CA-17 POINT LEPREAU
1. AS PER THE GRID ARRANGEMENT, THE UNIT POWER WAS DROPDOWNED AND OPERATED AT 88% FROM04:22Design Discharge Burnup:
Net Reference Unit Power
at the beginning of 2008: 650.0 MW(e)
Production Summary 2008
Net Energy Production: 5083.4 GW(e).h
Station Details
PHWR Type:
CN-9 QINSHAN 3-2
Operator:
Contractor:
2008 Operating Experience
AECL (ATOMIC ENERGY OF CANADA LTD.)
TQNPC (The Third Qinshan Jointed Venture Company Ltda.)
57.0 3.0 0.0
0.0
103.6 100.0
0.0 0.0 43.6 99.2
Jun Jul Aug
100.0 100.0 (%)
469.2 496.2 Jan
503.0 1.7 468.1 480.2
May
105.9 103.9 58.7
486.7 98.6 100.0 56.4 0.8 96.9 100.0 100.0 100.0
96.9 100.0 100.0 100.0
100.2 102.5 104.0 95.3 0.3 100.0 99.3 98.9
100.0 100.0 100.0 100.0 99.9 100.0 92.6
1.4 0.0 43.6 99.2 3.1 0.0 0.0 0.0 0.0 0.0 5.3
2.7 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 5.3
1.4 0.0 0.0 0.0 0.0 0.0 0.0
UCLF replaces previously used UUF.
0.0 0.0 0.0 0.0 100.0 100.0 56.4 0.8
88.9%
Date of First Criticality:
Date of Grid Connection:
Date of Construction Start:
24 Jul 2003 25 Sep 1998 18 Jan 2003 Date of Commercial Operation:
89.6%
11.2%
Cumulative Energy Unavailability Factor:
Lifetime Generation:
Cumulative Energy Availability Factor:
12.8%
Total Off–line Time:
27877.3 GW(e).h 88.8%
2008 Monthly Performance Data
2008 Summary of Operation
0.5 0.1
Status at end of year: 1063 hours
Cumulative Load Factor:
Cumulative Unit Capability Factor:
12 Jun 2003
Historical Summary
2005 Year
Annual Cumul.
2003
Annual Time Online Cumul.
91.7 91.7 8236 93.8
Hours of (%) Energy
GW(e).h
Performance for Full Years of Commercial Operation Load Factor (in %) Capacity
MW(e)
Annual Cumul. Annual Unit Capability
Factor (in %)
Energy Availability Factor (in %)
OF FEBRUARY 6TH TO 08:15OF FEBRUARY 9TH.2. ON APRIL 18, THE UNIT WAS SHUTDOWN FOR PLANNED MAINTENANCE OUTAGE. AT 01:55 ON MAY 31,THE UNIT CONNECTED TO GRID, AND REACHED FULL POWER OPERATION AT 17:30 ON JUNE 2.3. AT 3:06 OF DEC 4, THE UNIT EXPERIENCED A SETBACK ON LOW
DEAERATOR LEVEL AND SUBSEQUENTLYPOISONED-OUT BECAUSE CONDENSATE PURIFICATION BYPASS FLOW CONTROL VALVE 4324-FCV6010FAILED CLOSED. AT 9:48 OF DECEMBER 6, THE UNIT RE-CONNECTED TO GRID.
Data not provided
2004 5358.6 665.0 93.0 93.0 92.4 92.4
4604.6 665.0 80.2 86.6 80.1 86.3 79.0 85.4 7014 80.1
2006 5038.2 650.0 86.7 86.7 86.7 86.4 88.5
2007 5675.7 650.0 97.6 8559 97.7
86.4 7721 88.1
650.0 87.3
99.7 89.7
89.3 97.6 89.2
89.6 7697 87.9
88.9 87.2 88.8 89.3
2008 5083.4
6.
A.
D.
L.
N.
7.
Full Outages, Analysis by Cause
Outage Cause 2008 Hours Lost 2004 to 2008
Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External
Plant equipment problem/failure 69 26
Inspection, maintenance or repai 1037 657
without refuelling
Human factor related 18
Environmental conditions (lack o 9
cooling water due to dry weathe cooling water temperature limits
flood, storm, lightning, etc.
