• Aucun résultat trouvé

Development of Engineering Industries in the West African Subregion

N/A
N/A
Protected

Academic year: 2022

Partager "Development of Engineering Industries in the West African Subregion"

Copied!
17
0
0

Texte intégral

(1)

r

f l

Distr LmITED

! f

ECA/INR/',lA/Eng. /I/WP .1/Add.1 1 December 1983

UNITED NATIONS ECONOMIC COMMISSION FOR AFRICA Multinational PrograMming and Operational

Center of ECA for West Africa (Niamey MULPCC)

Sixth Meeting of Committee of Experts, 21-26 March 1933 Sixth Meeting of Council of Ministers, 28-31 March 1983 Cotonou, Benin

DEVELOPMENT OF ENGINEERING INDUSTRIES IN THE WEST ~FRIC~N SUBREGION

(2)

ECA!INR!WA!Eng.!I!WP.l!Add.l

DEVELOPMENT OF ENGINEERING INDUSTRIES IN THE WEST AFRICAN SUBREGION

I. INTRODUCTION

1. The report on the Development of Engineering Industries in the West African Subregion (ECA!I~T.!WA!Eng/I!WP.l)was presented to the First Meeting of Experts of West African Inter-governmental Organizations and the Sixth Meeting of Committee of Experts of the Niamey MULPOC held in Cotonou in March 1983.

2. The report examined the existing situation of the engineering industries and the projected demand for selected engineering goods and suggested an

approach to the integrated development of the engineering subsector in the West African Subregion. It made proposals for the integrated development of core and priority engineering industries. Finally i t were summarized these proposals by country, into subregional and national projects.

3. The above-mentioned meetings, after examining the report, proposed that i t should be examined by an Inter-governmental Cowmittee of Experts on

Engineering Industries whose creation then recommended. The meetings also recommended that the ECA should examine other subregional projects, where they exist, in order to integrated them into the same document. These

recommendations were approved by the South meeting of the Council of Ministers of the Niamey MULPOC.

4. This addendlli~, therefore, attempts to identify subregional projects proposed by other institutions as well as qive additional information on the proposals contained in the document referred to above.

II. PROJECT PROPOSALS

5. The existing situation of engineering industries in the subregion is basically confined to the manufacture of hand tools and animal drawn implements and, in some countries, the assemr-Lv of tractors and t.ransoor-c equipment (cars, lorries, buses, bicycles and mopeds). Production of parts and components for transport equipment and tractors is limited to silencersp exhaust; systems, radiators, and batteries.

6. 'I'he establishment of multinational manufacturing units is justified basically by the need for complementary factor inputs, c0nsideration of the market size and the economies of scale to be derived from the manufacturing unitse This will no doubt improve the subregion's self-reliance in te~ms of agricultural and transport machinery and equipments and related spare parts

whose production are beyond the capacity of individual countries. The development of iron and steel industry will provide the major raw material for the engineering subsector.

(3)

ECA!INR!WA!Eng.!I!WP.l!Add.l

p'"l,rye 2

7. Project proposals dealt with relate to the manufacturing of (1) agricultural

machinery and equipments, (2) transport equipment, including railway equipment,road ~

transport equipMent, ~nd river tr~sport 0~uipment; (3) telecommunication equipment, (41 building materials, and (5) energy generating and transmitting. These

proposals are described in the following pages.

III. CONCLUDING REMARKS

8. All the above-mentioned proposals were examined by a Joint ECA!OAU!UNIDO Committee which drafted the "Initial Integrntc:d Industrial Proqr amme for th'3 W"st African Subregion," and which decided to submit thc proposals Nos. 1 to 11

to the v.lest African SubregiOnal Commi t.t.ee on Industrial Development Decade for African scheduled to meet in Abidjan frnm 12 tc 16 December 1923. The other proposals namely proposals Nos. 12 to 14 wers not retained by the Joint ECA/O~U!

UNIDO Committee. It, however included the project proposal N0. 4 vrhLch has been proposed by the Nigerian Government as a subr.egional project.

