• Aucun résultat trouvé

E-3 ENVIRONMENTAL MANAGEMENT

N/A
N/A
Protected

Academic year: 2022

Partager "E-3 ENVIRONMENTAL MANAGEMENT"

Copied!
1
0
0

Texte intégral

(1)

Exam E-3 Environmental Management 2010 10 1 of 1 CANADIAN BOARD OF EXAMINERS FOR PROFESSIONAL SURVEYORS

E-3 ENVIRONMENTAL MANAGEMENT

October 2010

Note: This examination consists of 6 questions on 1 page.

Marks

Q. No Time: 3 hours Value Earned

1.

A parcel of 160 acres [64.7 hectares] is to be developed into residential [3/4 of the developable portion of the parcel] and commercial properties [the remainder of the developable portion]. About 15 hectares has the potential of being environmentally sensitive. Consider the development process from the purchase of the whole parcel to the occupation of a single family dwelling. Explain the steps involved in this process, any way in which an environmental concern would have to be addressed, and what authorities would likely be involved. Along with your explanation, cite references, such as statutes and regulations and government publications, which would pertain to the area in which you are working.

30

2.

In the context of a real estate transaction, explain what is involved in an

environmental site assessment [ESA] with respect to what is done, why, by whom, and what authorities [federal, provincial, municipal, or other] might be involved.

20

3.

By grouping the provinces and territories, explain what different climatic or physical geographic regions that comprise Canada and how environmental management might differ as a consequence. In your explanation, recognize what concerns would be significant in each region and how to deal with them [some key words or phrases that should be in your explanation: "agriculture", "aquaculture",

"coastal zone", "forest resources", "mineral resources", "permafrost", "petroleum resources", "watercourse", "wetland"].

25

4.

Explain whether environmental management concerning Aboriginal land would be different from dealing with non-Aboriginal land in:

a) northern Canada [the territories, northern Québec, Labrador];

b) western Canada [British Columbia and the Prairie provinces];

c) southern and eastern Canada [Ontario and elsewhere].

15

5. Explain "sustainable development" and how environmental management is

involved. 5

6. By either federal or provincial legislation, an area can be designated as "protected".

Explain the consequence of this in the development of land. 5 Total Marks: 100

Références

Documents relatifs

How does the relational model handle the following relationships between tables:. a)

Explain the complete mapping process that takes place when one measures very precisely the position of several points on the Earth, produces a map with these data, plans the

c) The motion of a satellite can be described by six Keplerian elements: the major-semi axis of the orbital ellipse a, the eccentricity of the orbital ellipse e, the inclination

A detailed large scale hydrographic survey is required for the construction of a pier to be used mainly for loading/offloading container vessels and bulk carriers. Your company

Through a long history of decisions, the courts have established the hierarchy of evidence to be considered by a land surveyor when re-establishing boundaries. In alphabetical

What are the effects on an owner’s riparian or littoral rights when fill is placed or excavation occurs along or over a water boundary.. Does it make a difference if the work

Considering that the total area for proposed roads would be 22% of the total area of the property and that 10% of the total property should be provided for a park, calculate

Discuss in point form some of the specific planning and design factors that must be taken into account for cities in cold climates.. What solutions would