CONSTRUCTION BEST MANAGEMENT PRACTICES PLAN
&KZ>KdWZK:dEhDZ
Z^WKE^/>K&&//>͗
DWWKDW/>Z͗
^/'EYh>/&/ZEd/>WZK&^^/KE>͗
project number
project location/description
county
stormwater permit sequence number responsible official
ALDOT Region Engineer for Edward N. Austin, P.E., ALDOT Chief Engineer
CBMPP compiler
company, title
CBMPP certifier
company, title
INDEX
CBMPP Explanation CBMPP Certifications ALDOT Contact Information
CBMPP DESIGN COMPONENT
I. Project Information
a. ADEM NPDES Notice of Intent b. Soil Properties
c. Hydraulics/Hydrology
II. Environmental Concerns and Commitments a. Environmental Concerns
b. Environmental Commitments III. Environmental Best Management Practices
a. Project Specific Best Management Practices i. ALDOT Project Specific Special Provisions ii. ALDOT Special Project Details
b. Standard Best Management Practices
i. 2022 ALDOT Standard Specifications and General Application Special Provisions ii. 2022 ALDOT Special Drawings
iii. ALDOT Construction Manual - Section 2.5 Construction Stormwater iv. ALDOT Approved Treatment Chemicals
CBMPP OPERATIONAL COMPONENT
IV. Contractor Submitted Components V. Inspections and CBMPP Review Log VI. Rainfall Journal and Rain Gauge Log VII. Regulatory Documentation and Actions Log VIII. CBMPP Modifications Log
APPENDIX
I. Preliminary Plan Set (***Only Include ESC Legend and ESC Plan Sheets) II. Environmental Supporting Documents
ALDOT CBMPP Version January 2022
CBMPP Explanation
dŚŝƐ>KdŽŶƐƚƌƵĐƚŝŽŶĞƐƚDĂŶĂŐĞŵĞŶƚWƌĂĐƚŝĐĞƐWůĂŶ;DWWͿŝƐŝŶƚĞŶĚĞĚƚŽƐĂƚŝƐĨLJƚŚĞƌĞƋƵŝƌĞŵĞŶƚƐŽĨƚŚĞůĂďĂŵĂ ĞƉĂƌƚŵĞŶƚŽĨŶǀŝƌŽŶŵĞŶƚĂůDĂŶĂŐĞŵĞŶƚ;DͿĚŵŝŶŝƐƚƌĂƚŝǀĞŽĚĞĂŶĚƚŚĞEĂƚŝŽŶĂůWŽůůƵƚĂŶƚŝƐĐŚĂƌŐĞůŝŵŝŶĂƚŝŽŶ
^LJƐƚĞŵ;EW^ͿŽŶƐƚƌƵĐƚŝŽŶ'ĞŶĞƌĂůWĞƌŵŝƚ͘
dŚŝƐDWWŝƐĂůƐŽĂŵĞĂŶƐƚŽŐĂƚŚĞƌĂŶĚĐŽŵŵƵŶŝĐĂƚĞĞŶǀŝƌŽŶŵĞŶƚĂůĐŽŶĐĞƌŶƐ͕ĐŽŵŵŝƚŵĞŶƚƐ͕ĂŶĚĐŽŶƚƌĂĐƚƌĞƋƵŝƌĞŵĞŶƚƐ ƚŽ>KdĚĞƐŝŐŶĂŶĚĐŽŶƐƚƌƵĐƚŝŽŶƉĞƌƐŽŶŶĞůĂƐǁĞůůĂƐŽŶƚƌĂĐƚŽƌƐ͘
dŚŝƐ ĚŽĐƵŵĞŶƚ͕ Ăůů ƌĞĨĞƌĞŶĐĞĚ Žƌ ĂƚƚĂĐŚĞĚ ĚŽĐƵŵĞŶƚƐ͕ ĂŶĚ ƚŚŽƐĞ ƉŽƐƚĞĚ ŽŶ ƚŚĞ ůĞĐƚƌŽŶŝĐ DWW ǁĞďƉĂŐĞ ƚŽŐĞƚŚĞƌ ĐŽŶƐƚŝƚƵƚĞƚŚĞDWWĨŽƌƚŚŝƐƉƌŽũĞĐƚ͘
dŚŝƐDWWŝƐƉƌŽǀŝĚĞĚƚŽ>KdŽŶƚƌĂĐƚŽƌƐƉƌŝŽƌƚŽƉƌŽũĞĐƚůĞƚƚŝŶŐ͘
dŚĞDWWŝƐĐŽŵƉƌŝƐĞĚŽĨƚǁŽŵĂŝŶĐŽŵƉŽŶĞŶƚƐ͖ĂĞƐŝŐŶŽŵƉŽŶĞŶƚĂŶĚĂŶKƉĞƌĂƚŝŽŶĂůŽŵƉŽŶĞŶƚ͘
