• Aucun résultat trouvé

ITU-R Liaison Group Report - Session #65 Opening Plenary IEEE 802.16 Presentation Submission Template (Rev. 9)

N/A
N/A
Protected

Academic year: 2022

Partager "ITU-R Liaison Group Report - Session #65 Opening Plenary IEEE 802.16 Presentation Submission Template (Rev. 9)"

Copied!
13
0
0

Texte intégral

(1)

1

ITU-R Liaison Group Report - Session #65 Opening Plenary

IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number:

IEEE L802.16-10/0001 Date Submitted:

2010-01-11 Source:

Reza Arefi Voice: +1 503 830 5485

Intel Corporation E-mail: [email protected]

Venue:

IEEE 802.16 Session #65, WG Opening Plenary Base Contribution:

None.

Purpose:

ITU-R Liaison Group presentation to Opening Plenary of the WG, containing plan for the week Notice:

This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the

“Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein.

Release:

The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16.

Patent Policy:

The contributor is familiar with the IEEE-SA Patent Policy and Procedures:

<http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>.

Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.

(2)

ITU-R Liaison Group Report - Session #65 Opening Plenary

Reza Arefi

802.16’s ITU-R Liaison Official

IEEE 802.16 Session #65

La Jolla, California, USA, 11-14 January 2010

(3)

Relevant Documents from Previous Sessions

• IEEE L802.16-08/058r5

IEEE 802.16 ITU-R Liaison Group Workplan

• IEEE L802.16-09/0135r1

ITU-R Liaison Group Report to Closing Plenary of Session #64

IMT-Advanced submission package (5D/542)

• IEEE L802.16-09/0101r5 – Part 1

• IEEE L802.16-09/0102r5 – Part 2

• IEEE L802.16-09/0103r5 – Part 3

• IEEE L802.16-09/0104r5 – Part 4

========== Also ===========

• IEEE L802.16-08/079

IEEE 802.18 IMT-Advanced review process (IEEE 802.18-08-0058/r6)

(4)

Input Documents for Session #65

Liaisons

IEEE L802.16-09/0139 – Statement from Japan concerning IEEE 802.16 IMT- Advanced Evaluation Group Coordination Meeting (2009-11-27)

IEEE L802.16-09/0140 – Statement from TTA TC7 concerning IEEE 802.16 IMT- Advanced Evaluation Group Coordination Meeting (2009-12-04)

IEEE L802.16-09/0141 – Statement from TTA PG707 concerning IEEE 802.16 IMT- Advanced Evaluation Group Coordination Meeting (2009-12-04)

IEEE L802.16-09/0142 – Statement from ARIB concerning the next steps of IMT- Advanced Process (2010-01-07)

(5)

Proposed Objectives for Session #65

per Workplan

•Hold IEEE 802.16 IMT-Advanced Evaluation Group Coordination Meeting (13 January) and prepare a meeting report

•Continue to prepare necessary responses on IMT-Advanced evaluations for submission to future WP 5D meetings

•Prepare communications with external organizations as necessary

•Prepare contribution to WP 5D on external evaluation matters including questions raised in ITU-R CG

beyond Workplan

Review input contributions and take appropriate action

Review input liaison statements and prepare responses as appropriate

Prepare for IMT-Advanced Evaluation Coordination Meeting

Prepare liaison to IMT-Advanced EGs on second IMT-Advanced coordination meeting

Update ITU LG workplan as appropriate

(6)

IEEE 802.16 IMT-Advanced Evaluation Group Coordination Meeting

• IEEE 802.16 WG has invited all IMT-Advanced Independent Evaluation Groups (IEG) (L802.16-

09/0132r1) to meet in conjunction with its Session #65 to facilitate exchange of information with each other and the proponent (IEEE).

