Proposal for Study of Gravel Mat Foundations for Eskimo Cabins at E-3 (The New Aklavik Townsite)

N/A
N/A
Protected

Academic year: 2021

Partager "Proposal for Study of Gravel Mat Foundations for Eskimo Cabins at E-3 (The New Aklavik Townsite)"

Copied!
6
0
0

Texte intégral

(1)

Publisher’s version / Version de l'éditeur:

Technical Note (National Research Council of Canada. Division of Building Research), 1956-07-01

READ THESE TERMS AND CONDITIONS CAREFULLY BEFORE USING THIS WEBSITE.

https://nrc-publications.canada.ca/eng/copyright

Vous avez des questions? Nous pouvons vous aider. Pour communiquer directement avec un auteur, consultez la première page de la revue dans laquelle son article a été publié afin de trouver ses coordonnées. Si vous n’arrivez pas à les repérer, communiquez avec nous à PublicationsArchive-ArchivesPublications@nrc-cnrc.gc.ca.

Questions? Contact the NRC Publications Archive team at

PublicationsArchive-ArchivesPublications@nrc-cnrc.gc.ca. If you wish to email the authors directly, please see the first page of the publication for their contact information.

Archives des publications du CNRC

For the publisher’s version, please access the DOI link below./ Pour consulter la version de l’éditeur, utilisez le lien DOI ci-dessous.

https://doi.org/10.4224/20359024

Access and use of this website and the material on it are subject to the Terms and Conditions set forth at

Proposal for Study of Gravel Mat Foundations for Eskimo Cabins at E-3 (The New Aklavik Townsite)

Dickens, H. B.

https://publications-cnrc.canada.ca/fra/droits

L’accès à ce site Web et l’utilisation de son contenu sont assujettis aux conditions présentées dans le site LISEZ CES CONDITIONS ATTENTIVEMENT AVANT D’UTILISER CE SITE WEB.

NRC Publications Record / Notice d'Archives des publications de CNRC: https://nrc-publications.canada.ca/eng/view/object/?id=22e3c257-cef4-4467-850e-bf15b68f8afb https://publications-cnrc.canada.ca/fra/voir/objet/?id=22e3c257-cef4-4467-850e-bf15b68f8afb

(2)

SUBJECT Proposal ror Study

or

Gravel Mat Foundations for Eskimo Cabins at E-3 (the New Aklavik Townsite).

R.F.L.-No.

212

July 1956.

FOR INTERNAL USE

APPROVED BY

NOTE

CHECKED BY

DIVISION OF BUILDING RESEARCH

'f

E

C

1HI N ][

CAlL

Aklavik Subcommittee of A.-C.N.D.

H.B. Dickens

NATIONAL RESEARCH COUNCIL OF CANADA

At the 19th meeting of the Aklavik Subcommittee of A.C.N.D.

held on June 1, 1956, the question

or

foundations for Eskimo

cabins in the unserviced area was discussed. It was noted that

pile foundations had previously been recommended at a liaison

meeting between the Department

or

Northern Affairs and National

Resources and the Department of Public Works on February 2, 1956 and that, on the basis of present information, pile foundations

appeared to be the most satisfactory for these cabins. It was

also noted that 90 of these cabins were to be built this year and were to be placed on temporary gravel mat foundations because the

pile foundations would not be ready until next year. These cabins

vlere to be moved to t heir permanent pile roundations in 1957.

The Division's proposal was tabled at the 20th meeting of

the Aklavik Subcommittee held on June 15, 1956. This proposal was

designed specifically for the short-term study which the Committee

had in mind. The number of buildings and observations recommended

were kept to a minimum, consistent with obtaining useful results

in the time available. It was explained to the Committee that a

study of such limited duration as one year cannot be expected to

be conclusive. At best it can serve only as a guide to the

problems that may arise. The Committee accepted the Division's

The Committee discussed the possible economies

or

using gravel

mat foundations as permanent foundations in place of piles, and suggested that the question of foundations for Eskimo cabins in

the unserviced area should be reviewed. It was further suggested

that the cabins to be constructed on temporary mat foundations this year be 'treated as an experimental installation and their

performance observed during the coming winter. The information

obtained in this way would be used as a guide in deciding next year whether gravel mat foundations would be acceptable as

permanent supports for these cabins. It was agreed that the

Division of Building Research of the National Research Council Hould submit recommendations concerning the details of this project.

NOT FOR PUBLICATION

PREPARED BY

(3)

pass it to the Department of Public Works for action. The following is the Divisionis proposal •.

Statement of Problem

Experience with the gfavel mat type of surface foundation in permafrost areas suggests that they do not preserve the thermal regime and hence cause the eventual lowering of permafrost under a building. This thawing of the permafrost may introduce problems of settlement and of drainage. The severity of these problems

varies with such factors as soil conditions, method of construction of both buildings and foundations, as well as the heating and

operation of the building.

On the basis of soil data already obtained by the Foundation of Canada Engineering Corporation Limited, it appears that in all areas of E=3 some settlement is likely to result if the permafrost is thawed. The object of the proposed study is to indicate the possible extent of this settlement under cabins constructed on gravel mat foundations and the effect of such settlement on the performance of the building. This can best be done by observing any changes in the level of the permafrost beneath each building and the extent of differential movement of the structure itself.

