• Aucun résultat trouvé

[PDF] Top 20 Graphite target for the spiral project

Has 10000 "Graphite target for the spiral project" found on our website. Below are the top 20 most common "Graphite target for the spiral project".

Graphite target for the spiral project

Graphite target for the spiral project

... archive for the deposit and dissemination of sci- entific research documents, whether they are pub- lished or ...not. The documents may come from teaching and research institutions in France or ... Voir le document complet

12

UC$_x$ target design for the SPIRAL 2 project and the ALTO project

UC$_x$ target design for the SPIRAL 2 project and the ALTO project

... 3. The SPIRAL 2 target: 19 series of about 60 pellets diameter 15 mm, thickness 1 mm, spacing about ...pellet. The target has to work at a temperature higher than 2000 °C in order to ... Voir le document complet

8

Beam Dynamics Studies for the Spiral-2 Project

Beam Dynamics Studies for the Spiral-2 Project

... INTRODUCTION The SPIRAL-2 project aims at building at GANIL a new ISOL-type facility for the production of high intensity rare isotope ...beams. The project has now ... Voir le document complet

4

The LEBT Chopper for the Spiral 2 Project

The LEBT Chopper for the Spiral 2 Project

... voltage for the three different particles are 20, 40 and 60 kV respectively, to match the RFQ input energy of ...20keV/A. The layout of the injector LEBT is shown in Fig. 1. The ... Voir le document complet

4

The SPIRAL 2 Project: Construction Progress and Recent Developments on the SC LINAC Driver

The SPIRAL 2 Project: Construction Progress and Recent Developments on the SC LINAC Driver

... allow the launch of the series units ...all the needed components and are completely equipped to be eventually installed in the Driver ...All the components for the first ... Voir le document complet

8

Spiral FFAG for protontherapy

Spiral FFAG for protontherapy

... of the modern high technology based therapies, in particular of ...Recently the rebirth of FFAG (Fixed Field Alternating Gradient) accelerators resulted in several designs for medical facilities ... Voir le document complet

4

New exotic beams from the SPIRAL 1 upgrade

New exotic beams from the SPIRAL 1 upgrade

... 2001, the SPIRAL 1 facility has been one of the pioneering facilities in ISOL techniques for reaccelerating radioactive ion beams: the fragmentation of the heavy ion beams of ... Voir le document complet

10

Irradiation control of the "SPIRAL" target by measuring the ion beam intensity via a fast current transformer

Irradiation control of the "SPIRAL" target by measuring the ion beam intensity via a fast current transformer

... and the irradiation mode of targets is regulated by the safety ...present, the target irradiation is limited by a safety criterion of 15 days of use , independently of the irradiating ... Voir le document complet

4

The test bench for the power amplifiers of the SPIRAL-2 SC LINAC

The test bench for the power amplifiers of the SPIRAL-2 SC LINAC

... Abstract The high current driver accelerator of the SPIRAL 2 project uses independently phased SC resonators working at 88 ...drive the cavities with widely ranging conditions of beam ... Voir le document complet

5

An FPGA target for the StarPU heterogeneous runtime system

An FPGA target for the StarPU heterogeneous runtime system

... improve the execution of a wide range of scientific applications, regarding both performance and energy consump- ...fit the application needs, making them an appealing target to extend traditional ... Voir le document complet

9

Target Selection for the LBTI Exozodi Key Science Program

Target Selection for the LBTI Exozodi Key Science Program

... , for details). Therefore, the results of this type of survey would have to be extrapolated to later spectral type targets using planet formation ...theory. The brightest nearby late-F- to K-type ... Voir le document complet

8

Commissioning of SPIRAL

Commissioning of SPIRAL

... be the production of atoms by fission of heavy material like ...way. The proposed production method uses a deuteron primary beam stopped in a beryllium converter, the target itself follows ... Voir le document complet

6

SPIRAL 2 injector diagnostics

SPIRAL 2 injector diagnostics

... OF THE FACILITY The SPIRAL2 project aims at producing Radioactive Ion Beam ...constructing the SPIRAL2 facility [1] composed of an injector including two ...Finally the H.E.B.T. lines ... Voir le document complet

4

Design of the high intensity exotic beams SPIRAL 2 project

Design of the high intensity exotic beams SPIRAL 2 project

... frequency for all RF power sources • moderate cost In addition, the focusing by means of room-temperature quadrupoles, instead of superconducting solenoids, resulting in one cryostat per focusing lattice, ... Voir le document complet

4

The Spiral 2 Project

The Spiral 2 Project

... OF THE SPIRAL 2 FACILITY The SPIRAL 2 facility ...converter, the 5 mA deuteron beam and a uranium carbide target, fast-neutron induced fission is expected to reach a rate of up ... Voir le document complet

9

SPIRAL II Project (electron option) - Preliminary Design Study

SPIRAL II Project (electron option) - Preliminary Design Study

... The target and the ion source will be placed in a rectangular module (called plug) that is surrounded by 2 m of concrete for shielding of workers and ...equipment. The same principle ... Voir le document complet

37

SPIRAL: The R.I.B. Facility under construction at GANIL

SPIRAL: The R.I.B. Facility under construction at GANIL

... The facility consists of a production target associated to an ECR ion source specially designed for this purpose, a low energy beam line, a k=26S compact cyclotron postaccel[r] ... Voir le document complet

4

On autonomous target tracking for UAVs

On autonomous target tracking for UAVs

... of the art This chapter presents work that has been done in domains that are closely related to this ...fields. The result was that those researchers produced solutions heavily influenced by their research ... Voir le document complet

153

New results for the EIE-Surveyor project

New results for the EIE-Surveyor project

... actually the common substrate of all the most advanced ...on the implementation of the Bologna-process in EIE: a tool for feedback, but also for ...colleagues. The aim of ... Voir le document complet

5

Apartment housing for the "farm" redevelopment project

Apartment housing for the "farm" redevelopment project

... The "Farm" Redevelopment Project, with 662 dwelling units, parking for some 760 automobiles and a commercial section covering approximately 15,000 square feet, present[r] ... Voir le document complet

51

Show all 10000 documents...