• Aucun résultat trouvé

Create Lean Implementation Plan

N/A
N/A
Protected

Academic year: 2021

Partager "Create Lean Implementation Plan"

Copied!
2
0
0

Texte intégral

(1)

Create Lean Implementation Plan

4.1A Identify Enterprise/IPT Lean Strategies and Initiatives that interact with the supply chain

4.1 Define supplier network

4.2 Baseline supplier capabilities & assess lean competency of suppliers 4.3 Select and qualify suppliers (incl. supplier certification)

4.4 Identify needs (supplier development; internal & external education) 4.5 Identify and prioritize supplier development initiatives

4.6 Create lean implementation plan with suppliers 4.6.1 Procurement plan

4.6.2 Long-term relationships; strategic alliances

4.6.3 Contract design (Incentives strategies,gain sharing) 4.6.4 Target costing

4.6.5 Information-sharing, cost-sharing, risk-sharing 4.7 Assemble the lean implementation tool set for executing

This block of activities represents the beginning of translating the

Organizations Lean Vision and Strategies developed earlier into reality. The previous block set the stage by developing the infrastructure, organization, defining incentives both internal to the Org and external with Suppliers, defining necessary technical and business processes and most critically allocated resources to implement the tasks ahead. Here you will assess the Lean competency of your suppliers to better understand their needs and ability to support your Lean Vision and Strategies. Through the earlier analysis performed in the Strategic Planning block, and in conjunction with IPT Lean Strategies, Suppliers are selected for integration into your Lean plans. Needs of both the Suppliers and the organization are identified with regard to

development and education and prioritized. Here specific plans and initiatives are developed with your suppliers, information is shared regarding cost, risks, and potential gains, relationships and alliances are defined and procurement plans developed. The Lean Tool Set is developed an assembled to meet the needs of the next block of actual Implementation of Lean initiatives.

This Block starts the beginning of the “Short Term Cycle” which is best

(2)

in fact should be well integrated with AOP serving as the cornerstone of its foundation. There are strong tactical relationships between the activities in this block and those in the Enterprise Level (TTL) Create and Refine

Implementation Program and Implement Lean Initiatives.

Implement Lean Initiatives

5.1 Refine & operationalize performance targets and metrics 5.2 Commit resources to lean initiatives

5.3 Map the "current state" supplier value stream 5.4 Map the "future state" supplier value stream 5.5 Implement lean transition initiatives

5.5.1 Adopt & pursue implementation model(s) [radical; incremental; pilot projects, as required (pilot-evaluate-scale-up)]

5.5.2 Implement procurement plan

5.5.3 Implement lean contractual relationships (e.g., long-term relationships & strategic alliances; mutual gainsharing arrangements)

5.5.4 Mutual performance improvement events/initiatives 5.6 Conduct internal and external training

This section of the Supplier Network Roadmap is where the Vision Strategies, Plans and Tools get executed. All sections up to this point have been

concerned with definition, strategy development, infrastructure development and preparation for implementation. This section is where “the rubber meets the road” and we “Do” what has been envisioned, strategized and planned. All of the previous stages have set the stage for metric data collection and refinement, value stream mapping, training and procurement initiatives. Plans should be prioritized and time phased with resources available to support the initiatives and/or the suppliers. Resources are key to fulfilling the plans and pave the way for continuous improvement actions.

Références

Documents relatifs

This allows us to tackle two key issues in the field of third-order nonlinear properties of gold nanoparticles: The influence of the generalized thermal lens in the long laser

En plus du nombre de composantes connexes, nous pro- posons de calculer des caractéristiques de forme avec le volume moyen et la compacité moyenne des composantes connexes. Ici

L’accès à ce site Web et l’utilisation de son contenu sont assujettis aux conditions présentées dans le site LISEZ CES CONDITIONS ATTENTIVEMENT AVANT D’UTILISER CE SITE WEB.

In patients with diagnostic uncertainty, 6-point/8-point LUS method (using the 1 bilateral positive point threshold) improves AHF diagnosis accuracy on top of the

共Received 10 August 2009; accepted 27 September 2009; published online 17 November 2009兲 This work examines the enhancement of current on/off ratio in field effect transistor

We present here an in-depth analysis of particle levitation stability and the role of the radial and axial forces exerted on fixed spherical and ellipsoidal particles levitated in

Finding 1: companies adopting lean manufacturing don’t show an additional contribution to efficiency (unit cost of manufacturing) and throughput time by

The fact that national identities and cultures can here, and at different moments, be more or less relevant than company culture, departmental cultures, or ethnic cultures,