• Aucun résultat trouvé

CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS C12 - HYDROGRAPHIC SURVEYING

N/A
N/A
Protected

Academic year: 2022

Partager "CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS C12 - HYDROGRAPHIC SURVEYING"

Copied!
1
0
0

Texte intégral

(1)

CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS C12 - HYDROGRAPHIC SURVEYING

Q. No Time: 3 hours Value Earned

Please define the following in one or two sentences:

a) LIDAR 2

b) GNSS 2

c) Shoal Exam 2

d) Spring Tide 2

e) RTK 2

f) Lead Line 2

g) Heave 2

h) Patch Test 2

i) Chart Datum 2

j) S-44 2

2.

Name the three ocean parameters that effect sound velocity in the ocean.

Which one has the greatest effect near the sea surface?

Which one has the greatest effect in the deep ocean?

3 1 1

3.

With the help of a diagram, describe the components necessary for reducing water depth easurements from a singlebeam transducer face to a chart datum.

Describe three of the main sources of vertical uncertainty involved in this reduction.

6 4

4. With the help of a diagram, describe the relationship between ellipsoidal, geoidal, and tidal vertical datums, as used in hydrographic operations. Explain how each are derived, what they are used for and how they are related to each other.

10

5. What factors contribute to the total vertical uncertainty of a sounding derived from

a multi-beam system? 10

6. With the help of diagrams, describe what side scan sonar (SSS) is and how it

works. 10

7.

With the help of a diagram, describe the various vertical datums used in hydrographic operations. Explain what each datum is used for and how it is related to the others.

10 8. Describe 5 different non-acoustic depth measuring techniques. 5 9.

What are the advantages and disadvantages of using a multibeam echo sounding system over a single beam echo sounder for charting surveys?

10

10.

Describe the purposes of nautical charting surveys including all essential data to ensure safety of navigation. Describe everything you would take into account in

order to plan and conduct a hydrographic survey for charting 10

100 Exam C12 - Hydrographic Surveying 2015 03 page 1 of 1

March 2015 Marks Note: This examination consists of 10 questions on 1 page.

1.

Références

Documents relatifs

b) Aerial images have varying scale. Use a sketch to illustrate this fact. Sketch a special case where the scale in a photograph is considered constant. a) Describe the

(singlebeam, sidescan sonar, multibeam and non-acoustic), water levels, water flow, horizontal positioning, vertical positioning and hydrographic survey practice and standards..

Each candidate writing examinations will be assigned a candidate number at the beginning of each examination cycle for purposes of tracking and anonymity. The candidate will use

Many provinces define a hierarchy of plans within their planning legislation that define the general types of plans necessary for land development.. Discuss the significance

Write the equation that relates frequency, wavelength and sound velocity.. Name the three ocean parameters that effect sound velocity in

Why is it necessary to apply pitch and roll observations to narrow-angle single beam transducers and not wide-angle single beam transducers, under normal survey conditions5. Use

With the help of a diagram, describe the relationship between ellipsoidal, geoidal and tidal vertical datums, as used in hydrographic operations.. Explain how each are derived,

C-1 MATHEMATICS June 2020 Although programmable calculators may be used, candidates must show all formulae used, the substitution of values into them, and any intermediate values to