• Aucun résultat trouvé

PRICES and TERMS

N/A
N/A
Protected

Academic year: 2022

Partager "PRICES and TERMS "

Copied!
1
0
0

Texte intégral

(1)

- - - -

- - - - - - - - - - - - - - - - ---

.=.=-:::';'= ISG

INTRODUCTION

Do not reproduce without written permission

INTRODUCTION

PRICES and TERMS

&.

CONDITIONS

Intro.1 Oct 83

The Service for Consultants Manual contains prices and related terms and conditions for standard products and services currently marketed to commercial customers by the National Accounts Division (NAD) and the National Marketing Division (NMD).

ORGANIZATION

The Service for Consultants Manual consists of ten sections with individual tabs. Each section has explanatory information, detailed data and, if applicable, footnotes. Each page within a section is identified with the section name, a page number, the month and year published. The section titles and contents are:

Introduction Hardware Prices

Hardware Terms & Conditions Software Prices

Software Terms & Conditions Model Upgrade Purchase Prices Accessory Prices

Pilot Test Plan Prices Service Offering Prices Appendices

ORDERING INSTRUCTIONS

The Service for Consultants Manual may be ordered through your local branch office The base publication numbers for ordering The Service for Consultants Manual are:

Binder Pages Tabs

S320-1070 SY20-0161 S320-1071

Initial orders are placed through the local IBM Branch Office. Updates will be issued periodically.

ADDITIONAL INFORMATION SOURCES

Many publications or data base files contain information on products and services. A list of some of these other sources is provided for your reference. These additional sources are not maintained by Central Sales Manual Services.

Announcement Letters Systems Selection Guide Software Directory (GB21-9949)

Software Catalog (G320-6531 through 6537) Systems Supplies Division Sales Manual General Services Administration (GSA) Contracts

(Reverse side is blank)

Références

Documents relatifs

POST: Terra Foundation for American Art Postdoctoral Teaching Fellowship at The Courtauld Institute of Art For period 1 September 2013 to 31 July 2015.. SALARY:

In case of a cancellation on behalf of L’Institut des Sciences Appliquées de Lyon related to the COVID situation (lockdown, closing of universities…), INSA Lyon will provide

The Company must notify the Authorized Representative in writing in the form attached as “Schedule 2 – Authorized Representative Commercial Credit Card

The determination of a requested reactive power volume in the context of the service for reactive power and voltage control is also coherent with the

Elia wants to remind the BSPs that the availability test is only failed if the aFRR Power supplied is inferior (respectively superior) to the aFRR Capacity Requested for more

The signature of a CIPU contract is required to participate to the black-start service because the outage planning, provided to Elia through CIPU procedures, is necessary

Elia adds the reason “Flexibility for fulfilment of BRP obligations” to the list of reasons accepted by Elia for (partial) rejection of activation of non-contracted mFRR energy

If an appropriate standard term does not exist, a new term may be constructed from a combination of standard terms.” The user guide for the electronic application form for a