Data sheets on individual nuclear power station units

INDIVIDUAL NUCLEAR POWER STATIONS UNITS

1. 2.

Unit Capability Factor (in %)

Cumul.

Energy GW(e).h

Performance for Full Years of Commercial Operation

5600 63.9

1983

Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Capacity

MW(e)

Annual Cumul. Annual

77.8 59.8 77.7

1982 335.0 59.2 77.8 59.2

Annual Cumul. Hours of (%) 2666 hours

67.2%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

1753.6

31.2%

Total Off–line Time:

58066.2 GW(e).h 70.2%

19 Mar 1974

29.8%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.1%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

24 Jun 1974 01 Jun 1968 13 Jan 1974

2003 Monthly Performance Data

2003 Summary of Operation

7.2

UCLF replaces previously used UUF.

0.0 0.0 0.0 0.0

100.0 93.3 0.2 26.9

52.9 76.3 91.4 100.0 100.0 100.0 99.9 100.0 55.6 100.0 100.0 53.6 73.9 89.8 100.8 100.6 100.4 99.7 99.3

88.9 100.0 100.0 100.0

0.0 6.7 99.8 73.1

100.0 100.0 100.0 53.6 99.5

239.6 131.8 0.0 6.7 99.8 73.1 88.9 100.0 100.0

0.0 8.3 100.1

Nov Feb

0.0 16.0 239.8

0.0 6.4

250.7 242.0 248.7 Jan

0.0 184.2 216.6 251.3

0.0

May Jun Jul Aug Sep Oct Dec Annual

AR-1 ATUCHA-1

Operator:

Contractor: SIEMENS (SIEMENS AG)

NASA (NUCLEOELECTRICA ARGENTINA S.A.)

68.8%

68.9%

69.6%

Production Summary 2003

Energy Production: 2020.6 GW(e).h

Station Details

PHWR

Energy Availability Factor:

Design Discharge Burnup:

335.0 MW(e) 319.0 MW(e) 5600 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Type:

Maximum Net Capacity at the beginning of 2003:

Design Net Capacity:

EAF UCF

Mar Apr

0.0 0.0

2356.0 335.0 78.4 77.9 78.4 77.9 80.3 78.0 8101 92.5

1984 1706.1 335.0 98.7 80.0 98.7 80.0 58.0 75.9 8678 98.8

67.2 3030 34.6

68.9 67.2

72.3 68.8 70.2

6.

7.

A.

B.

C.

D.

E.

H.

J.

K.

8.

Date Hours GW(e).h Type Code 01 Jan 2112.0 707.5

2003 Outages

Description

PF D11 REPLACEMENT OF FUEL CHANNELS AND CONTROL RODS GUIDE TUBES, INSTALLATION

AR-1 ATUCHA-1

AND COMISSIONING OF A NEW EMERGENCY FEEDWATER SYSTEM AND TURBINE INSPECTION 14 Dec 330.0 110.6 UF1 A42 MANUAL SHUTDOWN DUE TO A LOCAL INCREASE OF TEMPERATURE IN A CONNECTION OF

MAIN TRANSFORMER.

Full Outages, Analysis by Cause

Outage Cause 2003 Hours Lost 1974 to 2003

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment failure 330 818 2

Refuelling without a maintenance 14

Inspection, maintenance or repai 7

combined with refuelling

Inspection, maintenance or repai 2112 1223

without refuelling

Testing of plant systems or components 6

Nuclear regulatory requirements 1 93

Grid failure or grid unavailabilit 2

Load-following (frequency contro 16 57

reserve shutdown due to reduced energ demand)

1236 849 154

Total 2442 2239

Subtotal 2112 330 0

Equipment Related Full Outages, Analysis by System

System 2003

Hours Lost

1974 to 2003 Average Hours Lost Per Year

11. Reactor and Accessories 127

12. Reactor I&C Systems 57

13. Reactor Auxiliary Systems 167

14. Safety Systems 43

15. Reactor Cooling Systems 219

16. Steam generation systems 63

17. Safety I&C Systems (excluding reactor I&C 13

31. Turbine and auxiliaries 11

32. Feedwater and Main Steam System 28

33. Circulating Water System 10

41. Main Generator Systems 6

Total 330 791

42. Electrical Power Supply Systems 330 47

38

1. 2.

Performance for Full Years of Commercial Operation Unit Capability

Factor (in %) Capacity

MW(e)

Annual Cumul. Annual

2098 25.6

6355 Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Cumul.

16.6 0.0

1983 0.0 38.6

Annual Cumul. Hours of (%) 0.0

600.0 100.0

393 hours

84.1%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

815.4

4.9%

Total Off–line Time:

89630.5 GW(e).h 87.1%

25 Apr 1983

12.9%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.7%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

20 Jan 1984 01 Apr 1974 13 Mar 1983

2003 Monthly Performance Data

2003 Summary of Operation

4.6

UCLF replaces previously used UUF.

