ELEKTRIČNA ENERGIJA ELECTRICITY

5.3. Energetski subjekti 5.3 Energy Companies

5.4. Cijene električne energije

5.4 Electricity Prices

5.1 Generation Capacities and Networks 5.1.1 Electricity generation capacities

The installed electricity generating capacities in the Republic of Croatia include hydro and thermal power plants owned by the HEP Group (Croatian Power Company), a certain number of industrial power plants and a few privately owned power plants (wind power plants, small hydro power plants).

HEP’s electricity generation capacities

Electricity generation capacities within the HEP Group consist of 16 locations with hydro power plants, 7 locations with thermal power plants and one half of the installed capacities of the nuclear power plant Krško (located in the territory of Slovenia). Thermal power plants are gas-fired, coal-fired and fuel oil-coal-fired. The majority owner over the generation capacities in the Republic of Croatia is HEP d.d. The facilities that are not fully owned by HEP d.d. are the following:

NE Krško d.o.o. (Nuclear power plant Krško Ltd.)

under the joint ownership of the HEP d.d. (50%) and the Slovenian company ELES GEN d.o.o.

(50%)

TE Plomin d.o.o. (Thermal power plant Plomin

Ltd.) under the joint ownership of the HEP d.d.

(50%) and the German company RWE Power (50%). HEP Proizvodnja d.o.o. (HEP Generation Ltd.) won a management and operation and maintenance contract for the thermal power plant Plomin.

Total available capacities of all HEP’s power plants in the Republic of Croatia amount to 3 672.26 MW (including TPP Plomin and excluding NPP Krško) i.e., total capacities serving the needs of the Croatian electric power system amount to 4 020.26 MW (with 50% of Krško capacities). Out of this amount, 1 601 MW is placed in thermal power plants (including TPP Plomin and excluding NPP Krško), 2 071.26 MW in hydro power plants and 348 MW in the nuclear unit Krško (50% of total available capacity). These capacities do not include generating units in other countries from which the Croatian electric power system has the right to withdraw electricity on the basis of capacity lease and share-ownership arrangements.

5.1. Proizvodni kapaciteti i mreže

5.1.1. Kapaciteti za proizvodnju električne energije

Instalirani kapaciteti za proizvodnju električne energije u Republici Hrvatskoj obuhvaćaju hidro i termoelektrane u sastavu HEP grupe (oko 95% kapaciteta), određeni broj industrijskih termoelektrana i nekoliko elektrana na obnovljive izvore energije u privatnom vlasništvu.

Kapaciteti za proizvodnju električne energije u sastavu HEP grupe

Kapaciteti za proizvodnju električne energije u sastavu HEP grupe obuhvaćaju 16 pogona hidroelektrana, sedam pogona termoelektrana i polovinu instaliranih kapaciteta u nuklearnoj elektrani Krško (na teritoriju Slovenije). Termoelektrane koriste ugljen, plin i loživo ulje. Većinski vlasnik nad proizvodnim kapacitetima Republike Hrvatske je HEP d.d. Objekti koji nisu u potpunom vlasništvu HEP–a su:

NE Krško d.o.o. – mješovito vlasništvo HEP d.d.

(udio 50%) i slovenskog partnera ELES GEN d.o.o. (udio 50%)

TE Plomin d.o.o. – mješovito vlasništvo HEP d.d.

(udio 50%) i njemačkog partnera RWE Power (udio 50%). HEP Proizvodnja d.o.o. ima ugovor o vođenju i održavanju pogona s TE Plomin d.o.o.

Ukupna raspoloživa snaga elektrana u sastavu HEP grupe na teritoriju Republike Hrvatske je 3 672,26 MW (uračunata TE Plomin d.o.o., bez NE Krško d.o.o.), odnosno ukupna snaga elektrana za potrebe hrvatskog EES-a je 4 020,26 MW (s 50% NE Krško).

