RHIZOtest: a tool

to assess and manage risk

in polluted soils

L. Lemal, M. Valmier (MetRHIZlab)

M. Bravin, C. Chevassus-rosset, E. Doelsh, F. Feder, S. Legros, M. Montes, M. Tella (Cirad)

(2)

Risks ?

(3)

PHYTOAVAILABILITY

OM Clays Soil solution

Risks ?

pH

pH

AquaConSoil – 29/06/2017

(4)

PHYTOAVAILABILITY

OM Clays Soil solution

Risks ?

AquaConSoil – 29/06/2017 TOTAL TE TOXICITY AVAILABILITY

?

(5)
(6)

Phytoavailability measurment

in Polluted Sites and Soils

O

R

+

(7)

Le Port

Polluted green space irrigation

with ReUse

(8)

1 5 1 2 1 3 1 1 1 4 1 0 3 4 5 2 1 6 8 7 9 AquaConSoil – 29/06/2017

No ReUse if [TE]total > limit values of Sludge Order (08/01/98)

Derogation possible if TE ≠ mobiles & TE ≠ phytoavailables

Ministerial direction (26/04/2016)

(9)

Mesures sur plantes Les ET sont-ils mobiles ? Les ET sont-ils phytodisponibles ? Les ET sont-ils phytodisponibles ? NON : NON : ET mobiles Pas de dérogation ET phytodisponibles Pas de dérogation OUI : éch. n°4 Cr, Cu, Pb, et Zn OUI OUI Dérogation envisageable NON Extractio n CaCl2 Extraction NH4NO3 ET phytodisponibles Pas de dérogation 14 éch. 14 éch.

guide technique de l’Ademe (2005) Si [ET]tot > valeurs seuil et pH > 5

(10)

Low references [Pb]<100ppm

Discard from the derogation sample Sample to be tested [Pb]>100ppm 15 12 13 11 8 9 1 5 4 3 Fescue (ISO16198)

(11)

Nutrient solution Pre-culture period

RHIZOtest: a two step procedure

(12)

Nutrient solution Pre-culture period

RHIZOtest: a two step procedure

(13)

Sol Test period

RHIZOtest: a two step procedure

Pre-culture period Nutrient solution 14 days

FLUX

=

Q

contact

− Q

ℎ𝑦𝑑𝑟𝑜𝑝𝑜𝑛𝑖𝑐

S

exposition

∗ T

exposition 8 days

(14)

Low references

Sample discard

(15)

Expected Pb flux

Low references

Sample discard

(16)

Low references

Sample discard

(17)

Low references

Sample discard

(18)

Polluted green space irrigation

with ReUse

Except for soil 4, favourable opinion from the DEAL Monitoring of soils 5 (Cr and Ni) and 15 (Pb and Zn)

Further investigations:

Rhizosphere soil solutions Microbioma

(19)

Lallaing

Site expérimental – projet CASTOR

Châteauneuf

Crassier métallurgique

Saint-Laurent-le-Minier

Ancienne mine de Zn

Saint-Médard-d’Eyrans

Ancien site de traitement du bois Plateforme BIOGECO

Salsigne

Ancienne mine d’or

Courrières-les-Lens

(20)

Références

Documents relatifs

Peuvent ainsi être mis en jeu des phénomènes de fixation, d’adsorption ou au contraire de mise en solution des polluants (via une variation de pH rhizosphérique) et une

- the continuation of “the” regular medical monitoring of patients with chronic conditions at risk, according to the surveillance scheme defined prior to the epidemic, with

ACHIEVEMENTTARGETS BASE LINE (In Earlier Planning Period) National andother informatio nbases. National andother informatio nbases.. PERFORMANCEINDICATORMATRIX

Le programme COVASED s’inscrit dans une politique économique et de développement durable par la mise en place, le développement, la gestion et la pérennisation d’une

La comparaison des observations entre les deux zones de la lame montre non seulement que ces deux éléments, As et Se, ont été redistribués lors de

The EU greenhouse gas emissions trading scheme (ETS), created in 2005, could have had an impact on fossil-fuel power plant generating costs. It would have affected

L’archive ouverte pluridisciplinaire HAL, est destinée au dépôt et à la diffusion de documents scientifiques de niveau recherche, publiés ou non, émanant des

From the owner’s perspective this can be translated into continuity of cash flows versus a void period (or even a negative cash flow). Given the assumption of rational behavior,