0.0 0.2 0.4 0.0 100.0 100.0 100.0 100.0 100.0 67.4 79.2 100.0 67.1 78.5 99.2 100.2 100.3 100.5 100.4 100.3 66.7 78.1

100.0 100.0 100.0 100.0 99.1 99.3 99.6 100.0

100.0 66.9 78.1 99.2 99.7

337.3 442.9 99.1 99.3 99.6 100.0 100.0 100.0 100.0

100.0 100.0 100.0

Nov Feb

399.5 443.3 430.3

99.1 99.3

448.4 433.2 298.3 Jan

442.1 447.3 433.1 448.5

99.0

May Jun Jul Aug Sep Oct Dec Annual

AR-2 EMBALSE

Operator:

Contractor: AECL (ATOMIC ENERGY OF CANADA LTD.) NASA (NUCLEOELECTRICA ARGENTINA S.A.)

95.1%

95.2%

95.5%

Production Summary 2003

Energy Production: 5004.1 GW(e).h

Station Details

PHWR

Energy Availability Factor:

Design Discharge Burnup:

600.0 MW(e) 600.0 MW(e) 7200 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Type:

Maximum Net Capacity at the beginning of 2003:

Design Net Capacity:

EAF UCF

Mar Apr

99.0 99.0

EMBALSE NPP WAS IN OPERATION AT FULL POWER DURING 459 DAYS IN AN UNINTERRUPTED WAY, SINCE JULY 07, 2002 TO OCTOBER 09, 2003, ACHIEVING A NEW RECORD FOR CANDU PLANTS.

1984 2527.1 600.0 70.3 70.3 69.9 69.9 47.9 47.9 72.3

6.

7.

A.

B.

C.

D.

E.

H.

J.

K.

8.

Type Code 09 Oct 243.0 147.0

2003 Outages

Description UF

Date Hours GW(e).h

AR-2 EMBALSE

A16 SG TUBE FAILURE A16 SG TUBE FAILURE

Full Outages, Analysis by Cause

01 Nov 150.0 92.9 UF

Outage Cause 2003 Hours Lost 1983 to 2003

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment failure 393 7 270

Refuelling without a maintenance 0

Inspection, maintenance or repai 114

combined with refuelling

Inspection, maintenance or repai 656

without refuelling

Testing of plant systems or components 68 1

Nuclear regulatory requirements 10 2

Grid failure or grid unavailabilit 2 22

Load-following (frequency contro 4

reserve shutdown due to reduced energ demand)

855 279 22

Total 393 1156

Subtotal 0 393 0

Equipment Related Full Outages, Analysis by System

System 2003

Hours Lost

1983 to 2003 Average Hours Lost Per Year

11. Reactor and Accessories 10

12. Reactor I&C Systems 6

13. Reactor Auxiliary Systems 53

15. Reactor Cooling Systems 15

16. Steam generation systems 393 63

17. Safety I&C Systems (excluding reactor I&C 1

31. Turbine and auxiliaries 43

32. Feedwater and Main Steam System 28

41. Main Generator Systems 42

Total 393 270

42. Electrical Power Supply Systems 9

40

1. 2.

Performance for Full Years of Commercial Operation Unit Capability

Factor (in %) Capacity

MW(e)

Annual Cumul. Annual

7040 80.4

6741 Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Cumul.

79.3 73.6 73.6

1987 408.0 79.3 79.3 79.3

Annual Cumul. Hours of (%) 2640 hours

55.1%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

2629.1

39.4%

Total Off–line Time:

37074.9 GW(e).h 63.4%

05 Jan 1980

36.6%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.4%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

03 May 1980 01 Jul 1975 05 Jan 1980

2003 Monthly Performance Data

2003 Summary of Operation

0.0

UCLF replaces previously used UUF.

0.0 0.0 0.0 0.0 0.0 0.0 93.5 100.0 100.0 99.9 100.0 100.0 82.8 66.9 95.7

0.0 0.0 85.3 90.7 90.9 82.7 66.9

0.0 85.3 90.7 90.9

93.8 92.7 42.7 0.0

90.9 82.8 66.9 95.7 9.5

181.1 267.7

93.8 92.7 9.4 0.0 0.0 85.3 90.7

100.0 100.0 10.0

Nov Feb

236.9 259.3 25.7

93.8 92.7

253.8 246.0 231.6 Jan

May Jun Jul Aug Sep Oct Dec Annual

AM-19 ARMENIA-2

Operator:

Contractor: MNE (MINISTRY OF NUCLEAR ENERGY OF RUSSIAN FEDERATION) JSC (JOINT STOCK COMPANY ARMENIA NPP)

60.6%

60.6%

69.9%

Production Summary 2003

Energy Production: 1997.6 GW(e).h

Station Details

WWER

Energy Availability Factor:

Design Discharge Burnup:

376.0 MW(e) 376.0 MW(e) 28600 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Type:

Maximum Net Capacity at the beginning of 2003:

Design Net Capacity:

EAF UCF

Mar Apr

20.3 20.3

DURING THE YEAR THE UNIT DID NOT WORK WITH ITS FULL CAPACITY BECAUSE OF LIMITATION OF DAILY SHARE OF ENERGY GENERATION PROVIDED BY THE NPP TO THE ENERGY GRID OF ARMENIA.