Od toga je 1 601 MW u termoelektranama (uračunata TE Plomin d.o.o., bez NE Krško d.o.o.), 2 071,26 MW u hidroelektranama te 348 MW u NE Krško (50% ukupno raspoložive snage). U ovu snagu nisu uračunati proizvodni kapaciteti na teritoriju drugih država iz kojih elektroenergetski sustav Republike Hrvatske ima pravo isporuke električne energije na temelju zakupa snage i energije ili udjela u vlasništvu.

The capacities in other countries are the following:

Thermal power plant Gacko (Bosnia and

Herzegovina) – total installed capacity of 300 MW, coal-fired. Legal basis – shared ownership (1/3 of capacity and power for a 25 year period) Thermal power plant Obrenovac (Serbia and

Montenegro, today: in the Republic of Serbia) – installed capacity 305 MW, coal-fired. Legal basis – capacity and power lease on the basis of a credit for construction

The capacity and power from the above-mentioned facilities is not available, as the status of these facilities has not been resolved yet. The open issues regarding the agreements on investments in these facilities refer to the duration period, the way of treatment of the invested funds and what pricing methods should be applied to electricity deliveries.

The long term purchase agreement with Bosnia and Herzegovina regulated the position of the thermal units Tuzla and Kakanj (the agreement covers the period from 1 April 2003 through 2008).

In table 5.1.1 (Figure 5.1.1) are shown total electricity production capacities in HEP Group ownership. In tables 5.1.2 and 5.1.3 are listed all hydro and thermal power plants, and in figure 5.1.2 is shown fuel share in thermal power plants.

Table 5.1.1 Electricity generation capacity for the Republic of Croatia (HEP group ownership)

Kapaciteti u drugim državama obuhvaćaju:

u Bosni i Hercegovini – TE Gacko, instalirana

snaga 300 MW, gorivo ugljen. Temelj prava – udio u vlasništvu (1/3 snage i energije na razdoblje od 25 godina)

u Srbiji – TE Obrenovac, instalirana snaga 305

MW, gorivo ugljen. Pravo zakupa snage i energije na temelju kredita za izgradnju.

Snaga i električna energija iz navedenih objekata nije raspoloživa te položaj objekata još uvijek nije riješen. Otvorena pitanja po ugovorima vezanim za ulaganja u navedene objekte svode se na trajanje ugovora, tretman uloženih sredstava i način utvrđivanja cijene isporuke električne energije.

Dugoročnim ugovorom o nabavi električne energije iz Bosne i Hercegovine reguliran je položaj TE Tuzla i TE Kakanj (početak ugovora je 1. travnja 2003., a završetak u 2008. godini).

U 2007. godini je na temelju ugovora s Elektroprivredom BiH ostvaren uvoz električne energije od 0,96 TWh.

U tablici 5.1.1. (i slika 5.1.1.) prikazani su ukupni kapaciteti za proizvodnju električne energije u vlasništvu HEP grupe, a u tablicama 5.1.2. i 5.1.3.

nalaze se popisi svih hidroelektrana i termoelektrana u Hrvatskoj. Na slici 5.1.2. prikazana je struktura termoelektrana prema vrsti goriva.

Tablica 5.1.1. Proizvodni kapaciteti za potrebe Republike Hrvatske u sastavu HEP grupe

Izvor: EIHP, HEP Source: EIHP, HEP

Slika 5.1.1. Raspoloživa snaga proizvodnih kapaciteta za

potrebe Republike Hrvatske u sastavu HEP grupe Figure 5.1.1 Available electricity generation capacity for the Republic of Croatia (HEP group ownership)

Tablica 5.1.2. Hidroelektrane u Republici Hrvatskoj u sastavu

HEP grupe Table 5.1.2 Hydro power plants in the Republic of Croatia

(HEP group ownership)

Izvor: HEP Source: HEP

Table 5.1.3 Thermal power plants in the Republic of Croatia (HEP group ownership)

Tablica 5.1.3. Termoelektrane u Republici Hrvatskoj u sustavu HEP grupe

Izvor: HEP Source: HEP

Figure 5.1.2 Structure of Thermal power plants by fuel type Slika 5.1.2. Struktura termoelektrana prema vrsti goriva

Izvor: HEP Source: HEP

Industrijske i ostale elektrane

Industrijske elektrane obuhvaćaju elektrane u sklopu industrijskih postrojenja priključene na prijenosnu/

distribucijsku mrežu. Industrijske elektrane proizvode električnu/toplinsku/mehaničku energiju za potrebe

Industrial and other power plants

Industrial power plants include units within the industrial installations which are connected to the transmission or distribution grid. Industrial power plants generate electricity/heat/mechanical energy

nekog industrijskog procesa, a viškove proizvedene električne energije mogu plasirati u prijenosnu/

distribucijsku mrežu. Ove elektrane nisu u sastavu HEP d.d, ali imaju ugovor za plasman i prodaju električne energije u elektroenergetski sustav.

Ukupna instalirana snaga industrijskih elektrana je oko 210 MW, što se vidi u tablici 5.1.4.

Tablica 5.1.4. Industrijske elektrane u Republici Hrvatskoj

for own use in industrial processes, while the electricity surplus can be sold to the transmission/

distribution grid. These power plants are not a part of the HEP Group, but they have purchase agreements and can deliver the power they produce into the power system. Total installed capacity of industrial power plants amounts to about 210 MW (Table 5.1.4).

Table 5.1.4 Industrial power plants in the Republic of Croatia

Izvor: HEP Source: HEP

Beside industrial power plants there is in Republic of Croatia about 23 MW installed capacity for electricity generation in private ownership (Table 5.1.5).

Among them two wind power plants and four small hydro power plants sell all produced electricity to the grid, while others produce electricity for their own needs and only surplus give to the grid.

Total installed capacity of industrial and other power plants is about 230 MW.

Table 5.1.5 Other Power Plants in the Republic of Croatia (not in HEP Group ownership)

Osim industrijskih elektrana u Republici Hrvatskoj postoji oko 23 MW instaliranih kapaciteta za proizvodnju električne energije koji, također, nisu u sastavu HEP grupe (tablica 5.1.5.). Od toga dvije vjetroelektrane i četiri male hidroelektrane svu proizvedenu energiju predaju u mrežu, dok ostale elektrane proizvode električnu energiju za svoje potrebe, a samo višak energije predaju u mrežu.

Ukupna instalirana snaga industrijskih i ostalih elektrana je oko 230 MW.

Tablica 5.1.5. Ostale elektrane u Republici Hrvatskoj (nisu u sastavu HEP grupe)

Izvor: HEP, HSUSE Source: HEP, HSUSE

Izvor: HEP, HSUSE Source: HEP, HSUSE

5.1.2 Network capacities

Power network is part of the power system as a whole. Its purpose is to connect generators to end-users and to combine generation from power plants within the system with customer supply pattern under given security criteria. Power network is divided in two parts: transmission network and distribution network. In the Republic of Croatia all transmission and distribution capacities are owned (up to the metering points) by HEP d.d. and operated by HEP Group companies HEP Transmission system operator and HEP Distribution system operator.

During 2007 the following projects were finished:

reconstruction and commissioning of 400 kV switchyard and replacement of 220 kV circuit breakers at substation 400/220/110 kV Konjsko, construction of 45 km long 110 kV OHL Đakovo – Županja and 20 km of new 110 kV lines for connection of new substations. The following substations were constructed: 110/20 kV substation Vinčen, 110/20 kV substation Karlobag, 110/10(20) kV substation Dujmovača, 110/35/(20)10 kV substation Drniš and 110/10(20) kV substation Siscia.

