AS PER THE GRID ARRANGEMENT, THE UNIT POWER WAS DROPDOWNED AND OPERATED AT 88% FROM04:22Design Discharge Burnup:

CA-17 POINT LEPREAU

1. AS PER THE GRID ARRANGEMENT, THE UNIT POWER WAS DROPDOWNED AND OPERATED AT 88% FROM04:22Design Discharge Burnup:

Net Reference Unit Power

at the beginning of 2008: 650.0 MW(e)

Production Summary 2008

Net Energy Production: 5083.4 GW(e).h

Station Details

PHWR Type:

CN-9 QINSHAN 3-2

Operator:

Contractor:

2008 Operating Experience

AECL (ATOMIC ENERGY OF CANADA LTD.)

TQNPC (The Third Qinshan Jointed Venture Company Ltda.)

57.0 3.0 0.0

0.0

103.6 100.0

0.0 0.0 43.6 99.2

Jun Jul Aug

100.0 100.0 (%)

469.2 496.2 Jan

503.0 1.7 468.1 480.2

May

105.9 103.9 58.7

486.7 98.6 100.0 56.4 0.8 96.9 100.0 100.0 100.0

96.9 100.0 100.0 100.0

100.2 102.5 104.0 95.3 0.3 100.0 99.3 98.9

100.0 100.0 100.0 100.0 99.9 100.0 92.6

1.4 0.0 43.6 99.2 3.1 0.0 0.0 0.0 0.0 0.0 5.3

2.7 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 0.0 0.0 5.3

1.4 0.0 0.0 0.0 0.0 0.0 0.0

UCLF replaces previously used UUF.

0.0 0.0 0.0 0.0 100.0 100.0 56.4 0.8

88.9%

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

24 Jul 2003 25 Sep 1998 18 Jan 2003 Date of Commercial Operation:

89.6%

11.2%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

12.8%

Total Off–line Time:

27877.3 GW(e).h 88.8%

2008 Monthly Performance Data

2008 Summary of Operation

0.5 0.1

Status at end of year: 1063 hours

Cumulative Load Factor:

Cumulative Unit Capability Factor:

12 Jun 2003

Historical Summary

2005 Year

Annual Cumul.

2003

Annual Time Online Cumul.

91.7 91.7 8236 93.8

Hours of (%) Energy

GW(e).h

Performance for Full Years of Commercial Operation Load Factor (in %) Capacity

MW(e)

Annual Cumul. Annual Unit Capability

Factor (in %)

Energy Availability Factor (in %)

OF FEBRUARY 6TH TO 08:15OF FEBRUARY 9TH.2. ON APRIL 18, THE UNIT WAS SHUTDOWN FOR PLANNED MAINTENANCE OUTAGE. AT 01:55 ON MAY 31,THE UNIT CONNECTED TO GRID, AND REACHED FULL POWER OPERATION AT 17:30 ON JUNE 2.3. AT 3:06 OF DEC 4, THE UNIT EXPERIENCED A SETBACK ON LOW

DEAERATOR LEVEL AND SUBSEQUENTLYPOISONED-OUT BECAUSE CONDENSATE PURIFICATION BYPASS FLOW CONTROL VALVE 4324-FCV6010FAILED CLOSED. AT 9:48 OF DECEMBER 6, THE UNIT RE-CONNECTED TO GRID.

Data not provided

2004 5358.6 665.0 93.0 93.0 92.4 92.4

4604.6 665.0 80.2 86.6 80.1 86.3 79.0 85.4 7014 80.1

2006 5038.2 650.0 86.7 86.7 86.7 86.4 88.5

2007 5675.7 650.0 97.6 8559 97.7

86.4 7721 88.1

650.0 87.3

99.7 89.7

89.3 97.6 89.2

89.6 7697 87.9

88.9 87.2 88.8 89.3

2008 5083.4

6.

A.

D.

L.

N.

7.

Full Outages, Analysis by Cause

Outage Cause 2008 Hours Lost 2004 to 2008

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment problem/failure 69 26

Inspection, maintenance or repai 1037 657

without refuelling

Human factor related 18

Environmental conditions (lack o 9

cooling water due to dry weathe cooling water temperature limits

flood, storm, lightning, etc.