dŚĞĞƐŝŐŶŽŵƉŽŶĞŶƚŝƐĐƌĞĂƚĞĚĂŶĚƵƉĚĂƚĞĚĚƵƌŝŶŐƚŚĞƉůĂŶŶŝŶŐĂŶĚĚĞƐŝŐŶƉŚĂƐĞďLJ>KdĂŶĚͬŽƌĐŽŶƐƵůƚĂŶƚĚĞƐŝŐŶ ƉĞƌƐŽŶŶĞů͘dŚĞĞƐŝŐŶYƵĂůŝĨŝĞĚƌĞĚĞŶƚŝĂůĞĚWƌŽĨĞƐƐŝŽŶĂů;YWͿĐĞƌƚŝĨŝĞƐƚŚĞĞƐŝŐŶŽŵƉŽŶĞŶƚŽĨƚŚĞDWWĂƐŚĂǀŝŶŐ ĂĚĚƌĞƐƐĞĚĂůůŬŶŽǁŶĞŶǀŝƌŽŶŵĞŶƚĂůĐŽŶĐĞƌŶƐ͕ĂŶĚƚŚĂƚƚŚĞƐĞĐŽŶĐĞƌŶƐŚĂǀĞďĞĞŶĂĚĚƌĞƐƐĞĚŝŶƚŚĞƉƌŽũĞĐƚĚĞƐŝŐŶ͘
dŚĞ KƉĞƌĂƚŝŽŶĂů ŽŵƉŽŶĞŶƚ ŝƐ ĐƌĞĂƚĞĚ ĂŶĚ ƵƉĚĂƚĞĚ ĚƵƌŝŶŐ ƚŚĞ ĐŽŶƐƚƌƵĐƚŝŽŶ ƉŚĂƐĞ ďLJ >Kd ƉƌŽũĞĐƚ ƉĞƌƐŽŶŶĞů ĂŶĚ ĐŽŶƚƌĂĐƚŽƌƉĞƌƐŽŶŶĞů͘dŚĞKƉĞƌĂƚŝŽŶĂůYƵĂůŝĨŝĞĚƌĞĚĞŶƚŝĂůĞĚWƌŽĨĞƐƐŝŽŶĂů;YWͿĐĞƌƚŝĨŝĞƐƚŚĂƚƚŚĞĞƐŝŐŶŽŵƉŽŶĞŶƚǁŝůůďĞ ĂĚŚĞƌĞĚƚŽĂƐĐůŽƐĞůLJĂƐƉŽƐƐŝďůĞ͕ĂŶĚƚŚĂƚƚŚĞKƉĞƌĂƚŝŽŶĂů ŽŵƉŽŶĞŶƚǁŝůůďĞĐƌĞĂƚĞĚ͕ƵƉĚĂƚĞĚ͕ĂŶĚĂĚŚĞƌĞĚƚŽĚƵƌŝŶŐ ĐŽŶƐƚƌƵĐƚŝŽŶŽĨƚŚĞƉƌŽũĞĐƚ͘
dŚŝƐDWWŝƐƚŽďĞŵĂŝŶƚĂŝŶĞĚĂƚƚŚĞWƌŽũĞĐƚKĨĨŝĐĞĚƵƌŝŶŐĂĐƚŝǀĞĐŽŶƐƚƌƵĐƚŝŽŶŽŶƚŚĞƉƌŽũĞĐƚĂŶĚƌĞƚĂŝŶĞĚǁŝƚŚƚŚĞƉƌŽũĞĐƚ ƌĞĐŽƌĚƐĂĨƚĞƌƉƌŽũĞĐƚĐŽŵƉůĞƚŝŽŶ͘dŚĞDWWŝƐƚŽďĞŵĂĚĞĂǀĂŝůĂďůĞƚŽĂůůƉƌŽũĞĐƚƐƚĂĨĨŝŶĐůƵĚŝŶŐĂůůŽŶƚƌĂĐƚŽƌƐ͕>KdƐƚĂĨĨ͕
ĂŶĚZĞŐƵůĂƚŽƌƐ͘
Design QCP Certification of Completion
/ĐĞƌƚŝĨLJ ƵŶĚĞƌ ƉĞŶĂůƚLJ ŽĨůĂǁ ƚŚĂƚ ƚŚĞĞƐŝŐŶ ŽŵƉŽŶĞŶƚ ŽĨ ƚŚŝƐ DWW ĂŶĚ Ăůů ĂƚƚĂĐŚŵĞŶƚƐ ǁĞƌĞ ĐŽŵƉŝůĞĚ ƵŶĚĞƌŵLJ ĚŝƌĞĐƚŝŽŶŽƌƐƵƉĞƌǀŝƐŝŽŶĂŶĚĂƌĞĐŽŶƐŝƐƚĞŶƚǁŝƚŚĂƉƉůŝĐĂďůĞDĚŵŝŶŝƐƚƌĂƚŝǀĞŽĚĞĂŶĚƚŚĞEĂƚŝŽŶĂůWŽůůƵƚĂŶƚŝƐĐŚĂƌŐĞ ůŝŵŝŶĂƚŝŽŶ ^LJƐƚĞŵ ;EW^Ϳ ŽŶƐƚƌƵĐƚŝŽŶ 'ĞŶĞƌĂů WĞƌŵŝƚ͘ / ĨƵƌƚŚĞƌ ĐĞƌƚŝĨLJ ƚŚĂƚ Ăůů ŬŶŽǁŶ ĞŶǀŝƌŽŶŵĞŶƚĂů ĐŽŶĐĞƌŶƐ ĂŶĚ ĐŽŵŵŝƚŵĞŶƚƐ͕ĂƐŶŽƚĞĚŝŶ^ĞĐƚŝŽŶ//͕͘ǁĞƌĞĐŽŶƐŝĚĞƌĞĚĂŶĚĂĚĚƌĞƐƐĞĚĚƵƌŝŶŐƚŚĞĐƌĞĂƚŝŽŶŽĨƚŚĞĞƐŝŐŶŽŵƉŽŶĞŶƚŽĨƚŚŝƐ DWWĂŶĚƚŚĞĚĞƐŝŐŶƌĞĨůĞĐƚĞĚŝŶƚŚĞƉƌŽũĞĐƚƉůĂŶƐ͘dŚŝƐDWWĂŶĚĂŶLJDWƐŵĞĞƚƐŽƌĞdžĐĞĞĚƐƚŚĞƚĞĐŚŶŝĐĂůƐƚĂŶĚĂƌĚƐ ĂŶĚŐƵŝĚĞůŝŶĞƐŽĨdŚĞůĂďĂŵĂ,ĂŶĚŬĂŶĚĐƵƌƌĞŶƚŝŶĚƵƐƚƌLJƐƚĂŶĚĂƌĚƐ͘dŚĞĞƐŝŐŶŽŵƉŽŶĞŶƚŽĨƚŚŝƐDWWĂƐƐƵďŵŝƚƚĞĚ ŝƐ͕ƚŽƚŚĞďĞƐƚŽĨŵLJŬŶŽǁůĞĚŐĞĂŶĚďĞůŝĞĨ͕ƚƌƵĞ͕ĂĐĐƵƌĂƚĞ͕ĂŶĚĐŽŵƉůĞƚĞ͘/ĂŵĂǁĂƌĞƚŚĂƚƚŚĞƌĞĂƌĞƐŝŐŶŝĨŝĐĂŶƚƉĞŶĂůƚŝĞƐĨŽƌ ƐƵďŵŝƚƚŝŶŐĨĂůƐĞŝŶĨŽƌŵĂƚŝŽŶ͕ŝŶĐůƵĚŝŶŐƚŚĞƉŽƐƐŝďŝůŝƚLJŽĨĨŝŶĞĂŶĚŝŵƉƌŝƐŽŶŵĞŶƚĨŽƌŬŶŽǁŝŶŐǀŝŽůĂƚŝŽŶƐ͘
Date:
ALDOT CBMPP Version January 2022 CBMPP certifier
company, title project number county
Operational QCP Certification of Receipt and Responsibility
/ĐĞƌƚŝĨLJƵŶĚĞƌƉĞŶĂůƚLJŽĨůĂǁƚŚĂƚƚŚĞĞƐŝŐŶŽŵƉŽŶĞŶƚŽĨƚŚŝƐDWWĂŶĚĂůůĂƚƚĂĐŚŵĞŶƚƐǁŝůůďĞĂĚŚĞƌĞĚƚŽŝŶĂŵĂŶŶĞƌ ĐŽŶƐŝƐƚĞŶƚǁŝƚŚ ĂƉƉůŝĐĂďůĞ D ĚŵŝŶŝƐƚƌĂƚŝǀĞ ŽĚĞ ĂŶĚ ƚŚĞ EĂƚŝŽŶĂůWŽůůƵƚĂŶƚ ŝƐĐŚĂƌŐĞ ůŝŵŝŶĂƚŝŽŶ ^LJƐƚĞŵ ;EW^Ϳ ŽŶƐƚƌƵĐƚŝŽŶ'ĞŶĞƌĂůWĞƌŵŝƚ͘/ĨƵƌƚŚĞƌĐĞƌƚŝĨLJƚŚĂƚŵŽĚŝĨŝĐĂƚŝŽŶƐĂŶĚĂĚĚŝƚŝŽŶƐƚŽƚŚĞKƉĞƌĂƚŝŽŶĂůŽŵƉŽŶĞŶƚŽĨƚŚŝƐDWW ǁŝůůďĞŵĂĚĞƵŶĚĞƌŵLJĚŝƌĞĐƚŝŽŶŽƌƐƵƉĞƌǀŝƐŝŽŶĂŶĚƚŚĂƚƚŚĞKƉĞƌĂƚŝŽŶĂůŽŵƉŽŶĞŶƚŽĨƚŚŝƐDWWǁŝůůďĞ͕ƚŽƚŚĞďĞƐƚŽĨŵLJ ŬŶŽǁůĞĚŐĞĂŶĚďĞůŝĞĨ͕ƚƌƵĞ͕ĂĐĐƵƌĂƚĞ͕ĂŶĚĐŽŵƉůĞƚĞ͘/ĂŵĂǁĂƌĞƚŚĂƚƚŚĞƌĞĂƌĞƐŝŐŶŝĨŝĐĂŶƚƉĞŶĂůƚŝĞƐĨŽƌƐƵďŵŝƚƚŝŶŐĨĂůƐĞ ŝŶĨŽƌŵĂƚŝŽŶ͕ŝŶĐůƵĚŝŶŐƚŚĞƉŽƐƐŝďŝůŝƚLJŽĨĨŝŶĞĂŶĚŝŵƉƌŝƐŽŶŵĞŶƚĨŽƌŬŶŽǁŝŶŐǀŝŽůĂƚŝŽŶƐ͘