Capital investments have been accomplished in 110/10(20) kV substation Osijek 4, 110/10(20) kV substation Turnić, 110/10(20) kV substation Dugopolje, 110/20 kV substation Tupljak, 110/35 kV substation Buje, 110/35/10 kV substation Osijek 2, 110/20(10) kV substation Novalja and 110/10(20) kV substation Mlinovac. Ripple control installation 5.1.2. Kapaciteti mreže

Sastavni dio svakog elektroenergetskog sustava je i elektroenergetska mreža koja ima zadatak povezati proizvodna postrojenja i potrošače te omogućiti sigurnu opskrbu potrošača električnom energijom. Elektroenergetska mreža dijeli se na dva dijela: prijenosnu i distribucijsku mrežu. U Republici Hrvatskoj vlasnik svih distribucijskih i prijenosnih vodova (do mjernog mjesta) je HEP d.d.

Upravljanje prijenosnom mrežom je u nadležnosti HEP Operatora prijenosnog sustava d.o.o., a upravljanje distribucijskom mrežom u nadležnosti HEP Operatora distribucijskog sustava d.o.o.

Tijekom 2007. godine u TS 400/220/110 kV Konjsko pušteno je u pogon rekonstruirano 400 kV postrojenje i zamijenjeni su prekidači u transformatorskim poljima 220 kV. Izgrađen je dalekovod 110 kV Đakovo – Županja duljine oko 45 km te oko 20 km ostalih vodova za priključak novih transformatorskih stanica.

Dovršena je izgradnja sljedećih objekata prijenosne i distribucijske mreže: TS 110/20 kV Vinčent, TS 110/20 kV Karlobag, TS 110/10(20) kV Dujmovača, TS 110/35/(20)10 kV Drniš i TS 110/10(20) kV Siscia. Nastavljena su ulaganja u objekte 110 kV, od kojih su najvažnije transformatorske stanice TS 110/10(20) kV Osijek 4, TS 110/10(20) kV Turnić, TS 110/10(20) kV Dugopolje i TS 110/20 KV Tupljak.

Rekonstruirane su i dograđene sljedeće stanice:

TS 110/35 kV Buje, TS 110/35/10 kV Osijek 2, TS 110/20(10) kV Novalja i TS 110/10(20) kV

has been put in operation at 110/35 kV substation Krasica as well as new control systems in Distribution Management centers in Zagreb, Rijeka and Split. The most important projects in distribution network were construction of 35/10(20) kV substation Vinkovci 5 and reconstruction of 35/10 kV substation Mekušje and 35/10(20) kV substation Grobnik.

During 2007 the contract with Hungarian TSO for construction of new 2 x 400 kV interconnection line Ernestinovo (HR) – Pecs (H) has been signed.

At the end of 2007 HEP TSO placed order for construction of Croatian part of that line. Another important contract signed in 2007 is referring to software and hardware replacement in national and 4 regional dispatching centers (Osijek, Rijeka, Split and Zagreb).

Transmission network capacities are shown in Table 5.1.6 while distribution network capacities are given in Table 5.1.7.

Table 5.1.6 HEP-TSO transmission network capacities in the Republic of Croatia

Mlinovac. Završena je izgradnja postrojenja mrežnog tonfrekventnog upravljanja u TS 110/35 kV Krasica i obnova sustava daljinskog vođenja centara Zagreb, Rijeka i Split. Od značajnijih ulaganja u distribucijsku mrežu 35 kV i 20 kV potrebno je izdvojiti TS 35/10(20) kV Vinkovci 5 i rekonstrukcije TS 35/10 kV Mekušje i TS 35/10(20) kV Grobnik.

Sredinom 2007. godine potpisan je ugovor o izgradnji dalekovoda 2 x 400 kV Ernestinovo – Pečuh s mađarskim operatorom prijenosnog sustava, a krajem godine je ugovorena izgradnja hrvatske dionice tog voda. Potpisan je ugovor za zamjenu strojne i programske opreme u Nacionalnom dispečerskom centru u Zagrebu i četiri mrežna centra (Osijek, Rijeka, Split i Zagreb).

Kapaciteti prijenosne mreže HEP OPS-a prikazani su u tablici 5.1.6, a distribucijske mreže

HEP ODS-a u tablici 5.1.7.