Subtotal 1037 69 0 657 44 9
Total 1106 710
Equipment Related Full Outages, Analysis by System
System 2008
Hours Lost
2004 to 2008 Average Hours Lost Per Year
16. Steam generation systems 10
32. Feedwater and Main Steam System 69
Total 69 25
42. Electrical Power Supply Systems 15
1. 2.
Load Factor: 74.6%
71.4%
Operating Factor:
Oct Dec Annual
Operational
0.0 0.0 0.0 0.0
Energy Unavailability Factor:
Energy Availability Factor:
—
71.0%
Design Net Capacity:
EAF UCF
Mar Apr
933.0 MW(e)
1.AT 4:39 ON MARCH 12.2008,UNIT 1 OF TIANWAN NPP SYNCHRONIZED THE GRID AFTER T101 Design Discharge Burnup:
Net Reference Unit Power
at the beginning of 2008: 933.0 MW(e)
Production Summary 2008
Net Energy Production: 6116.2 GW(e).h
Station Details
PWR Type:
CN-10 TIANWAN 1
Operator:
Contractor:
2008 Operating Experience
IZ (Izhorskiye Zavody)
JNPC (Jiangsu Nuclear Power Corporation)
100.0 100.0 100.0
Jun Jul Aug
0.0 0.0 (%)
30.2 732.3 Jan
0.0 733.5 698.6 719.8
May
0.0 63.1 106.6
712.8 0.0 60.4 100.0 100.0 100.0 100.0 83.0 4.4
100.0 100.0 83.0 4.4
4.5 105.5 106.1 106.2 105.7 104.0 103.7 86.1
100.0 100.0 83.1 5.7 100.0 100.0 100.0
100.0 39.6 0.0 0.0 0.0 0.0 17.0 95.6 0.0 0.0 0.0
0.0 0.0 0.0 80.8 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 17.0 14.8 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0
UCLF replaces previously used UUF.
0.0 0.0 0.0 0.0 0.0 60.4 100.0 100.0
Date of First Criticality:
Date of Grid Connection:
Date of Construction Start:
17 May 2007 20 Oct 1999 20 Dec 2005 Date of Commercial Operation:
23.5%
Cumulative Energy Unavailability Factor:
Lifetime Generation:
Cumulative Energy Availability Factor:
76.5%
29.0%
Total Off–line Time:
12662.0 GW(e).h 76.5%
2008 Monthly Performance Data
2008 Summary of Operation
2.7 0.0
Status at end of year: 2514 hours
Cumulative Load Factor:
Cumulative Unit Capability Factor:
12 May 2006
Historical Summary
1000.0
2008 6116.2 933.0
4687.0
2007 84.7 84.7 84.7 84.7 85.4 4955 84.3
Capacity MW(e)
Annual Cumul. Annual Unit Capability
Factor (in %)
Energy Availability Factor (in %)
Annual Time Online Cumul.
85.4 Energy
GW(e).h
Performance for Full Years of Commercial Operation Load Factor (in %) Year
Annual Cumul. Hours of (%) 79.0%
OUTAGE.2.AT 17:32 ON AUGUST 26.2008, THE MAIN TRANSFORMER ON THE 1ST PHASE B WAS FAULT. THEN PROTECTION DEVICE MOVED,UNIT 1 AUTOMATIC SAFETY SHUTDOWN. AT THIS TIME, THE FIRST MINOR OUTAGE BEGING. AT 7:07 ON SEPTEMBER 29, 2008, UNIT 1 OF TIANWAN NPP SYNCHRONIZED THE GRID AFTER THE FIRST MINOR OUTAGE.
6270 71.4
Full Outages, Analysis by Cause
71.0 76.5 74.6 79.0
71.0 76.5
Outage Cause 2008 Hours Lost 2007 to 2008
Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External
Plant equipment problem/failure 233
Inspection, maintenance or repai 1709 432
combined with refuelling
Inspection, maintenance or repai 573 without refuelling
Subtotal 2282 233 0 432 0 0
Total 2515 432
Equipment Related Full Outages, Analysis by System
System 2008
Hours Lost
2007 to 2008 Average Hours Lost Per Year
Total 233 0
42. Electrical Power Supply Systems 233
1. 2.
