• Aucun résultat trouvé

Projected Budgetto be completed by the project bearer and returned with the application form

N/A
N/A
Protected

Academic year: 2022

Partager "Projected Budgetto be completed by the project bearer and returned with the application form"

Copied!
1
0
0

Texte intégral

(1)

INTER-UNIVERSITY SCIENTIFIC COOPERATION PROJECTS– PCSI – 2017

N° action Mobilité BUDGETED EXPENSES €

AUF Total

1 0 € 0 €

1.1

0 € 0 €

1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11

0 € 0 €

1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20

2 0 € 0 €

2.1

0 € 0 €

2.2 2.3 2.4 2.5 2.6 2.7

0 € 0 €

2.8 2.9 2.10 2.11 2.12

3 0 € 0 €

3.1

0 € 0 €

3.2 3.3 3.4

0 € 0 €

3.5 3.6

4 0 € 0 €

4.1

0 € 0 €

4.2 4.3 4.4

0 € 0 €

4.5 4.6

5 0 € 0 €

5.1

0 € 0 €

5.2 5.3 5.4

0 € 0 €

5.5 5.6

0 € 0 €

Total 0 €

0 €

Projected Budget

to be completed by the project bearer and returned with the application form

Project bearer institution (specify) : Title of the project:

Important: Fill only the White cells.

Report to your AUF correspondent any insertion or removal line

Rubric

Calendar

Brief description (Ex: Mission meeting syntheses first year, and analysis comparative study)

Recipient Name (Ex: Mrs ___)

Year Month Native

country Host country

Détailed calculation (Ex: 2 dayss * 110 Euros +

Airplane ticket 500 Euros) Share

AUF

Other funding

Totals € Other funding

Total 1 – Teaching assignments,

research, expertise, meetings

Flights at the best cost. Living expenses must not to exceed the AUF rate in effect on the date of notification, 140 € in North countries and 110 € in South countries. Living expenses capped at 21 days.

40 % at most of the requested credits.

1° year

AUF Total 1° year

2° year

AUF Total 2° year

2 – Mobility allowance for M2R ou Ph.D

Flights at the best cost.

Allowance must not to exceed the AUF rate in effect on the date of notification ( see AUF scale in « Presentation document »)

1° year

AUF Total 1° year

2° year

AUF Total 2° year

3 – Documentary support, publications and on-line

content 1° year

AUF Total 1° year

2° year

AUF Total 2° year

4 – Materials or scientific products and support (durable

equipment not included) 1° year

AUF Total 1° year

2° year

AUF Total 2° year

5 – Management fees 7% at most of the requested

credits. 1° year

AUF Total 1° year

2° year

AUF Total 2° year

Total 1° yearr Total 2° year

Total Other funding

N.B. : AUF total can not exceed 20 000€

Références

Documents relatifs

This Focus offers a fresh perspective on the production of urban forms, the reconfiguration of local governance, and the renegotiation of daily practices, mainly in Hanoi and

Finally, when the owner road wants to control the mechanical properties, for example in the case of high modulus mixes (EME), this test must one part of Level 1, because it is

But even if this holds true, the production and maintenance of a digital infrastructure (first order effects) and potential rebound and other higher order effects could outweigh

The current (draft) Statement does not deal with the decision to opt, at EU level, for a super deduction or for a tax credit. It only addresses the more general and

time spend since liberalisation and privatisation for electricity generation; capital and liquidity requirements, operational expenditures and interest rate volatility

Fifth, the significant results in the short run are the following; income in all the groups, housing wealth effect in Centre Western and Southern European Countries and

Cet article est la synthèse des réflexions d’un groupe de travail dans le cadre du 6 e colloque France Maghreb, organisé à Fès les 9 et 10 janvier 2015, concernant la mise en

Because of this WHO established the Centre for the Promotion of Environmental Planning and Applied Studies (PEPAS) in 1979. Located near Kuala Lumpur, in Malay- sia,