9. It. will be seen that project proposuls No. 2 <'iDrl 5 emanated from inter- governmental organizations (rGO's) namely the Mano River Union (MRU) and the Communaute Economique de l'Afrique de llouest (CEAO) respectively. They ~re the only prpasals ~~ceived from IGO's although officials of various IGO's had

expressed their respective organization's interest in some engineering projects to the ECA mission of July 1Q82. These were~ (1) manufacture of aluminium and steel products (OWlS), (ii) rn~nufactureof aqricultural t001s and implements (CEAO and Lipt.ako-Gourrna); and (iii) manufacture of spare parts and components (Liptako- Gourrna). However, no official intimation had, so far, been received on these projects and they could thus not be includpd in the subnission to the above- mentioned meeting.

(4)

(

PROJECT PROPOSAL NO. _ 1 _

SUBSECTOR: Engineering _

OBJECTIVES: To dc.vel.op agricultural machinery manufacture

SUBREGIONt West Africa

l . Project title 4. Project status 6. Raw materials 9. projected demand 11. Capacity by

by product product

2. Promotor/sponsor 5. Immediate 7. Energy

follow-up 10. Market

,

12. Total

3. Location activities 8. physical infra- investment

structure

3. Additional informa- tion including col- laboration arrange- ments already made and type of parti- cipation by member states souaht

10; Agricultu,ral sector in the

I subregion

units p.a. 11. Senegal plant; 5,000 1. ManufacturG of

four-wheel,~d

tractors 2. this proposal

~.;as examined

by

the sixth

I'llceting-based IIULPOC Council 'of Ministers

which referred .ic to the fi.rat;

meeting of the Intergovern- mental Cow~ittee

of Experts on

,

Engineering Industries for I'Jest Africa which will moot early next year.

3. (a) Senegal (b) Nigeria

4.

5.

Conceptual Further in depth studies

6.

7.

8.

To be imported pending the supply of grey cast iron/

malleable cast iron, forging quality steel, sheet metals 'and sections

from local projects or from the metall··

urgical projects . proposed for

subregion.

Available, primarily electrical energy Adequate in both locations proposed.

9. 23,000 (1990) : 50,000

(2000)

units p.a.

,Nigeria plant;lO,OOO 12. (a) Pre-

investmont studies US$ 200,000

(b) Total basic invest~

ment: US$ 70 million

(excluding investment for engine production and ancillary industries)

3. (~) 50 per cent of basic investment to be provided by equity shareholding and balance by loans.

(b) Ancillary

industries to be set up at

national level to provide ancillary parts and components.

(5)

PROJECT PROPOSAL NO.

SUBSECTOR: Engineering (agricultural machinery)

OBJECTIVES: To d~velop manufacture of agricultural machinery

2

SUBREGION: West Africa

I

1- project profile 4. Project status 6. Raw materials 9. Projected demand ll. Capacity by 3. Additional informa-

by product product tion including col-

2. promotor/spopsor 5. Immediate 7. Energy laboration arrange-

follow-ul' 10. Market 12. Total ments already made

3. Location activities 8. Physical infra' investment and type of parti~

structure cipation by member

States sought

.

.

1- l1anufacture of 4. Pre···feas- 6. To be imported 9. (for the sub- ll. Handtools:l.5 13. Not available agricultural tools ibility study pending the region) 1990 million

tools and available supplies from

llandtools: 41 pieces Agri-

implements the metallur- million pieces cultural

-

5. Further Ln- gical projects

Agricultural machinery:

2. Mano River depth studies, proposed for

m~chinery! 475,000 3,700 units

Union inoluding a the subregion

units

feasibili ty 12. Not available

3. Sierra Leone; study 7. Available 2000

primarily Handtools: 48 million eleotrioal pieoes Agricultural energy machinery: 538,000

units 8. Very good

10. Farmers in the subregion

I

i

I !

I

(6)

PROJECT PROPOSAL NO. __~3 _ lSECTOR, Engine~ring (Agricultural flachinery)

IECTIVE: To develop agricultural machinery and energy equipment manufacture

SUBREGION: West Africa

13. Additional informa- tion including col- laboration arrangc-

I1ont.G a Lr eady made;

and typ~ af participa- tion by menber

States souqht,

_.~---

-

+--~---+---+---+---+---~- 100,000 units p.a. II. 100,000 13. (a) 50 per cent of

(1990) units/year basic invest.ment to be

200,000 units p.a. provided by cqu.i,t.y

(2000) 12.. US$ 50 shareholding and

million balance by loans.

Manufactur<~ of it.

d~esel engines

fo r irrigation 5~

pumps and

generators This proposal

\'las examinQd by sixth !'L.~cti:1("

of the Niamey-

besed r1ULPOC Council of

14~nisters wl.Lch referred it tr the first ]leet·

ing of the

Intergovernmental Committee ~f

Experts on En;ineering Industries for West Africa which will meet early next year.

Guinea.

Conceptual Further in- depth studies

6. To be imported

19.

pending supplies from the mctall- urgiccl projects propQsed for the

aubr eoi.on 10. t7ntional manu fa - cturing- units 7. AvadLab Lo , irrigation equip-

primarily ment and sl'1.3.11 electrical gcn(..ratol~8 iL the

energy subregion

8. hdequatc

(including investment on national pump and generator as s enb.Ly

plants)

(7)

PROJECT PROFILE NO. 4 _

UB-SECTOR: _ SUB-REGION~: __

Project Title:

Objective: To establish a plant to manuf act.ur'e agricultural .impl ements and equipment.

Addit:ional information LncLud i.nc co l Leboz-rt dc:

arrAngements alreacy ~,

ond type of partici~at'

by member states sought

(a) It is not known whct.hcr Nigeria IV1S in"lit';(:d ot.he r ) count.r i.e s in rho subxec-Lon

I

to particip,"'..te in the rrojcc

I (b) Potential problems durir Impl ement.at Lons !night Lnc luc the lack of invf-,;sr,n:.t2nt funds 13. Estirnated at

N 31 ni Ll Lon including prc-

inveSL~ent costs fixed capital and working capital.

Location

Niqeria.

Information about ,t:he

5. Project 7. Ra;]

MAteri,,~--llO. pr.o~:~-t~-;-~2-~apacit:----114.

status

I

s ,~ Ener,?y

I d(~r!1.Jnd

by

I

1. by

I product /, product

6. Immediate I

I -f 11 9 - Physical I ' l k

; t

_:0 ow-up

I

mfrastructure _ . 'Iar et 13 - Toted

act Iv i.ti.e s I '

1

---L---- --t- In:~~tm~~~ +_~

I ! .

Government S. Feasibility II 7. No informution

110.

Lnfc rmet.Lon

I

12. Lnfozrna t Lon not of l!igeriaQ study conduct.cd I available on.tNhether[ not ava:U._able. available.

in 19GO is avail-l t.ne st cc.L required However, ore serit.

able

I

"ill be .local-Iy

I

subregional

produced or

I

demand arnount.s to:

6. Information I imported. lO,OeO small I

not available. 8. No information

I

tractorsr30,OOO I

"waH able about hand-held imple-

I

:project reqUirementslmentsoand 10.000

, various other

fo

Information not I implements.

iavailable.

11. Subregional.

sitei:n Nigeria is not avail-

able~

---r-

---1

Promotor/

Sponsor

I

t

(8)

:UBSECTOR: Engineering

lBJECTIVE: To develop marufacturc of transport equipment

PROJECT PROPOSAL NO. 5

SUBREGIONl West Africa

Project pxof'LLe 4 . Project status 6. ' " 1 9. Projected demand L Capacity by 13. Additional Ln fozma-:

.

.

Raw materl..a s

,

by product product tion including col-

! . promotor/sponsor 5. Ir.1rnedie.te ,

7 ... Energy , Iflbor2).tion arrange-

follow-up 10. r.1arket 2. Total ments already made

s, Location activities 8. Physical infra- investI!l8nt and type of participa-

structure tion by member States

; sought

l. t1anufacture of. <L Feas ibility 6. Tc be imported 9, 10,000 units p.a. d. Not 13. (a) Togo and Benin

:r::-ailway waqoris study pending the (1990) available have expressed interest

avei.Lub.le supplied from

25,000 units in the project.

Z. CEAO (Economic the metall- p.a. L2. Not

Community f,~r

,.

Further in- urgical (2000)

avci Lab Le (b) Ancillary

\'~est Africa) depth studies projects industries to bil set up

required to proposed for at nc:.tional level to

3. Senegal a.nd take into the subregion provide ancil13ry parts

Upper Volta account sub- ~ . . , and components

regional dem<md 7. Information

demand not availableC (c) Subcontracting

arrar1?ements are needed

8. Infonnation in order to make full

not available use .of existing railway

workshops in the

subregion for the supply of parts and components

,,' to the railway

manufacturing units -.

