HAL Id: halshs-00371842

https://halshs.archives-ouvertes.fr/halshs-00371842

Submitted on 30 Mar 2009

HAL is a multi-disciplinary open access archive for the deposit and dissemination of sci-entific research documents, whether they are pub-lished or not. The documents may come from teaching and research institutions in France or abroad, or from public or private research centers.

L’archive ouverte pluridisciplinaire HAL, est destinée au dépôt et à la diffusion de documents scientifiques de niveau recherche, publiés ou non, émanant des établissements d’enseignement et de recherche français ou étrangers, des laboratoires publics ou privés.

A game theoretic model for generation capacity

adequacy in electricity markets: A comparison between

investment incentive mechanisms

Haikel Khalfallah

To cite this version:

(2)

GATE

Groupe d’Analyse et de Théorie

Économique

UMR 5824 du CNRS

DOCUMENTS DE TRAVAIL - WORKING PAPERS

W.P. 09-05

A game theoretic model for generation capacity adequacy in

electricity markets: A comparison between investment

incentive mechanisms

Khalfallah Mohamed Haikel

Mars 2009

GATE Groupe d’Analyse et de Théorie Économique

UMR 5824 du CNRS

93 chemin des Mouilles – 69130 Écully – France B.P. 167 – 69131 Écully Cedex

Tél. +33 (0)4 72 86 60 60 – Fax +33 (0)4 72 86 60 90 Messagerie électronique gate@gate.cnrs.fr

(3)

1

A game theoretic model for generation capacity adequacy in electricity markets: A comparison between investment incentive mechanisms

Khalfallah Mohamed Haikel

Khalfallah@gate.cnrs.fr

Abstract

In this paper we study the problem of long-term capacity adequacy in electricity markets. We implement a dynamic model in which operators compete for investment and electricity production under imperfect Cournot competition. The main aim of this work is to compare three investment incentive mechanisms: reliability options, forward capacity market - which are both market-based - and capacity payments. Apart from the oligopoly case, we also analyze collusion and monopoly cases. Stochastic dynamic programming is used to deal with the stochastic environment of the market (future demand) and mixed complementarity problem formulation is employed to find a solution to this game. The main finding of this study is that market-based mechanisms would be the most cost-efficient mechanism for assuring long-term system adequacy and encouraging earlier and adequate new investments in the system. Moreover, generators would exert market power when introducing capacity payments. Finally, compared with a Cournot oligopoly, collusion and monopolistic situations lead to more installed capacities with market-based mechanisms and increase end-users’ payments.

Keywords: Electricity markets, capacity adequacy, dynamic programming, Nash-Cournot

model, mixed complementarity problem

(4)

2 Résumé

Ce papier traite du problème de l'adéquation des capacités de production d’électricité à la demande d'électricité sur le long terme. Sur la base d'un modèle dynamique concurrentiel à la Cournot, nous étudions une situation dans laquelle les producteurs décident à la fois du niveau de production à court terme et de leurs investissements en capacité de génération sur le long terme. L’objectif essentiel de ce travail est de comparer l’efficacité de trois mécanismes d'incitation à l'investissement : les options de fiabilité, le marché de capacité à terme et le paiement de capacité. En plus de la configuration oligopolistique, nous étudions la situation de monopole et celle de la collusion des producteurs. La programmation dynamique stochastique est utilisée afin de mieux prendre en compte l’incertitude sur le marché. La solution du jeu est obtenue en résolvant un problème de complémentarité mixte. Les résultats montrent que l’implémentation du mécanisme des options de fiabilités ou celui du marché des capacités à terme est efficace en terme de coût de production et qu'elle encourage les producteurs à effectuer des investissements adéquats pour répondre efficacement à l’évolution incertaine de la demande future. Par ailleurs, l'exercice du pouvoir de marché est atténué avec ces deux mécanismes contrairement à ce qui est obtenu pour le mécanisme de paiement de capacités. Finalement, le niveau des capacités installées augmentent avec le mécanisme des options de fiabilités et avec celui du marché des capacités à terme quand on passe d'une situation d'oligopole à une situation de collusion ou de monopole. Ce résultat se traduit par une augmentation du prix payé par le consommateur final.

Mots clefs: marché d’électricité, adéquation des capacités de génération, programmation

dynamique, problème de complémentarité mixte, modèle Nash-Cournot

(5)

3 1. Introduction

Policymakers in many countries agree that competitive wholesale electricity markets do not present adequate incentives to stimulate sufficient investment in new generation

capacity. The energy market itself1 without any additional mechanism fails to guarantee

generation adequacy. These concerns have increased owing to the uncertain growth of electricity demand, price volatility, which makes new investment very risky, and the potential for market power abuse, especially in a peaking period. Some studies suggest that these factors, coupled with serious market design flaws and other circumstances, caused the Californian crisis in the summer of 2000, viewed as the first failure of deregulation. It was characterized by extraordinarily high spot market prices, the rise of total energy costs at up to ten times the historical level, shortages and subsequent rolling blackouts within the state.

Apart from these factors in the failure of the energy-only market, another real problem which reduces market signals for attracting adequate investment in generation is the ‘missing money’ problem. In fact, a competitive electricity price cannot, by itself, cover both the operating costs and the capital investment cost required to attract new investment in long-lived generation capacity to support a least-cost generation supply portfolio consistent with mandatory reliability criteria. This would induce high and inefficient prices through price manipulations in the market as well as an imbalance between the steadily growing demand for power and the existing generation capacity.

The discussion above illustrates why there are many proponents of designing electricity markets with investment incentive mechanisms, in addition to the spot market, which could be a solution to ensure long-term reliability of electricity markets. Several mechanisms have either been applied or seriously considered at international level. They are classified in two categories. The first one is the non-market-based mechanisms. The most

important is the capacity payment mechanism.2 It has frequently been used to compensate

generators for improving reliability. These payments are important revenue sources for generating units that are scheduled to provide available capacity but would probably not be called to produce electricity and that would not recover investment costs when only receiving energy payments from competitive generation markets. In peak periods, generators are given an additional capacity payment based on their availability (whether they get dispatched or not) or based on generated energy as an addition to the energy market clearing price. The problem with this mechanism is that no commitment is imposed on generators and therefore the level of adequacy cannot be guaranteed. It is also very difficult to find a convincing way of determining the efficient capacity price. Another non-market-based mechanism is the purchase of peaking units by the system operator. This approach is meant to avoid generation units that provide capacity at the margin deciding to leave the market when their revenues are too volatile or when they are insufficient to cover at least their total operating cost. It is,

1 Known as the ‘energy-only market’, which requires the elimination of any price cap, it allows full participation

of demand and leaves each market agent to experience fully the volatility of market prices.