There are several possible variables in a study of this kind. These include:

1) Ground cover, 2) Soil conditions,

3) Thickness of gravel mat,

4)

Height of air space,

5)

Insulation value of floor construction.

Since the study will last only one year it is desirable to keep these variables to a minimum. In addition, owing to the work involved in making the necessary observations on the performance of the buildings, the number of buildings under controlled study should be as small as practicable.

Proposal

It is recommended that:

a) All buildings be built in an area of vegetative cover and this natural cover be preserved;

b) The buildings be located in an area where the soil conditions approximate the conditions in the unserviced area;

c) The floors of all buildings be constructed to meet the minimum requirements for the proposed building code for Aklavik. This

(4)

will mean that the floors be insulated with 2 inches of mineral

wool or its equivalents It is also strongly recommended that

the underside of the floor joists be sheathed with i-inch plywood to obtain wind tightness and to protect, the insulation;

. d) The buildings subject to controlled study be constructed in five groups of four buildings each with variations only in the thickness of gravel mat and in the height of air space as follows:

( i ) Group I: No gravel mat - the mud sill foundations to be placed directly on the ground;

No air space - no attempt to provide a ventilated air space between the underside of the building and the surface of the ground.

(ii) Group II: Two feet of gravel mat;

No air space.

(iii) Group III: Four feet gravel mat;

No air space.

(iv) Group IV: One foot of gravel mat;

18- to RTセゥョ」ィ air space - this space between

the underside of the building and the surface of the gravel mat to be well ventilated to the outside.

(v) Group V: Two feet of gravel mat;

18- to 24-inch air space - well ventilated. e) The remaining 70 buildings to be constructed this year not to

be used as a controlled study. If these are to be placed in a

temporary location they should be built as economically as possible consistent with reasonable protection of the thermal

regimes These could be constructed using a one-foot gravel

mat and a ventilated air space beneath the floor of

approximate-ly 18 inchess If these buildings are to be placed in their

permanent location this year then the gravel mat should be at

least 2 feet thick. The performance of these buildings should

be observed during the winter and reported on at the end of the period with particular reference to snow accumulation and

blocking of the air space beneath the buildingss Observations

To obtain information on changes in the level of permafrost and on the differential movement of buildings that may occur in a

(5)

period of one year the controlled study should begin and end at a

time when the active layer is at its greatest depth. This means

from August

1956

to August

1957.

The procedure recommended is as

follows:

(i) Prior to placing the gravel mat the area under each building

should be rodded in August

1956

to determine the general

level of the permafrost table. Five probings will probably

be sUfficient, one at each corner of the building and one in the middle,

(ii) The profile of the ground surface at each building location should be determined relative to some fixed known reference point,

(iii)The gravel mat should be placed to the required thickness and each building should be set to a known elevation

depending upon the height of air space,

(iv) In August of

1957

these measurements should be repeated.

The readings obtained by the above means will indicate the changes that have occurred in both the permafrost and each

building during the period of one year's operation. The general

condition of each building and each site should also be reported at that time.

It is almost essential that some record be kept of the use

and occupancy of these 20 test buildings. This should include at

a minimum details of the periods during which these bUildings are

occupied and heated. It would also be useful, personnel permitting,

to have records of temperatures, to which the buildings are heated

and of snow accumulations around the buildings. Temperature and

humidity readings taken in cabins occupied by Eskimo families would also be of value as they would prOVide data on their living habits.

General Comments

It should be noted that this controlled study of these 20 buildings will depend upon:

1) Their construction being scheduled in late August,or early

September;

2) The availability of personnel to establish ground elevations

just prior to placing the gravel mat and to make a level survey of the buildings shortly after they are up;

3) The availability of personnel to complete the necessary

rodding of the area to establish the elevation of permafrost; and

(6)

5

4)

General supervision of these buildings during the winter

months being provided to ensure that where air spaces are

used エィ・セ are not intentionally blocked by the occupants

to conserve heat.

The installation of thermocouples has not been proposed because a large number of these would be required to establish the location of the permafrost table and it is felt that this

could be achieved with less effort by rodding. It is recommended

that a detaileq analysis of soil conditions not be attempted until the year's study is completed and some indication of the performance of these buildings obtained.

Références

Documents relatifs

To strongly suppress the contribution from the high cross section background processes, the signal topol- ogy is enforced requiring events with a reconstructed invariant mass of

Determine the symmetric bilinear form φ associated to the quadratic form q and write its matrix A with respect to the canonical basis4. Determine the kernel of the bilinear

This monotone inclusion for a general convex function F is associated to the optimization Algorithm FISTA of Beck et al... The ideas presented in this note are an adaptation to

Note that we do not give the proof of Theorem 2 since it follows from the proof of Theorem 1 exactly as in the case of the semilinear heat equation 6 treated in [9].. We give

TSOs and NEMOs responsible for establishing the terms and conditions or methodologies in accordance with this Regulation shall publish them on the internet after approval

If an object present in a message has a mnt-by attribute, and the respective mntner has auth attribute(s) with PGPKEY-<id> value, the database software checks whether

To communicate the completion of an output response (4), the user process could issue an explicit system call; or, the Terminal Handler could assume completion when the

If the value in the document is more than one higher than the local version number, the local version number is set to the value in the new document, the document is