I

(9)

. Project Proposal No.6 UBSECTOR: Engineering

BJECTIVE: To develop manufacture of agricultural machinery and transport equ.ipment

Project titLo I

4.

Project status

6.

Ra" materials

9.

Projected demand 11. Capacity by

• Promo~or/sponsor

I 5.

Immediate

7.

Energy by product product

·

follow-up

9.

Physical lni'ra- 10. ;'!arket 12 .. Total

·

Location activities str"cture investment

SUBREGION: West Africa

~3. Additional infor- mation including collaboration arran- gements already made and typ e of partici- p'att.on by member

States sought

:anufacture of

.i,es el engines f Jr ractors, trucks, orries and buses ..

• This proposal "as xamined by the ixth ~8etillg of the iamey-based KUi.,P')C ouncil of l'1inistcrs hich referrec:. it to he first meet in,; of ntergovernmental

~mmitt8G of Experts n Engineering

rrdustri~s for VGRt frica, "hieh "ill set early next

Nigeria, Senegal

4.

Conceptual 5.. Further in-

dcpt.h studies

6. (i)

To be im- portedp ending the realisation of the proposed metallurgical projects in the subregion and/or to bosupplied by the Nigerian steel projects

(ii)

AlumiLium to be imported from Gh&18/0uinea.

7.

Available,

]5rimari 1y ci oc- trical energy 8. Adequat-e

9.

1~4,OOO uni ts psa 1990)~7,OOO(2000) 10. Supplios to

tractor fe,ctory arid lorr;ies /trucl<s /chnssi factories propos~d

for the subregion.

11. 100,000 units

12. US.,: 150 milJior

(e~n;luding inves- want for aneil- 1ary indus tri oa

13. (a) 50% of basic investm8nt to bo provided by equity share holding and

bala~ce by loans.

(b) Ancillary in- dustries to be se't up at national

level to provide anciL'l ar-y parts and components (c) Supply!purchase arrangements to be worked out in res- pect of raw mate·,.

rials and engines

'.

(10)

• ErojGot Proposal No.7

rOR:

IVES:

Engineering

Dovelop manufaoture of transport equipment

'-."

SUBREGION:

West Africa ject title

noto r /sponcor at i.on

4.

Proj Got status

6.

Raw materials

9.

5.

Emmed.i a t o

7.

Inergy

follow-up

8, Physical 10.

acti vi ties infra- ,I

etruc tur-e

,:,Iarket

Cap aoit.y by product Total investment

---,----1-.-,. - - - . - - - f - - - - -

Anoillary industries to be sot up at

n~tional level to

I

I,

provide ancillary J par-t s and componentsJ

1

I

50%

of basic invest- ment. to bo providod by cqui.ty share- holding and balance by lOQJ1S

(

-

0,\

us; 40

million for psa ,

(6-10 tan chassis)

typo ie.e", US') 120 million for all theee types

20,000 units

each ch2.ssis 30,000 units ! p.a(l tOll

Chr:U3Sis) (2:5,000 uni t

p • a (? ton chassis)

9.

131,000 u~its 11.

p.?

(199

0 ) 337,000 units

n ,CI. (2000) 10 .. All cOWltrie8

of the subregion for vehicle body

bu~_lding at the 118..tion3.1 level"

6. To be impor- ted. pending sup- plies from 10c[1,1 projects or tho

metallurgical p roj ec't.r proposed

for the subregion 7" Avo,ilo.b18, primarily elGc-

trical energy

5

c Fur-t hcr- ill- depth s budi ec

4e

Con c ep tur.I

eria s ..

~ pr-op oe a.L "las ed by the ei xth g of the Niablcy- MULPOC Coun cLl isters 'l"1hich Gd it to the meeting of the overnmental tee of E><perts inGoring

ries for :,-]c;:lt , "'hioh "ill ext year"

.if'ac tur-o of' -mounted chQscis

ucks/b'J.S 83 /

,

(11)

Project proposal No.8

& 7 _ . ~ ~ ~ _

~OR: To Engineering

rIVES:

To develop manufacture of transport equipment 3~ited to the rural needs"

SUBREGION: ',est Africa

(b) An8illary indus- tries to be set up at national level to pr-ov i d.e anci Llar'y pa..rts and components

13.

by

12. Tote.l

11.