Date:
operational QCP
ALDOT Stormwater Coordinator project number
county
ALDOT Contact Information
RESPONSIBLE OFFICIAL:
DESIGN QUALIFIED CREDENTIALED PROFESSIONAL:
OPERATIONAL QUALIFIED CREDENTIALED PROFESSIONAL:
Phone Fax
Phone Fax
Phone Fax
ALDOT CBMPP Version January 2022 responsible official
ALDOT Region Engineer for Edward N. Austin, P.E., ALDOT Chief Engineer street address
city, state zip
<business phone>
<business fax>
CBMPP certifier company, title street address city, state zip
<business phone>
<business fax>
operational QCP
ALDOT Stormwater Coordinator street address
city, state zip
<business phone>
<business fax>
I.a. ADEM NPDES Notice of Intent
I. b . Soil Properties
INSERT SOILS MAP
(USDA NRCS Web Soil Survey 3-page
Printable Version Available on the Soil Map Tab)
ALDOT CBMPP Version January 2022
I. c . Hydraulics/Hydrology
Pre/Post Development Flow Statement
;ƐĞůĞĐƚĂůůĂƉƉůŝĐĂďůĞƐƚĂƚĞŵĞŶƚƐͿ͗dŚĞƌĞǁŝůůďĞŶŽƐŝŐŶŝĨŝĐĂŶƚĚŝĨĨĞƌĞŶĐĞŝŶƉƌĞͲĂŶĚƉŽƐƚͲĚĞǀĞůŽƉŵĞŶƚƉĞĂŬĨůŽǁƐ͘
dŚĞƌĞǁŝůůďĞŶŽƐŝŐŶŝĨŝĐĂŶƚĚŝĨĨĞƌĞŶĐĞŝŶƉƌĞͲĂŶĚƉŽƐƚͲĚĞǀĞůŽƉŵĞŶƚŚLJĚƌĂƵůŝĐǀĞůŽĐŝƚŝĞƐ͘
dŚĞƌĞǁŝůůďĞŶŽƐŝŐŶŝĨŝĐĂŶƚĚŝĨĨĞƌĞŶĐĞŝŶƉƌĞͲĂŶĚƉŽƐƚͲĚĞǀĞůŽƉŵĞŶƚƌƵŶŽĨĨǀŽůƵŵĞ͘
Hydraulic Analysis
;ƐĞůĞĐƚŽŶĞͿ͗ŚLJĚƌĂƵůŝĐĂŶĂůLJƐŝƐǁĂƐĐŽŶĚƵĐƚĞĚĨŽƌƚŚŝƐƉƌŽũĞĐƚƵƐŝŶŐ ĂůĐƵůĂƚŝŽŶƐĂƌĞĂǀĂŝůĂďůĞƵƉŽŶƌĞƋƵĞƐƚ͘
,LJĚƌĂƵůŝĐĐĂůĐƵůĂƚŝŽŶƐǁĞƌĞŶŽƚƉĞƌĨŽƌŵĞĚĚƵĞƚŽͺ
Anticipated Rainfall Conditions
dŚĞĨŽůůŽǁŝŶŐŝŶĨŽƌŵĂƚŝŽŶǁĂƐŽďƚĂŝŶĞĚĨƌŽŵ;ƐĞůĞĐƚĂůůƚŚĂƚĂƉƉůLJͿ͗
EK͛ƐEĂƚŝŽŶĂůtĞĂƚŚĞƌ^ĞƌǀŝĐĞ,LJĚƌŽŵĞƚĞŽƌŽůŽŐŝĐĂůĞƐŝŐŶ^ƚƵĚŝĞƐĞŶƚĞƌ WƌĞĐŝƉŝƚĂƚŝŽŶ&ƌĞƋƵĞŶĐLJĂƚĂ^ĞƌǀĞƌ;EKƚůĂƐϭϰͿ
h^͛ƐEĂƚŝŽŶĂůZĞƐŽƵƌĐĞƐŽŶƐĞƌǀĂƚŝŽŶ^ĞƌǀŝĐĞĞ&Kd'
ůĂďĂŵĂ^ƵƉƉůĞŵĞŶƚƐƚŽƚŚĞEĂƚŝŽŶĂůŶŐŝŶĞĞƌŝŶŐ&ŝĞůĚ,ĂŶĚŬʹŚĂƉƚĞƌϮ KƚŚĞƌ
DŝŶŝŵƵŵĞƐŝŐŶ^ƚŽƌŵĨŽƌdĞŵƉŽƌĂƌLJDWƐсϮͲLJĞĂƌĨƌĞƋƵĞŶĐLJ͕ϮϰͲŚŽƵƌĚƵƌĂƚŝŽŶс inches Other 2-year Frequency Events (inches)
30 min 1 hr 2 hr 3 hr 6 hr 12 hr 2 day 4 day 7 day 10 day
Average Monthly Precipitation (inches)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Other Hydraulics/Hydrology Notes
Not Applicable
II.a. Environmental Concerns
Environmental Review
