All units are to have the new fan housing with the exception of forty scheduled to be shipped from Westminster in August and twenty-five from Puerto Rico in

CORRECTION 1: Restore Assembly Hole drawing to original condition.. CORRECTION 4: Correct Circuit Schematic

Further investigation has shown that an extension of this same fix could resolve an inherent write recovery problem in the RK05 that would otherwise be

CORRECTION; Relocate R2 to facilitate assembly. CORRECTION; Restored processor INITIALIZE NOTE; See continuation ECO M771Hl0003. Redesign WAKEUP circuit. PROBLEM 2;

Each of these related FCO's may be installed separately; each FCO relies upon the others only to fully implement pa- rity.. Re- work parity machines in Systems

In-plant effectivity -Rework all existing logics as soon as