120 Total invest- ment US, 82 mil- lion (Excll~ding investments, fQ,r c'..8G8mbly of bodies at the na'tiona.l level) j()O,OOO uni t.?

p.a (2000)

on ergy 8. Adequate

70 AvailabL:':, pri...

marily c12ctrica cost vehicles

ro j cct title

'red it to the , nceti.ng of .ntergovernmental

tte e of Experts Lgineering

~ tl~ie8 for ~··!e8t

'a, \'Ihich "ill early next 7Garo .nuf'ac tur-o of

-·,---·---i-4-.-project status I 6. RaH. r,mt-;rials '1"1" 9. Additional information

I '

including collaboration

romotor sponsor 1

5

<> Lmmedi rrt e

7

CI Erv3rgy !

I ,

ar-r-an gements already made

follo"J~up

I

"cation I . . . 8. Phys ical infrCl- 10. :,arket and type of participation

acti.Vl ties structure r investment by member States sought

t

--~---~-~--\--~= .. ---~-~-~=c=:-_=t=u=a=l===j===6~.-T~O=b~a~'~i=~f9'130~'~-+--5010~~l-+-"S-'-P-'-a-13.(a)~ofb~ic~n_l-

l

pending the cup- p ,a (1990) in each courrtr'y tment to be provided

5.

Further in- plies fr0ffi the by equity shareholding

Li3 p-r-cpo s a l w;:,s. depth studies proposed. wetal- auG. ba.Lance by loans"

.r.ed by tile Si"th lurgical pr-ojec c

ng of the Ni.amey f'o r the s~brc.giol 10<> ';\~lGIGn suoreglon. , ]\IUT;POC Counoil

nisters whi ch

'.) Guinea

"i)

Ivory Coast

(12)

19CTOR:

:CTIVES:

Engineering Devel.opmcnt

Project Proposal Ho. 9

"

of energy supply equipment manufacture

SUBREGION;

Hest Africa

Additional information including collaboration arrangements already made arid typ a of p arti- cipation by member Ste~

tes sought

(b) Given the av~il~bilit of aluminium in the BUb-

rc~ion,·thoUSG,of that W016rial proposed instead of copper.

1'3. (a) 5Cf/o of basic invest-

ment to be provided by equity shareholdi~gend ba.lance by 108118

13.

I

I

5,000 tons a in each cation Cap aci,ty by

roduct

Lnves tmant

S·.' 25 million or rod rolling ni.Ll, and cables and conductors manufnc tur-i.ng units).

Total rbject ti Ule

I 4.

Project status

6.

RaVl mauterials I 9. Projected dem;;;dl 11.

.romotor- /sponsor

I ,.

Immediate

1.

Energy by product p

.ocat i.on

\

fo 1 Low-up

8.

Physical infr:J.-

activities 10. Market 12.

structure

-

I~,uf2.cture of

4.

Ccnceptual

6.

AluminiuG1

9. 5

0 , 0 0 0 t on o 11. 2

ri n i.um conductors available in p.a (1990) p,

ck.bles

5.

Purther In-

both countr-i es 10

depth studies ~100,000 tons

ThlS p r-opoze.L

1.

Eledricity poa (2000) 12. U

examined by tl,e available,

10. Electricity (f

'h iieet i n g of primarily [,

enterprises in

N;iamey-basecl electrical

the subregion

'OC Council of energy

.s.tcr s Hhich

8.

Physical

:rr8d i t to the infrastruc-

t mooting of ture adequat e

lntcrgovern~ental in both

iilttee of E:><p arts

,

aiiineeri'n'g

!

locations

I .

for \oJes..lli \ :

.,trles

.ca , uhich Hill

early next ,

,

,

han a and. Guinea

\

(13)

Project Proposal No. 10 I.

lSECTOR:

-ECTIVE:

Engineering

To d.cve Lop manufacture of energy supply equ.ip ement

STJ'.ilREGION: If/est Africa

Additional information , including collaboration

!

arrangements already made and type of par- ticipation by member States sought

B.

11. Capacity by product 12. Total

investment Market

9.