dŚĞůŽĐĂƚŝŽŶŽĨƚŚŝƐƉƌŽũĞĐƚŚĂƐŶŽƚďĞĞŶƌĞǀŝĞǁĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚ&,t͛ƐƌĞƋƵŝƌĞĚEWƉƌŽĐĞĚƵƌĞƐ͘
dŚĞůŽĐĂƚŝŽŶŽĨƚŚŝƐƉƌŽũĞĐƚŚĂƐďĞĞŶƌĞǀŝĞǁĞĚŝŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚ&,t͛ƐƌĞƋƵŝƌĞĚEWƉƌŽĐĞĚƵƌĞƐ͘
;ƐĞůĞĐƚŽŶĞŽĨƚŚĞĨŽůůŽǁŝŶŐͿ͗ ĂƚĞŐŽƌŝĐĂůdžĐůƵƐŝŽŶ WƌŽŐƌĂŵŵĂƚŝĐdžĐůƵƐŝŽŶ
&ŝŶĚŝŶŐŽĨEŽ^ŝŐŶŝĨŝĐĂŶƚ/ŵƉĂĐƚ ŶǀŝƌŽŶŵĞŶƚĂů/ŵƉĂĐƚ^ƚĂƚĞŵĞŶƚ dŚĞĂƌĞĂƌĞǀŝĞǁĞĚĨŽƌĞŶǀŝƌŽŶŵĞŶƚĂůĐŽŶĐĞƌŶƐŝŶĐůƵĚĞƐƚŚĞůŝŵŝƚƐŽĨĂůůǁŽƌŬĂƌĞĂƐĂŶƚŝĐŝƉĂƚĞĚƚŽďĞŝŵƉĂĐƚĞĚďLJƚŚĞ
ƉƌŽũĞĐƚ͘
Environmental Concerns Found
;ƐĞůĞĐƚĂůůƚŚĂƚĂƉƉůLJͿ:
WƌŝŽƌŝƚLJŽŶƐƚƌƵĐƚŝŽŶ^ŝƚĞ;ƐĞůĞĐƚŽŶĞŽĨƚŚĞĨŽůůŽǁŝŶŐŝƐĐŚĂƌŐĞĐŽŶĚŝƚŝŽŶƐͿ͗
ϯϬϯ;ĚͿ>ŝƐƚĞĚʹ/ŵƉĂŝƌĞĚďLJdƵƌďŝĚŝƚLJ͕^ŝůƚĂƚŝŽŶ͕Žƌ^ĞĚŝŵĞŶƚĂƚŝŽŶ
dD>&ŝŶĂůŝnjĞĚͬƉƉƌŽǀĞĚʹ/ŵƉĂŝƌĞĚďLJdƵƌďŝĚŝƚLJ͕^ŝůƚĂƚŝŽŶ͕Žƌ^ĞĚŝŵĞŶƚĂƚŝŽŶ KƵƚƐƚĂŶĚŝŶŐůĂďĂŵĂtĂƚĞƌhƐĞůĂƐƐŝĨŝĐĂƚŝŽŶ
KƵƚƐƚĂŶĚŝŶŐEĂƚƵƌĂůZĞƐŽƵƌĐĞtĂƚĞƌhƐĞůĂƐƐŝĨŝĐĂƚŝŽŶ dƌĞĂƐƵƌĞĚůĂďĂŵĂ>ĂŬĞhƐĞůĂƐƐŝĨŝĐĂƚŝŽŶ
KƚŚĞƌ
:ƵƌŝƐĚŝĐƚŝŽŶĂůͬEĂǀŝŐĂďůĞtĂƚĞƌƐŽĨƚŚĞ^ƚĂƚĞŝŶĐůƵĚŝŶŐtĞƚůĂŶĚƐ 'ƌŽƵŶĚǁĂƚĞƌtĞůů
dŚƌĞĂƚĞŶĞĚͬŶĚĂŶŐĞƌĞĚ^ƉĞĐŝĞƐĂŶĚͬŽƌ,ĂďŝƚĂƚ ,ŝƐƚŽƌŝĐĂůͬƌĐŚĂĞŽůŽŐŝĐĂů^ŝƚĞ
,ĂnjĂƌĚŽƵƐDĂƚĞƌŝĂůƐ>ŽĐĂƚŝŽŶ;WĂŝŶƚ͕ƐďĞƐƚŽƐ͕hŶĚĞƌŐƌŽƵŶĚ^ƚŽƌĂŐĞdĂŶŬ͕ŽƚŚĞƌͿ
WƌŽdžŝŵŝƚLJƚŽdžŝƐƚŝŶŐDƵŶŝĐŝƉĂůŽƌWƵďůŝĐtĂƚĞƌ/ŶƚĂŬĞ;ЪDŝůĞhƉƐƚƌĞĂŵŽƌЬDŝůĞŽǁŶƐƚƌĞĂŵͿ
Potential Pollutants
;ƐĞůĞĐƚĂůůƚŚĂƚĂƉƉůLJͿ:
dŚŝƐƉƌŽũĞĐƚǁŝůůĞdžƉŽƐĞĞƌŽĚŝďůĞŵĂƚĞƌŝĂůĂŶĚƚŚƵƐĐƌĞĂƚĞĂƉŽƚĞŶƚŝĂůƐŽƵƌĐĞŽĨƐĞĚŝŵĞŶƚ͘
&ƵĞůƐ͕ŽŝůƐ͕ĂŶĚŽƚŚĞƌĐŚĞŵŝĐĂůƐĂƐƐŽĐŝĂƚĞĚǁŝƚŚŵŽƚŽƌŝnjĞĚĞƋƵŝƉŵĞŶƚĂŶĚǀĞŚŝĐůĞƐŵĂLJďĞƉƌĞƐĞŶƚ͘
ŽŶƐƚƌƵĐƚŝŽŶĂŶĚǁŽƌŬĞƌĚĞďƌŝƐŵĂLJďĞƉƌĞƐĞŶƚ͘
^ĞĞ^ĞĐƚŝŽŶ///͘ŽĨƚŚŝƐĚŽĐƵŵĞŶƚĨŽƌĂĚĚŝƚŝŽŶĂůŝŶĨŽƌŵĂƚŝŽŶƌĞŐĂƌĚŝŶŐƉŽůůƵƚŝŽŶƉƌĞǀĞŶƚŝŽŶƌĞƋƵŝƌĞŵĞŶƚƐ͘
Other Environmental Concerns or Design Considerations
ALDOT CBMPP Version January 2022 Not Applicable
II.b. Environmental Commitments
Permits, Agreements, Clearances, Easements
;ŶŽƚĞĂƉƉůŝĐĂďŝůŝƚLJĨŽƌĞĂĐŚͿYes No Commitment Type Identification No.
Applied Received Expires
;ĂƚĞͿ ;ĂƚĞͿ ;ĂƚĞͿ
EW^D^ϰWĞƌŵŝƚ
h^KϰϬϰ/ŶĚŝǀŝĚƵĂůWĞƌŵŝƚϭ h^KϰϬϰEĂƚŝŽŶǁŝĚĞWĞƌŵŝƚϭ
ŽƌƉƐEŽƚŝĨŝĐĂƚŝŽŶͲ ZĞƋƵŝƌĞĚ EŽƚZĞƋƵŝƌĞĚ
W
&D
ds
h͘^͘ŽĂƐƚ'ƵĂƌĚ
h͘^͘&ŝƐŚΘtŝůĚůŝĨĞͬŶĚĂŶŐĞƌĞĚ^ƉĞĐŝĞƐ ,ŝƐƚŽƌŝĐĂůͬƌĐŚĂĞŽůŽŐŝĐĂůůĞĂƌĂŶĐĞ ,ĂnjĂƌĚŽƵƐDĂƚĞƌŝĂůƐůĞĂƌĂŶĐĞ
&ZƉƉƌŽǀĂů
Documentation follows addressing all Environmental Commitments noted below.
ADEM NPDES Construction General Permit NOI and Receipt Letter are located in Section I. of this document.
EŽƚĞϭ͗dŚŝƐƉƌŽũĞĐƚŝƐĐŽǀĞƌĞĚƵŶĚĞƌĂh^KϰϬϰƉĞƌŵŝƚ͕ĂŶĚƚŚƵƐ͕ŝƚŝƐĞdžĞŵƉƚĨƌŽŵƚŚĞŽŶƐƚƌƵĐƚŝŽŶ'ĞŶĞƌĂůWĞƌŵŝƚ͛Ɛ ƌĞƋƵŝƌĞŵĞŶƚƚŽƉƌŽǀŝĚĞĂŶĚŵĂŝŶƚĂŝŶĂϮϱͲĨŽŽƚƵŶĚŝƐƚƵƌďĞĚŶĂƚƵƌĂůďƵĨĨĞƌ͘,ŽǁĞǀĞƌ͕ƚŚĞƉƌŽũĞĐƚǁŝůůƵƚŝůŝnjĞDWƐƚŽƚƌĞĂƚ ƐƚŽƌŵǁĂƚĞƌĚŝƐĐŚĂƌŐĞƐĨƌŽŵĞĂƌƚŚĚŝƐƚƵƌďĂŶĐĞƐǁŝƚŚŝŶϮϱĨĞĞƚŽĨƚŚĞƐƵƌĨĂĐĞǁĂƚĞƌƚŽƚŚĞŵĂdžŝŵƵŵĞdžƚĞŶƚƉƌĂĐƚŝĐĂďůĞ͘
Soil Exposure
dŚŝƐƉƌŽũĞĐƚŚĂƐ ĂĐƌĞƐŽĨDEW^ƉĞƌŵŝƚƚĞĚĚŝƐƚƵƌďĂŶĐĞ͘
dŚĞƉƌŽũĞĐƚŵĂdžŝŵƵŵĂƌĞĂŽĨĞdžƉŽƐĞĚĞƌŽĚŝďůĞŵĂƚĞƌŝĂůĂƚŽŶĞƚime is limited to acres, or the permitted disturbance acreage, whichever is less.
Turbidity Monitoring and Construction Stormwater Sampling Not Required
Required for ALL drainage areas at the associated Primary Stormwater Discharge and Background Points Required for SELECT drainage areas at the associated Primary Stormwater Disharge and Background Points Selected sites:
--
0
17
List sites
THIS PAGE TO BE REMOVED/REPLACED
INSERT
SUPPORTING
ENVIRONEMNTAL DOCUMENTS IN
APPENDIX SECTION II
8.5"x11" Preferred 11"x17" Maximum
ALDOT CBMPP Version January 2022
III.a. Project Specific Best Management Practices
Provide a narrative describing the project and all BMPs included to meet the permit requirements. The narrative should reference the erosion and sediment control plan sheets and any environmentally relevant project details, notes, or special provisions. It may be beneficial to provide sheet numbers when referencing the plan set. In addition to the project specific items, referencing applicable sections from the resources supplied in Section II.b may also be helpful.
The narrative should be concise and address the following items, if applicable:
•Project description/overview (scope of work) • Sequence of construction
o Phasing o Diversions
o Disturbed Acreage Limitations • Priority waters impacted
o Priority Water
o 303(d) Pollutants of Concern o TMDL Reduction Rates o Designer Reduction Goals
• BMPs included to minimize erosion and sediment loss during construction o Ditch Checks
o Perimeter Controls o Inlet protection o Slope protection o Sediment Basins
o Stabilized Construction Entrances o Soil Stabilization
• Additional BMPs provided in priority areas
o Flocculants - list applications and reference Section III.b. Note Individual SDS sheets will be included in the Contractors SWMP provided in Section IV.
All BMPs shall be installed as detailed in the 2022 ALDOT Special and Standard Drawings. All BMPs shall be implemented and maintained in accordance with the “2018 Alabama Handbook for Erosion, Sediment Control, and Stormwater Management on Construction Sites and Urban Areas.