• Meeting to be held on Wednesday, 13 January, in room Portofino AB

• Meeting agenda in L802.16-09/0130r1

• Several IEGs expressed interest in participation

(7)

Proposed Agenda for the Week

1)

Introduction, approval of the agenda

2)

Review and follow workplan of IEEE L802.16-08/058r5

3)

Review detailed schedule and agenda (including appointing speakers) for IMT-Advanced Evaluation Coordination meeting on Wednesday, 13 January 2010

4)

Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary

5)

Hold IMT-Advanced Evaluation Group Coordination Meeting 6) Update ITU LG workplan for 2010 and beyond

7) Approve all outgoing liaison statements

8) Other business

(8)

Proposed schedule for the Week

(Room: Portofino A)

Monday Tuesday Wednesday Thursday

AM

08:30 to 12:00

4) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary

5)

IMT-Advanced Evaluation

Group

Coordination Meeting (See slide 6

for details)

6) Update ITU LG

Workplan for 2010 and beyond

7) Approve all outgoing liaison statements

PM

13:30 to 18:00 (Mon 15:00 to 17:00)

1) Introduction, approval of the agenda

2) Review and follow workplan of IEEE L802.16-08/058r5 3) Review schedule

and agenda for Coordination meeting on Wednesday

4) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary

8) Other business

(9)

UPDATE ON ITU-R IMT-

ADVANCED PROCESS

(10)

Summary of Oct. ITU-R WP5D #6 in Dresden

• Six proposals received by Oct 7, the IMT-Advanced proposal submission deadline

Proposal based on 802.16 (from IEEE, Japan, TTA)

Proposal based on LTE-Advanced (from 3GPP, Japan, China

*

)

• Reviewed all proposal submissions at the 6

th

ITU-R WP5D meeting of 14-21 Oct in Dresden, Germany

• Considered as two technologies

IEEE Technology (three proposals are technically identical)3GPP Technology (three proposals are technically identical)

• All proposals considered “complete submissions”

• Step 3 (proposal submissions) completed and Step 4 (external evaluations) initiated

• Correspondence Group (CG) formed to facilitate external evaluations

• Evaluation Groups presented in 3

rd

IMT-Advanced Workshop

* China proposed only TDD component of LTE-Advanced (TD-LTE-Advanced)

(11)

IMT-Advanced Process

We are here

(12)

Evaluation Groups – Evaluation plans as of now

ARIB Evaluation Group: No plans for further evaluation work

ATIS WTSC: Both technologies

Canadian Evaluation Group (CEG): Both technologies

Chinese Evaluation Group (ChEG): Both technologies

ETSI: ?

Israeli Evaluation Group (IEG): Both technologies but priority with IEEE technology

Russian Evaluation Group (REG): IEEE technology

TCOE India: Both technologies

TR-45: Both technologies

TTA PG707: Both technologies but only FDD for LTE-Advanced

UADE, Instituto de Tecnología (Argentina): Did not present at workshop

WiMAX Forum Evaluation Group (WFEG): priority with IEEE technology

Wireless Communications Association International (WCAI EG): Both technologies, will start with IEEE first

WINNER+: LTE-Advanced

(13)

Key Milestones

Dec 17-18, 2009 – 3GPP Workshop on LTE- Advanced Evaluation in Beijing, China

Jan 13, 2010 – IEEE 802.16 IMT-Advanced

Evaluation Group Coordination Meeting in San Diego, USA

Feb 17-24, 2010 – 7

th

ITU-R WP5D Meeting in Turin, Italy

– EGs to submit “preliminary” evaluation results

Jun 9-16, 2010 – 8

th

ITU-R WP5D Meeting in Vietnam

– EGs to submit “final” evaluation results

Oct 13-20, 2010 – 9

th

ITU-R WP5D Meeting in China

– Complete “Step 7” of IMT-Advanced Process

Références

Documents relatifs

W can also be thought of as the allowed error tolerance in the final position, since the final point of the motion must fall within ± W/2 of the target's centre. Evaluation

Letter to IMT-Advanced Independent Evaluation Groups: Invitation to IEEE 802.16 IMT- Advanced Evaluation Group Coordination Meeting?.

• REG has capabilities to provide a complete set of the required simulations results for the IEEE 802.16m technology including link level and system level results compliant to the

• Currently working on a draft initial Evaluation Report to be submitted to ITU-R WP 5D meeting in February 2010. • No plans to develop simulation capabilities but will rely on input

–  WiMAX Forum Evaluation Group (WFEG) for IMT-Advanced.. –  Independent evaluation group formed by WiMAX

It is calculated before “Other operating income and expenses” which include amortization of intangible assets recognized in business combinations, the charge resulting from the

• Group’s share of pre-tax profits of £526.1 million 2018: £479.3 million and statutory profit before tax of £522.6 million 2018: £476.2 million • The main driver of the

Price Comparison Strategy > Confused.com’s strategy is focused on car insurance comparison and is aimed at making Confused.com the most competitive car insurance price