Projected demand j by product

Energ;f r

Physical infra-

J~O'

structure

t

6.

Raw materials

8.

7.

Project status

I

Immediate

follow-up I

acti vi ties

I

i 4~

!

5.

Project tiEe Promotor /sponsor Location

----+---t---+---+---+-~~~~-- i

llanufact1U'e of ler transformers

This proposal was uni.ncd by thE;

tth I'leeting of tho lmey-based MlJT DOC 'neil of Ministers .ch referred it to

~ first meeting of

I

, Intergovernmental

"mittee of Experts Engineering

lustries for -.Jast rica, which Nill et early next yaar

Conc ep bua.L Further in- depth studies

6. To be imported pending the

supp lies from metC\llurgico.l projects pro- posed for the

sub-region

7.

Availilble pri- rnar-LLy e18c- tric"-l energy 8. Adequ::<.t o

I 9.

eilch of lil.rge,2000lIVA p. "- medium QJ:1d distribution

trcnsformers (1990) 5000 I-IVA p ,0. or.ch

'.1f L:..r,Jll mc:d.iu.r.l one distribution tr·cns- formers (20'))) 10. Electricity

enterprises i.n 'thc eubno.jd on

11. 3000 lTVA

12. US~ 20 million

13.

(C1)

5010

of basic invest- ment to be provided by equity sh::<.re, helding C1Ud bclil.Uce by lO~lS.

(b) I t is proposed CIt the plant stQrts with the IDQnufacture of distribution transfor- mers, to be f'oLl.oued by the manufC1cture medium 0.'10. Lar-ge power tril.Usformers

Togo

(14)

R:

E:

Engine ering

Development of energy supply equipment manuf'aotur-c

SUBREGION: West Africa

one turing.

start by

. - l I

c lnVQS-

psa pLanf

Q then be

i

i

Lr-sady f pc..rti- ormation cboration

pr-ovi ded har o-

Q ba.l anc e r::.ber

t

c

e t e

tl 1

e

m e

1

u

1 t

[ect titlo ~-., Project status 60 Raw ma't er-i a.Ls 90 Projected demand 110 Capacity ',y

130

Additional inf

iobo r /sponsor

,

Immediate 70 Energy I by produot by product including call

JO

follow-up lOo lhrlcet 120 'rote.1 arrwgcments c_

~tion 80 Physical infrL1- made an type 0

activitios investment

structure cipC'-tion by me-n

I 1-- St(ct ee: soup.:ht

- - - - - -

~...-..-

__ .-

rt'ao'tur-o of (" Conccptu':cl to Available

9-

50,000 tons [Jo8.. i i , One 50,000 tons

( tt)

50)C of baei

31 towcr-s (1c;l90) p ..<1 rolling ,aill tment to -be

c Y'uthcr in- 10 Avai Labl c.pri.·.

~o to servG up to by oqui ty s

s proposal depth marily electri- 100,000 tons po::'

five 10,000 tGn8 holding

(2000 ) on

examined by studies CCtI oner67 p".:1 pac!' manuf'ac t.ur-Ln; by 10a11sQ

Sixth l'.J1eotLl,~ .S 0 ./-idcquate 100 Eleotrioity pLarrt s (b) Tho mnnufctc

he Nic,m8.y- ent crp ris cs in

C. WJLPOC 12., US-;~ 100 millior unit could

ths aubX'~gion

(for rolling installing

cil of one

sters which mill and fi veo 10,000 tons

rrod it to manuf~cturin6 which coul'

first Ine:ctin: plants) eJqJand.ed ,

to Intor- c:>rnmcnt:'\..l

ittee of Dts on ncering s tries for

l".frice.

h will meet y next yc~ro

ri~

...~

(15)

Project proposal No '_2

h ,II

BCTOR: Engineoring

CTIVE: To deve l.oj cap i tal goods manufacture

SUBREGION: 0est Afric~

roject title 1~o1 Pr-oj ec t status 60 R<1,j mnteri2.1s 90 Proj ecteu demand 110 Capacity by r-omoto r !SP01180"!:'

I

oJ

product product

)0 In:medio.te

7.

