• Aucun résultat trouvé

FL 30 FL 60 FL 100 FL 200

N/A
N/A
Protected

Academic year: 2022

Partager "FL 30 FL 60 FL 100 FL 200"

Copied!
16
0
0

Texte intégral

(1)

Acquittement de la maintenance FermentoLevain FL30/60/100/200

Ref AF408300694 Rev 00

Date : 06-03-19

APPAREILS À

LEVAIN LIQUIDE

FERMENTO- LEVAIN

Notice technique (original) FR

Technical manual (translation of the original

manual) EN

FL 30 FL 60 FL 100 FL 200

ACQUITTEMENT

MAINTENANCE

(2)

Acquittement de la maintenance FermentoLevain FL30/60/100/200

1. PRÉSENTATION

Après 4050 heures de fonctionnement, l’appareil affiche une clé à molette symbolisant la main- tenance à effectuer (voir feuille de l’entretien semestrielle page 18 de la notice d’utilisation).

Lorsque le technicien a terminé ses opérations , il faut faire disparaître la clé à molette de l’é- cran du FermentoLevain par l’accès au mode usine.

Couper la tension au sectionneur « OFF ».

Enlever la porte du coffret électrique et faire un pont entre les bornes 8 et F.

Mettre le sectionneur sur « ON ».

2. MODE OPERATOIRE

A

(3)

Acquittement de la maintenance FermentoLevain FL30/60/100/200

B

Le menu suivant (barré en rouge) apparaît.

Cliquer sur l’onglet « Maintenance »

C

Appuyer de façon continue sur le bouton « Acquitter la maintenance ».

Le bouton va passer du orange au vert lorsque l’opération est terminée.

(4)

Acquittement de la maintenance FermentoLevain FL30/60/100/200

D

La clé à molette a disparu.

Enlever le pont entre les bornes 8 et F puis refermer le coffret électrique.

Mettre le sectionneur sur « OFF ». Attendre 10s minimum.

Mettre le sectionneur sur « ON ».

Fin de procédure.

(5)

Acquittement de la maintenance FermentoLevain FL30/60/100/200

(6)

Acquittement de la maintenance FermentoLevain FL30/60/100/200

(7)

Acquittement de la maintenance FermentoLevain FL30/60/100/200

(8)

Acquittement de la maintenance FermentoLevain FL30/60/100/200

(9)

Acknowledgment of FermentoLevain Maintenance FL30/60/100/200

Ref AF408300694 Rev 00

Date : 06-03-19

APPAREILS À

LEVAIN LIQUIDE

FERMENTO- LEVAIN

Notice technique (original) FR

Technical manual (translation of the original

manual) EN

FL 30 FL 60 FL 100 FL 200

ACKNOWLEDG- MENT OF FERMEN-

TO-LEVAIN

(10)

Acknowledgment of FermentoLevain Maintenance FL30/60/100/200

1. PRESENTATION

After 4050 hours of operation, the device displays an adjustable wrench symbolizing the mainte- nance to be performed (see the half-yearly maintenance sheet on page 18 of the operating in- structions).

When the technician has completed his operations, you must remove the wrench from the Fer- mentoLevain screen by entering the factory mode.

Switch off the voltage at the OFF switch.

Remove the electrical box door and put a wire between terminals 8 and F.

Set the disconnect switch to "ON".

2. INSTRUCTION

A

(11)

Acknowledgment of FermentoLevain Maintenance FL30/60/100/200

B

The next menu (crossed out in red) appears.

Click on the "Maintenance" tab

C

Press and hold the "Acknowledge Maintenance" button.

The button will change from orange to green when the operation is complete.

(12)

Acknowledgment of FermentoLevain Maintenance FL30/60/100/200

D

The adjustable wrench has disappeared.

Remove the wire between terminals 8 and F and close the electrical box.

Set the disconnector to "OFF".

Wait 10s minimum.

Set the disconnect switch to "ON".

End of procedure.

(13)

Acknowledgment of FermentoLevain Maintenance FL30/60/100/200

(14)

Acknowledgment of FermentoLevain Maintenance FL30/60/100/200

(15)

Acknowledgment of FermentoLevain Maintenance FL30/60/100/200

(16)

Acknowledgment of FermentoLevain Maintenance FL30/60/100/200

Références

Documents relatifs

Next, the leftmost node of these child nodes is selected as the current node (in the bottom of the figure) and all four processors again cooperate to expand the node. The advantage

s disons boniour aux el6ves - Vous faites votre travail il est en ville - Vous dites quelouc chose - Vous etes chez vous a Nous sommes a la maison - Nous?. ommes a l'ecole - Vous

más antiguos, Cbina, India, Asia Menor, Grecia y Roma, hasta nuestros días. Producción de Salvat

The DPCB shall provide overall direction, coordination and oversight; establish standards and package of services on cancer control and ensure their quality, access,

The parts of the network to consider are the radio link from the user equipment to the base transceiver station for the cell, the ter- restrial radio network linking the cells and

The primary task of the operational control segment is tracking the GPS satellites in order to deter- mine and predict satellite locations, system integrity, behavior of the sat-

For example, if a write operation with incorrect data is directed to the shadow set because of a software or hardware error, the Volume Shadowing product

mero de .terneros tanto como parece á primera vista porque siempre es preciso que las vacas crien, y para proporcionarse buenas utilidades, hay que te¬. ner en cuenta que deben