1988 2254.5 376.0 73.4 76.5 73.4 76.5 68.3 71.0 76.7

54.5 6961 79.5

60.6 55.1

65.7 60.6 63.4

6.

7.

A.

B.

C.

D.

J.

8.

Hours GW(e).h Type Code 01 Jan 480.0 180.5

2003 Outages

Description PF D MAINTENANCE ACTIVITIES STARTED IN 2002 90.2 XF4

AM-19 ARMENIA-2

Date

J42 DUE TO INSTABILITY OF EXTERNAL GRID PARAMETERS THE REACTOR WAS SCRAMMED BY PROTECTION SYSTEM. DURING TRANSIENT ALL SAFETY SYSTEMS WERE AVAILABLE.

04 Apr 239.0

C MAINTENANCE AND REFUELLING ACTIVITIES

Full Outages, Analysis by Cause

14 Apr 1872.0 703.9 PF

Outage Cause 2003 Hours Lost 1987 to 2003

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment failure 67

Refuelling without a maintenance 3

Inspection, maintenance or repair 1872 963

combined with refuelling

Inspection, maintenance or repair 480 70

without refuelling

Grid failure or grid unavailability 239 1

Subtotal 2352 0 239 1033 70 1

Total 2591 1104

Equipment Related Full Outages, Analysis by System

System 2003

Hours Lost

1987 to 2003 Average Hours Lost Per Year

12. Reactor I&C Systems 0

15. Reactor Cooling Systems 8

16. Steam generation systems 12

17. Safety I&C Systems (excluding reactor I&C) 2

31. Turbine and auxiliaries 1

Total 0 24

42. Electrical Power Supply Systems 1

42

1. 2.

Unit Capability Factor (in %)

Cumul.

Energy GW(e).h

Performance for Full Years of Commercial Operation

8103 92.5

1983

Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Capacity

MW(e)

Annual Cumul. Annual

92.0 83.7

1982 98.8 91.7

Annual Cumul. Hours of (%) 91.7

395.0 83.4

807 hours

85.6%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

3184.5

13.6%

Total Off–line Time:

85652.7 GW(e).h 85.4%

28 Aug 1974

14.6%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.1%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

15 Feb 1975 01 Jul 1969 18 Jul 1974

2003 Monthly Performance Data

2003 Summary of Operation

0.6

UCLF replaces previously used UUF.

0.9 0.2 0.3 0.0 100.0 76.3 98.4 100.0 13.3 100.0 100.0 100.0 98.6 99.5 100.0 101.3 76.0 98.6 57.3 9.1 100.8 101.7

75.9 98.1 100.0 10.0 100.0 100.0 100.0 100.0

9.1 98.4 99.2 100.0 101.9

287.1 299.9

99.6 99.7 99.4 99.2 75.5 97.9 57.9

100.0 99.9 100.1

Nov Feb

269.6 297.8 287.2

102.3 102.1

167.0 25.7 294.3 Jan

298.6 295.4 214.4 287.6

102.4

May Jun Jul Aug Sep Oct Dec Annual

BE-2 DOEL-1

Operator:

Contractor: ACECOWEN (ACECOWEN ( ACEC-COCKERILL-WESTINGHOUSE )) ELECTRAB (ELECTRABEL M. V. NUCLEAIRE PRODUKTIE)

86.4%

88.1%

90.8%

Production Summary 2003

Energy Production: 3024.6 GW(e).h

Station Details

PWR

Energy Availability Factor:

Design Discharge Burnup:

392.0 MW(e) 392.0 MW(e) 33000 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Type:

Maximum Net Capacity at the beginning of 2003:

Design Net Capacity:

EAF UCF

Mar Apr

99.7 100.0

2823.0 393.0 82.1 96.7 82.1 83.2 82.0 83.5 7316 83.5

1984 3129.0 393.0 90.2 96.0 90.2 84.0 90.6 84.3 7988 90.9

6.

7.

A.

B.

C.

D.

E.

H.

J.

K.

Z.

8.

Date Hours GW(e).h Type Code 19 Jun 171.0 68.2

2003 Outages

Description PF

BE-2 DOEL-1

E14 COLD SHUTDOWN FOR THE PERFORMANCE OF PERIODIC TESTS ON THE SAFETY

14 Jul 12.0 4.6 UF4

116.4 XP

INJECTION SYSTEMS

A41 SCRAM DUE TOT EARTH FAULT STATOR (INTERNAL FAILURE) N MODULATION DUE TO COOLING WATER TEMPERATURE LIMITS

01 Sep 54.0 1.3 XP S STRETCH-OUT

04 Aug

03 Sep 591.0 232.5 PF

28 Sep 32.0 12.6 UF3

1.6 UP

C REFUELING OUTAGE

Z REFUELING OUTAGE EXTENTION

A32 POWER REDUCTION FOR REPAIR HIGH PRESSURE FEEDWATER PUMP B

01 Nov 6.0 1.5 PP E31 TESTING TURBINE CONTROL AND PROTECTION SYSTEM. (AND REPAIR FEEDWATER PUMP 24 Oct 25.0

B)

