• Aucun résultat trouvé

Go to Menti.com Enter the code: 55 23 31 9

N/A
N/A
Protected

Academic year: 2022

Partager "Go to Menti.com Enter the code: 55 23 31 9"

Copied!
4
0
0

Texte intégral

(1)

Go to Menti.com

Enter the code: 55 23 31 9

(2)

❑ To ask a question:

• Go to Menti.com

• Enter the code 55 23 31 9

Questions

PAGE 2

(3)

❑ Session B1 – 10:00-11:00 – led by CDC Biodiversité – Lessons learnt from the first corporate measurements; Chaired by Rose Choukroun, CDC Biodiversité.

• Aligning Biodiversity Measures for Business – continuing the collaboration 2021-2024 – Sharon Brooks, Deputy Head of Business and Biodiversity Programme, UNEP-WCMC

• First full “end to end” biodiversity footprint assessment ever conducted – Xavier Houot, Senior VP- Chief Environment Officer, Schneider Electric &

Patricia Zhang, Research officer, CDC Biodiversité

• Informing the group’s biodiversity strategy and targets with biodiversity footprinting – Thomas Andro, Head of Solvay Way, Solvay

• Approaches to understanding biodiversity risk for companies – Edward Pollard, Technical Director, The Biodiversity Consultancy

• Q&A

❑ Session B2 – 11:00-12:00 – led by The Biodiversity Consultancy – Biodiversity

measurement for business: emerging approaches and processes; Chaired by Helen Temple (The Biodiversity Consultancy).

PAGE 3

Agenda

(4)

❑ Go to www.menti.com and enter the code 55 23 31 9

❑ Let’s start by getting to know each other…

Mentimeter

PAGE 4

Références

Documents relatifs

These few examples based around the use of natural processes are a testament to the increasing importance of biodiversity challenges in certain sectors whose core businesses may

Identify common input data sets and agree on a limited set of input indicators and formats (including granularity) which companies could collect to feed most measurement

Impacts on biodiversity, and associated pressures, covered due to the endpoint characterisation factors available for each metric.. Endpoint characterisation factors and

Externally collected input data (e.g. global data sets) Used as direct inputs Used to build

- JL: To encourage broader uptake of measurement approaches is obligatory disclosure of performance by companies.. There is a tendency that there is increased regulatory pressure

By adding PM you can achieve closed loop performance management, where metrics are compared with business objectives and the results fed back to improve

Moving from the software engineering approach and from previous work, we define some axioms according to which we classify the measures as complexity, size, and coupling.. We do

From the e3 value perspective, the activities performed in the outlined phases, may be defined as followings (see also Figure 1): in the planning and identification phases, actors