2 It has been implemented in the UK (before the new trading arrangements (NETA)), Italy, Spain and several

(6)

4

however, strongly interventionist and may interfere with the proper functioning of the market (see Arriaga (2001)).

The second category is the market-based mechanisms. In a forward capacity market model, generation adequacy would be ensured by giving consumers the opportunity to ensure ex ante the capacities’ availability from generators. Every year, end-users can contract enough firm generation capacity above their peak load to cover their expected peak load plus a regulated margin. This leads to the creation of a forward capacity market, in addition to the energy market, that allows trading generators’ capacities. The forward capacity markets provide generators with the opportunity to collect extra revenue for their generation capacities and provide incentives for the building of reserves beyond those that meet the short-term needs for ancillary services. They are committed to have the contracted capacity available whenever they are required to produce it, otherwise they pay a penalty charge. Joskow (2007) suggests that when generators are called to offer their contracted capacity in the spot market, they are also required to refund the consumers any infra-marginal rent corresponding to the difference between the spot price and the marginal cost of a peaking unit of reference. In other words, energy prices are capped by a regulated reference price.

The second market-based mechanism is the reliability options scheme.3 It has the same

objective as the forward capacity market, in which the availability of generation has to be bought ex ante, but it differs in its organisation. Here, the system operator (SO) proposes a system of options to protect electricity buyers against excessive prices in the spot market. Energy producers are rewarded for the insurance they provide and punished when they fail to supply the energy for which they have contracted. The options are marketed by the SO through yearly uniform price auctions. The SO determines in advance the strike price for the auction, which acts as a price cap for demand, and the time horizon during which the generator is required to generate the committed energy at any time. The SO will exercise his/her option whenever the energy price exceeds the strike price. Generators submit one or several bids to the auction, expressing quantity (the committed energy) and price (the required premium). Finally, the market is cleared as a simple auction and all of the accepted bids receive the premium that was solicited by the marginal bid. The call is represented as follows: consumers pay a premium to acquire the right to buy energy at the exercise price rather than the spot price and generators receive the premium for abandoning the right to sell at the spot price and for committing to sell at the exercise price whenever consumers exercise the option. On the one hand, this method stabilizes the income of generators, who exchange an uncertain and volatile income (the energy price) for a certain one (the premium from the auction); on the other hand, it represents a market-based mechanism to hedge demand against the occurrence of high market prices (since the energy price is capped by the strike price).

The intention of the market-based mechanisms is to guarantee a regulated generation adequacy level for the system by defining specific commitment of generation and assuring that generators will be available when the system needs them because of scarcity of supply. They also give generators the opportunity to collect extra stable income in the market,

3

(7)

5

enabling them to cover both the operating costs and the capital investment cost required for new investment.

In this paper, we try to compare three investment incentive mechanisms, capacity payment, forward capacity market and reliability options in terms of long-term capacity adequacy in an uncertain environment, particularly since, to our knowledge, there has been almost no previous research on how the mechanisms can deal with this problem in the long term. In other words, do such instruments solve the problem of supply adequacy and at what cost? By long-term system adequacy we mean the existence of enough installed available capacity of the appropriate characteristics to meet the estimated peak demand with efficient costs. In the light of our assumptions about the structure, we also show why the energy-only market would not give good signals for new capacity additions, and why the implementation of an additional incentive mechanism is needed to guarantee the availability of all generators, to attract new investments and to reduce market power.

In the literature, the problem of long-term system reliability has been largely studied in qualitative terms. Arriaga [2001] studies the different mechanisms discussed above and indicates the weak and strong points of each one. Similar approaches to the reliability options scheme proposed by Vazquez and colleagues [2002] have also been described by Oren [2004] and Papalexopoulos [2004]. Joskow [2007] discusses three real problems with competitive wholesale electricity markets that reduce the attractiveness of investments in new generation capacity: the lower level of competitive electricity prices (the ‘missing money’ problem), their volatility and the regulatory uncertainty in market rules and market institutions. He suggests that the introduction of a forward capacity market, in addition to the spot market, would be a solution to attract adequate investment in generation capacity. Doorman [2003] proposes a capacity subscription model where consumers have the freedom to choose their level of reliability through the amount of maximum capacity to which they subscribe.

(8)

6

mechanisms with a regulated volume of generation capacity are more robust than those that use economic incentives for stimulating investments. It is therefore argued that capacity obligations are the most attractive.

The work presented in this paper adds to the literature on modelling the long-term effect of investment incentive mechanisms. Differently from the literature where imperfect competition is disregarded, we apply the Nash-Cournot model of oligopoly behaviour to formulate a three-stage model that may characterise three decisions in an imperfect competitive regime: expansion planning, generation decisions and commitment decisions (commitment to produce when applying the market-based mechanisms).

In the energy area, a considerable volume of literature deals with imperfect competition. Only investment and production decisions, however, are considered. Pineau and

Murto [2003] use a sample-path adapted open-loop information structure4 to present a

dynamic stochastic oligopoly model that describes production and investment in a deregulated electricity market with uncertainty of future demand. Variational inequality and mixed complementarity problem formulations are employed to find a solution. Their model offers a helpful description of the dynamic production-investment problem. Gilotte and colleagues [2005] extend their paper by increasing uncertainty and including the possibility of the phasing-out of existing capacities. In addition, other contributions (Von der Fehr and Harbord [1997], Murphy and Smeers [2005]) study investments in new generation capacities with theoretical two-stage oligopoly models, but the description of the electricity market is essentially static. Ventosa and colleagues [2002], from the mixed complementarity problem and the mathematical program with equilibrium constraints formulations, developed a Cournot model and a Stackelberg model of expansion planning where future demand is certain. Chuang and colleagues [2003] use a Cournot model that analyses the generation expansion planning in a competitive electricity industry. Based on the iterative search procedure, results show a greater industry expansion and system reliability under Cournot competition than under centralized expansion planning. Contrary to this literature, a mechanism stage is added in our work in order to study how the investment and production could change if an incentive mechanism is implemented.