Full Outages, Analysis by Cause

Outage Cause 2003 Hours Lost 1974 to 2003

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment failure 12 213

Refuelling without a maintenance 3

Inspection, maintenance or repair 591 789

combined with refuelling

Inspection, maintenance or repair 9

without refuelling

Testing of plant systems or components 171 25 1

Nuclear regulatory requirements 6

Grid failure or grid unavailability 7

Load-following (frequency control, 28 52

reserve shutdown due to reduced energy demand)

Others 32

Subtotal 762 44 0 851 275 7

Total 806 1133

Equipment Related Full Outages, Analysis by System

System 2003

Hours Lost

1974 to 2003 Average Hours Lost Per Year

11. Reactor and Accessories 12

12. Reactor I&C Systems 14

14. Safety Systems 10

15. Reactor Cooling Systems 17

16. Steam generation systems 44

31. Turbine and auxiliaries 80

32. Feedwater and Main Steam System 23

33. Circulating Water System 0

41. Main Generator Systems 12 7

Total 12 207

42. Electrical Power Supply Systems 0

44

1. 2.

Unit Capability Factor (in %)

Cumul.

Energy GW(e).h

Performance for Full Years of Commercial Operation

6598 75.3

1983

Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Capacity

MW(e)

Annual Cumul. Annual

74.6 76.7

1982 96.3 74.2

Annual Cumul. Hours of (%) 74.2

395.0 76.7

576 hours

80.3%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

2582.0

9.9%

Total Off–line Time:

78555.5 GW(e).h 80.2%

21 Aug 1975

19.8%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.1%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

01 Dec 1975 01 Sep 1971 04 Aug 1975

2003 Monthly Performance Data

2003 Summary of Operation

0.6

UCLF replaces previously used UUF.

0.0 0.0 0.0 3.8 100.0 24.2 100.0 98.5 100.0 100.0 100.0 97.4 100.0 99.9 97.2 85.6 16.7 100.0 85.7 100.9 102.2 102.7

21.9 99.9 97.9 100.0 100.0 100.0 99.8 99.6

100.0 100.0 99.9 93.5 101.3

289.9 280.7 100.0 100.0 99.6 85.6 16.6 99.9 86.0

100.0 99.9 100.1

Nov Feb

269.4 297.3 285.4

102.3 101.9

249.9 284.7 298.3 Jan

298.6 249.6 47.0 291.7

102.4

May Jun Jul Aug Sep Oct Dec Annual

BE-4 DOEL-2

Operator:

Contractor: ACECOWEN (ACECOWEN ( ACEC-COCKERILL-WESTINGHOUSE )) ELECTRAB (ELECTRABEL M. V. NUCLEAIRE PRODUKTIE)

90.1%

91.5%

93.4%

Production Summary 2003

Energy Production: 3142.6 GW(e).h

Station Details

PWR

Energy Availability Factor:

Design Discharge Burnup:

392.0 MW(e) 392.0 MW(e) 33000 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Type:

Maximum Net Capacity at the beginning of 2003:

Design Net Capacity:

EAF UCF

Mar Apr

100.0 100.0

2017.0 393.0 58.5 91.6 58.5 74.4 58.6 74.4 5190 59.2

1984 2916.0 393.0 84.2 90.8 84.1 75.5 84.5 75.5 7508 85.5

6.

7.

A.

B.

C.

D.

E.

J.

K.

Z.

8.

Date Hours GW(e).h Type Code 27 Apr 967.0 56.1

2003 Outages

Description XP

BE-4 DOEL-2

S STRETCH-OUT

04 May 42.0 1.1 PP

06 Jun 532.0 208.8 PF 5.3 UF3

D31 CONDENSOR PART OUT OF ORDER FOR REPAIR LEAKAGE.

C REFUELING OUTAGE

Z REFUELING OUTAGE EXTENSION 29 Jun 34.0 6.2 PP C START-UP AFTER REFUELING OUTAGE 29 Jun 13.0

06 Aug 168.0 33.0 XP

22 Aug 10.0 6.3 UF4

0.9 UP1

N MODULATION DUE TO COOLING WATER TEMPERATURE LIMITS A32 FEEDWATER SYSTEM FAILURE

A41 STOP FOR REPAIR EARTH FAULT ROTOR - PARTIAL 24 Dec 18.0 7.2 UF1 A41 STOP FOR REPAIR EARTH FAULT ROTOR - TOTAL

23 Dec 5.0

K MODULATION FOR GENCO (= GRID OWNER)

Full Outages, Analysis by Cause

24 Dec 38.0 11.0 XP

Outage Cause 2003 Hours Lost 1975 to 2003

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment failure 28 353

Refuelling without a maintenance 17

Inspection, maintenance or repair 532 831

combined with refuelling

Inspection, maintenance or repair 187

without refuelling

Testing of plant systems or components 76 16

Grid failure or grid unavailability 15

Load-following (frequency control, 10 12

reserve shutdown due to reduced energy demand)

Others 13

1104 398 15

Total 573 1517

Subtotal 532 41 0

Equipment Related Full Outages, Analysis by System

System 2003

Hours Lost

1975 to 2003 Average Hours Lost Per Year

12. Reactor I&C Systems 12

13. Reactor Auxiliary Systems 6

14. Safety Systems 10

15. Reactor Cooling Systems 29

16. Steam generation systems 103

31. Turbine and auxiliaries 100

32. Feedwater and Main Steam System 10 19

41. Main Generator Systems 18 12

Total 28 301

42. Electrical Power Supply Systems 10

46

1. 2.

Unit Capability Factor (in %)

Cumul.

Energy GW(e).h

Performance for Full Years of Commercial Operation

3505 42.6

1983

Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Capacity

MW(e)

Annual Cumul. Annual

33.9 0.0

1982 0.0 80.5

Annual Cumul. Hours of (%) 0.0

944.0 100.0

832 hours

85.4%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

2631.0

10.3%

Total Off–line Time:

151275.2 GW(e).h 85.5%

23 Jun 1982

14.5%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.6%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

01 Oct 1982 01 Jan 1975 14 Jun 1982

2003 Monthly Performance Data

2003 Summary of Operation

0.8

UCLF replaces previously used UUF.

0.0 0.0 0.0 0.0 82.9 84.3 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 82.8 82.1 96.2 96.3 99.1 100.4 100.5

83.6 99.9 100.0 100.0 96.2 20.5 96.4 82.8

100.0 100.0 100.0 100.0 96.5

728.0 754.5

96.2 20.5 96.4 82.8 82.9 99.5 99.8

97.6 22.4 100.1

Nov Feb

657.4 153.8 697.8

97.3 20.5

720.6 717.6 752.5 Jan

753.5 620.0 594.9 720.3

100.7

May Jun Jul Aug Sep Oct Dec Annual

BE-5 DOEL-3

Operator:

Contractor: FRAMACEC (FRAMACECO ( FRAMATOME-ACEC-COCKERILL )) ELECTRAB (ELECTRABEL M. V. NUCLEAIRE PRODUKTIE)

89.7%

89.3%

90.5%

Production Summary 2003

Energy Production: 7870.8 GW(e).h

Station Details

PWR

Energy Availability Factor:

Design Discharge Burnup:

1006.0 MW(e) 890.0 MW(e) 33000 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Type:

Maximum Net Capacity at the beginning of 2003:

Design Net Capacity:

EAF UCF

Mar Apr

100.0 100.0

6705.0 900.0 100.0 100.0 85.0 85.0 85.0 85.0 7807 89.1

1984 7074.0 900.0 89.5 94.8 89.5 87.3 89.5 87.3 8084 92.0

6.

7.

A.

B.

C.

D.

E.

H.

K.

8.

Date Hours GW(e).h Type Code

16 Feb 16.0 24.9

2003 Outages

Description UF4

BE-5 DOEL-3

A15 SCRAM DUE TO FAILURE PRESSURIZER SAFETY VALVE 07 Mar 576.0 580.3 PF

31 Mar 72.0 28.4 PP

12.3 UP

C REFUELING OUTAGE

C STARTUP AFTER REFUELING OUTAGE A31 MECHANICAL PROBLEM HP-TURBINE 26 May 208.0 210.1 PF D31 STOP FOR INSPECTION TURBINE 04 Apr 361.0

A42 BREAKER TRIP DUE TO MALFUNCTION OF SWITCH 24 KV (EARTHFAULT)

Full Outages, Analysis by Cause

04 Jun 32.0 32.7 UF

Outage Cause 2003 Hours Lost 1983 to 2003

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment failure 48 185

Refuelling without a maintenance 0

Inspection, maintenance or repair 576 713 2

combined with refuelling

Inspection, maintenance or repair 208 without refuelling

Testing of plant systems or components 1 1

Nuclear regulatory requirements 1

Load-following (frequency control, 12

reserve shutdown due to reduced energy demand)

Subtotal 784 48 0 714 201 0

Total 832 915

Equipment Related Full Outages, Analysis by System

System 2003

Hours Lost

1983 to 2003 Average Hours Lost Per Year

11. Reactor and Accessories 14

12. Reactor I&C Systems 1

13. Reactor Auxiliary Systems 1

15. Reactor Cooling Systems 16 35

16. Steam generation systems 64

17. Safety I&C Systems (excluding reactor I&C) 21

31. Turbine and auxiliaries 22

32. Feedwater and Main Steam System 10

41. Main Generator Systems 8

Total 48 181

42. Electrical Power Supply Systems 32 5

48

1. 2.

Unit Capability Factor (in %)

Cumul.

