Resource-constrained
Modeling a Generalized Resource Constrained Multi Project Scheduling Problem Integrated with a Forward-Backward Supply Chain Planning
7
Integration of routing into a resource-constrained project scheduling problem
30
A dynamic scheduling algorithm for time and resource-constrained task networks
9
MIROS: A Hybrid Real-Time Energy-Efficient Operating System for the Resource-Constrained Wireless Sensor Nodes
34
Effective segmentation of green vegetation for resource-constrained real-time applications
8
A linear‐discrete scheduling model for the resource‐constrained project scheduling problem
19
Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem
18
Integration of Supply Chain Planning with Time and Resource Constrained Project Scheduling Problems for Building’s Thermal Renovation Projects
13
A new approach for resource-constrained multi-project scheduling
13
A new shortest path algorithm to solve the resource-constrained project scheduling problem with routing from a flow solution
16
A note on time-indexed formulations for the resource-constrained project scheduling problem
16
An efficient pseudo-polynomial algorithm for finding a lower bound on the makespan for the Resource Constrained Project Scheduling Problem
11
An EAP-EHash authentication method adapted to resource constrained terminals
15
Elliptic curve cryptography algorithms resistant against power analysis attacks on resource constrained devices
150
Flow Polyhedra and Resource Constrained Project Scheduling Problems
37
Parallelizing with BDSC, a resource-constrained scheduling algorithm for shared and distributed memory systems
43
Coordination and competition in resource-constrained channels
227
Memory and Energy Optimization Strategies for Multithreaded Operating System on the Resource-Constrained Wireless Sensor Node
27
Hybrid real-time operating system integrated with middleware for resource-constrained wireless sensor nodes
133
Periodically Aggregated Resource-Constrained Project Scheduling Problem
27