Concrete washout, lay down, and maintenance areas will be determined by the contractor prior to construction and added to the field CBMPP (For additional information regarding Concrete Washout areas, see ALDOT Standard Specifications for Highway Construction, Section 107.22).
Offsite sediment will be removed as needed by the Contractor in accordance with ALDOT Construction Specifications (For
THIS PAGE TO BE REMOVED/REPLACED
INSERT TMDL CALCULATION SHEET(S) HERE IF
APPLICABLE
ALDOT CBMPP Version January 2022
ϭϬϲ͘Ϭϭ;ďͿ ůĞĂƌĂŶĐĞƐĂŶĚĐŬŶŽǁůĞĚŐĞŵĞŶƚƐĨŽƌƚŚĞhƐĞŽĨKĨĨƐŝƚĞƌĞĂƐͲ'^WϭϮͲϬϯϵϵ;ϯͿ͘
ϭϬϲ͘Ϭϭ;ĐͿ KƉĞƌĂƚŝŽŶŽĨKĨĨƐŝƚĞWŝƚƐĂŶĚtĂƐƚĞƌĞĂƐ ϭϬϳ͘Ϭϵ
ϭϬϳ͘ϭϮ ϭϬϳ͘ϭϯ ϭϬϳ͘ϭϰ ϭϬϳ͘Ϯϭ ϭϬϳ͘ϮϮ ϭϬϳ͘Ϯϯ ϭϬϳ͘Ϯϰ ϭϬϴ͘Ϭϰ ϮϬϭ͘Ϭϯ ϮϬϱ͘Ϭϯ ϮϬϲ͘Ϭϰ ϮϭϬ͘Ϭϯ ϮϱϬ͘Ϭϯ ϱϮϭ͘Ϭϰ ϱϮϭ͘Ϭϱ ϱϮϭ͘Ϭϲ ϱϮϭ͘Ϭϳ ϱϮϭ͘Ϭϴ ϱϮϭ͘ϭϰ
ŽŶƐƚƌƵĐƚŝŽŶKǀĞƌŽƌĚũĂĐĞŶƚƚŽtĂƚĞƌƐŽĨƚŚĞhŶŝƚĞĚ^ƚĂƚĞƐ
WƌŽƚĞĐƚŝŽŶĂŶĚZĞƐƚŽƌĂƚŝŽŶŽĨWƌŽƉĞƌƚLJ͕>ĂŶĚƐĐĂƉĞĂŶĚhƚŝůŝƚLJ&ĂĐŝůŝƚŝĞƐ
tŽŽĚůĂŶĚWƌŽƚĞĐƚŝŽŶ͕ŽŶƐĞƌǀĂƚŝŽŶ͕ďĂƚĞŵĞŶƚŽĨtĂƚĞƌWŽůůƵƚŝŽŶĂŶĚYƵĂƌĂŶƚŝŶĞZĞŐƵůĂƚŝŽŶƐ ZĞƐƉŽŶƐŝďŝůŝƚLJĨŽƌĂŵĂŐĞůĂŝŵƐ
^ƚŽƌŵǁĂƚĞƌDĂŶĂŐĞŵĞŶƚ
ŶǀŝƌŽŶŵĞŶƚĂůWƌŽƚĞĐƚŝŽŶĂŶĚ^ƉŝůůWƌĞǀĞŶƚŝŽŶ
dĞŵƉŽƌĂƌLJŽŶƐƚƌƵĐƚŝŽŶŶĐƌŽĂĐŚŵĞŶƚŝŶƚŽ^ƚƌĞĂŵƐ͕tĂƚĞƌŽĚŝĞƐĂŶĚtĞƚůĂŶĚƐ WĞƌŵŝƚƐĨŽƌWĞƐƚŝĐŝĚĞƉƉůŝĐĂƚŝŽŶ͘
WƌŽƐĞĐƵƚŝŽŶŽĨtŽƌŬ͘
ůĞĂƌŝŶŐĂŶĚ'ƌƵďďŝŶŐ
ZĞŵŽǀĂůĂŶĚZĞůŽĐĂƚŝŽŶŽĨ^ƚƌƵĐƚƵƌĞƐ ŝƐƉŽƐĂůŽĨDĂƚĞƌŝĂůƐ
džĐĂǀĂƚŝŽŶĂŶĚŵďĂŶŬŵĞŶƚ
ůĂƐƚůĞĂŶŝŶŐ͕DĞĐŚĂŶŝĐĂůůĞĂŶŝŶŐĂŶĚ^ƵƌĨĂĐĞZŽƵŐŚŶĞƐƐ ŽŶƚĂŝŶŵĞŶƚ^LJƐƚĞŵĨŽƌZĞŵŽǀĂůŽĨŽĂƚŝŶŐĨƌŽŵdžŝƐƚŝŶŐƌŝĚŐĞ ŽůůĞĐƚŝŽŶĂŶĚŝƐƉŽƐĂůŽĨŽĂƚŝŶŐDĂƚĞƌŝĂůtĂƐƚĞĨƌŽŵdžŝƐƚŝŶŐƌŝĚŐĞ
^ƵƌĨĂĐĞWƌĞƉĂƌĂƚŝŽŶWůĂŶ^ƵďŵŝƚƚĂůĨŽƌƚŚĞZĞŵŽǀĂůŽĨdžŝƐƚŝŶŐŽĂƚŝŶŐƐ
&ŝŶĂůůĞĂŶŝŶŐŽĨůĂƐƚůĞĂŶĞĚ^ƵƌĨĂĐĞƐ tŽƌŬĞƌWƌŽƚĞĐƚŝŽŶ
ϱϮϰ͘Ϭϯ;ĂͿϮ tĂƚĞƌYƵĂůŝƚLJWƌŽƚĞĐƚŝŽŶ ϱϯϰ
ϲϱϬϲϱϮ ϲϱϰϲϱϲ ϲϱϵϲϲϱ ϲϲϲϲϲϴ
ůĞĂŶŝŶŐdžŝƐƚŝŶŐƌĂŝŶĂŐĞ^ƚƌƵĐƚƵƌĞƐ dŽƉƐŽŝů
'ƌŽƵŶĚWƌĞƉĂƌĂƚŝŽŶ͕sĞŐĞƚĂƚŝŽŶƐƚĂďůŝƐŚŵĞŶƚĂŶĚDŽǁŝŶŐ
^ŽůŝĚ^ŽĚĚŝŶŐ
DƵůĐŚŝŶŐĨŽƌsĞŐĞƚĂƚŝŽŶƐƚĂďůŝƐŚŵĞŶƚ ZŽůůĞĚĂŶĚ,LJĚƌĂƵůŝĐƌŽƐŝŽŶŽŶƚƌŽůWƌŽĚƵĐƚƐ
dĞŵƉŽƌĂƌLJ^ŽŝůƌŽƐŝŽŶĂŶĚ^ĞĚŝŵĞŶƚŽŶƚƌŽůͲ'^WϭϮͲϬϯϵϵ;ϯͿ͘
WĞƐƚŽŶƚƌŽů
WƌĞͲŵĞƌŐĞŶƚ,ĞƌďŝĐŝĚĞdƌĞĂƚŵĞŶƚ
III.b. Standard Best Management Practices
ALDOT Standard Specifications and General Applications Special Provisions
ŽŶƚƌĂĐƚƐƉĞĐŝĨŝĐĂƚŝŽŶƌĞƋƵŝƌĞŵĞŶƚƐƌĞŐĂƌĚŝŶŐĞŶǀŝƌŽŶŵĞŶƚĂůƉƌŽƚĞĐƚŝŽŶĚƵƌŝŶŐĐŽŶƐƚƌƵĐƚŝŽŶŵĂLJďĞĨŽƵŶĚŝŶƚŚĞ >Kd
^ƚĂŶĚĂƌĚ^ƉĞĐŝĨŝĐĂƚŝŽŶƐĨŽƌ,ŝŐŚǁĂLJŽŶƐƚƌƵĐƚŝŽŶŽƌŝŶƚŚĞĐŽŶƚƌĂĐƚĚŽĐƵŵĞŶƚŝŶƚŚĞĨŽƌŵŽĨĂƐƉĞĐŝĂůƉƌŽǀŝƐŝŽŶ͘^ƉĞĐŝĂů ƉƌŽǀŝƐŝŽŶƐ ŵĂLJ ďĞ 'ĞŶĞƌĂů ƉƉůŝĐĂƚŝŽŶ ^ƉĞĐŝĂů WƌŽǀŝƐŝŽŶƐ ĂƉƉƌŽǀĞĚ ĨŽƌ ŐĞŶĞƌĂů ƵƐĞ ĂŶĚ ŝŶĐŽƌƉŽƌĂƚŝŽŶ ŝŶƚŽ ƚŚĞ ƐƚĂŶĚĂƌĚ ƐƉĞĐŝĨŝĐĂƚŝŽŶƐŝŶ ƚŚĞ ĨƵƚƵƌĞ Žƌ ĂƐ WƌŽũĞĐƚ ^ƉĞĐŝĨŝĐ ^ƉĞĐŝĂů WƌŽǀŝƐŝŽŶƐ ĐƌĞĂƚĞĚ ƐƉĞĐŝĨŝĐĂůůLJ ĨŽƌ ƚŚĞ ƉƌŽũĞĐƚ Ăƚ
ŚĂŶĚ͘ WůĞĂƐĞ ƌĞĨĞƌĞŶĐĞƚŚĞĨŽůůŽǁŝŶŐĂƉƉůŝĐĂďůĞ 2022 ALDOT Standard Specifications sections.
Removal of Underground Storage Tanks and Contaminated Soil
Drawing No. Description Index No.