Energy GW(e).h

Performance for Full Years of Commercial Operation

5263 61.3

1986

Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Capacity

MW(e)

Annual Cumul. Annual

100.0 50.8 0.0

1985 981.0 0.0 0.0 76.0

Annual Cumul. Hours of (%) 745 hours

82.8%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

4282.1

9.5%

Total Off–line Time:

134698.2 GW(e).h 82.9%

08 Apr 1985

17.1%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.8%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

01 Jul 1985 01 Dec 1978 31 Mar 1985

2003 Monthly Performance Data

2003 Summary of Operation

0.5

UCLF replaces previously used UUF.

0.3 0.6 0.6 1.1 100.0 99.0 3.9 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

99.2 96.5 1.0 96.8 98.6 99.4 99.5

98.8 0.8 98.7 100.0 100.0 96.5 100.0 100.0

99.6 99.4 99.4 98.9 99.3

705.4 726.3

99.8 96.5 99.7 100.0 97.0 0.8 98.7

100.0 96.8 100.1

Nov Feb

660.7 703.3 703.4

99.8 96.0

709.4 699.1 729.1 Jan

726.1 726.8 684.2 7.2

99.1

May Jun Jul Aug Sep Oct Dec Annual

BE-7 DOEL-4

Operator:

Contractor: ACECOWEN (ACECOWEN ( ACEC-COCKERILL-WESTINGHOUSE )) ELECTRAB (ELECTRABEL M. V. NUCLEAIRE PRODUKTIE)

90.5%

90.2%

91.5%

Production Summary 2003

Energy Production: 7781.2 GW(e).h

Station Details

PWR

Energy Availability Factor:

Design Discharge Burnup:

985.0 MW(e) 1000.0 MW(e) 33000 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Type:

Maximum Net Capacity at the beginning of 2003:

Design Net Capacity:

EAF UCF

Mar Apr

98.7 100.0

7722.9 1006.0 90.6 90.6 90.6 90.6 87.6 87.6 7973 91.0

1987 6809.3 1006.0 81.4 86.0 77.0 83.8 77.3 82.5 7448 85.0

6.

7.

A.

B.

C.

D.

E.

K.

8.

Date Hours GW(e).h Type Code

21 Mar 22.0 23.1

2003 Outages

Description UF4 E31 SCRAM DURING VACUUM TEST

09 Jun 511.0 12.5 XP1 S STRETCH-OUT

712.1 PF

BE-7 DOEL-4

C REFUELING OUTAGE

30 Jul 81.0 17.9 PP C STARTUP AFTER REFUELING OUTAGE 30 Jun 722.0

H POWER LIMITATION DURING STARTUP DUE TO CHEMISTRY PROBLEM

Full Outages, Analysis by Cause

30 Jul 15.0 14.5 UP

Outage Cause 2003 Hours Lost 1987 to 2003

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment failure 333

Refuelling without a maintenance 1

Inspection, maintenance or repair 722 833

combined with refuelling

Inspection, maintenance or repair 36

without refuelling

Testing of plant systems or components 22 2

Load-following (frequency control, 64

reserve shutdown due to reduced energy demand)

871 398 0

Total 744 1269

Subtotal 722 22 0

Equipment Related Full Outages, Analysis by System

System 2003

Hours Lost

1987 to 2003 Average Hours Lost Per Year

11. Reactor and Accessories 0

14. Safety Systems 1

15. Reactor Cooling Systems 23

16. Steam generation systems 274

31. Turbine and auxiliaries 8

32. Feedwater and Main Steam System 15

33. Circulating Water System 0

41. Main Generator Systems 4

Total 0 327

42. Electrical Power Supply Systems 2

50

1. 2.

Unit Capability Factor (in %)

Cumul.

Energy GW(e).h

Performance for Full Years of Commercial Operation

7269 83.0

1983

Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Capacity

MW(e)

Annual Cumul. Annual

76.0 80.9 75.9

1982 870.0 80.9 94.5 80.9

Annual Cumul. Hours of (%) 209 hours

82.6%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

6164.8

4.9%

Total Off–line Time:

184539.9 GW(e).h 82.9%

07 Mar 1975

17.1%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.1%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

01 Oct 1975 01 Jun 1970 21 Feb 1975

2003 Monthly Performance Data

2003 Summary of Operation

4.5

UCLF replaces previously used UUF.

0.0 0.0 0.0 0.0 96.0 96.4 100.0 100.0 86.5 100.0 95.3 100.0 100.0 95.2 95.6 85.6 92.8 95.5 82.3 86.4 101.5 96.8

96.4 100.0 89.7 86.4 100.0 96.9 100.0 86.6

86.4 100.0 95.2 95.6 99.3

670.7 704.0 100.0 96.9 100.0 86.6 96.4 100.0 84.6

100.0 97.0 100.0

Nov Feb

654.3 695.8 687.4

101.2 97.2

588.8 598.5 727.7 Jan

724.1 612.8 642.6 683.8

101.2

May Jun Jul Aug Sep Oct Dec Annual

BE-3 TIHANGE-1

Operator:

Contractor: ACLF ((ACECOWEN - CREUSOT LOIRE - FRAMATOME)) ELECTRAB (ELECTRABEL M. V. NUCLEAIRE PRODUKTIE)

95.1%

94.8%

97.6%

Production Summary 2003

Energy Production: 7990.4 GW(e).h

Station Details

PWR

Energy Availability Factor:

Design Discharge Burnup:

962.0 MW(e) 870.0 MW(e) 37000 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Type:

Maximum Net Capacity at the beginning of 2003:

Design Net Capacity:

EAF UCF

Mar Apr

100.0 100.0

5843.0 870.0 76.6 92.3 76.6 76.1 76.7 76.0 7135 81.4

1984 6374.0 870.0 83.4 91.3 83.4 76.9 83.4 76.8 7774 88.5

82.1 7631 87.1

94.8 82.6

89.2 95.1 82.9

6.