Mixed complementarity problem formulations are largely used to find a solution to a Nash-Cournot model (Ventosa et al. [2002], Gabriel et al. [2005]). It takes advantage of the competitors’ simultaneous decisions in a Nash-Cournot model and its complementarity structure. In our study, we have two continuous decisions (commitment and production) and one discrete decision (investment). Each sub-model at the continuous decision stage is described as a mixed complementarity problem in order to represent the equilibrium properly. A sequential Nash-Cournot solution, however, is used to find the optimal investment choice.

Contrary to the literature discussed above, a closed-loop solution5 is used in this paper

to represent the interaction between all competitors’ decisions. The method suggests that the

4 The method supposes that all decisions are simultaneous.

5

(9)

7

three decisions are not decided at the same time. Investment decisions are made in the first stage, commitment decisions in the second stage and operating decisions in the third stage. The game is then truly a three-stage game where competition takes place in three steps. The generators play against each other when making investments, knowing how they will play against each other when participating in the mechanism and when operating their plants. This is also the case in the mechanism stage; they know their optimal future production decisions depend on their actual commitment decisions. Owing to the presence of uncertainty of future

demand, stochastic dynamic programming is used to solve the overall problem.6

The main finding of this study is that market-based mechanisms would be the most cost-efficient way of ensuring long-term system adequacy and encouraging earlier and adequate new investments in the system. Moreover, generators would exert market power with non-market based mechanisms. Finally, compared with Cournot competition, cartel and monopolistic situations lead to more installed capacities with market-based mechanisms and increasing end-user payments.

The paper is organized as follows. Section 2 presents the assumptions used in our models. Section 3 outlines the proposed dynamic model formulations. Section 4 presents the empirical analysis and the results from the application of our model to the French electricity sector. Section 5 summarizes and concludes.

2 Modeling Assumptions

In this section, we describe the different assumptions made to formulate our Nash-Cournot models of oligopoly behavior.

Four models are developed to represent each investment incentive mechanism in an uncertain environment. The general assumptions apply to all the models, but there are specific assumptions that describe the functioning of each mechanism.

2.1 General assumptions

All the models consider a hyperannual scope divided into different time segments: periods and seasons. Periods correspond to years and seasons correspond to the following demand levels: off peak, shoulder and peak seasons.

We also consider the uncertainty of future demand. We assume that this uncertainty may be represented by a finite set of scenarios. Therefore, the stochastic evolution of the demand can be modeled by means of a Markov chain. Each branch represents a different realization of demand with its associated probability (see Figure 1).

6 Dynamic programming is an approach developed to solve sequential, or multi-stage, decision problems. It

(10)

8

1 2 3 t

Pdn Pup

Figure 1. Tree description of a

discrete Markov chain for uncertain demand

Periods

In the models, three firms compete in a Nash-Cournot manner. An important assumption of the models is that each firm is specialized in a single technology type (baseload, shoulder or peak technology). At each period, they decide the new capacity to be added into the system and at each season they choose simultaneously the operation decision. When introducing the market-based incentive mechanism, they also have to choose the commitment decision (commitment to produce in the future period). The investment decision is a discrete variable which takes into account the construction delay that differs according to the technology type. In order to reduce the investment scenarios, we suppose also that if an expansion decision is made, additional investments cannot be made until the ongoing construction period is finalized. Commitment and generation decisions, however, are continuous and constrained by the generation capacity level.

2.2 Specific assumptions

We distinguish between three groups of market designs: market-based incentive mechanisms, non-market-based incentive mechanisms and the benchmark case.

Market-based incentive mechanism: reliability options

Besides investment and operating decisions, firms decide in an organized auction the committed quantity to be available in the future peak period. The auction is organized one year ahead of real time, which corresponds to the peak season of a future period. In this auction, the system operator (SO) purchases the commitment from generators to produce in the future a prescribed quantity of energy (highest expected peak demand). The method is

based on the financial call option principle.7 The SO sets the strike price. When the electricity

7 A call option is the right (but not the obligation) to buy a stock, bond, commodity or other instrument at a

specified price (the strike price) within a specific time period. Average

(11)

9

price exceeds the strike price, the SO exerts his/her option and commits the generator to produce and to sell their committed energy at the strike price. If a generator is not available to produce, it pays a penalty charge fixed administratively at the time of the auction. Each generator submits one bid to the auction, expressing quantity and price (the required

premium). The market is cleared as a simple auction and all of the accepted bids receive the

premium that was requested by the marginal bid. The call is represented as follows: the SO on behalf of all consumers pays a premium to acquire the right to buy energy at the exercise price rather than the spot price and generators receive the premium for abandoning the right to sell at the spot price and for committing to sell at the exercise price whenever the SO exercises the option. Consequently, energy producers are rewarded for the insurance they provide and punished when they fail to supply the energy for which they have contracted.

The overall game is represented as follows: at each period, firms choose the new capacity to be added into the system. Since the decision is a discrete variable, we use the sequential Nash-Cournot method to find a solution. We suppose that there is a leader firm (L) which decides first, a second firm (F1) operating as a follower of L and a third firm (F2) as a second follower of L and F1. After deciding the capacity addition, they compete to choose the quantity to be committed in the auction of the mechanism. This decision is a continuous variable and is found from the mixed complementarity problem method (MCP). It is constrained by the expected generating capacity of the firm in a future year. Finally, at each season of the period, operating decisions are made, also constrained by the generating capacity level of the firm and the commitment decision made in the previous year. The game is then truly a repeated three-stage dynamic game where competition takes place in three steps. Therefore, a closed-loop solution is used to represent the interaction between all competitors’ decisions. The resolution method is detailed in Section 3.

Market-based incentive mechanism: forward capacity markets

Similarly to the reliability options design, the main aim of this mechanism is to ensure the ex ante availability of generation. It is, however, organized in another way. The commitment decision here concerns the firm generating capacity and not energy. Thus a capacity market is organized one year ahead of real time and the SO, on behalf of all demand,

purchases a prescribed level of firms’ generating capacities that can cover the expected future

peak load. The capacity market provides generators with the opportunity to collect extra revenue for their generation capacities and provides incentives for the building of reserves beyond those that meet the short-term needs for ancillary services. On the other hand, generators are committed to making available their contracted capacity whenever they are required to produce it, otherwise they pay a predetermined penalty charge.

(12)

10

price and the variable cost of a peaking unit of reference. This regulated cost of reference can be considered here as an endogenous strike price.

The overall game is represented as in the first market-based mechanism and described as a repeated three-stage dynamic game where competition takes place in three steps. Moreover, another variant of this mechanism is studied here. Instead of assuming that the capacity price is determined via an auction procedure, we use a specific function that reflects the market’s demand for capacity and expresses the relationship between the generator’s payment from capacity market and the expected reliability in the system.

Non-market-based incentive mechanism: capacity payments

With this design, generators are given in peak seasons an additional capacity payment based on their availability, whether they get dispatched or not. No obligation to serve is imposed on them and the additional payment given by the fixed capacity payment compensates generators for improving reliability and persuades them to invest in the system.

Here, the game is represented by a two-stage dynamic model: firms decide only the new capacity to be added into the system and operating decisions. The solution at each stage is found by the same method used for modelling the market-based mechanisms.

The benchmark case: energy-only market

Similarly to the capacity payment mechanism, only investment and operating decisions are made by generators. Furthermore, no additional instruments are introduced here and generators’ revenues are only provided by their sales in the spot market.

3. The Dynamic Models

3.1 Reliability options model (Model A)

When introducing the reliability options mechanism, as discussed in Section 2.2, the objective of each firm is to maximize its profit - market and mechanism revenues minus operating costs and investment costs - for the entire period.

The objective function to be maximized is described as follows: For each firm,

(13)

11

"  ≤ % -(/̃. 35 (5)

∑ "  ≤  (6)

The notation is defined as follows:

$ = 1,2,3 Player (generator) 9 = 1, … . ,16 Period (year)

< = 1,2,3 Season (baseload, shoulder and peak respectively)  Discount factor

=9 Construction delay of generator c’s technology

 Demand level state at t (random variable) /0 Successor state of  at t+lt

/̃ Successor state of  at t+1

Total expected profit of generator c (€)

 , Generator’s revenue at season s at period t (€)

! " ,  Generator’s revenue from market mechanism (€)  Probability of 

%  Capacity of generator c at period t and  (MW)

1  (Decision variable) capacity addition of generator c at period t and  (MW)

 ,  (Decision variable) production of c at season s at period t and  (MWh)

 = ∑  ,  Total production for season s at period t (MWh)

-( =  + >? (State variable) demand level for season s at period (MWh)

"  (Decision variable) quantity committed by c at the mechanism stage at

period t (MWh)

 = ∑ " 

Total quantity committed at the mechanism stage at period t (MWh)

$  Investment cost of generator c’s specific technology at period t (€)

>? Long-term uncertainty of demand level (MWh) 3 Number of hours in season s

Specific constraints are omitted here and will be presented later. Constraint (2) shows

that the capacity level of c at period t is only affected by investment decision made at 9 − =9

i.e. by taking into account the specific construction delay of technology. Constraints (3) and (4) prevent the firm’s production from exceeding its installed capacity and the total quantity produced from exceeding the demand level. Constraints (5) and (6) concern the mechanism stage. The former limits the generators’ committed quantity in the auction of the mechanism to its expected installed capacity in the future period. The latter prevents the total committed quantity from exceeding the quantity requested by the system operator.

3.1.1 Solving the model

(14)

12

concerns the commitment decision, " . This choice is constrained by the expected

capacity level of the firm in the future period and thus depends on the investment decision

made in 9 − =9 + 1. In fact, when offering energy at the auction, firms are ready to commit

themselve to be available and to produce at the future peak season, so they limit their offers to their expected capacity level % -(/̃. Finally, at each season of the period, they decide simultaneously their production depending on the demand level in the season and constrained by the capacity level. Moreover, in the peak season, generators have to fulfill their commitment made at the previous period (mechanism stage), so the production at this season is also constrained by " @(@(. This game is repeated annually over the planning period.

Given our game configuration, we use the closed loop information structure to solve the model where the solution is obtained by backward induction. Operating decisions are made on the basis of the observed investment decisions and commitment decisions. Commitment decisions are also chosen on the basis of previous observed investment decisions but with considerations of how operating decisions in the future peak season will be made. Similarly, investments decisions are obtained with considerations of how second and third stage decisions will be made. Except for the difficulty generally encountered in the use of this technique, it is subgame perfect because the associated strategies are Nash equilibrium at each stage of the game, even if there has been a deviation from the equilibrium strategy in an earlier subgame, contrary to the open-loop information structure. We note finally that firms also adapt their investment decisions at each period to those made in the future. Consequently, a stochastic dynamic programming method is used to find all capacity additions for the total

planning period. The essence of dynamic programming is Bellman’s principle of optimality.8

In the following sections, we calculate the Nash-Cournot equilibrium associated with each stage of the game (operating, commitment and investment stages) and, using the backward induction method, we start from the last decision and end with the first one.

3.1.2 Operating decisions stage

At each season of the period, firms decide in Nash-Cournot manner the quantity to be produced. We distinguish between two classes of seasons: first, the baseload and shoulder seasons where production level is only constrained by the operating capacity level; second, the peak season where the mechanism is activated and the commitments made at the last period (in the auction of the mechanism) become constraining.

3.1.2 a Plateau and off-peak seasons

Generator c’s sub-model associated with these seasons is represented as follows:

max

,A  ,0 = BC0 ,0 , A D,0  , 

0,  − EF ,0  ,0 , G .  ,0  7

8 Bellman’s principle of optimality states that: ‘An optimal policy has the property that, whatever the initial

(15)

13 Subject to:  ,0  ≤ % . 30 ( ,  (8)  ,0  + A ,0  ≤  (I ,  (9)  ,0 ,  , , I , ≥ 0 Where,

<0 Seasons (plateau, off-peak)

C0 = L0+ M0. 0 − ∑  ,0  Spot price at season <0 at period t and  (€/MWh)

EF ,0  = N ,0+ O ,0.  ,0 Unitary variable cost of firm c’s technology at season <0 at period t and  (€/MWh)

A D,0 Total production of generator c’s competitors which are assumed fixed (Nash-Cournot assumption) (MWh)

L0, M0 Constant to be estimated from historical data

N ,0, O ,0 Constant of variable cost function of c  , , I , Dual variables for the constraints

In order to evaluate the possibility of price manipulations by generators, we use a linear function that expresses the relationship between the electricity price and the security of the system represented by 0 − ∑  ,0 , which is the difference between the demand level of the season and the total quantity produced. On the one hand, if there is no shortage in the system (0 = ∑  ,0 ), the electricity price is equal to L0, which is an approximation of the marginal cost of the expensive technology operating at this season. On the other hand, when there are shortages, the electricity price increases: the scarcer the supply is 0 −

∑  ,0

≫ 0, the higher the price is. This price formulation will be used later for all the

models studied here. Furthermore, a quadratic function is used to represent the generator’s total variable cost.

