• Aucun résultat trouvé

Active network management for electrical distribution systems: problem formulation and benchmark

N/A
N/A
Protected

Academic year: 2021

Partager "Active network management for electrical distribution systems: problem formulation and benchmark"

Copied!
18
0
0

Texte intégral

Loading

Figure

Figure 3: Curtailment of a distributed generator.
Figure 5: Power curve of a wind generator.
Figure 6: Test network.
Figure 12: Scenario tree that is built at each time step.
+3

Références

Documents relatifs

Induction generators were used for a long time in a constant speed WECS, where the pitch control or active stall control are dictated for power limitation and protection,

Induction generators were used for a long time in a constant speed WECS, where the pitch control or active stall control are dictated for power limitation and

As stated in the beginning, the real purpose of these notes is not to simply repeat the standard calculation of the derivative of the logarithm function, but to replace the

a- The sum of all of the probabilities within the definition interval must be equal to one. Mathematically, the two restrictions can be expressed as:.. The resulting distributions

The rotor currents (which are linked to active and reactive powers by equation (16), quadrature rotor current K Q[ linked to stator active power I and direct rotor

A n y set of N-loops (S-loops) with disjoint interiors and diameters exceeding some positive constant is finite... Since flH n is non-singular this is

As the main result of this paper, we employ equality (1.4) to show that in the case of radial functions the answer to W 1,1 -problem is positive (Theorem 3.12).. Even in this case,

— This paper présents a method for finding the probability distribution f miction for the capacity of a muititerminal network, The capacities of the arcs of the network are