7.

A.

C.

D.

G.

K.

L.

8.

Date Hours GW(e).h Type Code

26 Mar 22.0 21.6

2003 Outages

Description

UF4 A32 REACTOR SCRAM FOLLOWING SHUTDOWN OF FEEDWATER VALVE.

66.3 UP2

BE-3 TIHANGE-1

A31 UNPLANNED SHUTDOWN OF SOUTH GROUP (1/2 POWER) DUE TO INTERN LEAK ON A STEAM REHEATER.

06 May 153.0

14 May 30.0 29.7 UF4 06 Jun 26.0 25.0 UF4

A12 SCRAM DURING A REACTOR PROTECTION TEST.

A33 REACTOR SCRAM BY LOW LEVEL STEAM GENERATOR 1 DUE TO THE AUTOMATIC SHUTDOWN OF A CIRCULATING PUMP.

07 Aug 241.0 36.7 XP N33 POWER LIMITATION DU TO DRY WEATHER AND LACK OF COOLING WATER.

25 Aug 154.0 73.9 UP 01 Sep 97.0 93.9 UF4

33.5 UF4

A42 SHUTDOWN OF THE SOUTH GROUP (1/2 POWER) DUE TO DAMAGE ON 6KV CABLE.

A42 SCRAM DUE TO DAMAGE ON A MAIN TRANSFORMER.

A32 SCRAM BY ELECTRIC DEFECT ON A MAIN CONDENSATE PUMP.

07 Dec 68.0 31.5 UP A31 STOP OF NORTH GROUP (1/2 POWER) DUE TO INTERN LEAK ON STEAM REHEATER.

28 Nov 34.0

Full Outages, Analysis by Cause

Outage Cause 2003 Hours Lost 1975 to 2003

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment failure 209 92

Inspection, maintenance or repai 863

combined with refuelling

Inspection, maintenance or repai 14

without refuelling

Major back-fitting, refurbishment o 10

upgrading activities without refuelling

Load-following (frequency contro 5 98

reserve shutdown due to reduced energ demand)

Human factor related 1

877 98 108

Total 209 1083

Subtotal 0 209 0

Equipment Related Full Outages, Analysis by System

System 2003

Hours Lost

1975 to 2003 Average Hours Lost Per Year

12. Reactor I&C Systems 30 9

14. Safety Systems 2

15. Reactor Cooling Systems 31

16. Steam generation systems 16

31. Turbine and auxiliaries 14

32. Feedwater and Main Steam System 56 5

33. Circulating Water System 26 0

42. Electrical Power Supply Systems 97 9

Total 209 87

XX. Miscellaneous Systems 1

52

1. 2.

Unit Capability Factor (in %)

Cumul.

Energy GW(e).h

Performance for Full Years of Commercial Operation

0 0.0

1983

Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Capacity

MW(e)

Annual Cumul. Annual

0.0 0.0

1982 0.0 0.0

Annual Cumul. Hours of (%) 0.0

960.0 100.0

1171 hours

86.7%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

0.0

14.4%

Total Off–line Time:

146896.4 GW(e).h 86.9%

13 Oct 1982

13.1%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.7%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

01 Jul 1983 01 Apr 1976 05 Oct 1982

2003 Monthly Performance Data

2003 Summary of Operation

1.4

UCLF replaces previously used UUF.

0.1 0.3 0.0 0.0 84.7 98.2 91.9 100.0 100.0 58.1 6.8 100.0 58.1 6.8 100.0

83.4 95.3 89.8 93.1 99.4 57.5 6.8

96.5 91.2 100.0 100.0 100.0 100.0 100.0 83.6

99.9 57.8 6.8 100.0 100.5

49.0 763.2 99.8 99.9 99.4 82.7 96.0 91.1 94.2

100.0 99.9 100.0

Nov Feb

693.2 762.7 729.4

102.3 101.7

698.3 721.7 431.3 Jan

761.9 625.2 691.8 673.5

101.6

May Jun Jul Aug Sep Oct Dec Annual

BE-6 TIHANGE-2

Operator:

Contractor: FRAMACEC (FRAMACECO ( FRAMATOME-ACEC-COCKERILL )) ELECTRAB (ELECTRABEL M. V. NUCLEAIRE PRODUKTIE)

85.6%

86.1%

86.6%

Production Summary 2003

Energy Production: 7601.0 GW(e).h

Station Details

PWR

Energy Availability Factor:

Design Discharge Burnup:

1008.0 MW(e) 902.0 MW(e) 33700 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Type:

Maximum Net Capacity at the beginning of 2003:

Design Net Capacity:

EAF UCF

Mar Apr

99.3 100.0

5507.0 901.0 0.0 0.0 69.8 100.0 69.8 0.0 6373 72.8

1984 6856.0 901.0 86.4 86.4 86.4 86.4 86.6 86.6 7693 87.6

6.