Tablica 5.1.6. Kapaciteti prijenosne mreže HEP OPS-a

* ukupne duljine vodova odnose se na pogonski napon u nadležnosti HEP Operatora prijenosnog sustava, kao i broj TS te broj i snaga transformatora.

Izvor: HEP OPS

* Total length of lines, number of substations, number and power of transformers refer to the operational voltage levels coordinated by HEP-TSO.

Source: HEP-TSO

Tablica 5.1.7. Kapaciteti distribucijske mreže HEP ODS-a Table 5.1.7 HEP-DSO distribution network capacities in the Republic of Croatia

* duljina vodova obuhvaća zbroj duljine nadzemnih vodova, kabela i podmorskih kabela iste naponske razine

Izvor: HEP ODS

* Length of lines is a sum of lengths of overhead lines, cables and marine cables of the same voltage level.

Source: HEP-DSO

Slika 5.1.3. Elektroenergetska mreža Republike Hrvatske u 2007. godini

Izvor: HEP OPS

Figure 5.1.3 Electric network of the Republic of Croatia in 2007

Source: HEP-TSO

5.2. Energetska bilanca električne energije

Tablica 5.2.1. Električna energija

5.2 Energy Balance of Electricity

Table 5.2.1 Electricity

Slika 5.2.1. Raspoloživa električna energija u Republici

Hrvatskoj Figure 5.2.1 Electricity supply in the Republic of

Croatia

Izvor: EIHP Source: EIHP

Slika 5.2.2. Struktura potrošnje električne energije u Republici

Hrvatskoj Figure 5.2.2 Electricity consumption in the Republic

of Croatia

U tablicama 5.2.2. i 5.2.3. nalazi se pregled broja kupaca i potrošnja električne energije po naponskim razinama, kategorijama potrošnje i distribucijskim područjima.

Tablica 5.2.2. Broj kupaca po kategorijama potrošnje (naponskim razinama)

In Tables 5.2.2 and 5.2.3 are shown numbers of customers by voltage level consumption categories and distribution areas.

Table 5.2.2 Number of customers by consumption categories (voltage levels)

Izvor: HEP Source: HEP

Tablica 5.2.3. Potrošnja električne energije po distribucijskim

područjima u 2007. godini (MWh) Table 5.2.3 Electricity consumption by distribution areas in 2007 (MWh)

5.3. Energetski subjekti

Za izdavanje dozvola za obavljanje energetskih djelatnosti, kao i za privremeno i trajno oduzimanje dozvola nadležna je Hrvatska energetska regulatorna agencija (HERA) u skladu sa Zakonom o regulaciji energetskih djelatnosti (“Narodne novine”, broj 177/2004) i Zakonom o izmjenama i dopunama Zakona o energiji (“Narodne novine”, broj 177/2004).

Energetska dozvola potrebna je za 26 energetskih djelatnosti. Do 31. prosinca 2007. godine izdano je ukupno 13 dozvola za elektroenergetske djelatnosti te 29 dozvola za djelatnost trgovanja, posredovanja i zastupanja na tržištu energije (tablica 5.3.1). U ovoj posljednjoj kategoriji samo tijekom 2007. godine je izdano ili produženo 12 dozvola.

Tablica 5.3.1. Dozvole za obavljanje elektroenergetskih djelatnosti izdane do kraja 2007. godine.

5.3 Energy Companies

The Croatian Energy Regulatory Agency (CERA) issues licenses for energy activities according to the Energy Law and its amendments and Law on Regulation of Energy Activities (Official Gazette 177/04).

Energy licenses are required for 26 energy activities.

Until December 31st, 2007 a total of 13 licenses were issued in the electric power sector and 29 licenses in category of trade, representation and agency on energy market (table 5.3.1). In this category, only during the year 2007, 12 licenses were issued or prolonged.

Table 5.3.1 Licences issued in the electric power sector

Izvor: HERA Source: CERA

5.4. Cijene električne energije

Ostvarena prosječna prodajna cijena električne energije u 2007. godini (bez PDV a) prikazana je u tablici 5.4.1. po tarifnim modelima, a u tablici 5.4.2.

po kategorijama kupaca prema Eurostatu.

Tablica 5.4.1. Ostvarena prosječna prodajna cijena električne energije u 2007. godini (bez PDV a) po tarifnim modelima

5.4 Electricity Prices

Average selling price of electrical energy in year 2007 (excluded VAT) is shown in Table 5.4.1.

Table 5.4.2 shows electricity selling prices by EUROSTAT categories.

Table 5.4.1 Average electricity selling prices in 2007 (VAT excluded)

Table 5.4.2 Average electricity selling prices by EUROSTAT categories in 2007 (VAT excluded) in HRK/kWh

Tablica 5.4.2. Ostvarena prosječna prodajna cijena električne energije u 2007. godini po kategorijama kupaca prema EUROSTAT-u (kn/kWh)

Na slici 5.4.1. prikazan je indeks promjene cijene električne energije u Republici Hrvatskoj u razdoblju od 2002. do 2007. godine (u odnosu na 2002.).

Figure 5.4.1 shows index of electricity price change in Croatia from 2002 to 2007 (relatively to year 2002).

Figure 5.4.1 Electricity price index for 2002-2007 period Source: EIHP

Slika 5.4.1. Indeks kretanja cijena električne energije u razdoblju 2002.-2007.

Izvor: EIHP

Na 21. sjednici Vijeća za regulaciju energetskih djelatnosti (danas HERA) održanoj 31. listopada 2003. godine definiran je iznos naknada za korištenje prijenosne i distribucijske mreže.

Naknade za korištenje prijenosne i distribucijske mreže primjenjuju se od 1. studenog 2003. godine, a prikazane su u tablicama 5.4.3, 5.4.4. i 5.4.5.

Tablica 5.4.3. Naknade za korištenje prijenosne mreže

On the 21st session of the Energy Regulatory Council (today Croatian Energy Regulatory Agency – CERA) held on October 31st, 2003 transmission and distribution network charges were set. These charges, shown in Tables 5.4.3, 5.4.4 and 5.4.5, are applied starting from November 1st, 2003.

Table 5.4.3 Transmission network charges

Izvor: HERA Source: CERA

Tablica 5.4.4. Naknade za korištenje distribucijske mreže Table 5.4.4 Distribution network charges

Izvor: HERA Source: CERA

Tablica 5.4.5. Naknade za mjerenje Table 5.4.5 Metering charges

Izvor: HERA Source: CERA

Tijekom 2007. godine donesena je Odluka o naknadi za organiziranje tržišta električne energije koja se naplaćuje od opskrbljivača, trgovaca i proizvođača (osim povlaštenih) koji sudjeluju na tržištu te iznosi 0,29 kn/MWh prodane električne energije. Također, isti subjekti su dužni platiti 10 000,00 kn godišnje za sudjelovanje na tržištu električne energije u Republici Hrvatskoj.

Tijekom 2007. godine Vlada Republike Hrvatske je, na temelju Zakona o energiji (“Narodne novine”, brojevi 68/01, 177/04, 76/07) i Zakona o tržištu električne energije (“Narodne novine”, brojevi 177/04, 76/06), usvojila paket od pet podzakona koji definiraju cjelokupni pravni okvira za proizvodnju električne energije iz obnovljivih izvora energije i kogeneracije (Poglavlje 8).

During year 2007 Decree on fee for organizing Electricity market have been adopted.

Fee is charged per sell-transaction in amount 0.29 HRK/MWh from suppliers, traders and producers (except eligible producers). Furthermore, access fee for all participants on electricity market in Republic Croatia is charged 10,000.00 HRK yearly.

Until mid 2007, Croatian Government has also adopted, referring on the Energy Law (Official Gazette 68/01, 177/04, 76/07) and Law on Electricity Market (Official Gazette 177/04, 76/07), a package of five sublaws in order to define the legal framework for production of electricity from renewable energy sources and cogeneration (Chapter 8).