Beamline Status

Henry Nebrensky

Brunel University

(2)

Decay Solenoid / PA / BS / Diffuser

- DS Compressor and main fridge serviced separately in January.

- DS Power Supply returned during the spring running - Improved alarm limits have eliminated false alarms - Overnight “standby” regime in place

- Overnight “standby” regime in place

- No significant issues reported this cycle.

- DS Compressor maintenance in August, to include an early annual service to carry through to end StepIV

(3)

Conventional Magnets

Currents now set via Run Control and overnight

“standby” regime agreed

- Known issue with limited cooling water flow

- downstream quads restricted in current

- significant water works upcoming

- During MDR a long-standing issue in Q1 supply went - During MDR a long-standing issue in Q1 supply went

OTT; replacement supply leaked water into Q2 supply killing the latter. (Lesson: check spares before storage!)

- Continuing glitches in water to both magnets and supplies, require “manual” oversight from MLCR

shifters and staff, and the chillers (ISIS water at

(4)

Target - 1

Installed S-series into ISIS in Dec. 2014:

- 2.5M successful pulses; expect 5M+

- Stable running at 30 deg.C

- Allowed to take 2V loss at 64/50 Hz - Regular beam-bump tuning sessions

- Concern about continuing losses in readout fibres - Concern about continuing losses in readout fibres

- Loopback monitoring restarted

Overnight “standby” regime implemented with shifters stopping and waking target

Shifter training is mandatory!

(5)

Target - 2

Crash of controller<->server USB link last Friday (at suitable point in BLOC training!).

The target server couldn’t be restarted and we had to bring in and have Ed remotely re-configure the R78 unit:

http://micewww.pp.rl.ac.uk/projects/computing-software/wiki/Debrief_TargetComputerFailure http://micewww.pp.rl.ac.uk/projects/computing-software/wiki/Debrief_TargetComputerFailure

Post-mortem continues...

Situation with other spares (VME crate, Xantrexes, etc.) is a concern – we have to take from R78, and spare target mechanisms still need to be

prepared...

(6)

BLOC roster

Showstopper for March running is lack of trained

BLOCs and very few volunteers. Piggyback training on early March run.

S

TILL remains a potential showstopper for autumn running – nearly had to cancel several shifts

already.

Estimate a pool of 5 schedulable BLOCs (and some reserves) – have 4. Just don’t have the local,

experienced people (or many alternative candidates). Proposed next training cycle:

ISIS & DSA: (one half-day of) 23rd August

Beamline etc.: (another half-day in) late August

Target/beambump (one half-day in) September

(7)

Safety and Beamline Preparation

We have got permission to streamline the beamline start- up/shutdown (“standby”) by:

allowing shifters to wake up target

keeping the conventional magnet supplies continuously powered in remote mode

leaving out the the beamstop mechanical restraint between shifts

shifts

Overt assumption that equipment is only driven from the MLCR, whence people know what is going on in the Hall!

Reduce need for on-site BLOC cover and Controlled Entries.

This works really well during unbroken running.

But the mess we’ve had this user cycle has, er,

(8)

“Oversight Environment”

Clunky phrase: includes software layers (EPICS, ALH), MLCR

facilities (& beyond) and the PEOPLE. I believe it is NOT “fit for purpose.”

Some things aren’t monitored, others aren’t in the Alarm

Handler, some items in the Alarm Handler don’t actually alarm (water flow trips). If the computers aren’t doing the

monitoring then the people must, but many are inexperienced and overwhelmed by the training (if they get it). Checklists monitoring then the people must, but many are inexperienced and overwhelmed by the training (if they get it). Checklists are an aid, but only if followed – and only a few exist.

It took 6 days before anyone noticed Q2 was dead, with the MLCR running and often staffed.

Less than a week after we covered this at the last VC, I arrived at the MLCR (for other reasons) to find Q6 in a tripped state. It still took 35 minutes to persuade the 2 shifters and MOM to investigate... plenty of time for the issue to escalate. Not the only ocurrence. MICE must allocate sufficient resources

(9)

Future work:

- Cleanup of R78 target controls (DL)

- Repeat earth leakage measurements on quads - Water leaks in magnets: will leave as-is

- Linde Control PC upgrade

- Installation of pressure transducer to monitor high pressure/purity compressed air state from outside pressure/purity compressed air state from outside MICE Hall

- Extended list in MICEmine #1854

- Chilled water changes – BIG.

Références

Documents relatifs

Only one other cross-sectional study on the secondary Sterling money market by Acharya and Merrouche (2013) provides evidence of a funding liquidity risk because

Abstract: This paper proposes an extension of the BDMP (Boolean logic Driven Markov Processes) formalism for enriching its capabilities to model replacement and resumption mechanisms

Therefore, in this exploratory study we compared overnight insulin and glucose profiles in children with type 1 diabetes, who received in random order either the sensor augmented

Similar relationships of Ts/(Ts + Tm) with redox, source indicators, and lithology indicate that Ts/(Ts + Tm) is affected by the same factors controlling the moretane/hopane

contact resistance due to acoustic mismatch between the nanowire and the membrane, the whole system has been microfabricated with the same material (SiN) with thickness of 100 nm.

La présente théorie du premier ordre de déformation de cisaillement basée dans la position exacte de la surface neutre et On suppose que les propriétés matérielles

The SELINA project developed a common measurement methodology and created extensive data collection of off-mode and standby input power values for more than 6000 different

This paper introduces an improved Low Rank Adaptive Nor- malized Matched Filter (LR-ANMF) detector in a high dimensional (HD) context where the observation dimension is large and of