Each firm maximizes simultaneously its profit from the season s (7) under constraints (8) and (9). The Nash-Cournot equilibrium9 is unique since the cost function EF ,0 .  is strictly convex and continuously differentiable, and the revenue function C0. .  ,0 is concave. The solution is found by grouping together all generators’ first order optimality

conditions, so a mixed complementarity problem10 is formed. After resolving the model, we

find the generator’s optimal production decisions of the season, function of installed capacity at the period ∗ ,0 %$99.

9

The proof of existence of the oligopolistic Nash-Cournot equilibrium is well-established in many papers. See Murphy et al. (1982) or even Friedman (1977).

10 It solves directly the necessary conditions of the Nash equilibrium. Writing the first order optimality

(16)

14

3.1.2.b Peak season

In the peak season, as explained in Section 2.2, the mechanism plays and the commitments made at the last period (in the auction of the mechanism) become constraining. The generator’s sub-model associated with this season can be defined as:

max ,R ,S

,R  ,&  =

T@(/̂. 

,&  + C&&, &, . S ,&  − EF ,0  ,& , S ,& , .  ,& + S ,& 

−C"V. & − ∑  ,& . "  −  ,&  (10)

Subject to:  ,&  ≤ " @(/̂ (δ  (11)

S ,& . " @(/̂ −  ,&  = 0 (X  (12)

 ,&  + S ,&  ≤ % . 3& (Y  (13)

∑  ,&  + ∑ S ,&  ≤ & (Z  (14)  ,& , S ,& , δ , Y , Z  ≥ 0 ; X  free

Where,

/̂ Direct predecessor of  T@(/̂ ≤ C

& Strike price predetermined in the last period (auction of the mechanism)

supposed to be lower than peak season electricity price (€/MWh)

 ,& Quantity produced by c that comes from their commitment (MWh)

S ,& Additional production of c after fulfilling their commitment (MWh)

C"V. & − ∑  ,&  The penalty paid by c per MWh of production below their committed

quantity (€/MWh)

C"V A constant of the penalty function δ , Y , Z , X  Dual variables of the constraints

The first term in (10) represents the generator’s income earned from sales in the market. The electricity price is capped by the strike price T@(.  for the quantity  ,& that comes for the commitment made at the auction mechanism. After fulfilling their commitment "  =  ,& , a generator can offer an additional quantity S ,& in the market and receives the electricity price C&. . The third terms represents the total variable cost of all quantities produced. The fourth term shows the penalty to be paid by the generator c whenever their commitments are not satisfied,  ,& .  < " . . The penalty is supposed to be endogenous to the reliability in the system, represented by & − ∑  ,& .

(17)

15

(14) prevent the firm’s production from exceeding its installed capacity and the total quantity produced from exceeding the demand level.

Operating decisions at this stage are made on the basis of the last period commitment decisions. So when this sub-model is solved, the optimal operating decisions  ,&∗ and S ,&∗ , are functions of " @(. .

Based on mixed complementarity problem method and regrouping together all first order optimality conditions for all generators, optimal operating decisions at the peak season are found as follows (see Appendix 1 for more details and proof):

- If ∑ " @(/̂ = &, then  ,&∗ = " @(/̂ and S ,&∗ = 0. Each generator produces their committed quantity whenever the total quantity sold by all generators at the auction of the mechanism corresponds to the demand level of the peak season.

- If ∑ " @(/̂ > &, then  ,&∗ = ](, . " @(/̂ + ]5, . " @(D /̂ + ]&, and ^ ,&∗ = 0. Where, ](, , ]5, , ]&, are constants depending on the strike price, the penalty, constants of the variable cost function of c and the total quantity sold in the auction of the mechanism.

Generator c’s production is a linear function of their committed quantity and the commitment of other generators whenever the total committed quantity exceeds the demand level of the season.

- If ∑ " @(/̂ < &, then  ,&∗ = " @(/̂ and S ,&∗ = ]&, % , " @(/̂, " @(/̂. The generator satisfies first their commitment and could produce additional quantity depending on their installed capacity and the demand level whenever the total committed quantity is below the demand in the peak stage.

The reaction functions  ,&∗" @( and S ,&∗" @( are introduced now in the sub-model of the mechanism stage in order to find optimal commitment decisions.

3.1.3 Mechanism stage

As explained in Section 2.2, the system operator purchases ex ante commitments from generators to produce in the future period a prescribed quantity of energy (highest expected peak demand). The method is based on the financial call option principle with auction procedure. We get the following assumptions for the realization of the auction:

- The auction is supposed to be organized one year ahead of real time.

- The time horizon: the peak season of the future period; the generators are required to

offer their committed quantity at any time during that period.

- The quantity purchased by the system operator on behalf of all demand equals the

(18)

16

- The system operator sets the strike price11 exogenously; the strike price level

corresponds to the variable cost of an efficient marginal generator unit.

- Each generator submits one bid to the auction, expressing the quantity they want to

sell and price (the required premium).

- The market is cleared as a simple auction and all of the accepted bids receive the

premium that was solicited by the marginal bid.

Knowing these auction parameters, each generator maximizes the sum of his revenue from the auction and expected profit in the future peak season. The associated generator’s sub-model is defined as follows:

max CO_` 9 . " 9 + >a$,39+1∗ $,39+1∗"$9, S$,39+1∗"$9, b9, ̃9c (15) Subject to: "  ≤ % -(/̃. 3& (ά  (16) "  ≤ eA, b − " D, b − ∑ " D D f (έ  (17) ∑ " ≤ A (ή  (18) " , ά , έ , ή  ≥ 0 Where,

 ,&-(∗.  Expected optimal pay-off in the future peak period depending on commitment decision

of c (€)

A Quantity purchased by the SO. It corresponds to the expected highest peak demand

(MWh)

CO_` 9 The auction price corresponding to the premium solicited by the marginal bid (€/MWh) " , ά , έ , ή  Dual variables of the constraints

In a Nash-Cournot manner, the generators decide simultaneously the quantity " .  to

be sold in the auction. They take into account their pay-offs in the future peak season  ,&-(∗.  since it depends on their actual commitment decisions. Constraints (16) and (18) prevent respectively the firm’s commitment from exceeding its expected installed capacity and the total committed quantity from exceeding the quantity requested by the SO. Constraint (17) shows that generator c can offer up to A if they have the lowest bid price, until b −

" D if only the bid price of generator c’ is lower than their offer and finally until b − ∑ " D D if their offer is the highest among the offers retained in the market.

We suppose that each generator offers a ‘marginal’ premium which guarantees minimum revenue for rational players. This is a reasonable assumption when players are single generating units acting alone in competition with other generators.

11

(19)

17

When participating in the auction, the generator knows that their revenue in the future peak season will be capped by the strike price. So their required premium would rationally incorporate the income that they will not receive from the spot market. It corresponds to the difference between the expected electricity price, calculated apart by assuming that the generator does not participate in the auction, and the strike price. If, however, the generator is a non-competitive one and the electricity price cannot, of itself, cover both their operating and investment cost, they would formulate a premium that covers the difference between the total expected cost and the strike price. Therefore the premium requested by generator c is:

CO  = max ijkBC&-( A ,&-(, /̃G − T ; jkBmE&-( A ,&-(, /̃G − Tn (19)

Where,

CO  The premium offered by the generator c (€/MWh)

C&-(/̃ Electricity price in the future peak season, if generator c does not participate

in the auction (€/MWh)

mE&-(/̃ Unitary total cost of generator c’s at future peak season (€/MWh)

A ,&-(/̃ Operating decision of generator c at the future peak season if they do not

participate in the auction (MWh)

Rationally, each generator is induced to offer all their installed capacity in the auction. In fact, the premium earned from the auction will be at least equal to their required premium and participating in the mechanism will at least assure the same profit as non-participation. In this last case, they should take into account the fact that their competitors will offer their installed capacity in the auction and therefore their expected operating decision is found by:

A ,&-(= LOoLp BC

&-( A ,&-(, %$9+1′ ,/̃− EF$,39+1$,<9A,/̃G. A ,&-(/̃ (20)

Subject to

A ,&-( ≤%$9+1̃9. 33 (21)

A ,&-( ≤399−∑$′%$9+1′ (22)

After calculating the premium function specific to each generator, we can deduce the price of the auction CO_` . :

CO_`  = CO

 if CO  is the highest and "  > 0

Finally, it is important to note that the expected pay-off in the future peak season

 ,&-(∗.  in (15) depends on the level of ∑ " . − 

&-(. , as shown in Section 3.1.2.a.

Owing, however, to the incentive given by the auction for generators to offer the highest quantity, we assume that:

(20)

18

Therefore,  ,&-(∗.  is a continuous function that depends only on parameters A.  and % -(. and so the objective function (15) is a monotone function and the respective sub-model can be handled by the mixed complementarity problem method.

After the sub-model is solved, optimal commitment decisions and future peak season operating decisions are found function of the level of generator’s installed capacity: " ∗% -(, % -(D ,  ,&∗% -(, % -(D  and S ,&∗% -(, % -(D .

3.1.4 Investment stage

After determining optimal operating and commitment decision functions of generators’ installed capacity levels, we formulate a stochastic dynamic sub-model, which takes the form of Bellman’s equation, as described in Bertsekas (1959), in order to find generators’ investment decisions. These decisions are discrete ones. A sequential Nash-Cournot equilibrium is calculated by supposing that there is a leader firm (L) which decides first, a second firm (F1) which operates as a follower of L and a third firm (F2) operating as a second follower of L and F1 (see Section 2.2). The decision rule gives the yearly decisions depending on the information available when the decisions have to be made, such as demand level, generators’ installed capacities and past information about investment decisions.

The mathematical formulation of the investment problem is described as follows:

 = oLp $,<9 9∗$,<, S$,39∗, 9∗$,<, S$9∗′,3,%$9, %$9′,1$′,  +!$9"$9∗, %$9, %$9′,− $$9. %$99 + 1 + O−1.>,9r -(B]%9$, %$9′1$, 1$′Gs (23) Subject to % -./0 = %  + 1  (24) Where,

 Max expected pay-off in period t (€)

-( Optimal expected pay-off in period t+1, corresponding to period t’s optimal investment decisions (€)

].  Future profits from period t to final period that correspond to generator’s investment

decisions made at period t

(21)

19

Owing to the presence of construction delays that differ according to the generator’s specialization, we suppose that if an expansion decision is made, additional investments cannot be made until the ongoing construction period is finalized.

3.2 Forward Capacity Market models (Models B1 and B2)

Two variants of capacity market mechanism are modeled here. The first one (Model B1) has the same assumptions as the reliability options model. The overall game is also described as a repeated three-stage dynamic game where competition takes place in three steps: investment, commitment and operating decisions. In the mechanism stage, a capacity market is organized via an auction procedure where generators sell capacity (and not quantity) and they are committed to making it available whenever they are called to do so in the future period (peak season).

For the second model (Model B2), we use a specific function that reflects the market’s demand for capacity and expresses the relationship between the generator’s payment from capacity market and the expected reliability in the system. We suppose that capacity price is determined by the capacity demand function, instead of the auction procedure.

3.2.1: Model B1: auction procedure

We use the same description and assumptions employed in Model A. The differences, however, concern the sub-models of the mechanism stage and the peak season.

In the mechanism stage, as explained in Section 2.2, the system operator purchases ex ante, via an auction procedure, commitments from generators to have available in the future period a prescribed capacity level (highest expected peak demand). We get the following assumptions for the realization of the auction:

- The auction is organized one year ahead of real time.

- The time horizon: the peak season of the future period; the generators are required to

offer their committed capacity at any time during that period.

- The capacity purchased by the system operator on behalf of all demand corresponds to

the highest expected peak demand.

- No strike price is explicitly defined but in the peak season of the future period,

generators are required to refund to consumers any infra-marginal rents for their contracted capacity. We can therefore define it as an implicit strike price.

- Each generator submits one bid to the auction, expressing the capacity they want to

sell and the price (the required premium).

- The market is cleared as a simple auction and all of the accepted bids receive the

premium that was solicited by the marginal bid.

Compared with the sub-model used in Section 3.1.3, the unique difference concerns the required premium offered by generators. It is redefined as:

(22)

20

Where,

$0 Peak generator

Eo 0,0  0,& , S 0,& ,  Marginal cost of the peak generator (€/MWh)

In fact, when generators are called to offer their contracted capacity in the spot market, they are also required to refund the consumers any infra-marginal rent corresponding to the

difference between the spot price and the marginal cost of peak generator Eo 0,0 . . While the

strike price is exogenous and fixed ex ante in the reliability option model, it is endogenous and uncertain in this model.

Therefore, the generator’s profit associated with the peak season can be redefined as:

 ,& = C&&, &, .  ,& + S ,&  − BC&&, &,  − Eo 0,0  0,& , S 0,& , G .  ,& −EF ,0  ,& , S ,& , .  ,& + S ,&  − C"V. & − ∑  ,& . "  −  ,&  (26)

As in model A, generators decide in the peak season the quantity to be produced that come from their commitments  ,& . . If they fulfil their commitments, they can offer additional quantities ^ ,& . . The generator earns the spot price C&.  for the total quantity produced, but is required to refund consumers the infra-marginal rents for all their contracted quantity (second term in (26)). Finally, the generator pays a penalty fee whenever their commitments are not satisfied.

3.2.2: Model B2: capacity demand function

Compared with model B1, the auction in the mechanism stage is replaced by a specific

capacity demand function12, equation (27).

C$Lt 9 = ℎ + V. Bb99−∑$"$99G (27)

Where,

C$Lt 9 Capacity price (€/MWh)

h and n Constants of the capacity demand function

The function expresses the relationship between the generator’s payment from the capacity market and the difference between the quantity required by the SO and the contracted capacity. This function reflects the market’s demand for capacity, where the payment increases as the reliability decreases.

The generators’ sub-model in the mechanism stage is now reformulated as:

max C$Lt$9 . " 9 + >a$,39+1∗ $,39+1∗"$9, S$,39+1∗"$9, b9, ̃9c (28)

12

(23)

21

Subject to:

"  ≤ % -(/̃. 3& (29)

∑ " ≤ A (30)

Owing to the fact that the future peak season profit  ,&-(∗.  in (28) depends on the level of ∑ " . − &-(.  and that C$Lt . . " .  is not a strictly continuous function, the objective function in (28) cannot be handled by the MCP method. The solution is therefore found by an iterative procedure.

Finally, we note that optimal operating decisions and investment decisions are calculated by use of the same formulation applied in Models A and B1.

3.3 Capacity payment model (Model C)

Generators are given in peak seasons a fixed capacity payment for their installed capacity whether they produce or not. The game is represented by a two-stage dynamic model. Generators compete in a Nash-Cournot manner to find investment and operating decisions (no mechanism stage). The solution at each stage is found by application of the same method used for modelling the market-based incentive mechanisms.

The unique difference concerns the peak season sub-model. It is reformulated as follows:

max

,R  ,& =

C&&, &, .  ,&  + CE. %  − EF ,0  ,& , .  ,& (31)

Subject to:

 ,&  ≤ % . 3& (32)

∑  ,&  ≤ & (33)

Where,

CE A constant capacity price (€/MW) 3.4 Energy-Only Market model (Model D)

Similarly to the capacity payment mechanism, only investment and operating decisions are made by generators. Furthermore, generators’ revenues only result from their sales in the spot market. Therefore generators’ sub-model for each season s is defined as:

max ,  ,

 =

(24)

22

Subject to:

 ,  ≤ % . 3 (35)

∑  ,  ≤  (36)

Investment decisions are found similarly to the market-based mechanisms by application of the stochastic dynamic programming method.

3.5 Comparison between investment incentive mechanisms

The objective of this study is to find which among these market designs is the best/most efficient in terms of ensuring long-term system adequacy, cost efficiency and price manipulations limitation. Three criteria are used to evaluate the different market designs. The first one is the evolution of peak capacity margins within the planning period. The second is the evolution of average peak prices and total incentive costs paid by end-users for each incentive mechanism. The third one concerns market price manipulation.

We also investigate how optimal competitors’ strategies could change according to the structure of competition (competitive oligopoly, collusion and monopole).

4. Case Study

4.1. General input data

The parameters in the models are estimated from historical data for the French

electricity market,13 and found in (Etudes DIGEC (1997), Etude DGEMP (2003) and

Powernext Bilan Statistique). We have referred to annual historical data for load and electricity price in Powernext from 2001 to 2006 to estimate the parameters in the spot price model. Table 1 shows the main parameters used in the models.

13

(25)

23

Parameter NAME IN THE MODELS

VALUE

Initial installed capacity %(v, %5v LVN %&v 67000 (MW), 20000 (MW) and 10000 (MW)

Construction delays =9(, =95 LVN =9& 5 years, 3 years and 2 years

New installed capacity 1(, 15 LVN 1& 2000 (MW), 1500 (MW) and 1000 (MW) Initial load level (v, 5v LVN &v 63333(MW),78500(MW) and 95000 (MW) Discount factor  1/(1,08)

Load growth >? 1300 (MW) or 650 (MW)

Yearly Investment cost $(, $5 LVN $& 115300(€/MW), 58400 (€/MW) and 30000 (€/MW)

Number of hours in the season 3(, 35 LVN 3& 4260 hours, 3000 (hours) and 1500 (hours) Parameters of price function M(, M5 LVN M& 5*10E-9, 5*10E-8 and 10*10E-7

Parameters of variable cost function N(,0, N5,0 and

N&,0

9 (€/MWh), 40 (€/MWh) and 80 (€/MWh)

Parameters of variable cost function O(,0

, O5,0 LVN O&,0

4,13*10E-8(€/MWh2) , 6,38*10E-8 (€/MWh2) and 3*10E-7 (€/MWh2)

Parameters of capacity demand function

h and n 18000 (€/MW) and 7*10E-7 (€/MW2),

There are three generators which are specialized in one production technology (plateau, off-plateau and peak). The plateau generator retains 70% of the total initial installed capacities, the off-plateau generator retains 25% and the peak generator 5%. This distribution reflects the situation in some energy markets where a predominant generator has a large part of the power generating units, such as the French electricity market. They are in competition at two or three stages: investment and production for all mechanisms and also at commitment stage for market-based mechanisms.

We firstly compare results between the different mechanisms when generators compete in an oligopoly. Then, we repeat the analysis by supposing that two generators collude and compete with the third one and we finish by studying the monopolistic situation.

4.2. Results

In this section, we identify optimal investments, generating and commitment decisions and study whether investment incentive mechanisms (i.e. reliability options, forward capacity

(26)

24

markets and capacity payments) facilitate long-term system adequacy. The capacity adequacy level is calculated by use of the capacity balance in the peak period. Optimal capacity adequacy is assured when the capacity margin is up to 4000 MW in the peak season and is at least positive. The best mechanism will be the one that both ensures the optimal adequacy level and efficient relative costs for end-users and reduces price manipulations. We also investigate the consequences for generators’ optimal strategies when different competitive scenarios are considered such as cartels and monopolistic scenarios. We finally show the results of a sensitivity analysis of the main parameters.

A planning horizon of sixteen years is used for the case study and the five market designs analyzed here are shown in Table 2.

Market designs

EOM Energy-only market RO Reliability options

CM1 Forward capacity market with auction

CM2 Forward capacity market with capacity demand function CP Capacity payments

Table 2: Definition of market designs in the case study

Parameters in the different scenarios are estimated on the assumption that additional payments will be identical at efficient thresholds. Indeed, in a perfect competitive situation the premium earned by generators in the auction of the RO and CM1 scenarios would be close to the investment cost of a peaking unit which corresponds to the ‘missing money’ encountered in the EOM scenario. Therefore we have set the capacity price in the CP scenario at this level. Moreover, in the CM2 scenario, parameters of the capacity demand’s function are settled such that the additional payment corresponds to the investment cost of a peaking unit since system reliability is assured.

Result 1: the introduction of investment incentive mechanisms leads to more capacity additions than the energy-only market design. Only reliability options and forward capacity markets with auction procedure, however, ensure optimal capacity adequacy.

We can see from Figure 2 that when investment incentive mechanisms are introduced, the average capacity addition is higher from T6 to the end of the planning period, compared with the EOM design. This result confirms the theoretical predictions, which assume that economic signals of incentive mechanisms tend to augment the volume of installed and available capacity and the reliability of the system is enhanced. It is shown in Figure 3, however, that from T10 to the end of the planning period the capacity margin is higher than required in CP scenario, yielding overcapacity periods, and is negative with CM1 scenario.

(27)

25

order to profit from this higher revenue, and the capacity additions increase slightly, yielding overcapacity situations, especially because no commitment to produce is imposed. On the other hand, in CM2 scenario the remuneration given by the mechanism is endogenous to the security in the market (difference between expected peak demand and committed capacity); the higher the commitment (security is assured), the more the remuneration decreases, so generators choose to wait until the system is close to rationing before they invest.

In RO and CM1 scenarios, additional payments given by the mechanisms (auction price) correspond efficiently to the cost of the reliability which is equivalent to the investment cost of the peak unit. The commitment to produce, which reduces market power, incites generators to invest only capacities that serve to meet expected future peak demand and long term capacity adequacy is assured in efficient manner.

Owing to the presence of demand uncertainty in our models, we complete our results by calculating the standard deviation of the future capacity margin. Figure 4 shows that it evolves similarly in the different scenarios and does not exceed 1500 MW. This means that, in all scenarios, total existing capacity at each period is only slightly dependent on the demand state.

Result 2: the market-based mechanisms provide lower peak spot prices.

With the market-based mechanisms (RO, CM1 and CM2 scenarios), average peak prices are the lowest (Figure 6). On the one hand, the exogenous strike price imposed by the

95000 98000 101000 104000 107000 110000 113000 116000 119000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 M W Time

Average Installed Capacity

EOM RO CP CM1 CM2 -2000 -1000 0 1000 2000 3000 4000 5000 6000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 M W Time

Average Capacity Margin

EOM RO CP CM1 CM2 0 500 1000 1500 2000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 M W Time

Std. Dev. Capacity Margin

EOM RO CP CM1 CM2

Figure 2. Average capacity expansion for the five market designs

Figure 3. Average capacity balance for the five market designs

(28)

26

system operator in the reliability options mechanism and, on the other hand, the obligation for generators to refund consumers any infra-marginal rents earned at the peak period with forward capacity markets mechanisms, act as a price cap by preventing peak prices from reaching high levels, and thus consumers are fully protected from high prices in the energy market. With these mechanisms, consumers receive a maximum-price hedge in exchange for all the capacity they are contracting. In CP scenario, however, prices are still high and close to the energy-only market ones. An important weak point of the capacity payment design is that consumers remain fully exposed to the potential high prices in the energy market, and they pay a capacity charge and receive nothing in return. Also, according to our assumptions about imperfect competition, the lack of obligation to produce gives incentive to generators to manipulate spot prices.

Figure 7 shows the standard deviation levels of the future peak prices. They do not

exceed 2€/MWh with market-based mechanisms.

Result 3: reliability options and forward capacity markets with auction procedure are the most cost-efficient mechanisms and lead to a stabilization of consumers’ payments.

Results 1 and 2 suggest that the EOM scenario would not give good signals for new capacity additions and would lead to high prices and insufficient capacity adequacy, especially at the end of the planning period, so the implementation of an additional incentive mechanism is needed.

The capacity payment mechanism, however, stimulates further capacity additions resulting in an over-capacity situation, yet with the highest peak prices of all scenarios.

In order to evaluate the market-based mechanisms better, we calculate the cost paid by consumers for all the capacity they contract. Figure 8 illustrates the evolution of this cost, which includes the peak price in the period and the specific incentive cost. It is stable and close to 105 €/MWh over all periods in scenarios RC and CM1, while it is higher in CP scenario (up to almost 130€/MWh) and in CM2 scenario (up to 160€/MWh).

70 75 80 85 90 95 100 105 110 115 120 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 € /M W h Time Average Peak Prices

EOM RO CP CM1 CM2 0 5 10 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 € /M W h Time Std.Dev. Peak Prices

EOM RO CP CM1 CM2

Figure 6. Average peak prices evolution for the fifth market designs

Références

Documents relatifs

We design an incentive mechanism under which the content provider rewards the nodes based on the data transmission rate they contribute.. The data transmission rate includes the

If incentives are caused by …nes and by the point-record driver’s license, we show that the optimal e¤ort level increases globally with the number of demerit points accumulated

Perhaps one of the most important foundations that contributes to the success of a university education and ensures its effectiveness the teaching skills of

– The use of the luminescent dosimetry techniques in high- dose environments (power reactors, irradiation facilities, etc.) is generally prohibited by the saturation of the

Accordingly, in order to assess telomere dysregulation at the early and late stages of liver carcinogenesis, we compared cell proliferation, Telomere Restriction Fragment (TRF)

Notons que l’entretien standard était choisi comme groupe contrôle dans cette étude, car ce sont les consignes sociales et cognitives (mnémotechnies) combinées de

لولأا ثحبملا - ميهافملا ديدحت : بويتوي عقوم ،ةيئاضفلا تاونقلا

Anatole-François Gruyer, Chantilly. Les portraits de Carmontelle, Paris, Plon-Nourrit et Cie, 1902, p.. York, Castle Howard. 55, notice par Rosemarie Burgstaller. Chantilly,