An alternative method of long lead-time tool purchases
Texte intégral
Figure
Documents relatifs
The existence of this solution is shown in Section 5, where Dirichlet solutions to the δ-Ricci-DeTurck flow with given parabolic boundary values C 0 close to δ are constructed..
In addition, after obtaining the auditor‘s declaration of independence and after conclusion of a disclosure agreement, the Audit Committee prepared the Supervisory Board’s proposal
We have designed a multilingual search interface (a front-end for the Flickr database) where users can search in three modes: no translation, automatic translation in the
The first stage measures firm operational performance through DEA efficiency scores to identify the best-perform- ing firm practices, and the second consists of a bootstrap pro-
It may, however, be worth pointing out that in case the operation of modulation leaves the core meaning unaltered, the possibilities of the "conditional interpretation"
Note that although the existence of steady states for a model with continuous trait and space is pro- vided in [2], the long time behavior of solutions is not known, to our
The clinical use of stress echocardiography in non- ischaemic heart disease: recommendations from the European association of cardiovascular imaging and the American Society
If system operators are choosing software packages and services for their sustainability footprint then there will be significant pressure on software developers to address