Schedulability Analysis at Early Design Stages with MARTE

N/A
N/A
Protected

Academic year: 2021

Partager "Schedulability Analysis at Early Design Stages with MARTE"

Copied!
19
0
0

Texte intégral

Loading

Figure

Fig. 6.1: Optimum process overview
Fig. 6.2: Stereotype specialization principle Table 6.1: Optimum restriction of MARTE subset MARTE4Optimum stereotype UML extensions
Table 6.2: Conformance on sets Conformance
Table 6.4: Conformance on task execution characterization Formal Model Optimum Model
+4

Références

Documents relatifs

This method was implemented as a prototype toolset that includes five contributions: definition of real-time property specific execution semantics for UML-MARTE architecture

It has been proven in Ramanathan (1999) that when the jobs of a given task are classified according to (3), then the pattern of mandatory jobs will be κ-periodic. An accelerable

Gaspard (DaRT team 2009, Gamatié et al 2008b) is a MDE based MARTE compliant SoC co- design framework dedicated specifically towards parallel hardware and software; and it allows to

These models are used to verify probabilistic temporal properties related to the dependability of real-time systems.. Keywords: Real-time systems, UML, dependability

Of course, the work presented here still preliminary, but it will be improved with the implementation of the following list of features, which are already implemented or

Unité de recherche INRIA Rennes : IRISA, Campus universitaire de Beaulieu - 35042 Rennes Cedex (France) Unité de recherche INRIA Rhône-Alpes : 655, avenue de l’Europe - 38334

Given a Mixed Criticality probabilistic real-time system with task executions described with pWCET, what is the optimal schedule when the system enters high criticality mode.. Given

Unit´e de recherche INRIA Lorraine, Technop ˆole de Nancy-Brabois, Campus scientifique, 615 rue du Jardin Botanique, BP 101, 54600 VILLERS L ` ES NANCY. Unit´e de recherche