• Aucun résultat trouvé

Collaborative processes across all project phases

N/A
N/A
Protected

Academic year: 2021

Partager "Collaborative processes across all project phases"

Copied!
9
0
0

Texte intégral

(1)

Vous avez des questions? Nous pouvons vous aider. Pour communiquer directement avec un auteur, consultez la première page de la revue dans laquelle son article a été publié afin de trouver ses coordonnées. Si vous n’arrivez pas à les repérer, communiquez avec nous à [email protected].

Questions? Contact the NRC Publications Archive team at

[email protected]. If you wish to email the authors directly, please see the first page of the publication for their contact information.

https://publications-cnrc.canada.ca/fra/droits

L’accès à ce site Web et l’utilisation de son contenu sont assujettis aux conditions présentées dans le site LISEZ CES CONDITIONS ATTENTIVEMENT AVANT D’UTILISER CE SITE WEB.

READ THESE TERMS AND CONDITIONS CAREFULLY BEFORE USING THIS WEBSITE.

https://nrc-publications.canada.ca/eng/copyright

NRC Publications Archive Record / Notice des Archives des publications du CNRC :

https://nrc-publications.canada.ca/eng/view/object/?id=c870f596-0597-42b4-82fd-1643fe6e1d60

https://publications-cnrc.canada.ca/fra/voir/objet/?id=c870f596-0597-42b4-82fd-1643fe6e1d60

NRC Publications Archive

Archives des publications du CNRC

Access and use of this website and the material on it are subject to the Terms and Conditions set forth at

Collaborative processes across all project phases

(2)

Collaborative Processes Across All

Project Phases

Dr. John Dickinson

[email protected]

Centre for Computer-assisted Construction Technologies

Institute for Research in Construction

National Research Council Canada

(3)

Current Construction

Processes

IDDS Panel - 28/09/2010

John Dickinson - Collaborative Processes

2

Processes

• Silos of expertise

• Suboptimal solutions

- Local and short-term

• Sequential work

• Risk adverse

• Data re-entry

People

•Separate Roles

•Separate

Contracts

Technology

•Limited Data

Interoperability

Integration or

Exchange

In general far from

ideal.

Entrenched due to

culture,

regulations,

contracts,

temporary

relationships

Exemplary

examples exist

(4)

Construction Processes

http://inside-the-system.typepad.com/my_weblog/bim_discussions/

BIM Interoperability

(5)

Future Construction

Processes

IDDS Panel - 28/09/2010

John Dickinson - Collaborative Processes

4

Processes

• Interdisciplinary team

• Iterative exploration

• Optimal solutions

- multi-disciplinary

- long-term (green, flexible)

• Concurrent work

• Data – living legacy linking

concept to demolition

People

•Incentives

•New roles –

Model Mgr

Technology

•Interoperability

•Sharing/Reuse

•Pervasive

Value to:

Facility

management

Asset Management

Operations

User/occupant

engagement and

support

(6)

Getting There

Both Lean and BIM are deep process

changes, in thinking and in practices. Both

require concerted long-term efforts, within

stable business and work environments

Absence of ‘Industry Leaders’ with large

market share and control

– fragmentation

(7)

Barriers & Enablers

Successful case studies, benchmarking

(life-cycle costs/ROI), evangelists, demand for

sustainability / holistic designs, educated

clients, social networking supporting virtual

collaborations

IDDS Panel - 28/09/2010

John Dickinson - Collaborative Processes

6

Entrenched stovepipe mindsets, current

management tools and business/contract

models, risk avoidance, rigid legislative

measures and rules, lack of long-term

perspective and business environment

(8)

NRC Construction:

Bringing Quality to the

Built Environment

(9)

www.irc.nrc-cnrc.gc.ca

John Dickinson - Collaborative Processes

8

Références

Documents relatifs

There were 6 treatments: 2 irrigation levels supplied with calcareous water on the control soil or supplied with deionized water on the control and on the

This mini-review summarizes and discusses the major information on (i) the micro- and macronutrients present in Solanum retroflexum, the most commonly consumed nightshade

Les essais tribologiques ont révélé, que pour toutes les conditions d'essais tribologiques réalisées, les coefficients de frottement des dépôts traités à 550 C sont inférieurs

Total milk fat extraction and quantification of polar and neutral lipids of cow, goat, and ewe milk by using a pressurized liquid system and chromatographic techniques.. Journal

Models vary according to risk factors considered, including tree-level characteristics: size, represented by tree diameter (D) and relative stem diameter growth rates (rel. growth)

improvements: (1) PCBA yields can be improved by optimizing component selection across the product portfolio by analyzing component cost and quality levels, and (2) Using

Our results showed that the term has increasingly been used over the past decade in the English-speaking literature, in various disciplines, mainly in North America and Northern

Les résultats relatifs aux coefficients de transmission et de réflexion en fonction des fréquences normalisées Ω sont tracés sur les figures (III.1.1-III.1.2), pour les trois