ECONOMIC COMMISSION FOR AFRICA
4 January 1978
INTRODUCTION OF THE ARABIC LANGUAGE AS THE THIRD WORKING LANGUAGE OF THE ECONOMIC COMMISSION FOR AFRICA
Following the decision "by the Third Conference of Ministers
(12th Session) of the Economic Commission for Africa, held in February 1975 in Nairobi and supported by the Economic and Social Council of the United Nations, the General Assembly approved in its Hesolution 319O(XXVIIl) the Arabic language as the third working language of the Commission. (Resolu tions annexed). Unfortunately, because of the severe constraints imposed by lack of resources in the United Nations system only a very limited number of posts have been provided to the Commission for the implementation of this
decision by the General Assembly.
At the Fourth Meeting of the Conference of Ministers of ECA
(13th Session) held at Kinshasa from 24 February to 3 March 1977, the dele
gations of the Arab member countries of the ECA expressed their concern at the fact that the documents for the conference were not available in the Arabic language. The Executive Secretary of the ECA promised to do his best to see that the Arabic language would be effectively used as a third working language of the Commission by the time the Fifth Conference of Ministers is
convened in 1979.
After thorough evaluation of this problem, it has been realized that in the light of the budgetary situation, it would >e very difficult for ECA to fully introduce the Arabic language as a third working language of ECA unless extra-budgetary resources are received to supplement the meagre re sources which ECA has for this purpose from the UN regular budget. For 1978/
1979 biennal budget period the ECA has been provided from the UN regular budget with two posts of Arabic translators and two posts of Arabic typists, which fall far short of the requirements for full and effective performance
of the Translation Unit of the ECA Secretariat. The attached working sheet
with the detailed calculations of the requirements for staffing of the Arabia
Translation Unit, as well as for purchase of dictionaries, reference books,
dictaphones, typewriters and the initial cost for travel of the newly recruited
candidates would amount to US$ 786,050 for 1978. The requirements for 1979 and
1980 will be US$ 618 ,700 each.- 2 -
It would be advisable to recuirt the Arabic staff at least for three years fixed-term period in order to ensure continuity and a high stan dard of candidates for translators as well as for general service personnel.
The total amount of money required for the full staffing of the Arabic Trans lation Unit and its equipment would thus equal to US$ 2,130,975,
In addition the Executive Secretary was asked by the Fourth Confe rence of Ministers (l3th Session) in Resolution 294(ZIIl) to provide Language Training cervices and facilities for the staff of ECA so that they can be pro ficient in the Arabic language in addition to the French and English langua ges. To equip and staff ECA language laboratory properly for this will cost an additional sum of US$ 75,700 per annum. This adds up to US$ 227,100 for the three year period 1978-80.
The total resources to be covered from the extra-budgetary sources will equal to 786,0^0.
ESTIMATEDCOSTFORESTABLISHMENTWITHINECASECRETARIATOFARABUTRANSLATIONUNIT
EstimatedCostofPostsinUSt TotalCostperYearinUS$ ProvidedfromUNRegularbud-]getinUS$ TobecoveredfromExtra-budgetaryResourcesinUS$
;I.StaffReviser(P-4)
S Translators (P-3) Six
sTypistR(GS)FourReferenceAssistant(GS)OnesPro-fReaders(GS)TwoSub-total-15postsCommorstaffcost(40f>)
Sub-total
"II.EstimatedcottofreproductionofECAtDocumentsinArabic
HIX,EstimatedcoetoftwoArabicInterpretersServicingECAMeetings
12Meetingsperyear
oIV.AcquisitionofDictionaries,ReferenceBocksandEquipment(a)DictionariesandReferenceBooksi(b)Dictaphones-twelve(c)Typewriters-four 33,00025,6005,0005,0005,000
Sub-total
VDInitialTravel
11candidate&x8,000
VI.ArabiclanguegeTrainingTeachers(tvo)1080h/yearat10US/hEquipmentardmaterials
Sub-total 66,000153,60020,0005,00010,000254,600101,840356,440298,86084,00010,0004,0002,70016,70088,000
10,80095,000
949,800 51,20010,00061,20024,80086,00040,000
5,0001,0001,350
7,350
5,40025,000
163,750 66jOOO102,40010,0005,00010,000
193,400
77,040
270,440
258,860
84,000
5,0003,0001,350
9,350
88,000
5,40070,000
786,050
For1978
For1979($786,©50less$9,350forDictionariesetc...,-less$88,000forinitialtravel,andless$70,000forequipment)
ForI960
Sub-Total
(Plus10focontingencies,includinginflationaryfactors)
TCTA1forthreeyears 786,050618,700618,700
2,023,450
202,345
2,225,795