• Aucun résultat trouvé

Building Lean Supplier Networks: Results

N/A
N/A
Protected

Academic year: 2021

Partager "Building Lean Supplier Networks: Results"

Copied!
9
0
0

Texte intégral

(1)

Create Lean Vision Develop Strategic Plan Assess Supply Chain Education and Training Education and Training Implement Lean Strategy Continuous Improvement Information Integration Assumptions:

•Lean vision & strategic plans are in place for the enterprise

•Infrastructure is in place •Tools exist

•Lean assessment tool •Training tools

(2)

Create Lean Vision

• Develop vision engaging key

stakeholders

– Customer Focused

– Shared Destiny/Vision

– Deliver Exceptional Value

• Lean is key

– Cost reduction

– Cycle time reduction

– Improved quality

Lead -Leland Williams George Reynolds Ron Thrower Mark Tedford Dick Morgan

(3)

Develop Strategic Plan

• Map company wide value stream

– Identify Core Competencies – Develop M/B Strategy

• Develop high level strategic metrics

• Develop compelling company business case

for supply chain

• Develop/Deploy resources and infrastructure

– Define roles and responsibilities

• Define supplier relationships

– Partnerships, LTA – Technology roadmaps Lead -Leland Williams George Reynolds Hamid Akhbari Ron Thrower Mark Tedford Dick Morgan Tim Christopherson

(4)

Assess Supply Chain

• Define supply base

• Baseline supplier capabilities

• Selection criteria for prioritization of lean

supplier projects

– Cost, Quality, lead time, performance, product life cycle, technology, competitiveness

• Assess supplier’s lean competency

– Baselining supplier

– Common lean assessment tool

Lead - Chris Darden Hamid Akhbari Mark Tedford Jeffrey Becksted Ronald McDonald Julie Gissel Dale Williams Dick Morgan Leland Williams Wayne Corbin

(5)

Education and Training

• Identify training needs

• Develop Lean Toolbox

– Implementation application guide – Tailored supplier training

• Conduct internal and external training

– Leadership/overview awareness – Tactical implementation

Lead - Julie Gissel Jeffrey Becksted Dale Williams Susan Moehring Jim Pitstick Matt Grubb

(6)

Implement Lean Strategy

• Develop an implementation plan with the

supplier

– Metrics and targets

– Develop value stream map (current state) – Value stream map (future state)

– Gap analysis

– Lean contract implementation

• Define and apply incentives

• Implement plan

– Pilot projects as required

• Evaluate scale-up

Lead - Jeffrey Becksted George Reynolds Chris Darden Ronald McDonald Dick Morgan Susan Moehring Hamid Akhbari

(7)

Continuous Improvement

• Monitor Supplier progress

– Measure

– Report metrics

– Define areas for further improvement – Recognize achievements

– Transfer ownership of lean process to suppliers

• Assess supply base lean

performance/progress and adjust the

strategic plan

Lead - Dale Williams Susan Moehring Jerry Khoury Ron Thrower

(8)

Parking Lot issues

• When and where are common assessment tools

required?

– Lean certification programs

• Do we create one?

• How do we recognize other company’s certifications

• Define value stream mapping

– Company level vs. product level

– Different tiers - enterprise, process or supplier

(9)

ASSUMPTIONS

(inserted by Kirk Bozdogan)

NOTE: Towards the end of the meeting, the

assumptions listed on the first chart came

under question. We will try to clarify this issue

soon as part of further information (coming

soon) to help guide the efforts of the respective

subteams

Références

Documents relatifs

Assembly Instructions Instructions d’assemblage Instrucciones de Ensamblaje Pottery Barn – Pottery Barn Teen – Pottery Barn Kids – Williams Sonoma Home – West Elm

Assembly Instructions Instructions d’assemblage Instrucciones de Ensamblaje Pottery Barn – Pottery Barn Teen – Pottery Barn Kids – Williams Sonoma Home – West Elm

These are normal (two phas es energised ), wave drive (one phase energis ed) and half-step (alternately one phase energised/two phases en- ergised) .Two inh ibit sig nals are

Assembly Instructions Instructions d’assemblage Instrucciones de Ensamblaje Pottery Barn – Pottery Barn Teen – Pottery Barn Kids – Williams Sonoma Home – West Elm

Cette journée a lieu à : l’IFSI (Institut de Formation en Soins Infirmiers) 1146, avenue du Père Soulas – Montpellier. Bus ligne 7 – arrêt

Ces différents troubles font l’objet d’une prise en charge adaptée (voir le chapitre « Quelles sont les aides mises en œuvre pour limiter et prévenir le handicap ? ») qui permet

• Ce luminaire fonctionne avec deux (2) ampoule à incandescence standard de TYPE A de 60 watts maximum (non incluse) ou deux (2) Ampoule dimmable SBLED de 9 watts (incluse)..

Si este equipo causa interferencia dañina a la recepción de radio o televisión, que se puede determinar al apagar y encender el equipo, se alienta al usuario