• Aucun résultat trouvé

Determiner la Valeur de la Position, et la Valeur du Chiffre de Unités a Centaines (Format SI) (A)

N/A
N/A
Protected

Academic year: 2021

Partager "Determiner la Valeur de la Position, et la Valeur du Chiffre de Unités a Centaines (Format SI) (A)"

Copied!
2
0
0

Texte intégral

(1)

Position et Valeur du Chiffre (A)

Nom:

Date:

Determinez la valeur de la position, et la valeur de chaque chiffre souligné.

1.

480

2.

392

3.

705

4.

555

5.

600

6.

158

7.

854

8.

772

9.

971

10.

301

11.

918

12.

901

13.

825

14.

293

15.

313

16.

143

17.

933

18.

205

19.

623

20.

558

MathsLibres.com

(2)

Position et Valeur du Chiffre (A) Réponses

Nom:

Date:

Determinez la valeur de la position, et la valeur de chaque chiffre souligné.

1.

480

Position: 1; Valeur: 0 2.

392

Position: 100; Valeur: 300 3.

705

Position: 1; Valeur: 5 4.

555

Position: 1; Valeur: 5 5.

600

Position: 1; Valeur: 0 6.

158

Position: 100; Valeur: 100 7.

854

Position: 1; Valeur: 4 8.

772

Position: 10; Valeur: 70 9.

971

Position: 100; Valeur: 900 10.

301

Position: 100; Valeur: 300 11.

918

Position: 1; Valeur: 8 12.

901

Position: 100; Valeur: 900 13.

825

Position: 100; Valeur: 800 14.

293

Position: 10; Valeur: 90 15.

313

Position: 10; Valeur: 10 16.

143

Position: 10; Valeur: 40 17.

933

Position: 100; Valeur: 900 18.

205

Position: 10; Valeur: 0 19.

623

Position: 10; Valeur: 20 20.

558

Position: 10; Valeur: 50 MathsLibres.com

Références

Documents relatifs

The humidity profiles derived using the radiosonde measured temperature match fairly well with the humidity as measured by the radiosonde, and the discrep- ancies (if any) in

The borehole was logged for the equilibrium temperature only once, in October 2006, but contrary to other Slovenian boreholes mentioned above, its greater depth allowed an inversion

using both methods with such a relatively large maximum allowed shift (17 grid points) yields to an unphysical comparison between forecast an observed fields.. A larger do- main over

Dst and Dst*, characteristic of the equatorial magnetic ®eld, responded to the 1314 (‹5) UT southward turning prior to the ®rst observed substorm expansion phase onset, suggesting

[“The nor- mal, thickness, and speed of the dusk magnetopause current layer from Cluster Electric Field and Wave experiment mea- surements of spacecraft potential”,

A short-period normal mode wave with the period 11.6 hours would modulate the tide with a period of 14 days and the zonal wave number of the modulation would be 2 (east-.. Merzlyakov

Although verification of rainfall using contiguous rain area analysis is an effective approach to verify systematic errors in quantitative precipitation forecasts (McBride and

are electron particle data from the plasma electron and cur- rent experiment (PEACE), spacecraft potential, electric field measurements from the field and wave experiment (EFW),