7.

A.

B.

C.

D.

E.

G.

K.

8.

Date Hours GW(e).h Type Code 20 May 122.0 123.4

2003 Outages

Description PF

BE-6 TIHANGE-2

D15 PLANNED SHUT DOWN FOR INSPECTION OF PRIMARY PIPES.

10 Jun 13.0 13.8 UF2 25 Jun 93.0 11.4 UP2

A15 UNPLANNED SHUTDOWN TO CHECK A PRIMARY VALVE.

A32 UNPLANNED LOAD REDUCTION (100 MW) DUE TO AUTOMATIC SHUTDOWN OF A DRAINS TRANSFER PUMP.

23 Jul 53.0 66.4 UF2 A31 UNPLANNED SHUTDOWN DUE TO STEAM LEAK IN THE HP CASING OF THE TURBINE.

06 Aug 258.0 43.2 XP 19 Oct 951.0 958.9 PF 32.1 UF3

N33 POWER LIMITATION DUE TO DRY WEATHER AND LACK OF COOLING WATER.

C INSPECTION AND MAINTENANCE COMBINED WITH REFUELLING.

A41 EXTENSION OF THE PLANNED OUTAGE FOR REFUELLING (DUE TO ABNORMAL VIBRATION ON THE BRUSHLESS).

26 Nov 32.0

Full Outages, Analysis by Cause

Outage Cause 2003 Hours Lost 1983 to 2003

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment failure 98 113

Refuelling without a maintenance 17

Inspection, maintenance or repai 951 722

combined with refuelling

Inspection, maintenance or repai 122 99

without refuelling

Testing of plant systems or components 3

Major back-fitting, refurbishment o 19

upgrading activities without refuelling

Load-following (frequency contro 17 33

reserve shutdown due to reduced energ demand)

Subtotal 1073 98 0 838 166 19

Total 1171 1023

Equipment Related Full Outages, Analysis by System

System 2003

Hours Lost

1983 to 2003 Average Hours Lost Per Year

11. Reactor and Accessories 6

12. Reactor I&C Systems 7

14. Safety Systems 3

15. Reactor Cooling Systems 13 18

16. Steam generation systems 34

31. Turbine and auxiliaries 53 9

32. Feedwater and Main Steam System 10

41. Main Generator Systems 32 0

Total 98 87

42. Electrical Power Supply Systems 0

54

1. 2.

Unit Capability Factor (in %)

Cumul.

Energy GW(e).h

Performance for Full Years of Commercial Operation

7733 88.3

1987

Energy Availability

Factor (in %) Load Factor (in %) Annual Time Online Capacity

MW(e)

Annual Cumul. Annual

85.6 84.6 84.6

1986 1020.0 86.5 86.5 85.6

Annual Cumul. Hours of (%) 915 hours

87.1%

Cumulative Load Factor:

Cumulative Unit Capability Factor:

Year

7558.0

13.5%

Total Off–line Time:

139735.0 GW(e).h 87.3%

15 Jun 1985

12.7%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

77.8%

Historical Summary

Date of Commercial Operation:

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

01 Sep 1985 01 Nov 1978 05 Jun 1985

2003 Monthly Performance Data

2003 Summary of Operation

0.1

UCLF replaces previously used UUF.

0.4 0.6 0.2 1.0 44.8 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 41.6 97.8 95.7 90.8 97.9 99.4 99.9

100.0 98.7 100.0 99.8 100.0 100.0 33.4 41.5

99.4 99.4 99.8 99.0 24.4

730.1 751.7 98.5 86.7 24.4 41.4 99.6 98.0 92.4

100.0 99.9 30.1

Nov Feb

675.5 653.8 178.4

99.0 86.6

686.0 715.2 751.4 Jan

767.5 314.4 714.9 722.6

101.6

May Jun Jul Aug Sep Oct Dec Annual

BE-8 TIHANGE-3

Operator:

Contractor: ACECOWEN (ACECOWEN ( ACEC-COCKERILL-WESTINGHOUSE )) ELECTRAB (ELECTRABEL M. V. NUCLEAIRE PRODUKTIE)

86.5%

86.2%

89.6%

Production Summary 2003

Energy Production: 7661.5 GW(e).h

Station Details

PWR

Energy Availability Factor:

Design Discharge Burnup:

1015.0 MW(e) 1006.0 MW(e) 33000 MW.d/t

Load Factor:

Operating Factor:

Energy Unavailability Factor:

Energy Unavailability Factor: