• Aucun résultat trouvé

Member by member postprocessing of hydrological ensemble predictions

N/A
N/A
Protected

Academic year: 2021

Partager "Member by member postprocessing of hydrological ensemble predictions"

Copied!
1
0
0

Texte intégral

(1)

Geophysical Research Abstracts Vol. 20, EGU2018-9097, 2018 EGU General Assembly 2018

© Author(s) 2018. CC Attribution 4.0 license.

Member by member postprocessing of hydrological ensemble predictions

Joris Van den Bergh and Emmanuel Roulin

KMI, Meteorological Research and Development, Brussels, Belgium ([email protected])

Meteorological ensemble predictions can be used as input for hydrological models to generate hydrological ensemble predictions. These have become an important established tool in areas such as flood forecasting and water management. However, hydrological ensemble predictions still contain errors, originating for example from errors in the precipitation forecasts and from model errors in the hydrological model. When training data with past forecasts and corresponding observations is available, such errors can be partly corrected with statistical postprocessing methods.

A hydrological ensemble prediction system (HEPS) is running operationally at the Royal Meteorological Institute of Belgium (RMI) for ten catchments in the Meuse basin. It makes use of the conceptual semi-distributed hydrological model SCHEME and the European Centre for Medium Range Weather Forecasts (ECMWF) Ensemble Prediction System (ENS). An ensemble of 51 discharge forecasts is generated daily.

We investigate a postprocessing technique for the discharge forecasts, making use of a set of 10-member ECMWF precipitation reforecasts generated during 2016. These reforecasts are run twice per week, at the original O640 (∼18km) ENS resolution, going back 20 years in the past. We use these as input to create a set of hydrological reforecasts. The postprocessing method is based on the member-by-member (MBM) approach of Van Schaeybroeck and Vannitsem (2015). Ensemble members are corrected individually, resulting in an overall shifting and/or scaling of the ensemble mean and spread. The MBM method retains rank correlations and thus takes correlations between lead times implicitly into account. This differentiates the method from ensemble model output statistics (EMOS), where such correlations are taken into account a posteriori via e.g. ensemble copula methods. Regression parameters are determined through minimization of a cost function such as the Continuous Ranked Probability Score (CRPS) for the observations and the corrected-forecast members.

We describe our operational setup and investigate the improvement attained though postprocessing for several catchments in the river Meuse basin. We provide verification results for our method, comparing the post- processed forecasts with the archived uncorrected 51-member hydrological forecasts, by means of probabilistic and deterministic verification skill scores.

Références

Documents relatifs

Daily radiosondes in Dumont d’Urville indicate positive trend at 20 km (∼50 hPa or 520 K), in winter and spring, but are not statistically significant, while a statistically

A spatially-explicit nitrogen mass-balance model for the Wood River Valley Watershed in south- central Idaho is developed (Blaine County Evaluation and Assessment of

] un esprit et une langue; avec cet esprit et cette langue je viens vous dire, au nom du peuple mexicain, que dans cette glorieuse lutte que vous réalisez pour la dignité humaine

C’est donc un vaste champ de réflexions que Catherine Méneux et Lucie Lachenal ont ouvert sur une période (l’extrême fin du xviii e siècle et le premier xix e siècle)

À partir des données actuellem ent disponibles et avec les approches mises en oeuvre sur le terrain et en laboratoire, les études des réseaux de diffusion

Elle permet de situer le moment où Rousseau fait basculer la pensée vers la modernité sur un plan philosophique et politique : l’Émile, c’est avant tout ce

The Brier score, which measures probabilistic skill for forecasts of discharge threshold exceedance, is improved for the entire forecast range during the hydrological summer period,