1 294.3 1,304.8 4,891.9 1,271.8 1,632.1 104.0

2016 142,807.1 90,112.8 5,188.6 95,301.5 17,712.5 67,590.1 376.5 1,450.2 5,063.3 1,275.5 1,896.3 104.0

2017 150,751.4 96,423.6 5,265.0 101,740.6 20,643.8 70,718.2 233.5 1,069.6 5,497.8 1,275.6 2,299.8 104.0 2018 152,327.2 98,952.8 5,028.1 103,894.9 20,710.9 72,102.0 123.8 1,346.9 5,928.5 1,291.2 2,397.5 104.0

Land is either: Full definitions are available here: http://osip.alberta.ca/library/Dataset/Details/29

cleared of trees

soil disturbed (used for mine or plant purposes)

ready for reclamation (no longer used for mine or plant purposes)

temporary reclamation (e.g. erosion control or vegetation has occurred where future disturbance is expected to occur)

soils placed

permanent reclamation (terrestrial, wetlands or aquatics)

certified

Regional Totals for Reclamation and Disturbance Tracking, by Year

Hectares

Regional Reclamation and Disturbance Tracking by Company, to December 31, 2018

Hectares

Références

Documents relatifs

As in the linear time-invariant (LTI) case the reference and disturbance signals are assumed to be generated by an autonomous system. This action gives rise to the

An improvement was developed through Interconnection and Damping Assignment (IDA) where the use of energy shaping was originated in [7]. Recently, the IDA-PBC has become an

[r]

In section 2, we recall the dynamic model of an n-D.O.F rigid robot manipulator, define the reduced-order controller structure dedicated to the trajectory tracking objective,

Heating well crystalline hydroxyapatite in a closed quartz system under high vacuum at 1000 °C for 43 h produced 90% oxyapatite sample that was stable in air. Oxyhydroxyapatite can

From these studies, we selected those that (i) were actually related to ecosystem recovery, (ii) had at least three measurements of recovery in time, (iii) had a clear reference

In this paper an approach to design linear disturbance estimators of minimal order using the nullspace based de- sign technique as well as advanced model approximation techniques

2 Organic and chemical fertilizer effect on a plant biomass and b chlorophyll levels for the plants that were either left unfertilized (control), fertilized with commercial