There were no equipment related outages reported for this period.
Equipment Related Full Outages, Analysis by System
System 2008
Hours Lost
2008 to 2008 Average Hours Lost Per Year
0 0 0
Total 1607 0
Subtotal 1607 0 0
combined with refuelling
Inspection, maintenance or repai 1607
Outage Cause 2008 Hours Lost 2008 to 2008
Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External
90.2
Full Outages, Analysis by Cause
86.7 81.1 86.7 85.7
2008 7003.0 933.0 81.1
Annual Time Online Cumul.
101.0 Energy
GW(e).h
Performance for Full Years of Commercial Operation Load Factor (in %)
90.2%
Capacity MW(e)
Annual Cumul. Annual Unit Capability
Factor (in %)
Energy Availability Factor (in %)
101.0 97.7
100.0
100.0 100.0 100.0 3586
958.0
7193 82.1
Year
3459.0
Annual Cumul. Hours of (%) 2007
Historical Summary
1567 hours
Cumulative Load Factor:
Cumulative Unit Capability Factor:
14 May 2007
2008,UNIT 2 OF TIANWAN NPP SYNCHRONIZED THE GRID AFTER OUTAGE.
Total Off–line Time:
10977.0 GW(e).h 86.7%
2008 Monthly Performance Data
2008 Summary of Operation
0.0 0.0 Status at end of year:
13.3%
Cumulative Energy Unavailability Factor:
Lifetime Generation:
Cumulative Energy Availability Factor:
86.7%
Date of First Criticality:
Date of Grid Connection:
Date of Construction Start:
16 Aug 2007 20 Oct 2000 01 May 2007 Date of Commercial Operation:
7003.0 81.1 81.1 100.0
100.0 100.0 99.7 99.3 0.0
85.7 82.1 18.9 18.8
0.0 0.0 0.0
UCLF replaces previously used UUF.
0.0 0.0 0.0 0.0
99.9 100.0 100.0
0.0 0.3 0.7 100.0 100.0 20.2 0.0
0.0 82.8 100.0 100.0
100.8 105.5 106.3 0.0 0.0 82.8 104.3
79.8 100.0 100.0 104.3
96.1
737.6 100.0 99.7 99.3 0.0 0.0 79.8 100.0 100.0 96.1
Nov 712.6
108.7 104.6 106.2
708.9 99.9 99.9
724.2 700.8
Jan
736.2 0.1 0.0 574.6
May Feb
681.7
(%)
Sep
Jun Jul Aug
100.0
CN-11 TIANWAN 2
Operator:
Contractor:
2008 Operating Experience
IZ (Izhorskiye Zavody)
JNPC (Jiangsu Nuclear Power Corporation)
Net Energy Production: 7003.0 GW(e).h
Station Details
PWR Type:
Production Summary 2008
Net Reference Unit Power
at the beginning of 2008: 933.0 MW(e) Design Net Capacity:
EAF UCF
Mar Apr
933.0 MW(e)
AT 0:35 ON MAY 1, 2008,UNIT 2 SHUTDOWN DURING REFUELING OUTAGE.AT 7:41 ON JULY 6, Design Discharge Burnup:
Energy Availability Factor:
—
Energy Unavailability Factor:
100.1 0.1 0.0
0.0
103.6 100.0
0.0
0.0 0.0 0.7 100.0 (%)
(%) GW(e).h
Load Factor: 85.7%
82.1%
Operating Factor:
Oct Dec Annual
Operational
1. 2.
3.
LF OF EUF PUF UCLF
4.
GW(e).h
Load Factor: 75.4%
77.7%
Operating Factor:
Oct Dec Annual
Operational
0.0 0.0 99.8 100.0
Energy Unavailability Factor:
Energy Availability Factor:
30000 MW.d/t
75.4%
Design Net Capacity:
EAF UCF
Mar Apr
604.0 MW(e)
1.UNIT SHUTDOWN FOR MAIN TRANSFORMER REPAIR ON MAY.09,2008.2.POWER RESTRICTION DUE TO Design Discharge Burnup:
Net Reference Unit Power
at the beginning of 2008: 604.0 MW(e)
Production Summary 2008
Net Energy Production: 3998.9 GW(e).h
Station Details
BWR Type: