ONCI{OCERCIASIS CONTROI- PROGRAMMIT IN

Expert Advisory Comminee Sixteentlr session

Ouaeadoueo.u. 5-9 June 1995

WE.ST AFRICA

OCP/EAC l6lBriefrng paper no. 1

ORIGINAL:

FRENCH

ADMINISTRATION AND MANAGBMENT

The

Administration and Management

in its

supporting

role to

the operhtions

of

the

Prograrrune, has favoured

in

1995

a

rationalization

of its

services

in

an

effort to

reduce the administrative costs and also

to

free the Programme

of

equipment, material and surplus stocks considering the progressive reduction

of

activities.

In

this respect,

all

sectors

of

administration identified

prioriry

projects which should help in a noticeable decrease

of

administrative costs.

An

important team

project involving all

sectors

of

administration centers around the holding,

in

1995,

of

a series

of

seminars on basic principles

of

management

for

WHO/OCP as

well as national teams adminisuators; subjects covered are resistance to change, motivation and leadership. Overall, a total

of

some 100 administrators and technicians

will

participate

in

these practical seminars.

Personnel

1-he key element in the operation of this unit centers around ttre dynarnic management

of

pcrsonnel

files

whose contracts are

no

longer renewed upon

expiring, or how to

make ftese peoplc accept a departure considered premature by those often showing nventy years of service.

This reduction of personnel

will

inevitably continue in the years to come, and the Personnel unit has the responsibiliry to see ttrat 0re process is both just and equitable for

all,

while ensuring the Progranrnre retain the technical competence and versatiliry

of

its remaining human resources.

The reduction

of

persomel as portrayed in the following figure represents a reduction

of

sonre 23%

of

human resources over a period

of five

years.

1lm I---=-

I

1* l. 978

I l!<\

*l

cof

152

7@

g)

iffiffi

50 f-

..

sor

f-

.-[- '.[_

o[_

i1

t{

tt lueel

l1 tt

l1 ,r-

WHO 9TATUS

lFa P(Xl

(2)

2

Sgpply

and services

This

unit

is pursuing its.policy

of

rationalization

of

equipment, stocks and materials in order to keep purchasing needs at a minimum. Considering the accumulation

of

stocks over the years,

the

Supply and Services

unit now

favours as

a prioriry

the

utilization of

stocks and materials already on hand including substitutes.

In

ttre same vein, efforts are being displayed to reduce ttre variety

of

a given product in order to keep in stocks only the items most

likely

to be

urilized

by

a majority

of

users,

all

other items are to be ordered according to specific needs.

Also a major drive to identify and reform obsolete and surplus materials in certain cases

will

permit the clearing

of

stock rooms at the main operational centers, and the reduction by the same taken

of

costs associated

with

handling

of

unused articles.

The following figure

shows clearly the efforts displayed

towards

spending cuts on operation and supply costs.

l

lrt 1P3

. Transport

and communications

.

The

reduction

of

the

fleet of

vehicles,

its

consotidation

with

regards

to the

rypes

of

vehicles

to mainAin right to

the end

of

the Programme, and the management

of

obsolete and surplus spare parts are key issues

for

this unit to handte. The

following

figure shows a sizeable reduction of the ngrnber of vehicles in the order of 21.4% over a period of five years. Moreover, ttre distribution

of

ttre types

of

vehicles has been modifred

to

favour all-terrain as opposed to transport and liaison vetriiles. Spare parts stores are presently undergoing a slimming cure which should enable the programme to retain at the end

of

1995, only the current

pars

needed

for

the present vehicles on hand.

4.5

(3)

3

The Transport unit is also responsible

for

the elaboration and realization

of

a devolution plan for the maintenance activities

of

the fleets in Guinea-Bissau, Senegal, Mali and particularly

in

Guinea and Sierra

lrone.

The objective is ro have those National Teams responsible

for

the take

over of the

maintenance

of the fleet of

vehicles provided

by the

Programme

in

those

countries.

-1

1901

ffil

Tnnaporr

ffi

uatron

Il --l

Tcnatn

J

rotat

400--

|

373

Budget and Finance

Close follow-up

of

the budgets in view

bf

the reduced expenses planned-for 1995; active follow-up necessitatini close

contict with

the main users

of

the Programme's funds in order to

t

""" pr"*r"rning signl of any

discrepancies

which could

possibly jeopardize the established

UuAges. Since

iqgg

ttre budglts have progressively diminished and this reducing trend

will

be

maintained until the end

of

thle fourttr financial phase which

in

turn could permit the Programme to finish this phase

with

expenses

well within

ttre 175.5

million

originally provided

in

the Plan

of

Operations. The substaniial savings would put the Programme

in

a bener position to acceed to tfre Phasing-out period planned

for

1998-2002'

Références

Documents relatifs

Considering the decision of the Economic and Social Council 1 which &#34; Invites the governing bodies of the participating organizations (a) to consider formally the problem of

Table 1 shows the number of MRI and CT imaging units per million population for both the private and public sectors for four countries of the Region, one from each income group

Legislated reductions in population sodium consumption were estimated to be more cost effective than hypertension programmes targeting individuals with systolic blood pressure

In this respect, the law shall prohibit any discrimination and guarantee to all persons equal and effective protection against discrimination on any ground such as race, colour,

35 See also the discussion on composite procedures in this volume.. the substantive relation of interested parties to the procedure is the basis for claim for

For each method, we obtain formulas that provide bounds on the total number of vector additions in F k b required to perform any of the following three computations, given a vector S

[r]

there is a decrease in the quality of working conditions combined with an increase in the intensities of technical and market constraints and a decrease in