Subtotal 1037 69 0 657 44 9

Total 1106 710

Equipment Related Full Outages, Analysis by System

System 2008

Hours Lost

2004 to 2008 Average Hours Lost Per Year

16. Steam generation systems 10

32. Feedwater and Main Steam System 69

Total 69 25

42. Electrical Power Supply Systems 15

1. 2.

Load Factor: 74.6%

71.4%

Operating Factor:

Oct Dec Annual

Operational

0.0 0.0 0.0 0.0

Energy Unavailability Factor:

Energy Availability Factor:

71.0%

Design Net Capacity:

EAF UCF

Mar Apr

933.0 MW(e)

1.AT 4:39 ON MARCH 12.2008,UNIT 1 OF TIANWAN NPP SYNCHRONIZED THE GRID AFTER T101 Design Discharge Burnup:

Net Reference Unit Power

at the beginning of 2008: 933.0 MW(e)

Production Summary 2008

Net Energy Production: 6116.2 GW(e).h

Station Details

PWR Type:

CN-10 TIANWAN 1

Operator:

Contractor:

2008 Operating Experience

IZ (Izhorskiye Zavody)

JNPC (Jiangsu Nuclear Power Corporation)

100.0 100.0 100.0

Jun Jul Aug

0.0 0.0 (%)

30.2 732.3 Jan

0.0 733.5 698.6 719.8

May

0.0 63.1 106.6

712.8 0.0 60.4 100.0 100.0 100.0 100.0 83.0 4.4

100.0 100.0 83.0 4.4

4.5 105.5 106.1 106.2 105.7 104.0 103.7 86.1

100.0 100.0 83.1 5.7 100.0 100.0 100.0

100.0 39.6 0.0 0.0 0.0 0.0 17.0 95.6 0.0 0.0 0.0

0.0 0.0 0.0 80.8 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 17.0 14.8 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0

UCLF replaces previously used UUF.

0.0 0.0 0.0 0.0 0.0 60.4 100.0 100.0

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

17 May 2007 20 Oct 1999 20 Dec 2005 Date of Commercial Operation:

23.5%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

76.5%

29.0%

Total Off–line Time:

12662.0 GW(e).h 76.5%

2008 Monthly Performance Data

2008 Summary of Operation

2.7 0.0

Status at end of year: 2514 hours

Cumulative Load Factor:

Cumulative Unit Capability Factor:

12 May 2006

Historical Summary

1000.0

2008 6116.2 933.0

4687.0

2007 84.7 84.7 84.7 84.7 85.4 4955 84.3

Capacity MW(e)

Annual Cumul. Annual Unit Capability

Factor (in %)

Energy Availability Factor (in %)

Annual Time Online Cumul.

85.4 Energy

GW(e).h

Performance for Full Years of Commercial Operation Load Factor (in %) Year

Annual Cumul. Hours of (%) 79.0%

OUTAGE.2.AT 17:32 ON AUGUST 26.2008, THE MAIN TRANSFORMER ON THE 1ST PHASE B WAS FAULT. THEN PROTECTION DEVICE MOVED,UNIT 1 AUTOMATIC SAFETY SHUTDOWN. AT THIS TIME, THE FIRST MINOR OUTAGE BEGING. AT 7:07 ON SEPTEMBER 29, 2008, UNIT 1 OF TIANWAN NPP SYNCHRONIZED THE GRID AFTER THE FIRST MINOR OUTAGE.

6270 71.4

Full Outages, Analysis by Cause

71.0 76.5 74.6 79.0

71.0 76.5

Outage Cause 2008 Hours Lost 2007 to 2008

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

Plant equipment problem/failure 233

Inspection, maintenance or repai 1709 432

combined with refuelling

Inspection, maintenance or repai 573 without refuelling

Subtotal 2282 233 0 432 0 0

Total 2515 432

Equipment Related Full Outages, Analysis by System

System 2008

Hours Lost

2007 to 2008 Average Hours Lost Per Year

Total 233 0

42. Electrical Power Supply Systems 233

1. 2.

There were no equipment related outages reported for this period.

