Sustainability of the Abia State
CDTI project,
Nigeria.
June 2003
World Health Organization
African Programme for Onchocerciasis Control
Assessment of the
REPORT
VOLUME 2 - INSTRUMENTS
Ekanem Ikpi Braide (Team Leader) Charles Franzen
Yisa A. Saka Sunday Isiyaku Obinna Onwujekwa
RECU
I 5
SEP. 2003A?ocrDtt
lnstrument 1: national/ State level
NOTE:
.
Thisinstrument
isfor
national level,which
coordinates programme imptementation in thecountry. lt
couldalso
be used (modifiedslighfly if
necessary)for
another levelof support
other than the main implementation level {districU LGA}. An example ofthis
level isthe'State' in
Nigeria.p,reviseasnecessary,andoverseeimplementationofCDTl
Policy.This
level also providessupport
tothe
level belowit:
.
Providing targetedtraining,
HSAM andmonitoring/ supervision.
- rzen, Obinna Onwujekwe and Sunday lsiyaku
Abbreviatio ns/ acronyms CDD
CDTI FLHF HSAM NGDO NOTF
community directed distributor
community directed treatment with lvermectin first line health facility
health education, sensitisation, advocacy, mobilisation
-
i.e. activities that are aimed at getting all the key players to participate wholeheartedly in the programmenon-govemmental development organisation national onchocerciasis task force
t
.t
Cfrecf wnether ttrere is a year planfor
onchocerciasiscontrol,
appearing as part of an overallwritten
planfor
the health service atthis
level.has bec:ame integrated into the health service, management is accepting ownerchip of the programme
-
both good for sustainability.Characteristics of
the indicator
Sourcesof information
a.
Onchocerciasis control should be integrated into the overall written year plan of the health service at this level. Note that this plan is usually not very detailed..
Examination of:*
Written plans: yearly, quarterly, monthly etc.*
Minutes of planning meetings..
lnteruiew wilh senior heatth senrice staff at this level.Describe the oresent situation:
There is an existing plan for onchocerciasis control activities and it is part of the overall annual plan of the department of public Health and Primary Health Carc and also of the State Ministry of Health services. There are also monthly plans for core CDTI aclivities at the project office.
All programmes submit plans, which are consolidated into an annual plan for the MoH. There is no direct evidence thai plinning is integrated, as this is not the system within the Ministry. All programmes submit plans, which are consolidated into an annual plan. The planning process is not integrated, as this is not the policy within the Ministry.
lf Olanninq and implementation of CDTI is not part of the overall vear plan:
.
Whv is this?Not Applicable
.
Which steps are beinq taken to improve the situation?Not Applicable
Sustainability evaluation instrument no.1
-
nationallevel-
March 2003 versionAnalysis
.
When writing therepft
you have to summarise:*
The evidence about how well fhis indicator is being achieved.*
Reasons for poor pefiormance (if any). sfeps being taken to improve it, and how f/,is is likely to affect sustainability..
Your overalljudgement: is this indicator for sustainability being achieved?Fully I Highly I Moderately I Slighily I
Not atail |
ruot appticable1.2
Gheck whether there is a year plancontaining
detailsof
allactivities
neededfor
CDTI atthis
level.This iMicator assesses whetherthe
poject
is functioning effectively, and whether managementaccess
ownerchip of the programme-
both good for sustainability.Gharacteristics of the
indicator
Sourcesof information
a. This more detailed plan should make provision for all key elements of onchocerciasis control: Mecitizan supply; targeted training ; ta rgeted HSAM; targeted monitoring/ supervision.
(Note that in the case of a country, which contains many projects, the NOTF plan will be less detaited).
The plan varies from yearto year, showing that it is targeted to the specific needs of each year.
Examination of written plans:
yearly, quarterly, monthly etc.
lnterview with senior health service and project staff at this level.
Sustainability evaluation instrument no.1
-
national level-
March 2003 version FindDescribe the plan for the oresent vear:
There is a written plan for CDTI activities at this level. The plan provides key elements of CDTI, is not a re-write of previous years plan and is targeted at specific activities. This plan exists within the overall Ministry of Health plan.
Though a plan exists with a bulk budget amount for all activities, it does not include activities that would need to be funded by the various partners. lt does not specify the costs to be bome by each partner neither does it indicates activities that would be funded post APOC. A supplementary plan for 2003 was produced just before the evaluation team anived.
Describe the plan for the orevious vear:
There was a similar plan for 2002, which varied with respect to line item and bulk budget amount.
lf the olan is incomolete. or simplv a re-write of previous plans:
.
WhY is this?Not Applicable
.
Which steps are beino taken to imorove the situation?Not Applicable
Analysis
t When writing the report you have to summarise:
*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability..
Your overall judgement: is this indicator for sustainability being achieved?FullylHighlylModeratelylstighty
Check whether
all
partnens (govemme overallplanning
process.indicator assesses the
gogrunme6
this is good for sustainabitity.
- if
each partner is about its role,Gharacteristics of
the indacator-
Sourcesof information
o.
/-\1l patruets snout(I ContnOute tO the foutine planning ofa
projeci.b.
Partnerc should be clear about their own roles, and those of the other parlners.'
Examination of:*
Plans: yearly, quarterly, monthly etc.*
Minutes of NOTF meetings..
lnterview with senior staff at this level (p@ect, govemment, relevant UN agencies, NGDOs etc.)The team was informed that the main partners
-
Ministry of Health (oncho coordinator, Assistantchief
planningofficer NocP/NGDo
of the Ministry and review meetings are also heid where state DPHIi'HC) and the tneNGbo panl
fpioj"cfAdministrator)aii
presented and adopted. Thereparl"iprte
in were the ptanning.however no minutes of these meetings.These plans are consolidated into the MoH ptans and sent to the state planning commission for approval. There was no evidence that participatory planning was done.
This is not the practice in the MOH
The Permanent secretary whg is strongly in.support of integration is planning to have a meeting with programme officers and supporting agencies to disluss intdjration.
When writing th
*
The evidence about how weil this indicator is being achieved.- ::::**lJpoor
performance (if anv), steps uein[ taren toi*pror"
it, and how this is likety to affecr. ,
Yorror"t lljudg",
1.4
Check whetherspecific
nfunding
is withdrawn.7l,s
assessesownerchip of it and can mobilise the resources rf needs. management has begun to take Characteristics of the
Members of NOTF h
programrne sustainability. Thi.s planning should include: identifying resource gaps, strategies to cut expenditure, and strategies to find oepenoante sources of resorrrc,es.
There should be written evidence that such pranning has taken prace.
There should be evidence that the ptans are being iuccessrutiylmpemented.
Examination of tfre written susiainability plans.
lnterviews with senior staff at this level (government, NGDO, NOTF etc.).
sustainability evaluation instrument no.1
-
nationallevel-
March 2003 versionDescribe the present situation
The state oncho coordinator has produced a plan for sustainability post
Apoc
that coverc the period of october 2003-
January 2004. This is yet to be agreed and finaliseo witn irri: MoH and the NGDo. There is no ptan for the period beyond..
Why is this?The Permanent secretary explained that the MoH is waiting for LGA chairmen to be appointed before sustainability plans are developed.
The state oncho coordinator is also waiting for the planning meeting.
: Thereisaplantoho1dmeetingswffieyareappointed.
When writing the
reportffi
*
The evidence about how weil this indicator is being achieved.*
Reasons for poor performance (if any), steps bein[ taken toi*proru
it, and how this is likely to affect.
Youroveralljrdn"
Check whether staff at
this
levelii
assesses whether programme is functioning of the
indicator
Staff members at this tev
level immediately berow them. Staff shoud nof supervise the FLHF.or community levels. ,Spot checks' rnay however be done from time to time.
Staff members at this level should have empowered staff members at the level below them to supervise activities at their own level, as well as levels further down.
*
Supervisory checklists, plans and reports.*
Visitor's books atallthe
levelsbelow this one.
*
Trip authorisations..
lnterviews with:*
Staff at this level.1
Staff at levels below this one.There are 5 SOCT members and each one is responsible for monitoring and supervision in 1 or 2 LGAs. A monthly workplan is prepared in which monitoring and supervision is inctuoeo ano canied out by the staff. Monitoring and supervisory checklist are used and reports written. Trrougn
wra;;pil;;;;;1;;i",
there were no reports of follow up activities.sustainability evaluation instrument no.1
-
national level-
tt"."nloog ,*oi*
Analysis
I When writing the report you have to summarise:
-
*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improvesustainability. it, and how this is likely to affect
'
Youroverall judgement: isthisindicatorfors@
Fully I xishty lffoderaCi, Slightly I
Not atail |
Not appticable2.2
Check whethermonitoring/ supervision is
being planned anCcarriio out
in an efficiena and indicator assesses whether thegogrartme
isCharacteristics of the
indicator
Sourcesof information
a.
one routine supervision visit per yearm@
(as a separate entity, or as a district).
b.
Supervision visits for cDTl should be integrated where appropriate with supervision of other programmes.c.
Resources for supervision (human, transport etc.) should be efficiently used:*
Using as few staff members as possible.*
Planning trips to cut down on distance travelled.*
Not spending unnecessarily many nights out etc.d.
Supervision visits should be thorough, using a checklist..
Examination of:*
Supervisory checklists, plans and reports.*
Visitor's books at the levelimmediately below this one.
.
lnterviews with:*
Staff at this tevel.*
Staff at the level. immecliately below this one.The SOCT monitor and supervise distribution based on planned activities. This is mainly at the LGA levelwith spot checks to communities. There is a minimum health package in the State and sometimei all programme officers work together- For example recently in Obingwa (UNICEF-assisted LGA) alt programme officers visited as a team and carry out separate interventions.
Occasionally there are integrated monitoring and supervision, but this is usually tied to the Oncho programme schedule because of the project vehicle. Other programme officers oflen scheduled their monitoring
tips
to coincide Oncho activities.Describe the situation the previous vear:
Same as above
Not Applicable
.
Which steps are beinq taken to imorove the situation?Not Applicable
When writing the report you nav-
to-uffiarise:
*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability evaluation instrurnent no_1-
nationallevel-
March 2003 version.
Examine the trend.
,Your
or"t"ll
2.3
Checkwhetherthe*
indicated by the
monitoring
systbm.management
a.
As soon as proUnsupervision visits, or from coverage data (i.e. areas with row
-
:ovgrage).the appropriate manager should deal with them.o.
uucn proDtems should usually be passed on to the appropriate managers at the next iever berow to dear with, with the necessary support _ thus empowering these persons.c.
Successes should be noted and reported, and appropriate feedback given.d.
There should be evidenceof
aclion taken based on recommendations in the reports of previous monitoring exercises.. Examinationofttre@
]
l].ans: yearty, quarterly, monthly etc.*
Minutes of staff/ planning meetings.*
Reports of previous monitoring exercises.*
Letters of commendation.*
Letters with information and feedback.
lnterviews with:*
Staff at this level.*
Staff at the levels below this one.. Whuj
writin] I[:r:9gl*
about how wefi this indicator is being achieved.. ffi:l*t tlJ;:or
performance (if anv), steps bein[ taren toimprove it, and how this is likety to affect Describe the presenGituationThe system in place for.solving problems is the normal administrative channel. lf there is a problem at the first instance the
socr
in-charge or firatr-cn ii
responsible for ensuring tne proolem is iesorveo. lf the problem is nott?S'r'rTJlis
reported to the state oncho cooniinator ano wneie'she cannot handte it, she passes*
on rhe where successes are recoded, they are noted and the officer or team is commended. For examptein
2001H'[YA':"ffif ,f,ff.Xfi.in
therapiutic coverase and the coordinatorwas nominateo to attend anNorF/Apoc
.
Whv is this?Not Appticable
Not Appticabte
.
,Yorr
or"rattjrOg
sustainability evaluation instrument no.1
-
nationallevel-
March 2003 version3.1
Check whethersufficien
stlstem at
this
level, in good time.This indicator asses
becoming more integrated into the fov6mment sysfem.
The Mectizan su
i::r".**t}:p
,!e.t|r"-.11"t9* routinety.useo rort[e
supprv oi o:tn", drugs.The system should be effecrive, uncomprieated and
eniciini.
This system should use dependable, sustainable resources for its operation. lt is.desirabte that the government should supply these
resou*r.
The system should supply sufficient Mectizan-for the needs or att fire projects concemed, ln good lime.
.
Examination of all Mectizan ordering and slock controldocumentation at this level.
.
lnterviews with staff at this level (govemment,once the state is notified of the availability of Mectizan@ it is collected by the state from the NGDg office in owerri and kept in the oncho coordinator's
offid
from where the LeAs are quickry informed to come and collect their allocations' Though this is considered as the project system antt is seen.. orp"norite
tor quick delivery to the LGAs, it is not within the drug supply system of the MoH.Same as above
The medicar store is not safe that is why the drugs are not stored there.
:.
None yetWhenwritingtneffi
+
The evidence about how weil this indicator is being achieved.-
ffj:ilt^tl#oor
performance (if any), steps oein! taten to improve ir, and how this is tikely to affecr.
What fras Ue.
,Yorr
orarrlljuOgt
-
nationallevel-
March 2003 version Sustai nability evaluationinsttmntao.
14.1
Check whether staff members atthis
level are being used appropriately as trainers.This indicator assesses whether the ffogramme is funclioning Characteristics of the
indicator
Sourcesof information
a.
Staff at this tevel should routinely only train staff at the level immediately below it.b.
Staff membes at this level should have empowered the levelimmediately below them to train lower levels.
Examination of training materials, plans/ programmes, reports:
*
At this level.*
At the levels below this one.lnterviews with:
*
Staff at this level (the trainers).*
Staff at the very next level below (the trainees).*
Staff at the districU LGA level.*
Staff at the FLHF level.The SOCT train the LOCTs on CDTI and they in tum the CDDs. The SOCT members are assigned topics during training. Training materials like reporting forms, flipcharts, posters and brochures were seen.
Describe the situation the vear before:
ln 2002 the situation was the same as above, but new LOCT members transfened from non-endemic areas were trained in addition to existing members.
lf staff members are not beinq used efficientlv as trainers:
.
Whv is this?Not Applicable
.
Which steps are beinq taken to improve the situation?Not Applicable
Analysis
.
When writing the report you have to summarise:*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability..
Examine the trend in the way in which staff are being used as trainers:'
Your overall judgement: is this indicator for sustainability being achieved?FullylHrghtvlModeratelylslignit
4.2
Check whethertraining
is being planned and carriedout
in anefficient
and integrated manner assesses whetherWrymfire
is fmctioningefficienily an
integrated manner.Characteristics of the
indicator
Sourcesof information
a- There should be an objective need for each episode of training.
This means there should be evidence that slaff to be trained lack knowledge and skills to perform the job, and the training should then focus on this deficiency only. Repeat traininq of alreadv skilled
.
Examination of training materials, planV prograrnrnes, reports:*
At this level.*
At the levels below this one.sustainability evaluation instrument no.1
-
nationallevel-
March 2003 versionb.
c.
staff should not happen.
lf circumstances permit training for CDTI should be integrated with othertraining, e.g. in in-service training programmes.
Resources for training (human, transport etc.) should be efficienily used:
*
Using as few staff members as possible.lnterviews with:
*
Staff at this level (the trainers).*
Staff at the very next level below (the trainees).*
Staff at the districU LGA level.*
Staff at the FLHF level.*
Using as little time as possible (without sacrificing quality)*
Choosing the most cost-effective site etc.Describe the oresent situation:
Staff have acquired and adequate training skills. Training is sometimes targeted at specific aspects of the CDTI.
There is minimal integration of CDTI with other trainings.
Describe the situation the vear before:
Training of LOCTs covered the whole CDTI processes because of the LOCTs were transfeped from other non- endemic areas.
lf tralnlno.ir not b"ino
*rri"d ort
in,n
"ffiri"nffi .
Whv is this?There is no clear policy on integrated training.
.
Which steps are being taken to improve the situation?None
Analysis
.
When writing the report you have to summar* *
The evidence Reasons for poor about performance how well this (if any), steps being taken indicator is being achieved.to improve it, and how this is likely to affect sustainability..
Examine the trend in training activities-
.
Your overall judgement: is this indicator foriu@
FullyIHighlylrvrooei
4.3Checkwhetherstaffatthislevelisplanninganocarry
Thi s i n dic ator assesses the yogramme is
are taking ownerchip of the programme. and effectively, whether managers
Characteristics of
the indicatoi
Sourcesof information
Staff members identify situations
information abouu cornmitment to cDTl, and undertake ac'tivities to inform and pesuade these persons.
HSAM activities are properly planned. They are only carried out where there is an objective need for them, and not as a matter of routine.
such activities should only be camed out at the national level, and at times at the level immediately below (but only when staff at that level asks for help).
There is evidence that these HSAM activities have been effective and have led to action.
b.
d.
.
Examination of HSAM plans/programmes and reports.
.
lnterviews with:*
Staff (programme and management) at this level.*
Civil authorities at this level.*
Staff and civil authorities at the next leveldown.sustainability evaluation instrument no.1
-
nationallevel-
March 2003 version10 Fi
Describe the present situation fin relation to efficiencv and outcome):
Briefings are canied out from time to time for decision makers and other staff in the Ministry to advocate, health educate, sensitize and mobilise them. For example when the cunent Permanent Secretary was appointed, HSAM was canied out and as a result she visited LGAs for advocacy and spot checks. ln other instances when planning division require clarification on issues HSAM is providecl.
Descilbe the situation the vear before (in relation to efficiencv and outcomeL
Advocacy visits were to LGA Chairmen and council members. The concept of CDTI is explained to them and support for CDTI activities solicited.
lf HSAM activities are not beinq canied out efficiently:
.
Whv is this?Not Applicable
.
Which steps are beinq taken to improve the situation?Not Applicable
Analysis
.
When writing the report you have to summarise:*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainabilitv..
Examine the trend in HSAM activities-
is it becoming more efficient and effective?.
Your overalljudgement: is this indicator for sustainability being achieved?Fully I Highly I Moderately I Slightly I
Not atall I tlot
applicablesffi4s
Describe the present situation:
There are no indications that support programmes are planned and executed in an integrated manner. There are however instances where SOCU memberc are involved in other programmes. For example, one member of the SOCU team is a health educator for CDTI and combines this with other diseases. The Data Manager also
data for other
5.1
Check whether thevarious
programmesupport activities
arebeing
planned and carriedout
in an efficiently andin an
integrated manner.Gharacteristics of
the indicator
Sourcesof information
a.
Staff combines two or more tasks on a single trip:x
Monitoring / supervision for CDTI (and other projects, if staff is responsible for them as well).*
Training for CDTI (and otherp0ects,
if staff is responsible for them as well).*
HSAM.*
Fetching records.*
Deliverino Mectizan..
Examination of documents: trip authorisations, log books, trip reports.
etc.lnterviews with:*
Staff from this level (managers, administrators, drivers etc.).*
Staff from the next level below.Sustainability evaluation instrument no.1
-
nationallevel-
March 2003 versionDescribe the situation the vear before:
Same as above
lf inteoration between support activities is poor:
.
Whv is this?There is no policy on integration
.
Which steos are beino taken to imorove the situation?Permanent Secretary intends to hold meetings of all programme managers to plan for integration Analysis
r When writing the report you have to summarise:
* *
The Reasons evidence for poor about performance (if how well this any), steps being taken indicator is being achieved.to improve it, andsustainability. how this is likely to affect
.
Examine the trend in the integration of aAiv.
Your overalljudgement: is this inOicatoFully l Highly
IF.:."::":".::.fn{.lqwgt{itr:ryqqlf4f
F:_fi fiffi
E*rt'.":::6.1Checkwhetherappropriateamountsarebudgetedforp
Characteristics of the
indicator
-
Sources
of information
b.
d.
The costs for each onchocerciasis control a should be clearly spelt out in a budget.
There is evidence of a const reduction/ containment slrategy (e.g. targeted training, HMAS and monitoring/ supervision; training conduCted
it thsnext
level below etc).Project managers should have a clear estimate of the funds that will be available to them for onchocerciasis control in the coming year, and should be able to justify this belief.
The total amount budgeted for in the year plan should fall within this estimated income.
.
Examination of the budget documents..
lnterviews with the health servicemanagers at this level.
F
The budget and estimated income:
.
For this year:The budgeting is canied out following the govemment's procedure. There is a budget line for onchocerciasis control activities, which is listed under subhead 12 in the recunent budget of the MoH. The budget estimate for 2003 is
Nl00,
000.00. There are olher CDTI activities, which are covered under other budget lines like travet,tllling
stationery etc. This is to ensure that the project has other budget lines from which funds can be sourced for CDTlactivities..
For the previous year:No amount was budgeted in 2002 for Onchocerciasis control activities, the State Govemment released N500, 5OO
from the 2001 budget.
lf budoetino has been inapprooriate:
.
Whv is this?ln 2002 there was no budget allocation for CDTI. Other sub heads within the MOH budget covered CDTI activities like training, travel, and stationery. This also applies to the 2003 budget.
.
Which steps are beino taken to imorove the situation?Advocacy will be intensified
sustainability evaluation instrument no.1
-
nationallevel-
March 2003 versionAnalysas
l2
.
When writing the report you have to summari*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability.'
Examine the trend in the budgeteoamouni@
'
Your overalljudgement: is this incticatorFullyIHightylrullo
Checkwhetherthegovernmentisbudgetinganddisbursingiu controlyearly,
and in good time.This iMicator assesses whether the
pr
,ownerchip of the gagramme and can mobilise
the resourC* it
needs.and wfietherthe govemment is acceptinig
Gharacteristics of the
indicator
Sourcesof information
a.
The relative budgetary contributions of tfreto onchocerciasis control should be clearly spelt out.
b.
The amount that the govemment has budgeted in one or more specific onchocerciasis control budget lines (e.9. cunent ancl capital) should be increasing yearly, as a proportion of total expenses. By the end of year 5 o.fAPoc
funding the bulk of onchocerciasis control eipenses at this level should be met from govemment funds; by the end of year 3 at least half of it.c.
The amounts actually disbursed from such budget lines shoutd be increasing yearly, as a proportion of total expenses. (Note that actual disbursement is more important than budgeting, and is a real sign of political commitment)..
Examination of:*
Budget documents (govemment, NGDO etc.)*
Records of disbursement and expenditure (ledgers, oderc, approvals for expenditure etc.).
lnterviews with managers at this level (govemment, NGDO etc.).Budgetary contributions of the govemment and other partners to Onchocerciasis control are not clearly spelt out.
The amount budgeted by govemment for CDTI has not increased yearly, as a proportion of total expenses. Close to the end of Year 5 of
Apoc
funding the bulk of expenses oncDil
is met nynebc.
The budget and disbursements from Govemment are as foilows
.
For this year: (2003)The sum of
Nl.5
million was requesled fnom the state govemment but there has been no approval yet. However the MoH has so far expended N93, 930 on spares, fueJ, and vehicle maintenance in 2003..
For the previous year: (2002)The sum of N76, 200 was used for stationery and entertainment during meeting and briefing. ApOC
.
Forthe year before that: (2001)The sum of N550, 500 was requested for the project in 2001. N370, 100 was used for coilection of capital equipments from WHO Lagos, allowances, repairs, fuel and other miscellaneous expenses.
From NGDO records contributions on APOC-WHO sustainability programme is given as follows for lmo Abia project
YEAR APOC NGDO
STATES1 $139,274.44
*$112,347.002 $87,940.53 $108,069.25
$5,244.083 $8s,032.0S $63,531.00
$1,093.s04 $69,779.s8 $197,202.26
$4,1s6.795 $26,275.63
$70,370.48TOTAL $408,000.00 $550,000.00
$10,500.0042o/o 56%
1.Zo/o* inclusive of capital equipment
COMMUNITIES
$2769.96.00 0.3olo
Sustainabilityevaluationinstrumentno.1-nationalffi
13 lf the government proportion of expenditure is not increasing proportionately:
'
Why is this?This is due to dwindling allocations from the govemment. E.g. in 2002 there were no budget allocations for CDTI.
Other sub heads within the MoH budget covered activities like training, travel, etc.
.
Which steps are being taken to improve the situation?A supplementary budget has been prepared and submitted to the govemment but there has not been any response
Analysis
.
When writing the report you have to summarise:*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability..
Examine the trend in govemment budgeting and disbursements:.
Your overall judgement: is this indicator for sustainability being achieved?FuilylHishtylModeraretylstishily[ffi
6.3
Check whether in case of adeficit
between estimated costs and the amountprovided
by theprovision is
being madeto
meet it.fhis
commitment
to
ownerch i p.assesses whether the goventment is to mobilise the resources rf needg as well as rfs
Characteristics of
the indicator
Sourcesof information
a.
Project management at this level should be aware of the shortfall, if one exists, and of its size.b.
Project management should have specific and realistic plans to bridge the shortfall.c.
lf it is planned that non-governrnent souroes of funding are to be used after APOC funding ends, written commitment for this should have been obtained at the highest level in these donor organisations. Projects in Year 3 of APOC funding should also be well on the way to achieving such commitment..
lnspection of:*
The budget documents.(Govemment, NGDO etc.).
*
Records of expenditure (ledgers, orders, approvals for expenditure etc.).*
Letters of agreement..
lnterviews with managers at this level (govemment, NGDO etc.).There are no plans to source for any dependable funding post APOC. lt is however believed that budget shortfalls or deficit could be bridged from other sub heads within the state Ministry of Health budget and the 50/o the MOH keeps from all revenue it generates.
Describe the situation the orevious vear:
Deficit bridged from other subheads in Ministry budget
lf the shortfall cannot be met:
'
Whv is this?There has been no plans for the post APOC period
.
Which steps are beino taken to imnrove the situation?The DPH/PHC is considering approaching the supporting NGDO to support some core activities
Sustainability evaluation inslrument no.1
-
nationallevel-
March 2003 versiont4
Analvsis
.
When writing the report you have to summarise:*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability..
Examine the trend in shortfall and how it is to be supplemented:.
Your overall judgement: is this indicator for sustainability being achieved?Futty I Highly I Moderately I Slightly I
Not atall I
Not applicable6.4
Check whetherfunds
disbursedfor
onchocerciasiscontrol
fromthe
budget attbis
level areCharacteristics of
the indicator
Sourcesof information
The budget holder should be using a control system with the following elements:
*
Approval of each item of expenditure.*
Allocation of expenditure against specific budget headings.*
Regular calculation of residual amounts under budget headings.All the funds released yearly should be spent as budgeted.
a.
b.
.
lnspection of:*
The budget documents (government, NGDO etc.).*
Financial control records (ledgers, orders, approvals for expenditure etc.).,
lnterviews with managers at this level (qovemment. NGDO etc.).Describe the oresent situation:
.
Approval of expenditure:The State Oncho coordinator requests for funds through the DPH/PHC. Funds from the State for Onchocerciasis control activities are approved by the Permanent Secretary and go through the accounting system in the ministry before it is released. However there were no clear guidelines as to how this is done because there is no project accountant for the State. ln February an APOC account was opened in the State and funds transfened. The APOC financial is due to end in September 2003.
.
Allocation of expenditure:Funds are allocated based on budget sub heads and is limited to available funds
.
Regular insight into budget line balances:Expenditures made with reference balances lf the funds are not beinq well manaqed:
.
Whv is this?Not Applicable
.
Which steps are beino taken to imorove the situation?Not Applicable
Analysis
.
When writing the report you have to summarise:*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability..
Your overall judgement: is this indicator for sustainability being achieved?Fully I Highly I Moderately I Slightly I
Not atall I
Not applicable Sustainability evaluation instrument no.1-
nationallevel-
March 2003 version7.1
Check if adequate and appropriatetransport
and other material resources are availablefor
necessary CDTIactivities
atthis
level.l5
Thi s indicator assesses
renources
it
needs. ffogramme is functioning effectively, and whether it is able to mobilise theCharacteristics of the
indicator
Sourcesof information
a.
There are adequate numbers of functional vehicles available for necessary CDTI activities.b.
The vehicles are appropriate for the purpose they are intended to fulfil-
tough but not luxurious.c.
There is sufficient office equipment available, in working order:computers, printers, photocopiers
-
also stationery and materials for training and HSAM.d.
The running costs for these vehicles and equipment are met from dependable. sustainable sources..
lnspection of:*
Each vehicle in the pool, each piece of equipment: its source; its functional status.*
Training materials and stationery stocks..
lnterviews with managers at this level (govemment, NGDO s.).Describe the availability/ suitabilitv/ functionality of the present vehicles. equioment and materials. considerino tfie work still to be done in the coming 5-10 vears:
Available CDTI vehicle will not last for the next 10 years. lt will require replacement in the next two yearc. Computer and accessories will need to be replaced in the next two years.
Adequacy for CDTI
tasks*
Adequacy for CDTI tasks**
* APOC, MoH, NGDO, other
*
/s rf working? ls there enough ot it for the job? lsit
suitable for the iob?
lf transport. equipment and materials are inadequate and/or funded from sources which are not dependable
.
Whv is this?.
Which steps are beino taken to imorove the situation?Analysis
I When writing the report you have to summarise:
*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability..
Your overall judgement: is this indicator for sustainability being achieved?FullylHighlylModeratelylS
sustainability evaluation instrument no.1
-
nationallevel-
March 2003 version7.2
Check iftransport
and other material resources in use atthis
level are adequately andappropriatelv
maintained.This indicator assesses whether the programme
ii@
Characteristics of the
indicator
Sourcesof information
b.
There is a routine maintenance schedule for each vehicte, wtrictr is adhered to and recorded. This incluctes weekly driver maintenance, scheduled garage servicing, and replacement of wom tyres.
Equipment such as photocopiers and generators is regularly maintained according to a schedule, and this is recorded.
staff
members have ways of coping when vehicles break down or are not available, so that CDTI activities are not disrupted.The costs for vehicte and equipment maintenance and repair are met by from dependable/ sustainable sources.
Repairs to vehicles and eguipment are rapidly and efficienflv done.
d.
e.
.
lnspection of:*
Vehicle and equipment maintenance schedules.*
Vehicle and equipmentmaintenance records.
'
lnterviews with managers at this level(govemment, NGDO etc.), driversRoutine maintenance is canied out for the vehicle and other equipment, but there is no record of maintenance (no maintenance book).
The MOH and NGDO provide vehicle when needed to ensure that CDTI activities are not disrupted.
The MOH has been providing funds for vehicle maintenance
Analysis
I When writing the report you have to summarise:
*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability..
Your overall judgement: is this indicator forsust@
Fully I Hishly I Moderatety
I
7.3
Check if thetranspgrt
available atthis
level is appropriatety managed and used.Gharacteristics of
the indicator
Sourcesof information
b.
Transport is used at this level, and to undertake
sup@
next level. lt should not be used for cDTl implementation activities at lower levels.
The use of transport is properly controlled:
*
Trips made forcDTl
purposes should be properly authorised in writing by the relevant official.*
Each trip undertaken for CDTI purposes should be recoded in a logbook.*
Trip authorities and log book entries and regular.ly reconciled, and action taken if there are discrepancies..
lnspection of vehicle control documents:*
Copies of tripauthorities (also noting destination and purpose).
*
Log books..
lnterviews with managers at this level (govemment, NGDO etc.).sustainability evaluation instrument no.1
-
nationallevel-
March 2003 versiont7
Describe the present situation:
Transport is adequately utilised for CDTI activities at this level. Authorizations for the use of the vehicle are however verbal based on approved workplan. There is no abuse of vehicle usage
lf the transoort is not being well managed:
.
Whv is this?Not Appticabte
.
Which steps are beino taken to imorove the situation?Not Applicable Analysis
I When writing the report you have to summarise:
*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), sleps being taken to improve it, and how this is likely to affect sustainabiliU.'
Your overalljudgement: is this indicator for sustainability being achieveOZFullylHighlylModeratelyls
7
.4
Check if there are appropriate andrcalistic
plans for the replacement oftransport
and other materia resources, when APOCsupport
comesto
an end.This indicator assesses whetherthe Wogrcmme
manage@
to find resources for it.
the gogramme, and are able
Gharacteristics of the
indicator
Sourcesof information
Management should know that replacements will be needed berore tne eno of the programme, and have specific, realistic plans to meet the need at that time.
It should be planned that the govemment will:
*
Provide replacements for vehicles and equipmeni.*
Maintain existing vehicles and equipment.*
Provide stationery and materials fortraining and HSAM.lf it is planned that replacement will be from non-govemment sources, written commitment for this should have been obtained at the highest level in these donor organisations (end of Year 5), or negotiations should have started (end of Year 3).
.
lnspection of letters of agreement..
lnterviews with:*
Programme managercat this level
(govemment, NGDO etc.).
*
High-ranking Ministry officials and other decision makers at this level.Vehicle is functional and will serve the proiect only for the next 1-5 years. The MoH is committed to replacing the vehicle and equipment when necessary. Replacement from other sources have not been explored
lf the plans for replacino vehicles. equioment and materials are unsatisfactorv:
.
Whv is this?The issue of APOC pulling out afier five years not seriousty considered and therefore no plan made for reptacing capital equipment.
.
Which steps are being taken to improve the situation?None yet Analysis
.
When writing the report you have to summarise:*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, sustainability.and how this is likely to affect
'
Your overall judgement: is this indicator for sustainability neingrechieved 2Fully I Hishly I Moderately
I
sustainability evaluation inslrument no.1
-
nationallevel-
March 2003 versionl8
8.1
Check whether staff atthis
level isskilled,
knowledgeable and committed, regardingthe
implementationof
GDTIin
its areaof
operation.This indicator assesses whether the gogramme has been able to develop sufficient resources for itself.
Characteristics of the
indicator
Sourcesof information
a.
The number of staff members in the govemment health service at this level should be appropriate to the task in hand: not too many or too few.b.
Team members should have enough knowledge and skill to undertake all the key CDTI activities themselves, without help:* Planning *
Data management*
Reportwriting *
Computer skills*
Training andHSAM *
Mectizan ordering/ distribrution*
Monitoring/supervisionc.
There should be evidence that the team is committed to the success of the programme (from the evidence of the partners, as well as workers at the next level below: from written reoorts and timetables)..
lnspection of:Staff files.
*
Training reports and timetables..
lnterviews with*
Managers and other staff at this level (government, NGDO etc.).*
Staff at the next level below.lf the staff at this level lack skills and commitment:
.
Whv is this?Not Applicable
.
Which steps are being taken to improve the situation?Not Applicable Analysis
When writing the report you have to summarise:
*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and sustainabilitv.I
how this is likely to affect
.
Your overalljudgement: is this indicator for sustainability being achieved?Fully I Highly I Moderately I Stigntty I
Not atall I
Not appticable.
Number of persors wJto show that they are committed to thier work, and perform it wetl : No. of persons quatifred inthis area
No. of persons competent enough to
8.2
Check whether staff atthis
level is stable, and whetherprovision
is madefor
passing on CDTIskills
when a trained person moves away.This indicator assesses whether the gogramme has been are able to maintain r'fs resources.
Characteristics of the
indicator
Sourcesof information
Staff at this level should remain in one post for at least five years.
There should be immediate orientation (in CDTI) of new, unskilled project staff members.
a.
b.
.
lnspec-tion of staff files..
The table in 8.1..
lnterviews with managers and other staff at this level.Sustainability evaluation instrument no.1
-
nationallevel-
March 2003 versiont9
Describe the oresent situation:
Members of Staff are stable and would remain in their posts. Some of them have been in the programme for 13 years. There plans to train more people on CDTI in case the cunent members of staff are moved.
Describe the situation two vears aqo:
Same as above
Describe the situation when APOC fundinq started beino oiven:
There were 5 staff members then and they have demonstrated commitment to the project because of the motivation and job satisfac{ion.
lf the staff is not stable. and new staff is not beinq trained:
.
WhY is this?Not Applicable
.
Which steps are beinq taken to improve the situation?Not Applicable
Analysis
.
When writing the report you have to summarise:*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability..
What is the trend in the number and quality of staff?.
Your overall judgement: is this indicator for suslainability being achieved?Fully I Highly I Moderately I Slightly I
Not atall I
Not applicable9.1
Check whetherall projects
in thecountry
(ordistricts
in the project) have a satisfactory therapeutic assesses whether the programmeis
effec-tive-
if the rates are poor the project is clearly struggling,Gharacteristics of
the indicator
Sourcesof information
a.
Alt projects in the country (or districts/ LGAs in a project) should have a therapeutic coverage rate of 650/o or higher (the denominator being the total population).b.
These rates should be stable or increasino..
lnspection of distribution reports and statistics at project level,forthe
past 3 years..
lnterviews with staff at:*
This level.*
The next levelbelow.ind
The theraoeutic coveraqe situation in the proiects (or districts/ LGAs):
.
At the last distribution:2003 distribution still going on. Final reports were not available
.
The vear before:Sustainability evaluation instrument no.1
-
nationallevel-
March 2003 versionSustainability evaluation instrument no.1
-
nationallevel-
March 2003 version 20 ln 2002 therapeutic coverage was 640lo - 81o/o. However it was discovered that therapeutic coverage in some communities was calculated using eligible population as against total population..
The vear before that:ln 2001 coverage was 610lo - Elo/o
lf the therapeutic coveraoe rates are ooor:
.
Whv is this?Not Applicable
.
Which steps are being taken to improve the situation? (lf such steps are already being taken that is good for sustainability)Not Applicable
Analysis
.
When writing the report you have to summarise the reasons for poor performance (if any); steps being taken to improve it: and how this is likelv to affect sustainabilitv..
What is the trend in therapeutic coverage?.
Your overall iudoement: is this indicator of sustainabilitv beino achieved?Fully (100o/o of projects have a therapeutic coverage rate 2650/o - stable
or increasino)
Highly (90- 99o/o of proiects)
Moderately (80-89o/o of
oroiects)
Slightly
(/0-
79o/o of oroiects)
Negligibly (<70o/o of oroiects)
lnstrument 2: districu LGA level
NOTE:
This instrument evaluates
the
level,which
actually takesresponsibility for
implementing CDTIin
its areaof
operations.lt
isthat
level where health services are planned and provided. We aregoing to
referto
it as thedistricu
LGA level.The level below
this
one is the one where the health centres/clinics/
dispensaries are located. We are goingto
referto this
level asthe
'FLHF'(front
line healthfacility)
level.Geographical name of this districu LGA: lkwuano, Ukwa East and Umunneochi LGAs Project: Abia State CDTI Proiect, Nigeria
ffikpiBraide,YisaSaka,charlesFranzen,obinnaonwujekweandSundaylsiyaku
Date: 17 -20 June 2003
Abbreviations/ acronyms CDD
CDTI FLHF HSAM NGDO
*,'.".."."-:.'..
community directed distributor
community directed treatment with ivermectin first line health facility
health education, sensitisation, advocacy, mobilisation
-
i.e. activities that are aimed at getting all the key playerc to participate wholeheartedly in the programmenon-govemmental development organisation
hsq&lqffrqffig{#ffiI;:::
' ttre miin function
ofthis
level isto
tafteresponsibility for
the implementationof
CDTIin
its areaof
operation..
However itsfunction
isstill
largely oneof
supportof the
FLHF level:*
Providing targetedtraining,
HSAM andmonitoringl supervision.
*
Arrangingfor
an adequatesupply of
Mectizan..
The FLHF level is the onethat
isfor workinq with
the CDDs in the communities.1.1
Check whether the year planfor
CDTI appears as part of an overallwritten
plan for theactivities of
the districU LGA.
management is beginningto accept ownerchip of the gogramme
-
both good for sustainability.Th i s i nd icator assesses the programme has become
integnted
into the heafth service, whetherGharacteristics of the
indicator
Sourcesof information
a.
CDT!should be integrated into the overallwritten plan (showing that staff at this level consider CDTI to be part of their yearly routine, like any other programme).b.
The plan should make provision forallkey
activities: Mectizan supply; targeted training; targeted HSAM, taqeted monitoring/supervision.
c.
Year plans should be drawn up in a participatory way.d.
Year plans must take into account community requirements for the timino of distribution..
lnspection of:*
The written year plans.*
Minutes of planning meetings..
lnterviews with:*
Staff at this level: managers and others (pharmacist, transport officer etc.).*
Staff at FLHF level.Sustainability evaluation instrument no. 2
-
districll LGA level-
March 2003 version2 Findin
Describe the present situation:
The comprehensive plan for CDTI activities is separate and is included as part of disease control or miscellaneous (subhead 10 & 13) under the PHC in the overall LGA plan. The CDTI plans do not in most cases have budgets estimates for CDTi activities. The plans are not drawn up in a participatory manner.
.
Whv is this?No explanation
.
Which steps are beino taken to improve the situation?Steps are being taken by the PHC coordinators to include CDTI control in the overall plan Analysis
.
When writing the report you have to summarise:*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainabilitv..
Your overalljudgement: is this indicator for sustainability being achieved?Futly I Highly I Moderately I Slightly I
Not atall I
Not applicable2.1
Check whether the districU LGA health management team is takingfull responsibility for
the imolementationof
CDTI atthis
level.indicator assesses whether management is takrng
Gharacteristics of the
indicator
Sourcesof information
a.
lt should be the rnanagernent tearn at this level, and not higher levels/ NGDO leadership, which is initiating the key CDT|ac{ivities: planning, targeted monitoring/ supervision, targeted training and HSAM, Mectizan ordering/ distribution.b.
There should be a focal person for CDTI activities..
lnspection of year plans..
lnterviews with:*
Management team at this level.*
Person responsible for CDTI at this level.*
Staff at the project level*
NGDO leadership.*
Staff at FLHF level.Descilbe the present situation:
The LGA Oncho Coordinator is in charge of activities at this level and initiates activities. There are 3 LOCT members who assisl the coodinator.
lf leadership at this level is nottakinq the initiative in implementino CDTI:
.
Why is this?Not Applicable
.
Which steps are beinq taken to imorove the situation?Not Applicable
Analysis
.
When writing the report you have to summarise:*
The evidence about how well this indicator is being achieved.*
Reasons for poor performance (if any), steps being taken to improve it, and how this is likely to affect sustainability..
Your overall judgement: is this indicator for sustainability being achieved?FullylHightylModeratetylSrignit
Sustainability evaluation instrument no. 2
-
districU LGA level-
March 2003 versionindicator a s sesses whether gogramme become more integratea
into@
f u n ctio ning effectively.
3.1
Check whether routine dataconceming
Gharacteristics of the
i-dicator
Sourcesof information
a. tne
reporting process should take place within thegovemment sysiem, not using other resources. Data being transmitted includes: coverage reports; Mectizan statistics;
training reports ; dislribution reports; financia t reports.
.
Examination of reports and report forms..
lnterviews with:*
Managerc and staff at this level.*
Staff at the project level.Reporting is done on a monthly basis and sent to the State oncho Coordinator. This is however not within govemment system, i.e. through the monitoring and evaluation unit.
.
Why is this?This was not the initialsystem adopted by the programme
.
Which steps are beinq taken to improve the situation?None
Whenwritingtnerep@
*
The evidence about how welr this indicator is being achieved.*
Reasons for poor performance (if any), steps bein! taken to improve it, and how this is likely to affect.
Your overall judgement: is th3'2 gg!y!!y 9l?.:[yHP'jl,:.s.:tgpiore
atthe
FLHF tevet in an integrated manner.indicator assesses
whe@
Characteristics of
the
staff at this level shourd routinery onty
sufffi
community level. 'spot checks' may however be done from time to time.
Although one routine supervision visit per FLHF per year is necessary, supervision visits should focus more on FLHFs where there are proven problems
-
each supervision visit must be justified.supervision visits for
cDTl
should be integrated with supervision of other programmes (e.9. through a shared checklist). Transport for supervisory visits should be shared with other programmes..
Examination of:*
Supervisorychecklists, plans, itineraries and reports.*
Visitor's books at FLHFlevel.
.
lnterviews with:*
Staff at this level.*
Staff at the FLHF level.supervision is canied out al this level to the FLHF with spot checks to communities. These trips are in most cases routine without definite schedules or targeted to solve problems. There are no suoervisorv checktists or wriiten
and no deliberate efforts are
rre no supervisory checklists or written made to inteorate.
Sustainability evaluation instrument no. 2