• Aucun résultat trouvé

CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS C12 - HYDROGRAPHIC SURVEYING

N/A
N/A
Protected

Academic year: 2022

Partager "CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS C12 - HYDROGRAPHIC SURVEYING"

Copied!
1
0
0

Texte intégral

(1)

CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS C12 - HYDROGRAPHIC SURVEYING

Q. No Time: 3 hours Value Earned

Please define the following in one or two sentences

a) Uncertainty 2

b) Neap Tide 2

c) Seiche 2

d) Daily Inequality (with repect to tides) 2

e) Diurnal Tide 2

f) Lead Line 2

g) Bar Sweep 2

h) Patch Test (in the context of multibeam surveying) 2

i) CTD 2

j) Bandwidth 2

2 Describe the principles of long, short and ultra-short baseline acoustic positioning

system modes. 9

3 Describe the factors that contribute to the total vertical uncertainty of a sounding

derived from a multi-beam survey. 10

4 Why is the tidal range in the Bay of Fundy much larger than in the mid-Atlantic? 6 5 Describe the difference between physical beam forming and electronic beam

forming. 5

6

With the use of diagrams, describe the four main errors that a multibeam “patch test” is designed to address. Make sure you include where, how and why the patch test lines are run.

10

7 Describe a hydrographic survey scenario where LiDAR would be more

advanageous than mulitbeam, and explain why. 10

8

Name the three properties of sea water that affect the speed of sound through the ocean. What are their units and typical ranges? What is the typical range of sound velocity in ocean water?

10

9 How can SSS imagery be used to estimate the height of an object on the sea bed?

What assumption must be made in order for this method to work properly?

10

10

Why is it necessary to apply motion corrections (pitch and roll) to narrow angle, single beam observations and not to wide angle, single beam observations? Use a diagram to illustrate your answer.

10

100 0

March 2014 Marks Note: This examination consists of 10 questions on 1 page.

1

C12 - Hydrography March 2014 Page 1 of 1

Références

Documents relatifs

b) Aerial images have varying scale. Use a sketch to illustrate this fact. Sketch a special case where the scale in a photograph is considered constant. a) Describe the

(singlebeam, sidescan sonar, multibeam and non-acoustic), water levels, water flow, horizontal positioning, vertical positioning and hydrographic survey practice and standards..

Each candidate writing examinations will be assigned a candidate number at the beginning of each examination cycle for purposes of tracking and anonymity. The candidate will use

Many provinces define a hierarchy of plans within their planning legislation that define the general types of plans necessary for land development.. Discuss the significance

Write the equation that relates frequency, wavelength and sound velocity.. Name the three ocean parameters that effect sound velocity in

Why is it necessary to apply pitch and roll observations to narrow-angle single beam transducers and not wide-angle single beam transducers, under normal survey conditions5. Use

With the help of a diagram, describe the relationship between ellipsoidal, geoidal and tidal vertical datums, as used in hydrographic operations.. Explain how each are derived,

C-1 MATHEMATICS June 2020 Although programmable calculators may be used, candidates must show all formulae used, the substitution of values into them, and any intermediate values to