Energy

f'ol Low-up

80 100 IIc.rket 120 Total

o crrti on Physi "<11 infrc,..

activities investment

structure

.-l---+---~---

130 Addi ti.ona.L informer- tion including 001··

laborQtion Qrrange- ments al.r-eady lTISCle and.

type of p arti c ip a't i.on by member StateG sought

l,lrmui'C10-'cure of ffi2..chine tools ::.nd rne'ta.L ~or­

kii.1g ffiQ,ohinerJ This pr-op oe r.L

1rJ2.,S examin ad. by

the Sixth I\~e2tin,~

of the ,Jiamey- based llJLFOC

Counci L of

ITinisters, which referred. it

co

the first fi1Geting of the Intergovor- nmenta'l. Comrni,t t ec of' Exp erts 0'1

Engineering Industries fbI'

\Jest Africa.

which will meet early next ye<1r Nigeria (machine tools),Upper Volt

,

(,lOad working m3.-- chinery); Cui.n ec (power operatad

hrend tools)

~. Further in- d.epth scudi es

60

Pig iron would be avm Lab'l.e ,

Other raw rr.::t-

toriC11s to be imported pon- ding their auppI I from mo- tQ,llurgico,l proJects pr o- pa'ired for the subregion

70

AVC1ilable

go

Avc..ilc..ble

9, 199C

3,000 unite r,~.

lathes 8tC, 2,500 uni ts p.e.

Hooi..h'lforking- ffi2",-

chinery,

150,000 unit3 po~

p cwc r op8rc..tcll_

handj oo Le0

100 ,HI :"utill C_ic~ H8CA

wo r-k, large, mc- d.i.um, and sma.I I scale industries in the subregion

110 '(OOOur,its p ,a (latlle3 Eel drilling, shaping nn d n:illinz p.n- chines,

3000 units po' l

W1ivor-sal

.::3~·~·:;tvii1~ machines wood ','lorking lathes, band S='..H kiln JryinG equipment etc.

200,000 units pva powcr

op ero.ted hand tools

US,:;200,OOO for preinvestment studies Mol USno million

toto.l basic Lnves tmerrt

( a)

( b)

This project figures on chart No<>1 of do- I cumont ECA/INR/:J;~/ EJ.1g/5

jtJP

<>1 mentioned I

~:J:r

nnci l l cry I

indue tries ;';ould have

I

to be set up at the

i

ihtion"l 1,,,<::1 to i supply motor, switoh-j :jOfl.r, accc~)::::lOri~s, mo·t

~',equaptncnt 0tc,,!

proposed for Nigeria,I

i.ln.uritani3. and Togo.

I

(16)

. ,

R: Engineering

E : r o d.eve Lop capital goods manuf'ac tur-e

~ruj(;"t Propos"l No.H

I -: ) SUBRFj}ION: West Afrioa

13. (,,) This proj ect

I

figurE::s on chart No.1 I ofioewnent ECA/INR/Il, Eng/5/Hp.l m811honeel I

in 20

I

(0)

This project i2 based on the project far tho manuf'ac'tur-e of ferro ~1d silico- managcmerrt in GhiJll::"

wILieh irJOuld. s crve 1.1

~uality stoel m0llu- fc...cturing lU1it to supply the -h1fo coneum- mable tools manufac- turing unit ..

13.

Additional infor-

m~tion including

coLlabor-c.t i.on

pieces psc in bach Lo cat i.cn 11. 1 million

1') US,,; 1,,) million for each plant industries in

tho 3ubrc;iun 90 2 ..

5

million

pioces

(1990)

10.

~ll metal work

9.

Projected Jemo.nl1. 11. Cupaci,ty by

by product product

10. lk~rket 120 Total

investment Raw materials

Physi c a! infra- structure

Energy

AdcqUC1tG ,:vail"ble

R3l:1 runt eri aLs

to be imrJorted pcndi.ng their

supply from ffistQ,11urt31c3.1

proj ec-t s prepared for

thE: subregion 7.

6.

7.

S.

C'..ii1ccpt'..1al

.iopth s tuo.i ce

5

0 Immediate f'oLlotc-up activities

---'----1---1---'--'-'--+---'-'-+---

4.

Projeot St"tU8

J ' jfu:cthcr in-

"T""""---,.---,---,---__,.-- _

ect title T otor /:t-:pol1sor .ti ori

.fact.ur-o or

arr~~gementB Glre~dy

r:iade an d typ e 0f

par-ti cipation by membGrl

r . '- - - -'--- - -+- - - '-- ...,- - - --- - - - '---'- +- .-+__

-'m;.;.~_"m;;.;...b_c..;;r_S;..t;..2"_.;c~~Bo~ugh~_

t

,

- - - --

-'-~--+

~ .

-urnmab.Le l1 cuttin;{

; p r-opos a.L ·,va:;

rin ed by thee .h meetil",6' of

niarnGy-ha8GL~

)OG Council of .stcr-r whi ch

;rred it t'J bo first meeting .hc Intcr- arnmen't a'i ri.tt ee of

.r-ts on LlJinc- 19 Ln dus t.r-Lor

',lest Africa .h \1ill mcot _y this yoar.

(17)

TOR: Engineering

IVE: To cbvolop capital goods manuf'act.ur-c ,

SUBREGION: 'kst Afrioa

Addi tional information including co Ll abor-ation ar-r angcmen ts a.l r-eady made and typ o of parti-- cipation by momber States sought

( b) 'i'his projeot i.o based on the pr)ject for the rIF='.T~uf,'J,cturc of ferro of' silico-P.l')!"_~g,JiTlcntin GhCll;'., whi.ch tcou.Ld serve

2. qun.li,ty steel nj[111Uf2.~­

turing uni t to supp ly the two C'()D.summ£'~ble too Is

mGnuf~cturingunito 130 (~) This project figur~s

on chnr-t ITo01 cf do cu-

ment ECA/IHRt[A!ErJG/5/~\Tpol!

ment ionGel in 20

+

'_~_~ .J

Capacity by product

rni Ll a on Lor ec-ch pLcnt Lo cat Lon 11. 1, )00 tuns

po" il:l. r;e.oh

I U.

in:luf-',tri;::-;s iaolu':in;;

L~n:Jrpris'':';8 in th« subr c i)-l1

9.

ProJccted demand by product

Ri1\-l ma't cr-i a.l e

Physical j,nfro.- structure

Energy

Other ro..w mate....

riJ..ls to be imported perl- ding their

~upply from met al.Lur-g'i caL projects pre- p ar cd for the

subrc~i..)a

7.

Avail"'ble 80 AdE::qlU'.to

60

Pig iron av~i­

LabI.o in the 8ubr>Jgion

12~ rr'otal

~nvcstwcmt

---t-~~~ _+_==-=-~=-:.=:=---==--=--~---

4·<> Concep tual

stucli88

.5" further iu-

depth

4.

ProJect stQtusl

5.

Immediate f811ol'l-UP activities jeot title

o.,tion

motol/sponsor

, tools, ures

ds and dies s proposal 1.:18.8

ined by the h lJIceting of Niamey-bascl OC Coun ci L of st er-e \'\Thich r-r-e.l it to first mcc c i.ng he Inter- rnment:11 rit t ce ,)1'

.rt s on Engine- .g Industries

t,est Africa .h vlill meet .y this year.

llufaeturc of

~er) Malia

o

Références

Documents relatifs

The results are given in Table 1. This shows that although the upper limit for a small unit is taJcen as 100 the bulk of the small-scale enterprises employed,less trum 50 workers.

Two plants are proposed, one of 16,000 tons per annum capacity including 5,000 tons for gas cylinders, located in either Rhodesia or Zambia and supplying these countries

As for enamelware, the local industry should be able'to cover about 80 per Cent of consumption and factories with a capacity of between 2,000 and 6j000 tons per annum can be located

As a refinery is also being established, fuel oil woul~ be available in ade~uate quantities to provide substitute fuel to sugar factories in exchange of

While confining our attention to road transport in Vlest '.I\.frica, we have tried not to lose sight of the importance of other mod~s 9f trans- port ,or of the, possible bearing of

Table II.3 (l) gives ,the values of .local production of electrical , machinery, apparatus and appliances in the countries of the East African Sub-region as given in the replies to

According to the SRO-WA Director, Madame Fatoumata Ba, “This review will be conducted against the observations of the United Nations Conference on MDGs in September 2010, which

in time for the West African Clearing House Agreement to be initialled by member banks at the Fifth Annual Meeting of the West African Sub-Regional Committee to be held in May 1975