Equipment Related Full Outages, Analysis by System

System 2008

Hours Lost

2008 to 2008 Average Hours Lost Per Year

0 0 0

Total 1607 0

Subtotal 1607 0 0

combined with refuelling

Inspection, maintenance or repai 1607

Outage Cause 2008 Hours Lost 2008 to 2008

Average Hours Lost Per Year Planned Unplanned External Planned Unplanned External

90.2

Full Outages, Analysis by Cause

86.7 81.1 86.7 85.7

2008 7003.0 933.0 81.1

Annual Time Online Cumul.

101.0 Energy

GW(e).h

Performance for Full Years of Commercial Operation Load Factor (in %)

90.2%

Capacity MW(e)

Annual Cumul. Annual Unit Capability

Factor (in %)

Energy Availability Factor (in %)

101.0 97.7

100.0

100.0 100.0 100.0 3586

958.0

7193 82.1

Year

3459.0

Annual Cumul. Hours of (%) 2007

Historical Summary

1567 hours

Cumulative Load Factor:

Cumulative Unit Capability Factor:

14 May 2007

2008,UNIT 2 OF TIANWAN NPP SYNCHRONIZED THE GRID AFTER OUTAGE.

Total Off–line Time:

10977.0 GW(e).h 86.7%

2008 Monthly Performance Data

2008 Summary of Operation

0.0 0.0 Status at end of year:

13.3%

Cumulative Energy Unavailability Factor:

Lifetime Generation:

Cumulative Energy Availability Factor:

86.7%

Date of First Criticality:

Date of Grid Connection:

Date of Construction Start:

16 Aug 2007 20 Oct 2000 01 May 2007 Date of Commercial Operation:

7003.0 81.1 81.1 100.0

100.0 100.0 99.7 99.3 0.0

85.7 82.1 18.9 18.8

0.0 0.0 0.0

UCLF replaces previously used UUF.

0.0 0.0 0.0 0.0

99.9 100.0 100.0

0.0 0.3 0.7 100.0 100.0 20.2 0.0

0.0 82.8 100.0 100.0

100.8 105.5 106.3 0.0 0.0 82.8 104.3

79.8 100.0 100.0 104.3

96.1

737.6 100.0 99.7 99.3 0.0 0.0 79.8 100.0 100.0 96.1

Nov 712.6

108.7 104.6 106.2

708.9 99.9 99.9

724.2 700.8

Jan

736.2 0.1 0.0 574.6

May Feb

681.7

(%)

Sep

Jun Jul Aug

100.0

CN-11 TIANWAN 2

Operator:

Contractor:

2008 Operating Experience

IZ (Izhorskiye Zavody)

JNPC (Jiangsu Nuclear Power Corporation)

Net Energy Production: 7003.0 GW(e).h

Station Details

PWR Type:

Production Summary 2008

Net Reference Unit Power

at the beginning of 2008: 933.0 MW(e) Design Net Capacity:

EAF UCF

Mar Apr

933.0 MW(e)

AT 0:35 ON MAY 1, 2008,UNIT 2 SHUTDOWN DURING REFUELING OUTAGE.AT 7:41 ON JULY 6, Design Discharge Burnup:

Energy Availability Factor:

Energy Unavailability Factor:

100.1 0.1 0.0

0.0

103.6 100.0

0.0

0.0 0.0 0.7 100.0 (%)

(%) GW(e).h

Load Factor: 85.7%

82.1%

Operating Factor:

Oct Dec Annual

Operational

1. 2.

3.

LF OF EUF PUF UCLF

4.

GW(e).h

Load Factor: 75.4%

77.7%

Operating Factor:

Oct Dec Annual

Operational

0.0 0.0 99.8 100.0

Energy Unavailability Factor:

Energy Availability Factor:

30000 MW.d/t

75.4%

Design Net Capacity:

EAF UCF

Mar Apr

604.0 MW(e)

1.UNIT SHUTDOWN FOR MAIN TRANSFORMER REPAIR ON MAY.09,2008.2.POWER RESTRICTION DUE TO Design Discharge Burnup:

Net Reference Unit Power

at the beginning of 2008: 604.0 MW(e)

Production Summary 2008

Net Energy Production: 3998.9 GW(e).h

Station Details

BWR Type: