• Aucun résultat trouvé

From piezometric monitoring to groundwater flooding risk management

N/A
N/A
Protected

Academic year: 2021

Partager "From piezometric monitoring to groundwater flooding risk management"

Copied!
12
0
0

Texte intégral

(1)

HAL Id: cea-02338849

https://hal-cea.archives-ouvertes.fr/cea-02338849

Submitted on 5 Mar 2020

HAL is a multi-disciplinary open access archive for the deposit and dissemination of sci-entific research documents, whether they are pub-lished or not. The documents may come from teaching and research institutions in France or abroad, or from public or private research centers.

L’archive ouverte pluridisciplinaire HAL, est destinée au dépôt et à la diffusion de documents scientifiques de niveau recherche, publiés ou non, émanant des établissements d’enseignement et de recherche français ou étrangers, des laboratoires publics ou privés.

From piezometric monitoring to groundwater flooding

risk management

S. Morilhat, J. Trincal

To cite this version:

S. Morilhat, J. Trincal. From piezometric monitoring to groundwater flooding risk management. GeoEnergy Days, Jul 2018, Pau, France. �cea-02338849�

(2)

FROM PIEZOMETRIC MONITORING TO

GROUNDWATER FLOODING RISK

MANAGEMENT

DTN/SMTA/LMTE

Sébastien MORILHAT

sebastien.morilhat@cea.fr

Julien TRINCAL

julien.trincal@cea.fr

CEA | 10 AVRIL 2012| PAGE 1

3

rd

- 5

th

July 2018

(3)

1. GENERAL PRESENTATION

8 JUIN 2018

o 16 000 employees

o 1 500 PhD students

o

4.2 M d’€ of annual budget

o 684 patents in 2017

Headquarters

Civil nuclear Center (DEN)

Military nuclear Center (DAM)

Cadarache

Surface : 16 km² (~ 9 km² fenced)

Facilities : 21 INB

1 INBS

~ 20 ICPE

Staff : 5000 people

(4)

• Operational studies and expertise:

o Flow modelling (substances transfer by groundwater)

o Groundwater flooding risk (for both fast and slow hydrodynamic aquifers)

o Liquefaction risks in case of earthquakes

o Sizing of drainage device

• Management of the piezometric park and hydrodynamic monitoring:

o Drilling

o Piezometer diagnostic, rehabilitation, fillers

o Piezometric data acquisition and managment

o Groundwater data control and verification

• R&D program in hydrogeology:

o Flow modelling developments

o Benchmark of hydrogeology simulation tools : MARTHE, MODFLOW-MT3D,

FEFLOW, HYTEC…

o Crisis tool design (GRENA, PERISCOP)

o Geochemistry studies (radionuclides behaviour)

LMTE : Reference laboratory in hydrogeology for all the CEA Nuclear Energy Division (DEN) facilities

1. GENERAL PRESENTATION

(5)

8 JUIN 2018

1 km

Alluvial deposits (Quaternary)

Sandstone (Miocene)

Limestone (Cretaceous)

BN02; BN04; PZ06

P luv iom étrie Niv ea u p iéz o mét riqu e (cot e NG F )

1. GENERAL PRESENTATION

1.3 SIMPLIFIED HYDROGEOLOGICAL CONTEXT OF THE CADARACHE CENTER

Quaternary

Cretaceous Miocene

(6)

+ 400 piezometers (180 with pressure sensor)

Quaternaire Miocène Crétacé

5 weather stations

(with remote transmission)

4 CPT stations (with remote transmission)

Large piezometric and weather data base

LMTE develop its own tools

PERISCOP

PIEZO

2. GROUNDWATER HYDRODYNAMIC MONITORING

(7)

Quick toolbar

Selection of graphic data

Setting data window

Formating data window

Export data window

Visualisation data window

8 JUIN 2018

Warning !

Data ok !

Chek performed !

Data ok !

1) Manual readings import

2) Raw fluctuation data import

between manual readings

3) Barometric corrections

4) Anomaly évaluation

5) Drift correction

2. GROUNDWATER HYDRODYNAMIC MONITORING

(8)

0 40 80 120 160 200 240 280 320 360 400 260 262 264 266 268 270 272 274 276 278 280 282 284 286 288 290 292 294 296 298 300 302 304 306 308 310 312 314 316 318 320 P luv iom étrie [ mm /jou rs] Co te piéz o mét riqu e [m NG F ]

Piezometer

Alert level

Facilitie

Raw rainfall

Effective rainfall

Groundwater level

T

0

T

1

Too short to anticipate !

2. GROUNDWATER HYDRODYNAMIC MONITORING

(9)

4.5 days forecast of the water table

MECK

(rain/level Model)

Weather data

T°c

Rain

Wind

PREVI-MISTRAU tool

4.5 days prediction

ALERT

Monitoring and simulation

Real time data

GPRS

Piezometric data

(in real time)

GPRS

2. GROUNDWATER HYDRODYNAMIC MONITORING

(10)

Measurements

Forecasts

Reconstitution

Update

4.5 days

Weather data forecasted

(ETP computation)

Max piezometric

level simulated

Rainfall data (mm)

Temperature data (°C)

Groundwater level (m NGF)

PREVI-MISTRAU tool

MECK tool

Real time

2. GROUNDWATER HYDRODYNAMIC MONITORING

(11)

0 40 80 120 160 200 240 280 320 360 400 260 262 264 266 268 270 272 274 276 278 280 282 284 286 288 290 292 294 296 298 300 302 304 306 308 310 312 314 316 318 320 P luv iom étrie [ mm /jou rs] Co te piéz o mét riqu e [m NG F ]

Piezometer

Alert level

Simulated warning level

Facilitie

T

0

– 2 days

T

0

– 3 days

PREVI-MISTRAU

Security

T

0

– 1 days

Emergency

pumps

Raw rainfall data

Effective rainfall data

Measured groudwater level

Simulated groudwater level

PERISCOP

2. GROUNDWATER HYDRODYNAMIC MONITORING

2.6 SCENARIO OF A EXTREME FLOOD BY GROUNDWATER RISING (

WITH PERISCOP)

(12)

DiEN DTN SMTA LMTE 8 JUIN 2018 | PAGE 11 CEA | 10 AVRIL 2012

Thank you for your attention !

Commissariat à l’énergie atomique et aux énergies alternatives Centre de Cadarache | DTN/DIR bt710 - 13108 Saint-Paul lez Durance

T. +33 (0)4.42.25.20.01 |F. +33 (0)4.42.25.78.78

Etablissement public à caractère industriel et commercial |

Références

Documents relatifs

In order to assist data scientists managing and understanding the different trans- formations applied to a relational database and create a tabular dataset serving as input to their

The presented method has been de- veloped for a specific and well-defined use case: inferring the level of the mobility traffic load on Hungarian high- ways from cell phone

To use Teal on data collected from students, we first train a model using an algorithm from the Knowledge Tracing family, then we use the learned parame- ters to calculate the

To tackle the complexity of memory design, we consider as essential to take into account memory accesses directly during the behavioral synthesis, assuming that a reasonable trade-

They are generally composed of a statistical part allowing the generation of the purely random aspect of the climate from distribution laws and determined

The tool developed in the Advanced Drilling Laboratory is used in a field experiment as a part of the research work and the data interpretation method is developed using the

L’exposition de trente huit (38) thalles du lichen, pour une durée de 30 jours, a permis de mesurer les concentrations du plomb et du Zinc atmosphériques en deux saison

Studying abstention on two recent French elections in the Parisian agglomeration, a linear regression is launched on three different levels of aggregation from the finest one