^ͲϭϬϬͲϭ ĞƐƚDĂŶĂŐĞŵĞŶƚWƌĂĐƚŝĐĞZĞĨĞƌĞŶĐĞDĂƚƌŝdž ϭϭϲϬ
^ͲϭϬϬͲϮ ĞƐƚDĂŶĂŐĞŵĞŶƚWƌĂĐƚŝĐĞZĞĨĞƌĞŶĐĞDĂƚƌŝdž ϭϭϲϬͲ
^ͲϮϬϬͲϭ dLJƉŝĐĂůdĞŵƉŽƌĂƌLJƌŽƐŝŽŶͬ^ĞĚŝŵĞŶƚŽŶƚƌŽůƉƉůŝĐĂƚŝŽŶƐ ϭϭϲϭ
^ͲϮϬϬͲϮ ĞƚĂŝůƐŽĨdĞŵƉŽƌĂƌLJ^ůŽƉĞƌĂŝŶ͕ĞƌŵƐĂŶĚŶĞƌŐLJŝƐƐŝƉĂƚŽƌ ϭϭϲϭͲ
^ͲϮϬϬͲϯ ĞƚĂŝůƐŽĨ^ĞĚŝŵĞŶƚĂƌƌŝĞƌƉƉůŝĐĂƚŝŽŶƐ ϭϭϲϭͲ
^ͲϮϬϬͲϰ ĞƚĂŝůƐŽĨ^ŝůƚ&ĞŶĐĞ/ŶƐƚĂůůĂƚŝŽŶ ϭϭϲϭͲ
^ͲϮϬϬͲϱ ĞƚĂŝůƐŽĨ^ĞĚŝŵĞŶƚZĞƚĞŶƚŝŽŶĂƌƌŝĞƌ ϭϭϲϭͲ
^ͲϯϬϬͲϭ ŝƚĐŚŚĞĐŬ^ƚƌƵĐƚƵƌĞƐ͕dLJƉŝĐĂůƉƉůŝĐĂƚŝŽŶƐĂŶĚĞƚĂŝůƐ ϭϭϲϮ
^ͲϯϬϬͲϮ ĞƚĂŝůƐŽĨ,ĂLJĂůĞŝƚĐŚŚĞĐŬƐ ϭϭϲϮͲ
^ͲϯϬϬͲϯ ĞƚĂŝůƐŽĨ^ĂŶĚďĂŐŝƚĐŚŚĞĐŬ ϭϭϲϮͲ
^ͲϯϬϬͲϰ ĞƚĂŝůƐŽĨƌŽƐŝŽŶŽŶƚƌŽůtĂƚƚůĞŝƚĐŚŚĞĐŬ ϭϭϲϮͲ
^ͲϯϬϬͲϱ ĞƚĂŝůƐŽĨ^ŝůƚŝŬĞŝƚĐŚŚĞĐŬ ϭϭϲϮͲ
^ͲϯϬϬͲϲ ĞƚĂŝůƐŽĨZŽĐŬŝƚĐŚŚĞĐŬ ϭϭϲϮͲ
^ͲϯϬϬͲϳ ĞƚĂŝůƐŽĨZŽĐŬŝƚĐŚŚĞĐŬǁŝƚŚ^ƵŵƉdžĐĂǀĂƚŝŽŶ ϭϭϲϮͲ&
^ͲϯϬϬͲϴ ĞƚĂŝůƐŽĨ^ŝůƚ&ĞŶĐĞŝƚĐŚŚĞĐŬ ϭϭϲϮͲ'
^ͲϰϬϬͲϭ /ŶůĞƚWƌŽƚĞĐƚŝŽŶdLJƉŝĐĂůƉƉůŝĐĂƚŝŽŶƐĂŶĚĞƚĂŝůƐ ϭϭϲϯ
^ͲϰϬϬͲϮ /ŶůĞƚWƌŽƚĞĐƚŝŽŶĞƚĂŝůƐĨŽƌŽĂƌƐĞŐŐƌĞŐĂƚĞŽŶ'ƌĂĚĞƐΘ^ĂŐƐ ϭϭϲϯͲ
^ͲϰϬϬͲϯ /ŶůĞƚWƌŽƚĞĐƚŝŽŶĞƚĂŝůƐŽĨtĂƚƚůĞƐ ϭϭϲϯͲ
^ͲϰϬϬͲϰ /ŶůĞƚWƌŽƚĞĐƚŝŽŶĞƚĂŝůƐŽĨ^ŝůƚ&ĞŶĐĞ ϭϭϲϯͲ
^ͲϰϬϬͲϱ /ŶůĞƚWƌŽƚĞĐƚŝŽŶĞƚĂŝůƐŽĨ^ĂŶĚĂŐƐ ϭϭϲϯͲ
^ͲϱϬϭ &ůŽĂƚŝŶŐĂƐŝŶŽŽŵ ϭϭϲϰ
^ͲϱϬϮ ^ƚĂďŝůŝnjĞĚŽŶƐƚƌƵĐƚŝŽŶŶƚƌĂŶĐĞ ϭϭϲϱ
^ͲϱϬϯ dĞŵƉŽƌĂƌLJĞǁĂƚĞƌŝŶŐ^ƚƌƵĐƚƵƌĞƐ ϭϭϲϲ
^ͲϱϬϰ dĞŵƉŽƌĂƌLJƵůǀĞƌƚ^ƚƌĞĂŵƌŽƐƐŝŶŐ ϭϭϲϳ
^ͲϱϬϱ dĞŵƉŽƌĂƌLJ^ƚƌĞĂŵŝǀĞƌƐŝŽŶ ϭϭϲϴ
^ͲϱϬϲͲϭ ^ƵƐƉĞŶĚĞĚWŝƉĞŝǀĞƌƐŝŽŶ;ŽǁŶƐƚƌĞĂŵͿ ϭϭϲϵ
^ͲϱϬϲͲϮ ^ƵƐƉĞŶĚĞĚWŝƉĞŝǀĞƌƐŝŽŶ;hƉƐƚƌĞĂŵͿ ϭϭϲϵͲ
^ͲϱϬϳ dĞŵƉŽƌĂƌLJ^ĞĚŝŵĞŶƚĂƚŝŽŶĂƐŝŶ ϭϭϳϬ
^ͲϱϬϴ &ůŽĐĐƵůĂŶƚhƐĂŐĞ'ƵŝĚĞ ϭϭϳϭ
^ͲϱϬϵ ĞƚĂŝůƐŽĨZŽůůĞĚĂŶĚ,LJĚƌĂƵůŝĐƌŽƐŝŽŶŽŶƚƌŽůWƌŽĚƵĐƚ/ŶƐƚĂůůĂƚŝŽŶ ϭϭϳϮ
ALDOT Construction Manual – Section 2.5 Construction Stormwater
>KdŽŶƐƚƌƵĐƚŝŽŶDĂŶƵĂů͕^ĞĐƚŝŽŶϮ͘ϱĐŽŶƚĂŝŶƐŝŶƚĞƌŶĂůƉŽůŝĐŝĞƐĂŶĚƉƌŽĐĞĚƵƌĞƐƌĞůĂƚŝŶŐƚŽĐŽŶƐƚƌƵĐƚŝŽŶƐƚŽƌŵǁĂƚĞƌ͘dŚŝƐ ŵĂŶƵĂůŝƐŝŶƚĞŶĚĞĚĂƐĂũŽďƐƉĞĐŝĨŝĐŐƵŝĚĂŶĐĞƌĞƐŽƵƌĐĞĨŽƌ>KdŝŶƐƉĞĐƚŽƌƐ͘/ƚŝƐƵƚŝůŝnjĞĚŝŶĂĚĚŝƚŝŽŶƚŽƐƚĂŶĚĂƌĚ
ƐƉĞĐŝĨŝĐĂƚŝŽŶƐ͕ƐƚĂŶĚĂƌĚĚƌĂǁŝŶŐƐ͕ĂŶĚĐŽŶƚƌĂĐƚƐƉĞĐŝĨŝĐĚŽĐƵŵĞŶƚƐ͘
66501 66502
66506 66505 66507 66508 66509 66512 66513 66514 66515 66516 66517 66518 66519 66522 66523 66524 66525 66526 66529 66532 66535 66538 66541 66544 66545 66548 67201 65901
ALDOT Special Drawings
ŽŶƚƌĂĐƚƌĞƋƵŝƌĞŵĞŶƚƐƌĞŐĂƌĚŝŶŐĞŶǀŝƌŽŶŵĞŶƚĂůƉƌŽƚĞĐƚŝŽŶĚƵƌŝŶŐĐŽŶƐƚƌƵĐƚŝŽŶŵĂLJďĞĨŽƵŶĚŝŶƚŚĞĨŽƌŵŽĨĐŽŶƐƚƌƵĐƚŝŽŶ ĚĞƚĂŝůĚƌĂǁŝŶŐƐŝŶƚŚĞƉůĂŶƐĞƚŽƌŝŶƚŚĞĂƉƉůŝĐĂďůĞ>Kd^ƉĞĐŝĂůĂŶĚ^ƚĂŶĚĂƌĚ,ŝŐŚǁĂLJƌĂǁŝŶŐƐŬ͘ĞƚĂŝůĚƌĂǁŝŶŐƐ ĨŽƵŶĚŝŶƚŚĞƉůĂŶƐĞƚĂƌĞƌĞĨĞƌƌĞĚƚŽĂƐ^ƉĞĐŝĂůWƌŽũĞĐƚĞƚĂŝůƐĂŶĚĐŽŶƐŝƐƚŽĨĚĞƚĂŝůƐƚŚĂƚĂƌĞŶŽƚŝŶĐůƵĚĞĚŝŶƚŚĞ^ƉĞĐŝĂů ĂŶĚ^ƚĂŶĚĂƌĚƌĂǁŝŶŐƐŬ͘WůĞĂƐĞƌĞĨĞƌĞŶĐĞƚŚĞĨŽůůŽǁŝŶŐĂƉƉůicable 2022 ALDOT Special Drawings.
ALDOT CBMPP Version January 2022
Flocculants W^ϳϬϬ^ĞƌŝĞƐ ŶǀŝƌŽWĂŵ;'ƌĂŶƵůĂƌͿ
&>K
,ĂůŽ<ůĞĂƌͬ^ƚŽƌŵ<ůĞĂƌWͲϮϭϬϬΘ'Ğů&ůŽĐ;^LJƐƚĞŵͿ ,LJĚƌŽLoc &ůŽĐ;&ůĂƚͿ
,LJĚƌŽ>ŽĐ,ϯϬWD;ŶŝŽŶŝĐ>ŝŶĞĂƌWŽůLJĂĐƌLJůĂŵŝĚĞͿ
Tackifiers
W^ϳϬϬ^ĞƌŝĞƐ^ŝůƚ^ƚŽƉWŽǁĚĞƌ;DŽĚĞůEŽ͘ϳϬϮͿ W^ϳϬϬ^ĞƌŝĞƐ^ŝůƚ^ƚŽƉWŽǁĚĞƌ;DŽĚĞůEŽ͘ϳϬϱͿ W^ϳϬϬ^ĞƌŝĞƐ^ŝůƚ^ƚŽƉWŽǁĚĞƌ;DŽĚĞůEŽ͘ϳϬϳͿ W^ϳϬϬ^ĞƌŝĞƐ^ŝůƚ^ƚŽƉWŽǁĚĞƌ;DŽĚĞůEŽ͘ϳϭϬͿ W^ϳϬϬ^ĞƌŝĞƐ^ŝůƚ^ƚŽƉWŽǁĚĞƌ;DŽĚĞůEŽ͘ϳϭϮͿ W^ϳϬϬ^ĞƌŝĞƐ^ŝůƚ^ƚŽƉWŽǁĚĞƌ;DŽĚĞůEŽ͘ϳϯϬͿ W^ϳϬϬ^ĞƌŝĞƐ^ŝůƚ^ƚŽƉWŽǁĚĞƌ;DŽĚĞůEŽ͘ϳϰϬͿ ŶǀŝƌŽWĂŵ;'ƌĂŶƵůĂƌͿ
ŶǀŝƌŽͲdĂŬ
&/EE,LJĚƌŽ^ƚŝŬƚŝ ZĞƐŝŶĂƚŽƌ dĂĐŬŝŶŐŐĞŶƚϯ Hydraulic Mulches ĐŽ&ŝďƌĞWůƵƐdĂĐŬŝĨŝĞƌ
,LJĚƌŽŽǀĞƌtŽŽĚ&ŝďĞƌǁŝƚŚdĂĐŬ WƌŽĨŝůĞůĞŶĚ,LJĚƌĂƵůŝĐDƵůĐŚ
WƌŽĨŝůĞtŽŽĚǁŝƚŚdĂĐŬŝĨŝĞƌ,LJĚƌĂƵůŝĐDƵůĐŚ Hydraulic Erosion Control Products
ŝŶĚĞƌ&D
ĂƌƚŚ'ƵĂƌĚ&ŝďĞƌDĂƚƌŝdž ĐŽDĂƚƌŝdž
WƌŽĨŝůĞWƌŽĚƵĐƚƐ͕>>
WƌŽĨŝůĞWƌŽĚƵĐƚƐ͕>>
WƌŽĨŝůĞWƌŽĚƵĐƚƐ͕>>
WƌŽĨŝůĞWƌŽĚƵĐƚƐ͕>>
ŵĞƌŝĐĂŶdžĐĞůƐŝŽƌ
>^ŶǀŝƌŽŶŵĞŶƚĂůWƌŽĚƵĐƚƐ͕>>͘
WƌŽĨŝůĞWƌŽĚƵĐƚƐ͕>>
ALDOT Approved Treatment Chemicals
Contract requirements regarding flocculants and chemical stabilization during construction may be found in the form of contract pay items on the Quantities Sheets, and their usage locations are shown on the Erosion and Sediment Control Sheets in the plan set. Proper usage requirements are included in the applicable 2022 ALDOT Special and Standard Highway Drawings book and applicable 2022 ALDOT Specifications. These products may only be used if they have been reviewed and included on the applicable approved products lists of the ALDOT Materials, Sources, and Devices with Special Acceptance Requirements Manual, which is maintained on the ALDOT website. Safety Data Sheets and manufacturer's dosage instructions for these products are also maintained on the ALDOT website. Please visit the applicable ALDOT web-pages for the most current information. Specific products selected for use on a project and associated documentation is submitted as part of the Contractor's Stormwater Management Plan and included in the CBMPP after project award.
HaloKlear (StormKlear) DBP-2100 & Gel Floc (System)
ƉƉůŝĞĚWŽůLJŵĞƌ^LJƐƚĞŵƐ͕/ŶĐ͘
ƉƉůŝĞĚWŽůLJŵĞƌ^LJƐƚĞŵƐ͕/ŶĐ͘
ƉƉůŝĞĚWŽůLJŵĞƌ^LJƐƚĞŵƐ͕/ŶĐ͘
ƉƉůŝĞĚWŽůLJŵĞƌ^LJƐƚĞŵƐ͕/ŶĐ͘
ƉƉůŝĞĚWŽůLJŵĞƌ^LJƐƚĞŵƐ͕/ŶĐ͘
ƉƉůŝĞĚWŽůLJŵĞƌ^LJƐƚĞŵƐ͕/ŶĐ͘
ƉƉůŝĞĚWŽůLJŵĞƌ^LJƐƚĞŵƐ͕/ŶĐ͘
/ŶŶŽǀĂƚŝǀĞdƵƌĨ^ŽůƵƚŝŽŶƐ WƌŽĨŝůĞWƌŽĚƵĐƚƐ͕>>
&/EEŽƌƉŽƌĂƚŝŽŶ DŽƌŵĂƌ͕/ŶĐ͘
WƌŽĨŝůĞWƌŽĚƵĐƚƐ͕>>
ƉƉůŝĞĚWŽůLJŵĞƌ^LJƐƚĞŵƐ͕/ŶĐ͘
/ŶŶŽǀĂƚŝǀĞdƵƌĨ^ŽůƵƚŝŽŶƐ /ŶŶŽǀĂƚŝǀĞdƵƌĨ^ŽůƵƚŝŽŶƐ Dober Chemical Group Carolina Hydrologic, LLC.
Carolina Hydrologic, LLC.
ALDOT CBMPP Version January 2022
Appendix Section I.
** Insert ESC Legend and ESC Plans Sheets
Appendix Section II.
** Insert Environmental Supporting Documents