Active network management for electrical distribution systems: problem formulation and benchmark
Texte intégral
Figure
Documents relatifs
Induction generators were used for a long time in a constant speed WECS, where the pitch control or active stall control are dictated for power limitation and protection,
Induction generators were used for a long time in a constant speed WECS, where the pitch control or active stall control are dictated for power limitation and
A n y set of N-loops (S-loops) with disjoint interiors and diameters exceeding some positive constant is finite... Since flH n is non-singular this is
As the main result of this paper, we employ equality (1.4) to show that in the case of radial functions the answer to W 1,1 -problem is positive (Theorem 3.12).. Even in this case,
a- The sum of all of the probabilities within the definition interval must be equal to one. Mathematically, the two restrictions can be expressed as:.. The resulting distributions
As stated in the beginning, the real purpose of these notes is not to simply repeat the standard calculation of the derivative of the logarithm function, but to replace the
— This paper présents a method for finding the probability distribution f miction for the capacity of a muititerminal network, The capacities of the arcs of the network are
The rotor currents (which are linked to active and reactive powers by equation (16), quadrature rotor current K Q[ linked to stator active power I and direct rotor